CN103490333B - Lead spacer tool specially for attaching and detaching - Google Patents
Lead spacer tool specially for attaching and detaching Download PDFInfo
- Publication number
- CN103490333B CN103490333B CN201310248128.5A CN201310248128A CN103490333B CN 103490333 B CN103490333 B CN 103490333B CN 201310248128 A CN201310248128 A CN 201310248128A CN 103490333 B CN103490333 B CN 103490333B
- Authority
- CN
- China
- Prior art keywords
- wrench
- handle
- disassembling
- spacer
- assembling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/02—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明涉及分裂式导线间隔棒拆装专用工具,包括扳头、固定设置在扳头上的手柄、固定设置在扳头上两个对称的耳板,所述两耳板一端连接并设置有对应的轴孔,所述轴孔内插置有转轴,所述转轴插置有螺母固定的钩杆,所述两耳板另一端分别设置有偏心撑板,本发明小巧轻便,便于携带,操作简单可以有单人操作,在进行拆装时手柄可以自行锁死,有利于高空作业,避免多人对同一工序同时作业,达到省时、省力的效果,节省了作业时间,也节省了作业人员体力,如果是带电更换间隔棒工作,还能提高了电网经济效益,降低了等电位电工安全风险。
The invention relates to a special tool for disassembling and assembling a split wire spacer, comprising a wrench, a handle fixed on the wrench, and two symmetrical lugs fixed on the wrench, one end of the two lugs is connected and provided with a corresponding shaft hole, the shaft hole is inserted with a rotating shaft, the shaft is inserted with a hook rod fixed by a nut, and the other ends of the two ear plates are respectively provided with eccentric support plates. The invention is small and light, easy to carry and easy to operate. It can be operated by a single person, and the handle can be locked by itself when disassembling and assembling, which is conducive to high-altitude operations and avoids multiple people working on the same process at the same time, achieving the effect of saving time and labor, saving operating time and physical strength of operators , If the work of replacing the spacer with live electricity can also improve the economic benefits of the power grid and reduce the safety risk of equipotential electricians.
Description
技术领域 technical field
本发明涉及分裂式导线间隔棒拆装专用工具。 The invention relates to a special tool for disassembling and assembling split wire spacers.
背景技术 Background technique
在高压输变电线路检修时,分裂式导线更换间隔棒时,首先需要将间隔棒爪上的穿钉取出,现在都是使用穿孔型间隔棒拆装专用工具或者双钩型间隔棒拆装专用工具,穿孔型间隔棒拆装专用工具只适用于部分型号间隔棒,而双钩型间隔棒拆装专用工具容易变形,且经常出现钩不住现象,这两种间隔棒拆装专用工具都比较笨重,不便携带,而且一般导线张力比较大,对作业人员体力要求高,由于上述原因,会造成作业时间长、作业人员体力消耗大,如果是带电更换间隔棒,还会影响电网经济效益和作业人员安全。 In the maintenance of high-voltage power transmission and transformation lines, when replacing the spacer with split wires, you first need to take out the nails on the claws of the spacer. Now, special tools for disassembly and assembly of perforated spacer or special tools for disassembly of double-hook spacer are used. , The special tool for disassembling and assembling the perforated spacer is only suitable for some types of spacers, and the special tool for disassembling and disassembling the double-hook spacer is easy to deform, and often fails to hook. These two special tools for disassembling the spacer are relatively heavy. It is inconvenient to carry, and generally the tension of the wire is relatively large, which requires high physical strength of the operators. Due to the above reasons, it will cause long working hours and high physical exertion of the operators. If the spacer is replaced with electricity, it will also affect the economic benefits of the power grid and the safety of the operators. .
发明内容 Contents of the invention
本发明所要解决的技术问题是提供一种轻便高效的分裂式导线间隔棒拆装专用工具。 The technical problem to be solved by the present invention is to provide a portable and efficient special tool for disassembling and assembling split wire spacers.
本发明采用如下技术方案: The present invention adopts following technical scheme:
本发明包括扳头、固定设置在扳头上的手柄、固定设置在扳头上两个对称的耳板,所述两个耳板的一端连接并设置有对应的轴孔,所述轴孔内插置有转轴,所述转轴插置有螺母固定的钩杆,所述两个耳板另一端分别设置有偏心撑板。 The invention comprises a wrench, a handle fixed on the wrench, and two symmetrical lugs fixed on the wrench. One end of the two lugs is connected and provided with a corresponding shaft hole. A rotating shaft is inserted, the rotating shaft is inserted with a hook rod fixed by a nut, and the other ends of the two ear plates are respectively provided with eccentric support plates.
所述两个对称的偏心撑板在手柄一端设置有锁死区。 The two symmetrical eccentric braces are provided with a dead zone at one end of the handle.
两个对称的耳板之间设置有承柱。 A supporting column is arranged between the two symmetrical ear plates.
所述钩杆自由端向偏心撑板一侧弯曲。 The free end of the hook rod is bent to one side of the eccentric support plate.
所述手柄自由端设置有挂环。 The free end of the handle is provided with a hanging ring.
本发明积极效果如下: The positive effect of the present invention is as follows:
本发明小巧轻便,便于携带,操作简单可以有单人操作,在进行拆装时工具可以自行锁死,有利于高空作业,避免多人对同一工序同时作业,达到省时、省力的效果,节省了作业时间,也节省了作业人员体力,如果是带电更换间隔棒工作,还能提高了电网经济效益,降低了等电位电工安全风险。 The invention is small and light, easy to carry, easy to operate and can be operated by a single person, and the tool can be locked by itself when disassembling and assembling, which is beneficial to high-altitude operations, avoids multiple people working on the same process at the same time, and achieves time-saving and labor-saving effects. It saves the working time, and also saves the physical strength of the operators. If the work of replacing the spacer is live, it can also improve the economic benefits of the power grid and reduce the safety risk of equipotential electricians.
附图说明 Description of drawings
附图1为本发明结构示意图; Accompanying drawing 1 is a structural representation of the present invention;
附图2为本发明侧面结构示意图; Accompanying drawing 2 is the side structure schematic diagram of the present invention;
附图3为本发明正面结构示意图; Accompanying drawing 3 is the schematic diagram of front structure of the present invention;
附图4为本发明钩杆使用状态结构示意图; Accompanying drawing 4 is the schematic structural diagram of the use state of the hook bar of the present invention;
在附图中:1扳头、2手柄、3耳板、4轴孔、5钩杆、6偏心撑板、7锁死区、8承柱、9挂环、10转轴。 In the accompanying drawings: 1 wrench, 2 handle, 3 lug plate, 4 shaft hole, 5 hook rod, 6 eccentric support plate, 7 deadlock area, 8 bearing column, 9 hanging ring, 10 rotating shaft.
具体实施方式 detailed description
如附图1、2、3、4所示,本发明包括扳头1、固定设置在扳头1上的手柄2、固定设置在扳头1上两个对称的耳板3,所述两耳板3一端连接并设置有对应的轴孔4,所述轴孔4内插置有转轴10,所述转轴10插置有螺母固定的钩杆5,所述两耳板3另一端分别设置有偏心撑板6,所述两对称的偏心撑板6在手柄2一端设置有锁死区7,两个对称的耳板3之间设置有承柱8,所述钩杆5自由端向偏心撑板6一侧弯曲,所述手柄2自由端设置有挂环9。 As shown in accompanying drawings 1, 2, 3, and 4, the present invention includes a wrench 1, a handle 2 fixedly arranged on the wrench 1, two symmetrical lugs 3 fixedly arranged on the wrench 1, the two ears One end of the plate 3 is connected and provided with a corresponding shaft hole 4, a rotating shaft 10 is inserted in the shaft hole 4, and a hook rod 5 fixed by a nut is inserted in the rotating shaft 10, and the other ends of the two ear plates 3 are respectively provided with An eccentric brace 6, the two symmetrical eccentric braces 6 are provided with a dead zone 7 at one end of the handle 2, a bearing column 8 is arranged between the two symmetrical ear plates 3, and the free end of the hook rod 5 is braced toward the eccentric One side of the plate 6 is bent, and the free end of the handle 2 is provided with a hanging ring 9 .
本发明在进行分裂式导线间隔棒安装时,将间隔棒爪套夹在导线上,用钩杆5前端的钩子钩住间隔棒爪下瓣的镂空边棱,在将偏心撑板6压在间隔棒爪上瓣,扳动手柄2偏心撑板6力矩变大,随之间隔棒爪上、下瓣会靠近,当手柄2带动偏心撑板6旋转至偏心撑板6上的锁死区7,锁死区7与间隔棒爪上瓣接触,此时由于力矩突然变小达到锁死状态,然后安装间隔棒爪穿钉,扳动手柄2解锁取下工具,完成安装。拆除间隔棒的过程与安装过程相反,扳动手柄2取出间隔棒爪穿钉,取下工具就完成拆卸,手柄2上的挂环9可以系上绳索防止工具在操作时发生坠落,不使用时,手柄2可以从扳头1上旋转下来,体积变小便于携带,使用时通过丝扣直接旋紧就可以使用了。 When the present invention installs the split-type wire spacer, clamp the claw sleeve of the spacer on the wire, hook the hook at the front end of the hook bar 5 to the hollow edge of the lower flap of the spacer claw, and press the eccentric support plate 6 on the spacer. The upper flap of the rod claw, the torque of the eccentric support plate 6 when the handle 2 is pulled becomes larger, and then the upper and lower petals of the rod claw will be closer to each other. When the handle 2 drives the eccentric support plate 6 to rotate to the dead zone 7 on the eccentric support plate 6, The locking zone 7 is in contact with the upper flap of the spacer rod claw. At this time, due to the sudden decrease of the torque, the locked state is reached, and then the spacer rod claw is installed to penetrate the nail, and the handle 2 is pulled to unlock and remove the tool to complete the installation. The process of dismantling the spacer is opposite to the installation process. Pull the handle 2 to take out the claws of the spacer to penetrate the nails, and then remove the tool to complete the disassembly. The hanging ring 9 on the handle 2 can be tied with a rope to prevent the tool from falling during operation. , the handle 2 can be rotated from the wrench 1, the volume becomes small and easy to carry, and it can be used by directly tightening the threaded buckle during use.
本发明小巧轻便,便于携带,操作简单可以有单人操作,在进行拆装时工具可以自行锁死,有利于高空作业,避免多人对同一工序同时作业,达到省时、省力的效果,节省了作业时间,也节省了作业人员体力,如果是带电更换间隔棒工作,还能提高了电网经济效益,降低了等电位电工安全风险。 The invention is small and light, easy to carry, easy to operate and can be operated by a single person, and the tool can be locked by itself when disassembling and assembling, which is beneficial to high-altitude operations, avoids multiple people working on the same process at the same time, and achieves time-saving and labor-saving effects. It saves the working time and saves the physical strength of the operators. If the spacer is replaced with live electricity, it can also improve the economic benefits of the power grid and reduce the safety risk of equipotential electricians.
Claims (3)
Priority Applications (2)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310248128.5A CN103490333B (en) | 2013-06-21 | 2013-06-21 | Lead spacer tool specially for attaching and detaching |
| PCT/CN2014/078490 WO2014201941A1 (en) | 2013-06-21 | 2014-05-27 | Dedicate tool for disassembling and assembling spacer of conductor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201310248128.5A CN103490333B (en) | 2013-06-21 | 2013-06-21 | Lead spacer tool specially for attaching and detaching |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN103490333A CN103490333A (en) | 2014-01-01 |
| CN103490333B true CN103490333B (en) | 2016-07-13 |
Family
ID=49830370
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201310248128.5A Active CN103490333B (en) | 2013-06-21 | 2013-06-21 | Lead spacer tool specially for attaching and detaching |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN103490333B (en) |
| WO (1) | WO2014201941A1 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103490333B (en) * | 2013-06-21 | 2016-07-13 | 国家电网公司 | Lead spacer tool specially for attaching and detaching |
| CN114043408A (en) * | 2021-11-22 | 2022-02-15 | 国网青海省电力公司黄化供电公司 | Portable stay wire fiber strand manufacturing tool |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202668420U (en) * | 2012-04-19 | 2013-01-16 | 国家电网公司 | Universal type installation wrench for wire spacer rod |
| CN203014279U (en) * | 2012-12-10 | 2013-06-19 | 上海中瑞通用航空有限公司 | Special-purpose tool for replacing spacing rod during helicopter live-line work process |
| CN203377539U (en) * | 2013-06-21 | 2014-01-01 | 国家电网公司 | Special tool for dismounting lead spacer bar |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US8056445B2 (en) * | 2008-12-09 | 2011-11-15 | Jackson Iii Denton L | Multi-task-tool |
| CN201797262U (en) * | 2010-06-18 | 2011-04-13 | 湖北省超能超高压电力科技开发有限公司 | Special tool for replacing spacers |
| CN201900590U (en) * | 2010-12-01 | 2011-07-20 | 万勇 | Special wrench for high-tension line lead spacers |
| CN202123488U (en) * | 2011-06-28 | 2012-01-25 | 北京市电力公司 | Space rod dismounting tool |
| CN102522716B (en) * | 2012-01-12 | 2015-03-25 | 云南电网公司昆明供电局 | R pin type insulator replacement tool for electrifying indirect operation of transmission line |
| CN103490333B (en) * | 2013-06-21 | 2016-07-13 | 国家电网公司 | Lead spacer tool specially for attaching and detaching |
-
2013
- 2013-06-21 CN CN201310248128.5A patent/CN103490333B/en active Active
-
2014
- 2014-05-27 WO PCT/CN2014/078490 patent/WO2014201941A1/en not_active Ceased
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN202668420U (en) * | 2012-04-19 | 2013-01-16 | 国家电网公司 | Universal type installation wrench for wire spacer rod |
| CN203014279U (en) * | 2012-12-10 | 2013-06-19 | 上海中瑞通用航空有限公司 | Special-purpose tool for replacing spacing rod during helicopter live-line work process |
| CN203377539U (en) * | 2013-06-21 | 2014-01-01 | 国家电网公司 | Special tool for dismounting lead spacer bar |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2014201941A1 (en) | 2014-12-24 |
| CN103490333A (en) | 2014-01-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104201489A (en) | Novel anti-falling-off grounding wire clamp device for electric power circuit | |
| CN203752083U (en) | Bearing pulling device | |
| CN204663119U (en) | Concrete pole reinforcing device | |
| CN103117522B (en) | A kind of front cable plug separation device | |
| CN202607600U (en) | Bolt detaching equipment | |
| CN203377539U (en) | Special tool for dismounting lead spacer bar | |
| CN204552588U (en) | A kind of insulated ladder being applied to power transmission tower | |
| CN103490333A (en) | Special tool for disassembling and assembling spacers of conductors | |
| CN202817593U (en) | Circuit hardware bolt fastener | |
| CN205148216U (en) | Water pump wheel extracting tool | |
| CN102611039B (en) | Universal lead interval bar mounting spanner | |
| CN205377163U (en) | General type 500kV overhead earth wire carries ply -yarn drill utensil | |
| CN205104835U (en) | A auxiliary device for power line erects | |
| CN103779805B (en) | Assembling and disassembling device for grounding lead wire | |
| CN103683098A (en) | Method of replacing strain poles without laying down lines | |
| CN205231616U (en) | Four -bundled conductor conductor spacer dismouting specialized tool | |
| CN203377538U (en) | Tool specially for dismounting of four-cracking type lead spacer rod | |
| CN103187695B (en) | Tool specially for assembling and disassembling power circuit spacer and assembling and disassembling method thereof | |
| CN203747303U (en) | Fast dismounting device for lead spacer | |
| CN202268668U (en) | Operating device of line lifter lead screw for transmission line | |
| CN204658337U (en) | A kind of bearing disassembling device | |
| CN105006762B (en) | Change high-voltage insurance booster | |
| CN204019440U (en) | The special connecting rod of a kind of disassembling and assembling machine | |
| CN204046063U (en) | Transmission line earth potential replacement strain insulator pin pulling clamp | |
| CN203071500U (en) | Dismounting tool for cross-arm of original pole tower in power supply line migration process |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant |