CN103485785A - 综放工作面放顶煤时防止残留煤的方法 - Google Patents

综放工作面放顶煤时防止残留煤的方法 Download PDF

Info

Publication number
CN103485785A
CN103485785A CN201310398739.8A CN201310398739A CN103485785A CN 103485785 A CN103485785 A CN 103485785A CN 201310398739 A CN201310398739 A CN 201310398739A CN 103485785 A CN103485785 A CN 103485785A
Authority
CN
China
Prior art keywords
coal
caving
slope
top coal
fully mechanized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310398739.8A
Other languages
English (en)
Inventor
孙广京
卢诗祥
王继之
刘善勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XINJULONG ENERGY CO Ltd
Original Assignee
SHANDONG XINJULONG ENERGY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XINJULONG ENERGY CO Ltd filed Critical SHANDONG XINJULONG ENERGY CO Ltd
Priority to CN201310398739.8A priority Critical patent/CN103485785A/zh
Publication of CN103485785A publication Critical patent/CN103485785A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Auxiliary Methods And Devices For Loading And Unloading (AREA)

Abstract

本发明公开了一种综放工作面放顶煤时防止残留煤的方法,它是在上一循环放完顶煤、拉后部运输机后,再进入下一循环放顶煤时,首先操作综放支架的尾梁插板,使采空区内的碎矸从尾梁后冒落,冒落的碎矸充填在后部运输机前移后形成的空间内,待这个空间用碎矸充填起来后自然形成斜坡,然后操作综放支架的尾梁千斤顶,使尾梁上下摆动,此时顶煤沿尾梁斜坡和碎矸斜坡直接流入后部运输机中。由于后部运输机前移与采空区形成的空间内用碎矸填满,提高了顶煤回收率;又降低了工作面采空区煤炭自燃发火的危险,保证了工作面安全开采。

Description

综放工作面放顶煤时防止残留煤的方法
技术领域
本发明涉及到井下综采放顶煤工作面顶煤回收工艺。
背景技术
目前,煤矿采用综放支架的综放工作面工艺流程是:割煤--推前部运输机----移架--放顶煤--拉后部运输机--移端头支架--反空刀--进入下一循环;其中放顶煤的工作程序是:收支架铲板,同时收回尾梁插板,然后操作尾梁千斤顶,使尾梁上下摆动,尾梁下摆时形成坡度,顶煤沿尾梁斜坡流入后部运输机中(如图1所示),当见到矸石流出时停止操作,进行下一步的拉后部运输机流程。在上述工艺流程中,每次拉后部运输机后,由于后部运输机前移与采空区形成一个如图2所示的空间,(空间断面大小为后部运输机溜槽高度330mm乘以每次前移距离800mm,如图2所示);在下一循环放顶煤时,煤炭先充填这个空间后才能进入后部运输机,这个空间的煤炭处于后部运输机之外,无法进入后部运输机,残留在采空区得不到回收,造成顶煤损失;同时加剧采空区残煤自燃发火的危险,给矿井安全生产带来重大的隐患。
发明内容
为了克服上述缺陷,本发明提供一种综放工作面放顶煤时防止残留煤的方法。
一种综放工作面放顶煤时防止残留煤的方法,它是在上一循环放完顶煤、拉后部运输机后,再进入下一循环放顶煤时,首先操作综放支架的尾梁插板,使采空区内的碎矸从尾梁后冒落,冒落的碎矸充填在后部运输机前移后形成的空间内,待这个空间用碎矸充填起来后自然形成斜坡,然后操作综放支架的尾梁千斤顶,使尾梁上下摆动,此时顶煤沿尾梁斜坡和碎矸斜坡直接流入后部运输机中。
由于后部运输机前移与采空区形成的空间内用碎矸填满,提高了顶煤回收率;又降低了工作面采空区煤炭自燃发火的危险,保证了工作面安全开采。
附图说明
图1是放顶煤后拉后部运输机之前的状况图;
图2是放顶煤后拉后部运输机之后的状况图;
图3是拉后部运输机之后碎矸填满空间的状况图;
图4是顶煤沿尾梁斜坡和碎矸斜坡直接流入后部运输机的状况图。
图例说明,1-尾梁,2-尾梁插板,3-后部运输机,4-空间,5-斜坡,6-顶煤。
具体实施方式
图1是放顶煤后拉后部运输机之前的状况图,从图中可以看出,顶煤沿尾梁斜坡流入后部运输机中。
下面根据图2-4说明综放工作面放顶煤时防止残留煤的方法。
它是在上一循环放完顶煤、拉后部运输机3后(如图2所示),再进入下一循环的放顶煤时,首先操作综放支架的尾梁插板2,使采空区内的碎矸从尾梁1后冒落,冒落的碎矸充填在后部运输机3前移后形成的空间4内,待这个空间用碎矸充填起来后自然形成5(如图3所示),然后操作综放支架的尾梁1千斤顶,使尾梁1上下摆动,此时顶煤6沿尾梁1斜坡和碎矸5斜坡直接流入后部运输机3中(如图4所示)。

Claims (1)

1.一种综放工作面放顶煤时防止残留煤的方法,其特征在于,它是在上一循环放完顶煤、拉后部运输机后,再进入下一循环放顶煤时,首先操作综放支架的尾梁插板,使采空区内的碎矸从尾梁后冒落,冒落的碎矸充填在后部运输机前移后形成的空间内,待这个空间用碎矸充填起来后自然形成斜坡,然后操作综放支架的尾梁千斤顶,使尾梁上下摆动,此时顶煤沿尾梁斜坡和碎矸斜坡直接流入后部运输机中。
CN201310398739.8A 2013-09-05 2013-09-05 综放工作面放顶煤时防止残留煤的方法 Pending CN103485785A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310398739.8A CN103485785A (zh) 2013-09-05 2013-09-05 综放工作面放顶煤时防止残留煤的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310398739.8A CN103485785A (zh) 2013-09-05 2013-09-05 综放工作面放顶煤时防止残留煤的方法

Publications (1)

Publication Number Publication Date
CN103485785A true CN103485785A (zh) 2014-01-01

Family

ID=49826330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310398739.8A Pending CN103485785A (zh) 2013-09-05 2013-09-05 综放工作面放顶煤时防止残留煤的方法

Country Status (1)

Country Link
CN (1) CN103485785A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101942A (zh) * 2018-10-29 2020-05-05 西安科技大学 倾斜特厚煤层放顶煤开采下盘残留煤炭回收方法及系统
CN113006798A (zh) * 2021-04-29 2021-06-22 西安科技大学 一种大倾角厚煤层组合式放顶煤开采方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260810A (zh) * 2007-03-06 2008-09-10 李泽宇 一种液压支架用的尾梁
CN101886547A (zh) * 2010-06-10 2010-11-17 中煤北京煤矿机械有限责任公司 二柱掩护式大采高铺网液压支架
CN101936164A (zh) * 2010-08-17 2011-01-05 天地科技股份有限公司 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构
CN102352762A (zh) * 2011-10-13 2012-02-15 兖州煤业股份有限公司 低位放顶煤液压支架
CN102704975A (zh) * 2012-06-29 2012-10-03 中国矿业大学 一种放顶煤工作面选煤液压支架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101260810A (zh) * 2007-03-06 2008-09-10 李泽宇 一种液压支架用的尾梁
CN101886547A (zh) * 2010-06-10 2010-11-17 中煤北京煤矿机械有限责任公司 二柱掩护式大采高铺网液压支架
CN101936164A (zh) * 2010-08-17 2011-01-05 天地科技股份有限公司 极软厚煤层超前支护抱采放顶煤采煤法与液压支架结构
CN102352762A (zh) * 2011-10-13 2012-02-15 兖州煤业股份有限公司 低位放顶煤液压支架
CN102704975A (zh) * 2012-06-29 2012-10-03 中国矿业大学 一种放顶煤工作面选煤液压支架

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
孙和平: "残煤采区综采放顶煤技术", 《煤炭技术》, no. 12, 10 December 2008 (2008-12-10), pages 150 - 152 *
张雪枫: "ZFS3000/14.5/23型放顶煤液压支架的应用", 《山东煤炭科技》, no. 02, 25 April 2006 (2006-04-25), pages 5 - 6 *
范志忠等: "大采高综放开采降低含矸率途径分析", 《中国煤炭》, no. 02, 22 February 2011 (2011-02-22), pages 59 - 62 *
贾继宇等: "两柱掩护式综采放顶煤支架的应用", 《煤矿开采》, no. 02, 30 June 1995 (1995-06-30), pages 8 - 12 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111101942A (zh) * 2018-10-29 2020-05-05 西安科技大学 倾斜特厚煤层放顶煤开采下盘残留煤炭回收方法及系统
CN113006798A (zh) * 2021-04-29 2021-06-22 西安科技大学 一种大倾角厚煤层组合式放顶煤开采方法
CN113006798B (zh) * 2021-04-29 2023-02-24 西安科技大学 一种大倾角厚煤层组合式放顶煤开采方法

Similar Documents

Publication Publication Date Title
CN104405437B (zh) 一种固体充填与综采混合式工作面开采方法
CN104533416B (zh) 极厚大矿体大规模机械化无底柱分段崩落采矿方法
CN102996131B (zh) 一种预掘两巷前进式固体充填采煤方法
CN101725352B (zh) 一种固体充填综采回收房式煤柱方法
US10876403B2 (en) Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique
CN102383794B (zh) 综放工作面后部输送机交叉侧卸布置配套方式与支架结构
CN102937035B (zh) 在煤矿采空区内采岩充填的方法
CN106968671B (zh) 煤矿井下采煤工作面回撤通道充填回撤方法
CN106321102A (zh) 一种煤矿固体密实条带充填采煤方法
CN104929642A (zh) 大倾角煤层变角度综放工作面顶煤放煤量分区域控制方法
CN103104260B (zh) 复杂地质条件下综—机对拉面采煤方法
CN108150206B (zh) 一种通过综采工作面顺槽高冒区的方法
CN105317438A (zh) 一种特厚煤层中部预采分层破碎顶煤的采煤方法
CN105134274B (zh) 带三级顶煤回收装置的两柱大采高放顶煤液压支架
CN101285384B (zh) 大直径深孔不拉底采矿法
CN102418525B (zh) 软煤层长壁大采高综合机械化采煤末采方法
CN109736806A (zh) 一种无预掘巷道前进式砌块充填采煤方法
CN103726848B (zh) 适用于缓倾斜/倾斜薄矿体回采的采矿方法
CN103485785A (zh) 综放工作面放顶煤时防止残留煤的方法
CN203962014U (zh) 综采充填两用工作面液压支架
CN105019903A (zh) 一种急倾斜煤层工作面一体化支架及其开采方法
CN203756173U (zh) 一种采后充填原巷道无煤柱沿空掘巷系统
CN102808624A (zh) 煤矸同采系统及方法
CN105240017A (zh) 一种双层极薄玉石矿块状切割顶推出矿采矿方法
CN106555591B (zh) 薄及中厚急倾斜煤层综合机械化采煤工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140101