CN103485415A - Splicing structure - Google Patents

Splicing structure Download PDF

Info

Publication number
CN103485415A
CN103485415A CN201310399369.XA CN201310399369A CN103485415A CN 103485415 A CN103485415 A CN 103485415A CN 201310399369 A CN201310399369 A CN 201310399369A CN 103485415 A CN103485415 A CN 103485415A
Authority
CN
China
Prior art keywords
stay hook
present
upper plate
hinge
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310399369.XA
Other languages
Chinese (zh)
Inventor
郭峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Good Peak Of Dong Bang Town Changshu City Xu Shi Machinery Plant
Original Assignee
Good Peak Of Dong Bang Town Changshu City Xu Shi Machinery Plant
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Good Peak Of Dong Bang Town Changshu City Xu Shi Machinery Plant filed Critical Good Peak Of Dong Bang Town Changshu City Xu Shi Machinery Plant
Priority to CN201310399369.XA priority Critical patent/CN103485415A/en
Publication of CN103485415A publication Critical patent/CN103485415A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a splicing structure comprising a main board body and an upper board body. The main board body is composed of two boards, a fixing hook is connected onto each board, each fixing hook comprises symmetrical hook bodies and hook body holes and is connected to a mounting body through a hinge, the mounting body is mounted on a crossbeam of the main board body, the fixing hooks are distributed on the boards symmetrically, and the hinges are hinged into the hook body holes. Since the upper board body is connected to the mounting body through the hinges, the splicing structure is simple, and connecting strength of the connecting structure is guaranteed.

Description

A kind of splicing construction
Technical field
The present invention relates to building field, relate in particular to a kind of splicing construction.
Background technology
Integrated house is born in eighties of last century end of the fifties, through the development of nearly 50 years, American-European, with Japanese market development scale and industry concentration ratio, has all reached higher level.Integrated house is a kind of specialized design, and standardization, modularization, generalization production are easy to remove, store in a warehouse, the one off houses can be repeatedly used, had enough to meet the need.Be widely used in interim office, the dormitory of building site; The large-scale ground observations such as traffic, water conservancy, oil, natural gas, field work construction room; The room such as city office, civilian arrangement, exhibition, earthquake relief work and military field.
Some mounting structure complexity of the upper plate body of integrated house of the prior art, waste time and energy, although some mounting structure is simple; but it is not firm to connect; when wind-force is larger, due to integrally-built strength deficiency, usually certain danger can occur particularly.
Summary of the invention
The objective of the invention is in order to overcome the deficiencies in the prior art, a kind of firm integrated house upper plate body fixing body of installing is provided.
The present invention is achieved through the following technical solutions:
A kind of splicing construction, comprise mainboard body and upper plate body, and described upper plate body is comprised of two plates, on described plate, is connected with stay hook, and described stay hook comprises symmetrical coupler body and coupler body hole, and described stay hook is connected through the hinge on fixing body.
Further, described fixing body is arranged on the crossbeam of mainboard body.
Further, described stay hook is symmetrically distributed on plate.
Further, described hinge is hinged in the coupler body hole.
Further, described mainboard body upper plate body is formed by exhausted combustible material manufacture.
Compared with prior art, the invention has the beneficial effects as follows: the present invention is connected through the hinge upper plate body on fixing body, simple in structure, has guaranteed its bonding strength simultaneously.
The accompanying drawing explanation
The structural representation that Fig. 1 is a kind of splicing construction of the present invention;
The structural representation that Fig. 2 is stay hook of the present invention.
The specific embodiment
In order to make purpose of the present invention, technical scheme and advantage clearer, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Refer to Fig. 1 and Fig. 2, the structural representation that Fig. 1 is a kind of splicing construction of the present invention, the structural representation that Fig. 2 is stay hook of the present invention.
Described a kind of splicing construction, comprise mainboard body 1 and upper plate body 2, described upper plate body 2 is comprised of two plates, is connected with stay hook 3 on described plate, described stay hook 3 comprises symmetrical coupler body 31 and coupler body hole 32, and described stay hook 3 is connected on fixing body 5 by hinge 4.
Described fixing body 5 is arranged on the crossbeam of mainboard body 1, being symmetrically distributed on plate of described stay hook 3, described hinge 4 is hinged in coupler body hole 32, simple in structure, install firm.Described mainboard body 1 upper plate body 2 is formed by exhausted combustible material manufacture.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in protection scope of the present invention.

Claims (2)

1. the present invention relates to a kind of splicing construction, comprise mainboard body and upper plate body, described upper plate body is comprised of two plates, be connected with stay hook on described plate, described stay hook comprises symmetrical coupler body and coupler body hole, and described stay hook is connected through the hinge on fixing body, and described fixing body is arranged on the crossbeam of mainboard body, being symmetrically distributed on plate of described stay hook, described hinge is hinged in the coupler body hole.
2. the present invention is connected through the hinge upper plate body on fixing body, simple in structure, has guaranteed its bonding strength simultaneously.
CN201310399369.XA 2013-09-05 2013-09-05 Splicing structure Pending CN103485415A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310399369.XA CN103485415A (en) 2013-09-05 2013-09-05 Splicing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310399369.XA CN103485415A (en) 2013-09-05 2013-09-05 Splicing structure

Publications (1)

Publication Number Publication Date
CN103485415A true CN103485415A (en) 2014-01-01

Family

ID=49825968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310399369.XA Pending CN103485415A (en) 2013-09-05 2013-09-05 Splicing structure

Country Status (1)

Country Link
CN (1) CN103485415A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090044461A1 (en) * 2006-01-13 2009-02-19 Martin Diamond Modular Dwelling Structure Made From Recycled Tire Materials, a Kit For Same and a Method of Assembling Same
CN201241488Y (en) * 2008-07-11 2009-05-20 金胜财 Assembled double-slope double-roof movable house
CN101636544A (en) * 2006-12-05 2010-01-27 思玛泰科设计有限公司 Collapsible room
CN201526173U (en) * 2008-07-11 2010-07-14 金胜财 Assembly type portable housing with double slopes
CN101831954A (en) * 2010-04-30 2010-09-15 李连英 House box
CN202012208U (en) * 2011-03-22 2011-10-19 升逸豪环保工程科技(上海)有限公司 Light board integrated assembly type residential construction structure with steel frame
CN102561731A (en) * 2012-03-09 2012-07-11 沈汉杰 Module constructed one-layer villa and construction method thereof
CN202324688U (en) * 2011-12-01 2012-07-11 雅致集成房屋股份有限公司 Disaster relief placement mobile house
CN103243934A (en) * 2013-04-26 2013-08-14 上海魔立方新型房屋有限公司 House system constructed by single independent foundation and erecting method of house system
CN203160400U (en) * 2013-03-01 2013-08-28 佛山市森科能源科技开发有限公司 Steel structure prefabricated assembling type house

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090044461A1 (en) * 2006-01-13 2009-02-19 Martin Diamond Modular Dwelling Structure Made From Recycled Tire Materials, a Kit For Same and a Method of Assembling Same
CN101636544A (en) * 2006-12-05 2010-01-27 思玛泰科设计有限公司 Collapsible room
CN201241488Y (en) * 2008-07-11 2009-05-20 金胜财 Assembled double-slope double-roof movable house
CN201526173U (en) * 2008-07-11 2010-07-14 金胜财 Assembly type portable housing with double slopes
CN101831954A (en) * 2010-04-30 2010-09-15 李连英 House box
CN202012208U (en) * 2011-03-22 2011-10-19 升逸豪环保工程科技(上海)有限公司 Light board integrated assembly type residential construction structure with steel frame
CN202324688U (en) * 2011-12-01 2012-07-11 雅致集成房屋股份有限公司 Disaster relief placement mobile house
CN102561731A (en) * 2012-03-09 2012-07-11 沈汉杰 Module constructed one-layer villa and construction method thereof
CN203160400U (en) * 2013-03-01 2013-08-28 佛山市森科能源科技开发有限公司 Steel structure prefabricated assembling type house
CN103243934A (en) * 2013-04-26 2013-08-14 上海魔立方新型房屋有限公司 House system constructed by single independent foundation and erecting method of house system

Similar Documents

Publication Publication Date Title
TR200100795A2 (en) Method for production and assembly of the request.
CN203200985U (en) Light steel structure plant wind-resisting column and roof beam connection structure
CN203296184U (en) Integrated house roof fixing device
CN203296253U (en) Prefabricated house connecting board
CN103485415A (en) Splicing structure
CN203296200U (en) Integrated house fireproof plate connection structure
CN204358675U (en) Solar electrical energy generation formula underground pedestrian passageway
CN201627303U (en) Novel combined truss type purline
CN203296207U (en) Windproof integrated house
CN203296252U (en) Novel heat-absorbing wallboard for integrated housing
CN201717528U (en) Expandable UPS case
CN103306375A (en) Roof fixing device of integrated house
CN204940552U (en) A kind of connecting angle
CN203296202U (en) Connection device of integrated house fireproof plates
CN203307933U (en) Reinforcing connecting part of steel structure
CN203729437U (en) Fabricated connecting piece for steel plate shear wall and steel beam
CN103290983A (en) Connecting plate for portable house
CN203729439U (en) Light inner wall and I-shaped steel beam connector
CN103290939A (en) Connection structure of fire-proof boards of integrated house
CN103276808A (en) Windproof integrated house
CN201428107Y (en) Gallery bridge of solar power generation
CN205018122U (en) Novel green mosquito killer
CN103290938A (en) Connection device of fire-proof boards of integrated house
CN203296256U (en) Novel fireproofing wallboard
CN204634177U (en) A kind of water power assembly protective housing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140101