CN201241488Y - Assembled double-slope double-roof movable house - Google Patents

Assembled double-slope double-roof movable house Download PDF

Info

Publication number
CN201241488Y
CN201241488Y CNU2008201282452U CN200820128245U CN201241488Y CN 201241488 Y CN201241488 Y CN 201241488Y CN U2008201282452 U CNU2008201282452 U CN U2008201282452U CN 200820128245 U CN200820128245 U CN 200820128245U CN 201241488 Y CN201241488 Y CN 201241488Y
Authority
CN
China
Prior art keywords
double
wallboard
indoor
board
roofing
Prior art date
Application number
CNU2008201282452U
Other languages
Chinese (zh)
Inventor
金胜财
Original Assignee
金胜财
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 金胜财 filed Critical 金胜财
Priority to CNU2008201282452U priority Critical patent/CN201241488Y/en
Application granted granted Critical
Publication of CN201241488Y publication Critical patent/CN201241488Y/en

Links

Abstract

An assembled double-pitch double-roofed mobile house comprises a ground-groove base, wallboards, a door, a window, an indoor top board, roofing truss beams, roofing purlines, roofing tiles, ridge tiles, decorating parts and the like, and is characterized in that the ground-groove base is laid on a prefabricated foundation according to an available size, the lower ends of the equal-height wallboards are inserted in the ground-groove base, the wallboards are inserted with each other to form a maintenance wall, the decorating parts are utilized at the vertical connections of the wallboards, the indoor top board is spread out over the wallboards and the indoor top board and the wallboards are connected by tapping screws, the roofing truss beams transversely laid on the indoor top board are integrally connected with the indoor top board and the wallboards through tapping screws, the adjacent roofing truss beams are connected and fixed by a roofing purline, the roofing tiles are spread out on roofing truss beams along the slope direction, and the ridge tiles are longitudinally covered on the joint of the ridge. The assembled double-pitch double-roofed mobile house has flexible and variable combination forms, and simple operation realizes perfect sealing, thermal insulation and heat preservation, and has beautiful indoor and outdoor appearances.

Description

Modular double pitched and double-roofed mobile home

(1) technical field: the utility model relates to a kind of prefabricated house, particularly a kind of modular double pitched and double-roofed mobile home.

(2) background technology: at present, the mobile house that use in fields such as building site, oil, exploration, field work, emergency dwelling, its house combining form is single, uses the area in house arbitrarily to enlarge or to dwindle; There is framework to influence the attractive in appearance of house because of the house is indoor; Simultaneously, to demanding client, because of indoor roofing have structure leak outside the influence attractive in appearance, also need to make furred ceiling in addition, increased the cost in house; Because Roof system all be individual layer generally, to sweltering heat or cold district, be incubated, effect of heat insulation is bad; Cause difficulty of construction to strengthen because of the wallboard height differs, increase defectives such as site work amount.

(3) the purpose of this utility model is the shortcoming at above-mentioned existing mobile house, and a kind of modular double pitched and double-roofed mobile home is provided, and its combining form is versatile and flexible, all wallboard high unities, construction is simple, realizes good sealing, heat insulation, good heat insulating, the indoor and outdoor beautiful decoration.

The purpose of this utility model is achieved through the following technical solutions:

1. a modular double pitched and double-roofed mobile home is made of parts such as geosyncline base, wallboard, door, window, indoor top board, roofing truss beam, roof purline, roof tile, crest tile, decorations.It is characterized in that according to using size that the geosyncline base is placed on the ready-made in advance basis all contour wallboard lower ends being plugged in the geosyncline base, safeguard body of wall through the formation of pegging graft between the wallboard, the vertical junction of wallboard adopts decoration to connect; Indoor top board is tiled on the wallboard, is connected with wallboard by tapping screw, and the roofing truss beam is laterally put on indoor top board, is connected in one by tapping screw and indoor top board, wallboard; Be connected and fixed with roof purline between the adjacent roofing truss beam; Roof tile is in roofing truss beam gradient direction tiling, vertically is coated with crest tile at the seam crossing of ridge.

2. this mobile house wallboard upper end is equipped with the steel built-in fitting with the roofing junction, and cross sectional shape is the U type, is buckled in the position that is connected with roofing above the wallboard, and roofing and wallboard are fixed as one.

3. this mobile house roofing truss beam is welded by light-gauge steel section, and the angular dimension of roofing truss beam can be regulated, and the roofing truss beam winds up and is welded with and the fixedly purlin holder of roof purline.

4. this mobile house decoration can be aluminum alloy decorating part, and aluminum alloy decorating part is made of exterior angle decoration and interior angle decoration, and the decoration fastener is all arranged on the decoration.The screw Hide All that leaks outside or not house connecting portion screw, makes the house overall appearance.

5. the wallboard outside is provided with column before and after this house, is connected with the roofing truss beam, increases the wind resistance in house.The beneficial effects of the utility model are: the big I of floor space designs according to instructions for use, and the wallboard high unity can exchange arbitrarily, and the position of partition can be arranged arbitrarily, thereby can form diversified room layout form; All wallboards and roof panel type are unrestricted, can use various lightweight composite materials; The house is double-deck roofing, makes the insulation in house, effect of heat insulation better; Indoorly do not need to do in addition furred ceiling, beautiful decoration, structural stability is good.

Description of drawings

Fig. 1 is a transverse cross-sectional view of the present utility model;

Fig. 2 is a gable side eaves structural representation of the present utility model;

Fig. 3 is wallboard of the present utility model and door connection diagram;

Fig. 4 is wallboard of the present utility model and window connection diagram;

Fig. 5 is junction, a body of wall of the present utility model right angle schematic diagram;

Fig. 6 is wallboard of the present utility model and indoor top board connection diagram;

Accompanying drawing number

1. 3. 4. windows of geosyncline base 2. wallboards, 5. indoor top board 6. roofing truss beams 7. roof purlines

8. roof tile 9. crest tiles 10. decorations 11. wall column 12.U shaped steel matter built-in fittings 13. purlin holders

The specific embodiment

As Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, shown in Figure 6, the utility model modular double pitched and double-roofed mobile home is made of parts such as geosyncline base 1, wallboard 2, door 3, window 4, indoor top board 5, roofing truss beam 6, roof purline 7, roof tile 8, crest tile 9, decoration 10, outdoor column 11, purlin holders 13.According to size geosyncline base 1 is placed on the ready-made in advance basis, is fixed with expansion bolt; Wallboard 2 lower ends that all are contour are plugged on 1 li in geosyncline base, safeguard body of wall through the formation of pegging graft between the wallboard 2, and wallboard 2 vertical junctions adopt decorations 10 to connect, and all wallboards 2 are highly identical, and the job site need not to distinguish, and reduces workload; Indoor top board 5 is tiled on the wallboard 2, is connected with wallboard 2 upper end steel built-in fittings by tapping screw, and roofing truss beam 6 is laterally put on indoor top board 5, is connected in one by tapping screw and indoor top board 5, wallboard 2; Roof purline 7 is connected and fixed between the adjacent roofing truss beam 6; Roof tile 8 is in roofing truss beam 6 gradient directions tilings, and roof tile 8 seam crossings are connected and fixed with tapping screw and roof purline 7, vertically is coated with crest tile 9 at the seam crossing of ridge.With decoration 10 and gable tile the gap closing between the two-layer roofing is got up, form a complete Roof system.

As Fig. 2, shown in Figure 6, wallboard 2 upper ends and roofing junction are equipped with U shaped steel matter built-in fitting 12, wallboard 2 two sides are buckled in metal faced inboard all with metal faced with U shaped steel matter built-in fitting 12, from the outside with pulling rivet steel built-in fitting 12 and wallboard 2 are fixed as one.

As shown in Figure 1 and Figure 2, roofing truss beam 6 is welded by light-gauge steel section, and the angular dimension of roofing truss beam 6 can be regulated.Roofing truss beam 6 winds up and is welded with the fixedly purlin holder 13 of roof purline 7 usefulness.

As shown in Figure 1 and Figure 2, this mobile house decoration 10 can be aluminum alloy decorating part, and aluminum alloy decorating part is made of exterior angle decoration and interior angle decoration, the decoration fastener is all arranged on the decoration, make the screw Hide All that leaks outside, house connecting portion screw does not leak outside, the house overall appearance.

As shown in Figure 1, the wallboard outside is provided with outdoor wall column 11 before and after this house, and column 11 upper ends are connected with roofing truss beam 6 by connector, become one, and increase the wind resistance in house.

Claims (5)

1. a modular double pitched and double-roofed mobile home is made of parts such as geosyncline base, wallboard, door, window, indoor top board, girder truss, roof purline, roof tile, crest tile, decoration, outdoor columns.It is characterized in that the groove base being placed on the ready-made in advance basis, be fixed with expansion bolt according to size; All contour wallboard lower ends are plugged in the groove base, safeguard body of wall through the formation of pegging graft between the wallboard, the vertical junction of wallboard adopts U type decoration to connect; Indoor top board is tiled on the wallboard, is connected with wallboard by self threading pin, and girder truss is laterally put on indoor top board, is connected in one by self threading pin and indoor top board, wallboard; Be connected and fixed with roof purline between the adjacent girder truss; Roof tile is in girder truss gradient direction tiling, vertically is coated with crest tile at the seam crossing of ridge.
2. modular double pitched and double-roofed mobile home as claimed in claim 1 is characterized in that described wallboard upper end is equipped with the steel built-in fitting with the roofing junction.
3. modular double pitched and double-roofed mobile home as claimed in claim 1 is characterized in that described girder truss is welded by light-gauge steel section, and the angular dimension of girder truss can be regulated.
4. modular double pitched and double-roofed mobile home as claimed in claim 1 is characterized in that described decoration can be color steel die mould spare or aluminum alloy decorating part.
5. modular double pitched and double-roofed mobile home as claimed in claim 1, the wallboard outside is provided with outdoor wall column before and after it is characterized in that, is connected with roof girder, increases the wind resistance in house.
CNU2008201282452U 2008-07-11 2008-07-11 Assembled double-slope double-roof movable house CN201241488Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008201282452U CN201241488Y (en) 2008-07-11 2008-07-11 Assembled double-slope double-roof movable house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008201282452U CN201241488Y (en) 2008-07-11 2008-07-11 Assembled double-slope double-roof movable house

Publications (1)

Publication Number Publication Date
CN201241488Y true CN201241488Y (en) 2009-05-20

Family

ID=40714784

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008201282452U CN201241488Y (en) 2008-07-11 2008-07-11 Assembled double-slope double-roof movable house

Country Status (1)

Country Link
CN (1) CN201241488Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518267A (en) * 2011-11-30 2012-06-27 哈尔滨工业大学空间钢结构幕墙有限公司 Adjustable, waterproof and heat-preserving metal roof
CN103485415A (en) * 2013-09-05 2014-01-01 常熟市董浜镇徐市嘉峰机械厂 Splicing structure
WO2014094458A1 (en) * 2012-12-21 2014-06-26 昆山生态屋建筑技术有限公司 Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN104060685A (en) * 2013-03-20 2014-09-24 北京恒通创新赛木科技股份有限公司 House structure
CN104563513A (en) * 2015-02-07 2015-04-29 刘德刚 Construction method of waterproof insulation structure of flat roof
WO2017133257A1 (en) * 2016-02-04 2017-08-10 中清大科技股份有限公司 Prefabricated house
CN107587639A (en) * 2016-02-24 2018-01-16 张日龙 A kind of heat-insulating sound-insulating log cabin roof
CN109113371A (en) * 2017-05-10 2019-01-01 刘义辉 A kind of cabin of protecting a forest for forest ranger's rest

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518267A (en) * 2011-11-30 2012-06-27 哈尔滨工业大学空间钢结构幕墙有限公司 Adjustable, waterproof and heat-preserving metal roof
CN102518267B (en) * 2011-11-30 2015-08-19 陈月明 Be applicable to Hyperbolic Roof, adjustable waterproof thermal insulation metal roof
WO2014094458A1 (en) * 2012-12-21 2014-06-26 昆山生态屋建筑技术有限公司 Fully assembled, fully cast-in-place, composite-type house and construction method thereof
US9797137B2 (en) 2012-12-21 2017-10-24 Kunshan Ecological Building Technology Co., Ltd. Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN104060685A (en) * 2013-03-20 2014-09-24 北京恒通创新赛木科技股份有限公司 House structure
CN103485415A (en) * 2013-09-05 2014-01-01 常熟市董浜镇徐市嘉峰机械厂 Splicing structure
CN104563513A (en) * 2015-02-07 2015-04-29 刘德刚 Construction method of waterproof insulation structure of flat roof
CN104563513B (en) * 2015-02-07 2016-08-17 河北启德建设集团有限公司 The construction method of flat roof water-proof insulation construction
WO2017133257A1 (en) * 2016-02-04 2017-08-10 中清大科技股份有限公司 Prefabricated house
CN107587639A (en) * 2016-02-24 2018-01-16 张日龙 A kind of heat-insulating sound-insulating log cabin roof
CN109113371A (en) * 2017-05-10 2019-01-01 刘义辉 A kind of cabin of protecting a forest for forest ranger's rest

Similar Documents

Publication Publication Date Title
CN101974956B (en) Built-in latticed steel frame exterior protected structural slab as well as building and production and construction method thereof
US7735282B2 (en) Fully insulated frame building panel system
US4488392A (en) Underground house and construction method
CN102003083B (en) Mobile modularized dwelling house
CN101748903B (en) Structural system of industrial low storied dwelling
CN103711262B (en) A kind of curved surface aluminum-magnesium-manganese alloy roof plate system construction method
CN2921130Y (en) Dismounting light steel structure movable storied building
CA2591949A1 (en) A portable building
CN105863110B (en) A kind of modular assembly formula light gauge cold-formed steel shape wallboard structural system
US20040255534A1 (en) Structure formed of foaming cement and lightweight steel and a structural system and method of forming the structural system
CN102505763B (en) Externally laid masonry composite heat-insulating sintered building block exterior wall heat insulating system
CN101265723B (en) Architecture structure system assembled by composite building board and building method
CN207110125U (en) A kind of single bulkhead of light-weight steel keel plaster tablet
WO2007109965A1 (en) A binding compound insulating exterior wall with a support
CN102134878A (en) Compound sandwich layer assembled building
WO2017101556A1 (en) Container type combination house and construction method thereof
CN105863067A (en) Modular low-layer assembling type house system of special-shaped column steel structure
CN105317110A (en) Integrated assembly type steel structure building
CN102493548A (en) Steel framework concrete structural system and construction method thereof
JPH07150627A (en) Building, constructing method thereof and structure member
CN203361341U (en) Assembly type integration house
CN201665915U (en) Movable house with detachable single-layer lightweight steel structure
CN101514589A (en) Novel ventilation air-conditioning room
CN101649650B (en) Light steel building
CN105421818B (en) Built-in steel Standard house

Legal Events

Date Code Title Description
GR01 Patent grant
C14 Grant of patent or utility model
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Chengdong International Modular Housing Co., Ltd.

Assignor: Jin Shengcai

Contract fulfillment period: 2008.11.20 to 2018.7.10

Contract record no.: 2009990000956

Denomination of invention: Assembled double-slope double-roof movable house

Granted publication date: 20090520

License type: Exclusive license

Record date: 2009.8.25

Assignee: Beijing Chengdong International Modular Housing Co., Ltd.

Assignor: Jin Shengcai

Contract fulfillment period: 2008.11.20 to 2018.7.10

Contract record no.: 2009990000956

Denomination of utility model: Assembled double-slope double-roof movable house

Granted publication date: 20090520

License type: Exclusive license

Record date: 20090825

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2008.11.20 TO 2018.7.10; CHANGE OF CONTRACT

Name of requester: BEIJING CHENGDONG HOUSE MANUFACTURING CO., LTD.

Effective date: 20090825

TR01 Transfer of patent right

Effective date of registration: 20101228

Address after: 101118 No. 6 South Street, Songzhuang Town, Beijing, Tongzhou District

Patentee after: Beijing Chengdong International Modular Housing Co., Ltd.

Address before: 101118 No. 6 South Street, Songzhuang Town, Beijing, Tongzhou District

Patentee before: Jin Shengcai

C41 Transfer of patent application or patent right or utility model
ASS Succession or assignment of patent right

Owner name: BEIJING CHENGDONG INTERNATIONAL MODULAR HOUSING CO

Free format text: FORMER OWNER: JIN SHENGCAI

Effective date: 20101228

CX01 Expiry of patent term

Granted publication date: 20090520

Granted publication date: 20090520

CX01 Expiry of patent term