CN103473629A CN2013103651616A CN201310365161A CN103473629A CN 103473629 A CN103473629 A CN 103473629A CN 2013103651616 A CN2013103651616 A CN 2013103651616A CN 201310365161 A CN201310365161 A CN 201310365161A CN 103473629 A CN103473629 A CN 103473629A
Authority
CN
China
Prior art keywords
code
namely
establishing
establishing method
attribute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103651616A
Other languages
Chinese (zh)
Inventor
许建华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Shanghai Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013103651616A priority Critical patent/CN103473629A/en
Publication of CN103473629A publication Critical patent/CN103473629A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an establishing method for a code of a power system material. The establishing method comprises the following steps: establishing a material code structuring system; establishing a basic attribute framework of a code; establishing parameter attribute structure of the code, establishing a unit attribute framework of the code. Compared with the prior art, the establishing method for the code of the power supply material has the following advantages of uniqueness, namely non-repetition of the code and definition of a target structure relation can be achieved; rationality, namely reasonable code resource consumption and reasonable code length can be achieved; overall property, namely unified standard suitable for business application and information transmission among various functional departments can be achieved; applicability, namely the establishing method is applicable to the need of foreign exchange of information; flexibility, namely convenience and high efficiency of operations of querying, reporting forms and the like can be achieved; usability, namely the establishing method is simple to use and hard to make mistakes; high performance, namely less impact on the system processing efficiency can be achieved; expandability, namely the establishing method is adaptive to business change and is easy to track; ease maintenance, namely the establishing method is convenient and simple to maintain and has small possibility of making mistakes.

Description

A kind of framework method for the electric system materiel code
Technical field
The present invention relates to a kind of framework method of materiel code, relate in particular to a kind of framework method for the electric system materiel code.
Background technology
Along with deepening constantly and continuous distillation that the integration service management requires of Shanghai Electric Power Co informatization, set up the standard set coding scheme, be the effective support performance to the system integration, business integration, conformability decision analysis.Materiel code is the part of standard code system, and it runs through and the Logistics Operation link of the whole enterprises such as extensively utilization and buying, storage, production run.Simultaneously, with external logistics related service system information and business integration on also play very important effect.At a time when ERP (enterprise resource plan management system) is implemented in full in Shanghai Electric Power Co, the materiel code system of setting up a set of standard, science, realistic business need becomes an instant job.This materiel code system mainly applies to the Shanghai Electric Power ERP system, simultaneously the goods and materials code interface of compatibility and peripheral system.The whole Shanghai Electric Power material management information that is established as of standard material coding scheme is integrated, and data statistic analysis and the data mining of being sought unity of talking lay a solid foundation.Simultaneously, the extensibility of goods and materials code fully takes into account the sustainable development of code system, for further carrying out from now on becoming more meticulous of logistics management, improves the logistics management level and has carried out sufficient preparation.
Summary of the invention
Purpose of the present invention be exactly in order to overcome the defect that above-mentioned prior art exists, provide a kind of easy-to-use, flexibly for the framework method of electric system materiel code.
Purpose of the present invention can be achieved through the following technical solutions:
A kind of framework method for the electric system materiel code is characterized in that this framework method comprises the following steps:
(1) set up the materiel code structure system;
(2) set up the base attribute framework of coding;
(3) set up the parameter attribute framework of coding;
(4) set up the unit attribute schema of coding.
Described base attribute comprises description, measurement unit, material basic classification and the design drawing numbering of material.
Described parameter attribute comprises:
For power cable, record its interface size, core number and electric pressure;
For isolating switch, record its electric pressure, rated current and dropout current.
Described unit attribute comprises safety stock, buying measurement unit and accounting bookkeeping rule.
Compared with prior art, the present invention has the following advantages:
1, uniqueness: the nothing that guarantees code repeats, and the object structure relation is clear and definite;
2, rationality: the code resource consumes rationally, and code length is reasonable;
3, of overall importance: standard is unified, is applicable to each functional department's service application and information transmission;
4, applicability: can adapt to external information interchange needs;
5, dirigibility: the convenience of the operation such as inquiry, form and efficient;
6, ease for use: use simply, be difficult for makeing mistakes;
7, high-performance: little on the impact of system treatment effeciency;
8, extensibility: the adaptation business changes, and is easy to follow the tracks of;
9, ease for maintenance: easy to maintenance simple, be difficult for makeing mistakes.
Embodiment
Below in conjunction with specific embodiment, the invention will be further described.
One, overall architecture thinking
Owing to considering a certain material, its base attribute is consistent whole Shanghai Electric Power scope planted agent, mainly refer to that the information Ying Quan companies such as the coding, description of material, basic measurement unit, classification are unified, thus will be above must be unified in company's scope entirely information as the essential information of goods and materials.
In addition, consider inconsistent aspect service management of each grass-roots unit, for meeting the requirement on business need difference, partial information can be different at each base unit.
This materiel code system usable range of having mentioned in the preceding article contains the four module of Shanghai Electric Power ERP system, for meeting the interlock of the integrated and business of intermodule information, consider that in the framework of materiel code the information that will connect between business module includes in the information bank of material.
Two, coded system:
This encoding scheme code bit adopts 12 codings.Adopt the coded system of serial code, but front 4 the large classes that can distinguish coding.Wherein:
1001XXXXXXXX representative: equipment
2001XXXXXXXX representative: starting material
3001XXXXXXXX representative: equipment part
4001XXXXXXXX representative: five metals material
5001XXXXXXXX representative: instrument
6001XXXXXXXX representative: instrument and meter
7001XXXXXXXX representative: power transformation line material
The goods and materials code information, by serial code and Attribute Association, forms tree structure.Code attribute quantity has extensibility and maintainability flexibly.
Three, base attribute
Base attribute mainly comprises: the information such as the description of material, measurement unit, material basic classification, design drawing numbering.These information keep strict conformance in full Shanghai Electric Power scope.
Four, parameter attribute (relating generally to the technical parameter of material)
Parameter attribute is mainly used in the tree structure attribute unified to some full Shanghai Electric Power and the record of property value.Shanghai Electric Power is mainly used in the technical parameter of recording unit class goods and materials at present, as for power cable, records its interface size, core number and electric pressure; For isolating switch, record its electric pressure, rated current and dropout current.
Extended attribute is a kind of extension to base attribute, can support theoretically unlimited categorical attribute and the requirement of property value.Shanghai Electric Power is just progressively considered the classification such as assets classes are introduced to extended attribute.
Five, the service attribute of distinguishing by grass-roots unit
Due to the difference of business demand, coded system takes into full account the difference of same material parameter value when commensurate is not used, as safety stock, buying measurement unit, accounting bookkeeping rule etc.Therefore, consider to arrange the property value memory mechanism of minute unit when design, to meet minute requirement of unit business use.

Claims (4)

1. the framework method for the electric system materiel code, is characterized in that, this framework method comprises the following steps:
(1) set up the materiel code structure system;
(2) set up the base attribute framework of coding;
(3) set up the parameter attribute framework of coding;
(4) set up the unit attribute schema of coding.
2. a kind of framework method for the electric system materiel code according to claim 1, is characterized in that, described base attribute comprises description, measurement unit, material basic classification and the design drawing numbering of material.
3. a kind of framework method for the electric system materiel code according to claim 1, is characterized in that, described parameter attribute comprises:
For power cable, record its interface size, core number and electric pressure;
For isolating switch, record its electric pressure, rated current and dropout current.
4. a kind of framework method for the electric system materiel code according to claim 1, is characterized in that, described unit attribute comprises safety stock, buying measurement unit and accounting bookkeeping rule.
CN2013103651616A 2013-08-20 2013-08-20 Establishing method for code of power system material Pending CN103473629A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103651616A CN103473629A (en) 2013-08-20 2013-08-20 Establishing method for code of power system material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103651616A CN103473629A (en) 2013-08-20 2013-08-20 Establishing method for code of power system material

Publications (1)

Publication Number Publication Date
CN103473629A true CN103473629A (en) 2013-12-25

Family

ID=49798471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103651616A Pending CN103473629A (en) 2013-08-20 2013-08-20 Establishing method for code of power system material

Country Status (1)

Country Link
CN (1) CN103473629A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113177758A (en) * 2021-04-28 2021-07-27 青岛鼎信通讯股份有限公司 Material informatization management method applied to electric power product

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
柯赛: "SGSC公司基于ERP平台物资集约化管理", 《中国优秀硕士学位论文全文数据库》 *
胡永焕: "电力企业集成业务信息系统中物资编码方法", 《供用电》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113177758A (en) * 2021-04-28 2021-07-27 青岛鼎信通讯股份有限公司 Material informatization management method applied to electric power product

Similar Documents

Publication Publication Date Title
CN102385739A (en) Integrated information management platform for county-level power supply enterprises
Abramovici et al. PSS sustainability assessment and monitoring framework (PSS-SAM)–case study of a multi-module PSS solution
CN112991060A (en) Block chain-based carbon trace data tracking method and device and storage medium
CN110826731A (en) Digital management method and management system for electrical equipment of thermal power plant
CN104834998A (en) Intellectual property service information platform for small and medium-sized enterprises
CN103473629A (en) Establishing method for code of power system material
CN104573997B (en) Distribution network mapping and thematic map application architecture design method
CN105321049A (en) An enterprise management system
CN110070249A (en) A kind of digital factory intelligent platform
Athukorala et al. Global production sharing: Exploring Australia's competitive edge
CN107067301A (en) A kind of joint project machine and equipment leasing system
CN104539647A (en) Integrated control platform for safe power supply and consumption of important and high-risk clients
CN103310297A (en) Letting agency management system
CN109949052A (en) Agricultural equipment after-sale service system based on SBOM data management
CN116228103A (en) Inventory life cycle real-time management method and system
Hargreaves et al. Developing emerging standards for power system data exchange to enable interoperable and scalable operational modelling and analysis
CN114240351A (en) Distributed intelligent economic management system
CN103005760A (en) Piece counting system
Lu China's industrial carbon dioxide emissions in manufacturing subsectors and in selected provinces
CN102662925B (en) Method for converting configuration languages in different formats into generic functional description language
Wang et al. [Retracted] Analysis of Enterprise Marketing Data Management Integration and Innovation Path Based on BD
Yukun et al. Design of lean management system for equipment assets based on BOM tree and RFID
CN203054878U (en) Multifunctional cable marking system
CN104933512A (en) Production management information system
Zhihong et al. Design on information management system of gas station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20131225