CN103473607A - 一种按轨迹特征离线优化和实时匹配外推模型的风电超短期预测方法 - Google Patents
一种按轨迹特征离线优化和实时匹配外推模型的风电超短期预测方法 Download PDFInfo
- Publication number
- CN103473607A CN103473607A CN2013103827933A CN201310382793A CN103473607A CN 103473607 A CN103473607 A CN 103473607A CN 2013103827933 A CN2013103827933 A CN 2013103827933A CN 201310382793 A CN201310382793 A CN 201310382793A CN 103473607 A CN103473607 A CN 103473607A
- Authority
- CN
- China
- Prior art keywords
- track
- wind power
- wind
- prediction
- characteristic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Wind Motors (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310382793.3A CN103473607B (zh) | 2013-08-29 | 2013-08-29 | 按轨迹特征优化和匹配外推模型的风电超短期预测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310382793.3A CN103473607B (zh) | 2013-08-29 | 2013-08-29 | 按轨迹特征优化和匹配外推模型的风电超短期预测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103473607A true CN103473607A (zh) | 2013-12-25 |
CN103473607B CN103473607B (zh) | 2016-12-28 |
Family
ID=49798450
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310382793.3A Active CN103473607B (zh) | 2013-08-29 | 2013-08-29 | 按轨迹特征优化和匹配外推模型的风电超短期预测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103473607B (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927600A (zh) * | 2014-04-22 | 2014-07-16 | 国家电网公司 | 基于复合数据源自回归模型光伏发电功率超短期预测方法 |
CN104239979A (zh) * | 2014-10-09 | 2014-12-24 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104268659A (zh) * | 2014-10-09 | 2015-01-07 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN107769254A (zh) * | 2017-08-01 | 2018-03-06 | 中国农业大学 | 一种风电集群轨迹预测与分层控制方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100082172A1 (en) * | 2008-09-25 | 2010-04-01 | Korea Electric Power Corporation | Load forecasting analysis system for calculating customer baseline load |
CN102999786A (zh) * | 2012-10-17 | 2013-03-27 | 浙江埃菲生能源科技有限公司 | 基于相似日特征分类与极端学习机的光伏发电功率短期预报方法 |
-
2013
- 2013-08-29 CN CN201310382793.3A patent/CN103473607B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100082172A1 (en) * | 2008-09-25 | 2010-04-01 | Korea Electric Power Corporation | Load forecasting analysis system for calculating customer baseline load |
CN102999786A (zh) * | 2012-10-17 | 2013-03-27 | 浙江埃菲生能源科技有限公司 | 基于相似日特征分类与极端学习机的光伏发电功率短期预报方法 |
Non-Patent Citations (1)
Title |
---|
彭虎: "风电分布模式及概率预测方法研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》, no. 2, 15 February 2012 (2012-02-15) * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103927600A (zh) * | 2014-04-22 | 2014-07-16 | 国家电网公司 | 基于复合数据源自回归模型光伏发电功率超短期预测方法 |
CN104239979A (zh) * | 2014-10-09 | 2014-12-24 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104268659A (zh) * | 2014-10-09 | 2015-01-07 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN104239979B (zh) * | 2014-10-09 | 2017-11-10 | 国电南瑞科技股份有限公司 | 一种风电场发电功率超短期预测方法 |
CN104268659B (zh) * | 2014-10-09 | 2017-12-29 | 国电南瑞科技股份有限公司 | 一种光伏电站发电功率超短期预测方法 |
CN107769254A (zh) * | 2017-08-01 | 2018-03-06 | 中国农业大学 | 一种风电集群轨迹预测与分层控制方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103473607B (zh) | 2016-12-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Lei et al. | A review on the forecasting of wind speed and generated power | |
CN107732970B (zh) | 一种新能源并网电力系统的静态安全概率评估方法 | |
CN108876163B (zh) | 综合因果分析与机器学习的暂态功角稳定快速评估方法 | |
CN103473393B (zh) | 一种考虑随机概率的输电裕度控制模型建模方法 | |
CN110533092B (zh) | 一种基于运行工况的风力发电机组scada数据分类方法及应用 | |
Chen et al. | Integrated planning of distribution systems with distributed generation and demand side response | |
CN101873091A (zh) | 一种太阳能双峰最大功率点的跟踪方法 | |
Yang et al. | Short-term PV generation system direct power prediction model on wavelet neural network and weather type clustering | |
CN106611243A (zh) | 一种基于garch模型的风速预测残差修正方法 | |
CN103473607B (zh) | 按轨迹特征优化和匹配外推模型的风电超短期预测方法 | |
CN104036356A (zh) | 一种利用分形算法对电网未来运行状态进行预测的方法 | |
CN103761582A (zh) | 一种高适应度的互动型微电网配置规划方法 | |
CN104834980A (zh) | 一种用于优化绿色数据中心电费的负载调度方法 | |
CN105244890A (zh) | 新能源并网的无功优化方法 | |
Ni et al. | A review of line loss analysis of the low-voltage distribution system | |
CN106485603A (zh) | 一种应用于风力发电的短期风速预测方法 | |
CN109767353A (zh) | 一种基于概率分布函数的光伏发电功率预测方法 | |
CN105528517B (zh) | 基于神经网络、小波分解光伏电站功率预测方法、系统 | |
Hui et al. | Short-term wind speed forecasting simulation research based on ARIMA-LSSVM combination method | |
CN107453366B (zh) | 计及风电决策风险的含upfc多目标最优潮流计算方法 | |
Sun et al. | Short term load forecasting based on BP neural network trained by PSO | |
CN106684854B (zh) | 一种基于节点等效的有源配电网电压越限风险分析方法 | |
Wei et al. | Ultra-short-term/short-term wind power continuous prediction based on fuzzy clustering analysis | |
Wu et al. | Short-term wind power prediction based on time series analysis model | |
Al-Fatlawi et al. | Techno-economic analysis of wind turbines powering rural of Malaysia |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Effective date: 20141125 Owner name: STATE GRID ELECTRIC POWER RESEARCH INSITITUTE Free format text: FORMER OWNER: NANJING NARI CO., LTD. Effective date: 20141125 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20141125 Address after: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant after: State Grid Electric Power Research Insititute Applicant after: NARI Technology Development Co., Ltd. Address before: Nan Shui Road Gulou District of Nanjing city of Jiangsu Province, No. 8 210003 Applicant before: Nanjing Nari Co., Ltd. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |