CN103469783A - 一种软土地基加固方法 - Google Patents

一种软土地基加固方法 Download PDF

Info

Publication number
CN103469783A
CN103469783A CN2013104645307A CN201310464530A CN103469783A CN 103469783 A CN103469783 A CN 103469783A CN 2013104645307 A CN2013104645307 A CN 2013104645307A CN 201310464530 A CN201310464530 A CN 201310464530A CN 103469783 A CN103469783 A CN 103469783A
Authority
CN
China
Prior art keywords
rail pressure
down adjustment
compacting
adjustment part
devices
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013104645307A
Other languages
English (en)
Other versions
CN103469783B (zh
Inventor
李树一
张荣森
廖绫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dacheng Kechuang Infrastructure Co Ltd
Original Assignee
ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd filed Critical ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING Co Ltd
Priority to CN201310464530.7A priority Critical patent/CN103469783B/zh
Publication of CN103469783A publication Critical patent/CN103469783A/zh
Application granted granted Critical
Publication of CN103469783B publication Critical patent/CN103469783B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Soil Working Implements (AREA)

Abstract

一种软土地基加固方法,所述加固方法使用软土压实设备,所述软土压实设备包括:压滚机以及两套轨压装置;所述加固方法包括如下步骤:首先确定软土地基的一次压下量;设置四个固定地基点;将所述压滚机设置在压实初始位置;分别使所述两套轨压装置的前伸缩机构(8)和后伸缩机构(18)交替运动,所述压滚机对应地前后运动,从而对所述软土地基进行压实,直至实际压下量满足总压下量的要求。

Description

一种软土地基加固方法
技术领域
本发明涉及一种地基加固方法,具体为一种利用压滚机的软土地基加固方法。 
背景技术
软土地基在施工中是经常遇到的情况。为了在软土地基上进行建筑构造以及施工,往往需要对于软土地基进行加固。如果对于软土地基的加固不牢,加固不到位,容易引起日后的沉降,造成巨大安全隐患。 
现有的一些软土地基加固方法很多。例如可以使用夯实机对软土地基进行加固。这种夯实机的型号规格很多,利用质量惯性和重力对软土地基提供压实力,在操作之下反复进行,可以对软土地基进行压实。但是,这种方法,在软土地基加固的初期容易具有较大的压下量,但是一旦达到一定的加固程度,地基具有一定硬度后,这种方式往往不能继续进行压实,因而在对于软土地基的压实加固性能要求较高时往往难以达到合格加固性能。 
现有技术中也可以采用压滚机进行软土地基的加固,这种设备的运行效率高,而且性能稳定,便于在大规模施工的过程中对软土地基进行大规模加固。而且可以根据软土地基的加固性能要求对于压滚机的型号进行选择。但是,这种设备的弊端也是明显的,由于其压实力的调节性能差,不能胜任各种压实要求的工况,即对于不同要求的压实要求,要通过选择不同型号的压滚机,如此对于施工的设备要求、成本等均提出挑战。 
发明内容
为了克服现有技术的缺陷,提供一种能够满足较宽压实力和压下量要求的压实方法,从而降低施工成本、提高施工质量,本发明提出一种软土地基加固方法。 
所述方法的方案为:一种软土地基加固方法,其特征在于,所述加固方法使用软土压实设备,所述软土压实设备包括:压滚机以及两套轨压装置; 
所述压滚机包括机身、压实滚以及驱动滚,所述压实滚和驱动滚分别安装在机身的前端和后端,所述压实滚两端面的中心处设置有轴向向外延伸的圆柱状轨压轴;
每套所述轨压装置包括前伸缩系统、后伸缩系统以及轨压杆,所述前伸缩系统包括前伸缩机构、前固定装置、前立杆以及前上下调节件,所述前固定装置用于将前伸缩机构与地面固定连接,所述前立杆与前伸缩机构连接并受前伸缩机构的驱动,所述前上下调节件与前立杆连接并且所述前上下调节件的位置能够在前伸缩机构的驱动下进行上下调节;所述后伸缩系统包括后伸缩机构、后固定装置、后立杆以及后上下调节件,所述后固定装置用于将后伸缩机构与地面固定连接,所述后立杆与后伸缩机构连接并受后伸缩机构的驱动,所述后上下调节件与后立杆连接并且所述后上下调节件的位置能够在后伸缩机构的驱动下进行上下调节;所述轨压杆的两端分别与所述前上下调节件与后上下调节件铰接,并且所述轨压杆的下侧面用于与所述圆柱状轨压轴压力接合;
其中,所述两套轨压装置平行地设置在所述压滚机的两侧,并且所述两套轨压装置的两根轨压杆的下侧面分别与压实滚两端的圆柱状轨压轴压力接合,用于给所述压实滚提供向下的压下力,并且成为所述圆柱状轨压轴的运行轨道;
所述加固方法包括如下步骤:
1)首先根据软土地基的软硬程度信息、总压下量信息以及土质的结合性能信息确定软土地基的一次压下量;
2)根据所述总压下量信息,在软土地基上设置用于固定所述固定装置的四个固定地基点;
3)将所述压滚机设置在压实初始位置,并将相应的固定装置与所述四个固定地基点固定连接,从而将所述两套轨压装置平行地设置,并且所述两套轨压装置的两根轨压杆分别位于所述压实滚两端的圆柱状轨压轴之上;
4)启动所述两套轨压装置的前伸缩机构和后伸缩机构,对两根轨压杆的上下位置进行同时调节从而使其与所述圆柱状轨压轴接触; 
5)根据所述一次压下量,启动所述两套轨压装置的所述前伸缩机构对所述前上下调节件的位置下降量进行调节,此时的位置下降量小于所述一次压下量;
6)启动所述压滚机向前运动,进行首次试压实:所述压滚机在所述两根轨压杆压力之下向前运行,从而将所述软土地基进行首次试压实;
7)根据所述一次压下量,启动所述两套轨压装置的所述后伸缩机构对所述后上下调节件的位置下降量进行调节,此时的位置下降量等于所述一次压下量;
8)启动所述压滚机向后运动,进行正式压实:所述压滚机在所述两根轨压杆压力之下向后运行,从而将所述软土地基进行正式压实;
9)通过交替地对所述前上下调节件和后上下调节件分别向下调节,所述压滚机对应地前后运动,从而对所述软土地基进行压实,直至实际压下量满足总压下量的要求。
通过上述方案,由于所述轨压杆的压下量可以根据需要进行调节,因此能够相应地对压滚机的压下力进行调节,从而既能够满足压实力的要求,又能够提供足够的压下量,即一种压滚机就可以提供多种压下量和压下力的选择,还能够往复循环进行多次压下,从而提高施工质量,降低施工成本。 
附图说明
图1是本发明的软土地基加固施工过程的侧视示意图; 
图2是本发明的软土地基加固施工过程的俯视图。
具体实施方式
现在结合说明书附图1和2,对本发明进行详细说明。由于软土的性能不同,对于加固过程中的具体参数也不同。例如,软土的软硬程度对于每次的压下量具有影响,软土较软,则一次的压下量大,反之要小;而土质的结合能力也影响到一次压下量。例如,土质的结合能力强,对于在其上运转的驱动轮,其能够提供较高的驱动力;而土质的结合能力较差,例如土质较散,则其只能提供较低的驱动力,因此每次的压下量不能太高。据此,本发明提供的方法方案如下: 
一种软土地基加固方法,所述加固方法使用软土压实设备,所述软土压实设备包括:压滚机以及两套轨压装置;
所述压滚机包括机身1、压实滚2以及驱动滚4,所述压实滚2和驱动滚4分别安装在机身1的前端和后端,所述压实滚2两端面的中心处设置有轴向向外延伸的圆柱状轨压轴3;
每套所述轨压装置包括前伸缩系统、后伸缩系统以及轨压杆5,所述前伸缩系统包括前伸缩机构8、前固定装置9、前立杆7以及前上下调节件6,所述前固定装置9用于将前伸缩机构8与地面固定连接,所述前立杆7与前伸缩机构8连接并受前伸缩机构8的驱动,所述前上下调节件6与前立杆7连接并且所述前上下调节件6的位置能够在前伸缩机构8的驱动下进行上下调节;所述后伸缩系统包括后伸缩机构18、后固定装置19、后立杆17以及后上下调节件16,所述后固定装置19用于将后伸缩机构18与地面固定连接,所述后立杆17与后伸缩机构18连接并受后伸缩机构18的驱动,所述后上下调节件16与后立杆17连接并且所述后上下调节件16的位置能够在后伸缩机构18的驱动下进行上下调节;所述轨压杆5的两端分别与所述前上下调节件6与后上下调节件16铰接,并且所述轨压杆5的下侧面用于与所述圆柱状轨压轴3压力接合;
其中,所述两套轨压装置平行地设置在所述压滚机的两侧,并且所述两套轨压装置的两根轨压杆5的下侧面分别与压实滚2两端的圆柱状轨压轴3压力接合,用于给所述压实滚2提供向下的压下力,并且成为所述圆柱状轨压轴3的运行轨道;
所述加固方法包括如下步骤:
1、首先根据软土地基的软硬程度信息、总压下量信息以及土质的结合性能信息确定软土地基的一次压下量;
2、根据所述总压下量信息,在软土地基上设置用于固定所述固定装置9、19的四个固定地基点;
3、将所述压滚机设置在压实初始位置,并将相应的固定装置与所述四个固定地基点固定连接,从而将所述两套轨压装置平行地设置,并且所述两套轨压装置的两根轨压杆5分别位于所述压实滚2两端的圆柱状轨压轴3之上;
4、启动所述两套轨压装置的前伸缩机构8和后伸缩机构18,对两根轨压杆5的上下位置进行同时调节从而使其与所述圆柱状轨压轴3接触; 
5、根据所述一次压下量,启动所述两套轨压装置的所述前伸缩机构8对所述前上下调节件6的位置下降量进行调节,此时的位置下降量小于所述一次压下量;
6、启动所述压滚机向前运动,进行首次试压实:所述压滚机在所述两根轨压杆5压力之下向前运行,从而将所述软土地基进行首次试压实;
7、根据所述一次压下量,启动所述两套轨压装置的所述后伸缩机构18对所述后上下调节件16的位置下降量进行调节,此时的位置下降量等于所述一次压下量;
8、启动所述压滚机向后运动,进行正式压实:所述压滚机在所述两根轨压杆5压力之下向后运行,从而将所述软土地基进行正式压实;
9、通过交替地对所述前上下调节件6和后上下调节件16分别向下调节,所述压滚机对应地前后运动,从而对所述软土地基进行压实,直至实际压下量满足总压下量的要求。
如图1所示,线11代表每次压实之前的地基;线10代表压实之后的地基,也是压实滚的运行轨迹。 
其中,所述四个固定地基点的构筑可以根据情况确定。在周围地面较硬的情况下,可以直接选取较硬的地块作为地基点;而大多数情形下可能地面强度不能满足要求,这时,需要在正式施工之前,先根据需要构筑需要数量的地基点。例如,可以通过挖掘工具对地面进行挖掘桩孔,然后对桩孔进行混凝土浇筑建桩,从而构筑地基点。 
以上的实施例只是对于本发明的解释性信息,并非旨在限制本发明权利要求的范围。 
  

Claims (1)

1.一种软土地基加固方法,其特征在于,所述加固方法使用软土压实设备,所述软土压实设备包括:压滚机以及两套轨压装置;所述压滚机包括机身(1)、压实滚(2)以及驱动滚(4),所述压实滚(2)和驱动滚(4)分别安装在机身(1)的前端和后端,所述压实滚(2)两端面的中心处设置有轴向向外延伸的圆柱状轨压轴(3);每套所述轨压装置包括前伸缩系统、后伸缩系统以及轨压杆(5),所述前伸缩系统包括前伸缩机构(8)、前固定装置(9)、前立杆(7)以及前上下调节件(6),所述前固定装置(9)用于将前伸缩机构(8)与地面固定连接,所述前立杆(7)与前伸缩机构(8)连接并受前伸缩机构(8)的驱动,所述前上下调节件(6)与前立杆(7)连接并且所述前上下调节件(6)的位置能够在前伸缩机构(8)的驱动下进行上下调节;所述后伸缩系统包括后伸缩机构(18)、后固定装置(19)、后立杆(17)以及后上下调节件(16),所述后固定装置(19)用于将后伸缩机构(18)与地面固定连接,所述后立杆(17)与后伸缩机构(18)连接并受后伸缩机构(18)的驱动,所述后上下调节件(16)与后立杆(17)连接并且所述后上下调节件(16)的位置能够在后伸缩机构(18)的驱动下进行上下调节;所述轨压杆(5)的两端分别与所述前上下调节件(6)与后上下调节件(16)铰接,并且所述轨压杆(5)的下侧面用于与所述圆柱状轨压轴(3)压力接合;其中,所述两套轨压装置平行地设置在所述压滚机的两侧,并且所述两套轨压装置的两根轨压杆(5)的下侧面分别与压实滚(2)两端的圆柱状轨压轴(3)压力接合,用于给所述压实滚(2)提供向下的压下力,并且成为所述圆柱状轨压轴(3)的运行轨道;
所述加固方法包括如下步骤:
1)首先根据软土地基的软硬程度信息、总压下量信息以及土质的结合性能信息确定软土地基的一次压下量;
2)根据所述总压下量信息,在软土地基上设置用于固定所述固定装置(9、19)的四个固定地基点;
3)将所述压滚机设置在压实初始位置,并将相应的固定装置与所述四个固定地基点固定连接,从而将所述两套轨压装置平行地设置,并且所述两套轨压装置的两根轨压杆(5)分别位于所述压实滚(2)两端的圆柱状轨压轴(3)之上;
4)启动所述两套轨压装置的前伸缩机构(8)和后伸缩机构(18),对两根轨压杆(5)的上下位置进行同时调节从而使其与所述圆柱状轨压轴(3)接触; 
5)根据所述一次压下量,启动所述两套轨压装置的所述前伸缩机构(8)对所述前上下调节件(6)的位置下降量进行调节,此时的位置下降量小于所述一次压下量;
6)启动所述压滚机向前运动,进行首次试压实:所述压滚机在所述两根轨压杆(5)压力之下向前运行,从而将所述软土地基进行首次试压实;
7)根据所述一次压下量,启动所述两套轨压装置的所述后伸缩机构(18)对所述后上下调节件(16)的位置下降量进行调节,此时的位置下降量等于所述一次压下量;
8)启动所述压滚机向后运动,进行正式压实:所述压滚机在所述两根轨压杆(5)压力之下向后运行,从而将所述软土地基进行正式压实;
9)通过交替地对所述前上下调节件(6)和后上下调节件(16)分别向下调节,所述压滚机对应地前后运动,从而对所述软土地基进行压实,直至实际压下量满足总压下量的要求。
CN201310464530.7A 2013-10-04 2013-10-04 一种软土地基加固方法 Active CN103469783B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310464530.7A CN103469783B (zh) 2013-10-04 2013-10-04 一种软土地基加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310464530.7A CN103469783B (zh) 2013-10-04 2013-10-04 一种软土地基加固方法

Publications (2)

Publication Number Publication Date
CN103469783A true CN103469783A (zh) 2013-12-25
CN103469783B CN103469783B (zh) 2015-05-27

Family

ID=49794812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310464530.7A Active CN103469783B (zh) 2013-10-04 2013-10-04 一种软土地基加固方法

Country Status (1)

Country Link
CN (1) CN103469783B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252300A (zh) * 2016-03-18 2018-07-06 泉州台商投资区尚良建筑装饰有限公司 一种自攻地基桩建立地基的方法
CN110805021A (zh) * 2019-11-01 2020-02-18 上海精硕建设发展有限公司 一种软基处理施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0155929A2 (de) * 1984-03-23 1985-09-25 VOEST-ALPINE Aktiengesellschaft Fahrbares Bodenverdichtungsgerät
CN1176328A (zh) * 1997-04-01 1998-03-18 太原重型机械学院 复合式冲击压实机
JP2004232433A (ja) * 2003-02-03 2004-08-19 Maeda Corp 盛立転圧管理方法及びシステム
CN101265701A (zh) * 2007-03-16 2008-09-17 张伯谦 一种软土地基加固方法
CN101761065A (zh) * 2009-12-17 2010-06-30 上海岩土工程勘察设计研究院有限公司 软土地基处理方法
DE102011012715A1 (de) * 2011-03-01 2012-09-06 Bomag Gmbh Vorrichtung zur Bodenverdichtung und Verfahren zum Aufgleisen einer Vorrichtung zur Bodenverdichtung

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0155929A2 (de) * 1984-03-23 1985-09-25 VOEST-ALPINE Aktiengesellschaft Fahrbares Bodenverdichtungsgerät
CN1176328A (zh) * 1997-04-01 1998-03-18 太原重型机械学院 复合式冲击压实机
JP2004232433A (ja) * 2003-02-03 2004-08-19 Maeda Corp 盛立転圧管理方法及びシステム
CN101265701A (zh) * 2007-03-16 2008-09-17 张伯谦 一种软土地基加固方法
CN101761065A (zh) * 2009-12-17 2010-06-30 上海岩土工程勘察设计研究院有限公司 软土地基处理方法
DE102011012715A1 (de) * 2011-03-01 2012-09-06 Bomag Gmbh Vorrichtung zur Bodenverdichtung und Verfahren zum Aufgleisen einer Vorrichtung zur Bodenverdichtung

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108252300A (zh) * 2016-03-18 2018-07-06 泉州台商投资区尚良建筑装饰有限公司 一种自攻地基桩建立地基的方法
CN108252300B (zh) * 2016-03-18 2020-06-05 台州市黄岩宗义模塑有限公司 一种自攻地基桩建立地基的方法
CN110805021A (zh) * 2019-11-01 2020-02-18 上海精硕建设发展有限公司 一种软基处理施工方法

Also Published As

Publication number Publication date
CN103469783B (zh) 2015-05-27

Similar Documents

Publication Publication Date Title
CN106501079B (zh) 一种路基动力加载模型试验系统
CN109024211A (zh) 一种道路修复设备
CN103469783B (zh) 一种软土地基加固方法
CN107159366A (zh) 一种废弃建筑材料回收用处理装置
CN107401164A (zh) 一种小型建筑工地用机械式打桩机
CN107702926A (zh) 一种碰撞试验车辆调正装置
CN106498946A (zh) 一种低空间落锤式自动液压打桩机
CN204255764U (zh) Crts ⅲ型轨道板强度检测试验台
CN103498463B (zh) 一种滚压设备
CN113463612A (zh) 可适应多种格数的土地治理用土工格室铺设装置
CN103498464B (zh) 一种滚压系统
CN103485261B (zh) 一种路面加固设备
CN112252295A (zh) 一种建筑施工地基用夯实设备
CN103498395B (zh) 一种路面加固系统
CN109944544A (zh) 一种安防工程施工用地面打孔装置
CN109281316A (zh) 一种桩工机械用打桩装置
CN116223084A (zh) 一种凿岩负载模拟装置及模拟方法
DE102010019053A1 (de) Bodenverdichtungsvorrichtung mit Messvorrichtung zum Bestimmen von Bodenkennwerten
CN206592131U (zh) 导管打入控制系统及暗挖台车
CN208168380U (zh) 预制梁底板钢筋穿束装置及系统
CN108756960A (zh) 一种隧道防水板铺设和钢筋定位提升装置的使用方法
CN202117045U (zh) 无振动挤密扩孔设备
CN115125951A (zh) 一种建筑工程用的大型机电打桩装置及方法
CN203021269U (zh) 全自动推进装置
CN203270546U (zh) 渠面自行夯筑机车

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: YE CHENG

Free format text: FORMER OWNER: ZHEJIANG DONGHUA COUSTRUCTION ENGINEERING CO., LTD.

Effective date: 20150423

Owner name: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: ZHANG RONGSEN

Effective date: 20150423

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Ye Cheng

Inventor after: Liao Ling

Inventor after: Pan Yuefeng

Inventor after: Li Shuyi

Inventor before: Li Shuyi

Inventor before: Zhang Rongsen

Inventor before: Liao Ling

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LI SHUYI ZHANG RONGSEN LIAO LING TO: YE CHENG LIAO LING PAN YUEFENG LI SHUYI

Free format text: CORRECT: ADDRESS; FROM: 362200 QUANZHOU, FUJIAN PROVINCE TO: 325000 WENZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150423

Address after: Longwan Waterfront Street Wenzhou city Zhejiang province 325000 Sand Street No. 228 second floor

Applicant after: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Applicant after: Ye Cheng

Address before: Xiyuan built field in Jinjiang city of Fujian province in 362200 Quanzhou District No. 108

Applicant before: Zhang Rongsen

Applicant before: Zhejiang Donghua Coustruction Engineering Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Free format text: FORMER OWNER: YE CHENG

Effective date: 20150616

Owner name: WUHAN DACHENG FOUNDATION ENGINEERING LLC

Free format text: FORMER OWNER: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Effective date: 20150616

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150616

Address after: 430000 Hubei city of Wuhan province Hannan District East Wan farm

Patentee after: Wuhan Dacheng Foundation Engineering Co., Ltd.

Address before: Longwan Waterfront Street Wenzhou city Zhejiang province 325000 Sand Street No. 228 second floor

Patentee before: WENZHOU HONGCHENGXIANG TECHNOLOGY CO., LTD.

Patentee before: Ye Cheng

C53 Correction of patent of invention or patent application
C56 Change in the name or address of the patentee
CB03 Change of inventor or designer information

Inventor after: Xu Gao

Inventor after: Hu Shouchao

Inventor after: Ye Lihua

Inventor after: Fan Huanhuan

Inventor before: Ye Cheng

Inventor before: Liao Ling

Inventor before: Pan Yuefeng

Inventor before: Li Shuyi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: YE CHENG LIAO LING PAN YUEFENG LI SHUYI TO: XU GAO HU SHOUCHAO YE LIHUA FAN HUANHUAN

CP02 Change in the address of a patent holder

Address after: 430000 Hubei city of Wuhan province Hannan District East embankment farm

Patentee after: Wuhan Dacheng Foundation Engineering Co., Ltd.

Address before: 430000 Hubei city of Wuhan province Hannan District East Wan farm

Patentee before: Wuhan Dacheng Foundation Engineering Co., Ltd.

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 430000 Hubei city of Wuhan province Hannan District East embankment farm

Patentee after: DACHENG KECHUANG INFRASTRUCTURE CO., LTD.

Address before: 430000 Hubei city of Wuhan province Hannan District East embankment farm

Patentee before: Wuhan Dacheng Foundation Engineering Co., Ltd.