CN103467038B - A kind of Foam lightweight soil high ferro roadbed - Google Patents

A kind of Foam lightweight soil high ferro roadbed Download PDF

Info

Publication number
CN103467038B
CN103467038B CN201310390787.2A CN201310390787A CN103467038B CN 103467038 B CN103467038 B CN 103467038B CN 201310390787 A CN201310390787 A CN 201310390787A CN 103467038 B CN103467038 B CN 103467038B
Authority
CN
China
Prior art keywords
lightweight soil
foam lightweight
roadbed
cement
high ferro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310390787.2A
Other languages
Chinese (zh)
Other versions
CN103467038A (en
Inventor
常波
金睿
徐拥建
章志钢
沈西华
罗轩昂
李宗平
孙红林
邓飞
顾湘生
赵新益
严栋
罗勇
汪建斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG SHENGRUI TECHNOLOGY CO., LTD.
China Railway Siyuan Survey and Design Group Co Ltd
Zhejiang Construction Engineering Group Co Ltd
Original Assignee
Guangdong Sheng Rui Civil Technology
China Railway Siyuan Survey and Design Group Co Ltd
Zhejiang Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Sheng Rui Civil Technology, China Railway Siyuan Survey and Design Group Co Ltd, Zhejiang Construction Engineering Group Co Ltd filed Critical Guangdong Sheng Rui Civil Technology
Priority to CN201310390787.2A priority Critical patent/CN103467038B/en
Publication of CN103467038A publication Critical patent/CN103467038A/en
Application granted granted Critical
Publication of CN103467038B publication Critical patent/CN103467038B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of Foam lightweight soil high ferro roadbed, it is characterized in that, downward 0 ~ the 1.0m in roadbed top, built by the Foam lightweight soil of bubble rate 66.6% and form, is the Foam lightweight soil of every cubic metre by 343kg cement and 223? kg water and whipping agent mixed foaming are formed, does is construction wet density 570kg/m3 ~ 600? kg/m3; Downward more than the 1.0m in roadbed top, is built by the Foam lightweight soil of bubble rate 69.6% and forms, is the Foam lightweight soil of every cubic metre by 312? kg cement and 203kg water and whipping agent mixed foaming are formed, and construction wet density is 550kg/m3 ~ 570kg/m3.Foam lightweight soil high ferro subgrade strength of the present invention is high, stable performance, not free settling, distortion, can ensure the steady and safety that bullet train runs, and reduce the maintenance cost during operation in the future.

Description

A kind of Foam lightweight soil high ferro roadbed
Technical field
The invention belongs to the technical field of building operation, particularly relate to a kind of Foam lightweight soil high ferro roadbed, adopt intensity high, that wet density is good Foam lightweight soil to build and form, can ensure shaping after Foam lightweight soil subgrade strength and monolithic stability.
Background technology
China has promoted the climax of railway construction in recent years, and within nearly ten years, China railways will build Line for Passenger Transportation 1.2 ten thousand more than km, and by 20,000 km both wired Speed Increased Reformed of carrying out speed per hour 200km, facilitates the construction of many large-scale stations or super-huge station simultaneously.And the ride comfort of train high-speed cruising to track has very high requirement, otherwise high-speed cruising just can not realize.Roadbed is the basis of track, therefore also must have strict restriction to the smooth-going, stable of roadbed.
Rail track is made up of the foundation structure thing (bridge, tunnel, roadbed etc.) of different characteristics and track structure, and they interact, interdependence, jointly forms a combination foundation circuit.Foundation structure thing is divided into again cast-in-place structural basis and fills architecture basics, cast-in-place structural basis is railway span river, the bridge that intermountain etc. must be arranged, the structures such as tunnel, fill architecture basics to be generally and to fill graded broken stone or graded sand gravel mixes a certain amount of cement, fill the railway bed of the design forms such as AB material, these two kinds different foundation structure things are in intensity, rigidity, distortion, there is very large difference the aspects such as material, easily cause non-uniform settling, the diseases such as distortion, when causing train to pass through basic intersection, impact is produced to track structure, train is made again to produce large vibration conversely, cause train operation worsening condition, vehicle, track structure service life reduction, affect the steady and security problems that bullet train runs.Therefore need that a kind of intensity is high, the roadbed embankment material of stable performance makes basis and to substitute or Part Substitution (arranging basement transition stage) fills structure roadbed, guarantee the current safety of bullet train, and the maintenance cost reduced during operation in the future, accomplish to put things right once and for all.
Summary of the invention
The object of the present invention is to provide a kind of Foam lightweight soil high ferro roadbed, adopt high, that wet density the is good Foam lightweight soil of intensity to build and form.Foam lightweight soil formula is configured according to high ferro subgrade rating feature and designing technique index request, is tested and checks, can meet the demands completely by flow valuve, froth breaking and ultimate compression strength etc.
In order to realize above-mentioned technical purpose, present invention employs following technical scheme:
A kind of Foam lightweight soil high ferro roadbed, it is characterized in that the downward 0 ~ 1.0m in roadbed top is built by the Foam lightweight soil of bubble rate 66.6% and forms, the Foam lightweight soil of every cubic metre is formed by 343kg cement and 223kg water and whipping agent mixed foaming, and construction wet density is 570kg/m 3~ 600kg/m 3; Downward more than the 1.0m in roadbed top, is built by the Foam lightweight soil of bubble rate 69.6% and forms, and the Foam lightweight soil 312kg cement 203kg water of every cubic metre and whipping agent mixed foaming are formed, and construction wet density is 550kg/m 3~ 570kg/m 3.
Downward 0 ~ the 1.0m in roadbed top, subgrade strength is more than 1.0MPa; Downward more than the 1.0m in roadbed top, subgrade strength is more than 0.8MPa.
Described cement is preferably composite Portland cement, and the presetting period is greater than 45 minutes, and final setting time is less than 10 hours.The hard tower board PC32.5 composite Portland cement that the such as Zhijiang River, Zhejiang Province Cement Co., Ltd produces.Whipping agent selects that bleeding rate is low, wet density increment rate is low, the Foam lightweight soil steady quality that can ensure to prepare, evenly.The SRTJ-A type whipping agent that such as Guangdong Sheng Rui Civil Technology produces.
Described Foam lightweight soil flow valuve is 160 ~ 180mm, can give full play to cast-in-place foamed light soils good fluidity, meets the requirement of construction pumping.
The acid-basicity of described water is neutral.
The present invention, in conjunction with the construction characteristic of high ferro roadbed, specify that different depths roadbed adopts different Foam lightweight soil to build.With from the downward 1m of roadbed end face for boundary, the roadbed of 0 ~ 1.0m is built by the Foam lightweight soil of bubble rate 66.6% and is formed; The roadbed of more than 1.0m is built by the Foam lightweight soil of bubble rate 69.6% and is formed.
Foam lightweight soil high ferro roadbed technical indicator is:
(1) wet density index:
From end face distance (m) Construction wet density R fw(kg/m 3)
0~1.0 600≥R fw≥570
>1.0 570>R fw≥550
(2) ultimate compression strength index:
(3) flow valuve: 160 ~ 180mm.
(4) froth breaking test Foam lightweight soil wet density increment rate is no more than 10%.
High ferro roadbed Foam lightweight soil formulating of recipe and raw material quality control very strict, the formula of every block roadbed Foam lightweight soil used wants strict conformance, newly mix Foam lightweight soil and must have fabulous workability and cohesiveness, absolutely not allow the phenomenon occurring laminated segregation.The starting material place of production must be unified, and cement used is as far as possible with same batch of same producer.
High ferro roadbed of the present invention, its Foam lightweight soil is filled a prescription, component ratio is scientific and reasonable, its serviceability meets Foam lightweight soil pumping and fills requirement, the advantages such as good mobility, stable antifoam performance, pumpability can be reached, can ensure shaping after Foam lightweight soil subgrade strength and monolithic stability.
Foam lightweight soil high ferro subgrade strength of the present invention is high, stable performance, not free settling, distortion, can ensure the steady and safety that bullet train runs, and reduce the maintenance cost during operation in the future.
For further illustrating constructional feature of the present invention and effect, below in conjunction with accompanying drawing, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is Foam lightweight soil froth breaking trial curve figure.
Specific embodiment
Each component of preparation high ferro roadbed Foam lightweight soil is as follows:
(1), cement adopts the hard board tower P.C32.5 composite Portland cement that the Zhijiang River, Zhejiang Province Cement Co., Ltd produces.Leading indicator: the presetting period must not early than 45min, and final setting time must not be later than 10h, and fineness, time of coagulation, stability and intensity meet national regulation requirement; Cement density is not less than 2700kg/m 3.
(2), main raw material(s) marches into the arena and must provide product certificate, answers according to the form below requirement to test simultaneously.
(3), the whipping agent that adopts of foaming is the SRTJ-A type whipping agent that Guangdong Sheng Rui Civil Technology produces, and has the features such as bleeding rate is low, wet density increment rate is low, the Foam lightweight soil steady quality ensureing to prepare, evenly.Whipping agent should meet following table and require:
Whipping agent technical indicator
Performance index Prescribed value
Dilution ratio 40~60
Expansion ratio 800~1200
(4), hydromining tap water, soda acid inspection is in neutral.
(5), to this high ferro roadbed Foam lightweight soil formula carry out wet density, flow valuve and froth breaking test, when flow valuve meet the demands, froth breaking test the wet density increment rate determined meet the demands time, produce test specimen and carry out maintenance and carry out compressive strength test.
(6), according to " cast-in-place foamed light soils technical regulation " (CECS:2492008) first carried out froth breaking test to the PC32.5 cement adopted, test-results as shown in Figure 1.
(7) again to aforementioned formula ultimate compression strength result in the shaping 7 day length of time as following table.
Formula strength test results table
Final table from the graph can find out that the high ferro roadbed Foam lightweight soil flow valuve of this formula mixing, wet density and ultimate compression strength all meet high ferro roadbed technology and construction requirement.
Above-mentioned Foam lightweight soil is adopted to build high ferro roadbed, downward 0 ~ the 1.0m in roadbed top, built by the Foam lightweight soil of bubble rate 66.6% and form, the Foam lightweight soil of every cubic metre is formed by 343kg cement and 223kg water and whipping agent mixed foaming, and construction wet density is 570kg/m 3~ 600kg/m 3.Downward more than the 1.0m in roadbed top, is built by the Foam lightweight soil of bubble rate 69.6% and forms, and the Foam lightweight soil 312kg cement of every cubic metre and 203kg water and whipping agent mixed foaming are formed, and construction wet density is 550kg/m 3~ 570kg/m 3.
Configuration high ferro roadbed Foam lightweight soil after testing, the downward 0 ~ 1.0m in roadbed top, subgrade strength can reach more than 1.0MPa; Downward more than the 1.0m in roadbed top, subgrade strength can reach more than 0.8MPa.
Foam lightweight soil high ferro subgrade strength of the present invention is high, stable performance, not free settling, distortion, can ensure the steady and safety that bullet train runs, and reduce the maintenance cost during operation in the future.

Claims (2)

1. a Foam lightweight soil high ferro roadbed, it is characterized in that, downward 0 ~ the 1.0m in roadbed top, built by the Foam lightweight soil of bubble rate 66.6% and form, the Foam lightweight soil of every cubic metre is formed by 343kg cement and 223kg water and whipping agent mixed foaming, and construction wet density is 570kg/m3 ~ 600kg/m3; Downward more than the 1.0m in roadbed top, is built by the Foam lightweight soil of bubble rate 69.6% and forms, and the Foam lightweight soil of every cubic metre is formed by 312kg cement and 203kg water and whipping agent mixed foaming, and construction wet density is 550kg/m3 ~ 570kg/m3; Downward 0 ~ the 1.0m in roadbed top, subgrade strength is more than 1.0MPa; Downward more than the 1.0m in roadbed top, subgrade strength is more than 0.8MPa; Described cement is composite Portland cement, and the presetting period is greater than 45 minutes, and final setting time is less than 10 hours; Described Foam lightweight soil flow valuve is 160 ~ 180mm.
2. Foam lightweight soil high ferro roadbed according to claim 1, is characterized in that, the acid-basicity of described water is neutral.
CN201310390787.2A 2013-08-30 2013-08-30 A kind of Foam lightweight soil high ferro roadbed Active CN103467038B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310390787.2A CN103467038B (en) 2013-08-30 2013-08-30 A kind of Foam lightweight soil high ferro roadbed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310390787.2A CN103467038B (en) 2013-08-30 2013-08-30 A kind of Foam lightweight soil high ferro roadbed

Publications (2)

Publication Number Publication Date
CN103467038A CN103467038A (en) 2013-12-25
CN103467038B true CN103467038B (en) 2015-12-02

Family

ID=49792121

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310390787.2A Active CN103467038B (en) 2013-08-30 2013-08-30 A kind of Foam lightweight soil high ferro roadbed

Country Status (1)

Country Link
CN (1) CN103467038B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105985138A (en) * 2015-03-05 2016-10-05 中交第三公路工程局有限公司 Foam light soil synthetic material for filling highway subgrade, method for preparing foam light soil synthetic material, and highway subgrade filling method
CN104961393A (en) * 2015-06-11 2015-10-07 东南大学 Quartz sand slag foamed light soil filling material for highway abutment backfill
CN105155383A (en) * 2015-07-31 2015-12-16 中交二公局第三工程有限公司 Construction process of bubble light soil
CN105803875A (en) * 2016-03-15 2016-07-27 广东盛瑞科技股份有限公司 Construction method for preparing foam-light-soil-poured high-speed rail subgrade
CN105906251B (en) * 2016-04-14 2017-11-24 河海大学 The step loop control fast determining method of Two indices three of air bubble mix light-textured soil
CN111116137A (en) * 2019-12-30 2020-05-08 同济大学 Recycling method of building waste soil after foaming process
CN112851401B (en) * 2021-03-17 2022-11-18 哈尔滨工业大学 Polyacrylonitrile fiber foam light soil applied to roadbed and preparation method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1422826A (en) * 2002-12-25 2003-06-11 广东冠粤路桥有限公司 Bubble mixed light clay and method for preparing the same
CN101386548A (en) * 2008-10-29 2009-03-18 梁林华 Light foaming concrete and production method and use thereof

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6417901A (en) * 1987-07-09 1989-01-20 Nagasaki Ryoko Concrete Kogyo Artificial lightweight material for ground and piled soil
JP5950544B2 (en) * 2011-11-18 2016-07-13 東日本旅客鉄道株式会社 Roadbed material with glass foam

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1422826A (en) * 2002-12-25 2003-06-11 广东冠粤路桥有限公司 Bubble mixed light clay and method for preparing the same
CN101386548A (en) * 2008-10-29 2009-03-18 梁林华 Light foaming concrete and production method and use thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
泡沫轻质土填充施工工艺;吴玉彪;《城市建设理论研究(电子版)》;20121231(第33期);第2,4页 *

Also Published As

Publication number Publication date
CN103467038A (en) 2013-12-25

Similar Documents

Publication Publication Date Title
CN103467038B (en) A kind of Foam lightweight soil high ferro roadbed
CN103497503B (en) A kind of lightweight compound sleeper and preparation method thereof
CN100526252C (en) Rubber powder modified concrete asphalt mortar
CN104030638A (en) Rubber elastic self-compaction concrete for plate-type ballastless tracks
CN104693413A (en) Polyurethane patching material used for settlement repairing of ballastless track structure for high-speed railway
CN102924021B (en) Composite cement-based quick-setting dry material and mortar for maintaining ballastless tracks and method for preparing same
CN102241497A (en) Concrete with ultra-large volume, high strength and low hydration heat
CN102173662A (en) Low-temperature super early strength support grouting material for high-speed rail
CN104150836A (en) Track board sealing anchor mortar and preparation method thereof
CN104860613A (en) 160MPa super-strength concrete with high cracking resistance and high fluidity
CN103482940B (en) High-crack-resistance concrete
CN102898105B (en) Inorganic multi-element composite super-high-early grouting material and preparation method thereof
CN106336136A (en) Vibration damping function concrete used for sleepers
CN105294006A (en) C100-C120 graded ultrahigh-strength concrete having high workability
CN111943583A (en) Low-shrinkage high-crack-resistance high-durability long-life concrete and preparation method thereof
CN108774033A (en) A kind of high-strength micro- contraction highway crack mud jacking mortar and highway maintenance method of flowing automatically
CN103145361B (en) Seepage-proof and anti-crack agent for concrete
CN104496309A (en) Method for preparing underground railway track acoustical board
CN102515644A (en) High temperature resistant and bleeding proof CA mortar dry material suitable for summer construction and CA mortar
CN105461271A (en) A method of preparing components of railroad engineering machine-made sand pump concrete
CN114956745A (en) Quick-setting foaming cement for grouting and preparation method thereof
CN105294155B (en) A kind of method that foam concrete is prepared using gangue
CN110818357B (en) Waterproof anti-cracking fully-recycled aggregate foam building block based on macro-micro dual-pore structure and preparation method thereof
CN109516710B (en) Preparation method of ultrahigh-performance concrete rheological stabilizer
CN109626912B (en) Underground engineering concrete for shield construction and preparation method and application thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: THE FORTH SURVEY AND DESIGN INSTITUTE (GROUP) CO.,

Free format text: FORMER OWNER: GUANGDONG SHENG RUI CIVIL TECHNOLOGY

Effective date: 20140402

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Chang Bo

Inventor after: Gu Xiangsheng

Inventor after: Zhao Xinyi

Inventor after: Yan Dong

Inventor after: Luo Yong

Inventor after: Wang Jianbin

Inventor after: Jin Rui

Inventor after: Xu Yongjian

Inventor after: Zhang Zhigang

Inventor after: Shen Xihua

Inventor after: Luo Xuanang

Inventor after: Li Zongping

Inventor after: Sun Honglin

Inventor after: Deng Fei

Inventor before: Chang Bo

Inventor before: Jin Rui

Inventor before: Xu Yongjian

Inventor before: Zhang Zhigang

Inventor before: Shen Xihua

Inventor before: Luo Xuanang

Inventor before: Li Zongping

Inventor before: Luo Yong

Inventor before: Wang Jianbin

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHANG BO JIN RUI XU YONGJIAN ZHANG ZHIGANG SHEN XIHUA LUO XUANANG LI ZONGPING LUO YONG WANG JIANBIN TO: CHANG BO JIN RUI XU YONGJIAN ZHANG ZHIGANG SHEN XIHUA LUO XUANANG LI ZONGPING SUN HONGLIN DENG FEI GU XIANGSHENG ZHAO XINYI YAN DONG LUO YONG WANG JIANBIN

TA01 Transfer of patent application right

Effective date of registration: 20140402

Address after: 9 building, building 20, building 310012, Wensanlu Road, Zhejiang, Hangzhou

Applicant after: Zhejiang Construction Engineering (Group) Co., Ltd.

Applicant after: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

Applicant after: Guangdong Sheng Rui Civil Technology

Address before: 9 building, building 20, building 310012, Wensanlu Road, Zhejiang, Hangzhou

Applicant before: Zhejiang Construction Engineering (Group) Co., Ltd.

Applicant before: Guangdong Sheng Rui Civil Technology

C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 9 building, building 20, building 310012, Wensanlu Road, Zhejiang, Hangzhou

Patentee after: Zhejiang Construction Engineering (Group) Co., Ltd.

Patentee after: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

Patentee after: GUANGDONG SHENGRUI TECHNOLOGY CO., LTD.

Address before: 9 building, building 20, building 310012, Wensanlu Road, Zhejiang, Hangzhou

Patentee before: Zhejiang Construction Engineering (Group) Co., Ltd.

Patentee before: The forth Survey and Design Institute (Group) Co., Ltd. Of CRCC

Patentee before: Guangdong Sheng Rui Civil Technology