CN103456378B - A kind of Real time auto measure method of protection Channel Response Time - Google Patents

A kind of Real time auto measure method of protection Channel Response Time Download PDF

Info

Publication number
CN103456378B
CN103456378B CN201210180226.5A CN201210180226A CN103456378B CN 103456378 B CN103456378 B CN 103456378B CN 201210180226 A CN201210180226 A CN 201210180226A CN 103456378 B CN103456378 B CN 103456378B
Authority
CN
China
Prior art keywords
alarm
response time
signal
time
setting value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210180226.5A
Other languages
Chinese (zh)
Other versions
CN103456378A (en
Inventor
李红霞
张帆
吴斌
张玉峰
苟拓
李小芬
霍雨佳
朱加良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nuclear Power Institute of China
Original Assignee
Nuclear Power Institute of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nuclear Power Institute of China filed Critical Nuclear Power Institute of China
Priority to CN201210180226.5A priority Critical patent/CN103456378B/en
Publication of CN103456378A publication Critical patent/CN103456378A/en
Application granted granted Critical
Publication of CN103456378B publication Critical patent/CN103456378B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Abstract

The present invention relates to a kind of Real time auto measure method of protection Channel Response Time, include successively: one, loop to be measured to protection rack, input a signal below or above alarm card alarm setting value;Two, by the first width contact of relay, make signal step to higher or lower than alarm card alarm setting value;Three, the second width contact simultaneously triggered with relay the first width contact is introduced, it is thus achieved that the time point t0 of alarm card input step signal;Four, time t1 during alarm card alarm actuating contact action is obtained;Five, the response time t=t1 t0 in protection rack loop to be measured is obtained.The present invention can carry out the Real time auto measure of response time online to protection system simulation passage, need not dismantle fastener during testing, it is not required that carries out loaded down with trivial details wiring work;Need not testing crew during test intervene too much, to reduce the probability of maloperation, improve the economy of nuclear power plant, reliability, maintainability.

Description

A kind of Real time auto measure method of protection Channel Response Time
Technical field
The present invention relates to a kind of Real time auto measure method of protection Channel Response Time, particularly relate to And a kind of Real time auto measure method of pressurized-water reactor nuclear power plant protection Channel Response Time.
Background technology
Reactor protection measures the key components that system is nuclear power plant instrument Ore-controlling Role, for nuclear power station Safe operation plays an important role, and its Measurement channel whether working properly directly influences nuclear power station Safety.According to security legislation and the requirement of relevant criterion, it is necessary to have means that protection passage is carried out fixed Phase tests, i.e. " T1 test ".
The function of T1 assay device is the availability of check protection Measurement channel during reactor operation.By T1 assay device provides sends into, as close possible to actual analogue signal, the measurement loop that need to test, and checks letter Number transformed error, whether response time error, the whether action of threshold value relay, action threshold error surpass Go out the prescribed limit of protection system design, significant for ensureing the safe operation of nuclear power plant.
In existing T1 assay device designs, by sending analog quantity alarm voltage signal, connect the most again The contact signal of the alert actuating of relay of receiving.100mS is can only achieve the soonest owing to CPU performs the cycle, and The time issuing a signal to receive signal is a process cycle.Therefore, such speed of service can not expire The response time of foot millisecond dimension accuracy is measured.
Currently, PWR nuclear power plant protection Channel Response Time can only manually have been tested, and does not has Method realizes Real time auto measure.During testing, need to dismantle fastener, carry out loaded down with trivial details wiring work, So causing the test period the longest, the burden of testing crew is the heaviest, is susceptible to maloperation.
Therefore need badly and a kind of Real time auto measure method of novel protection Channel Response Time is provided.
Summary of the invention
The technical problem to be solved in the present invention is to provide one and improves test efficiency, significantly reduces test The burden of personnel, decreases the side of the protection Channel Response Time Real time auto measure of misoperation probability Method.
For solving above-mentioned technical problem, the on-line automatic survey of the present invention a kind of protection Channel Response Time Method for testing, comprises the following steps successively:
The first step, when test upper limit alarm response time, loop to be measured to protection rack, input One signal less than alarm card alarm setting value;When the response time that test lower limit is reported to the police, protection is surveyed Amount rack loop to be measured, inputs a signal higher than alarm card alarm setting value;
Second step, when test upper limit alarm response time, by the first width contact of relay, make letter Number step is to higher than alarm card alarm setting value;When the response time that test lower limit is reported to the police, pass through relay The first width contact, make signal step to less than alarm card alarm setting value;
The second width contact that 3rd step, introducing trigger with relay the first width contact simultaneously, it is thus achieved that alarm card The time point t0 of input step signal;
Time t1 when the 4th step, acquisition alarm card alarm actuating contact action;
5th step, obtain the response time t=t1-t0 in protection rack loop to be measured.
Signal in the first step is the signal of lower than alarm card alarm setting value or high 5%.
In second step, the signal after step is the signal of high or low 5% than alarm card alarm setting value.
Utilize the accident order recording software of Invensys I/A system, by time point t0 and t1, directly remember Record is inside On-off signal fastener FBM207, and by t0 and t1, synchronous transfer is to AIM data base In;After sending reading data command, the corresponding time in accident order recording software transfer AIM data base Data, write CPU, and calculate response time t=t1-t0.
The present invention can carry out the Real time auto measure of response time online to protection system simulation passage, Need not during test dismantle fastener, it is not required that carry out loaded down with trivial details wiring work;Need not during test Testing crew is intervened too much, to reduce the probability of maloperation, improve nuclear power plant economy, can By property, maintainability.
Accompanying drawing explanation
Fig. 1 is protection Channel Response Time principle explanatory diagram.
Detailed description of the invention
The present invention is further detailed explanation with embodiment below in conjunction with the accompanying drawings.
1, ultimate principle
The present invention is mainly from how measuring protection Channel Response Time, how realizing input voltage signal Several aspects such as transition, how Quick Acquisition response time are designed.
How to measure protection Channel Response Time
Accompanying drawing 1 is shown in the ultimate principle explanation of protection Channel Response Time Real time auto measure.At accompanying drawing 1 In, signal A is the time point of alarm card input step signal, is recorded as t0;Signal B is alarm card report Time point during alert contact action, is recorded as t1;Therefore, to be both poor for the response time of alarm circuit Value: t=t1-t0.
As a example by the response time of upper limit alarm is tested, during test, it is desirable to testing stand is automatically added to a ratio The signal of alarm setting value low 5%, now loop is in the state not yet reported to the police.Then by this input signal Rising to the position of high 5% than alarm setting value, now alarm signal triggers.Record rises to 10% width from signal Spend the moment (t0 moment) to the time difference triggered between corresponding alarm relay action moment (t1 moment) (t1-t0) response time in this loop, it is.
How to realize input voltage signal transition
In the present invention, we complete by being arranged on a relay R 3 within T1 assay device, This relay is provided with two auxiliary contacts, and an auxiliary contact is for realizing the transition of voltage signal, another auxiliary contact Introduce the SOE time for tracer signal step moment point.When relay R 3 occurs action to realize signal While step, owing to its contact introducing SOE is triggered simultaneously, therefore, this contact of SOE record is moved Make the time i.e. time of representation signal step moment point.
How Quick Acquisition response time
Present invention uses the software disaster order recording software that Invensys I/A system is newly developed (Sequence of Events) realizes response time writing function.This software can record every number The time in word amount input signal generation transition moment.Its work does not relies on the CPU(CPU of I/A system Long processing period), but transit times is directly recorded in inside On-off signal fastener FBM207, FBM The AIM data server that the time data of fastener collection can be simultaneously transmit in I/A system stores, convenient Calling, when being afterwards read out response time data, then by SOE software transfer AIM data afterwards Corresponding time data in storehouse, write CPU, and calculate both differences (t=t1-t0), can test out The response time in loop.
To sum up, in the present invention, we realize input voltage signal transition by the actuating of relay, use SOE The time of two time points that function tracer signal transition and triggering are reported to the police, calculate both differences, with this Realize response time to measure.In other words, it is will originally to record analog quantity (voltage) change and Time between individual digital quantity (warning) change, (relay touches to be converted into record two numeral amount change Point upset and alarm actuating contact overturn) between time, realize response time function with this.
The present invention comprises the following steps successively:
The first step, when test upper limit alarm response time, loop to be measured to protection rack, input One signal less than alarm card alarm setting value 5%;When the response time that test lower limit is reported to the police, to protection Measure rack loop to be measured, input a signal higher than alarm card alarm setting value 5%;
Second step, when test upper limit alarm response time, by the first width contact of relay, make letter Number step is to higher than alarm card alarm setting value 5%;When the response time that test lower limit is reported to the police, pass through relay First width contact of device, makes signal step to less than alarm card alarm setting value 5%;
The second width contact that 3rd step, introducing trigger with relay the first width contact simultaneously, it is thus achieved that alarm card The time point t0 of input step signal;
Time t1 when the 4th step, acquisition alarm card alarm actuating contact action;
Utilize the accident order recording software of Invensys I/A system, by time point t0 and t1, directly remember Record is inside On-off signal fastener FBM207, and by t0 and t1, synchronous transfer is to AIM data base In;
5th step, send reading data command after, in accident order recording software transfer AIM data base Corresponding time data, writes CPU, and is calculated the response time t=in protection rack loop to be measured t1-t0。

Claims (3)

1. a Real time auto measure method for protection Channel Response Time, comprises the following steps successively:
The first step, when test upper limit alarm response time, loop to be measured to protection rack, input one The individual signal less than alarm card alarm setting value;When the response time that test lower limit is reported to the police, to protection machine Cabinet loop to be measured, inputs a signal higher than alarm card alarm setting value;
Second step, when the response time of test upper limit alarm, by the first width contact of relay, make described Signal step is to higher than described alarm card alarm setting value;When the response time that test lower limit is reported to the police, by continuing First width contact of electrical equipment, makes described signal step to less than described alarm card alarm setting value;
The second width contact that 3rd step, introducing trigger with relay the first width contact simultaneously, it is thus achieved that alarm card is defeated Enter the time point t0 of step signal;
Time point t1 when the 4th step, acquisition alarm card alarm actuating contact action;
5th step, obtain the response time t=t1-t0 in protection rack loop to be measured;
The signal that described signal is lower than alarm card alarm setting value or high 5% in the first step.
The Real time auto measure side of a kind of protection Channel Response Time the most according to claim 1 Method, it is characterised in that: in second step, described signal after step is than alarm card alarm setting value high or low 5% Signal.
The Real time auto measure side of a kind of protection Channel Response Time the most according to claim 1 Method, it is characterised in that: utilize the accident order recording software of Invensys I/A system, by described time point T0 and t1, is directly recorded in inside On-off signal fastener FBM207, and by t0 and t1, synchronous transfer is extremely In AIM data base;After sending reading data command, right in accident order recording software transfer AIM data base Answer time data, write CPU, and calculate response time t=t1-t0.
CN201210180226.5A 2012-06-04 2012-06-04 A kind of Real time auto measure method of protection Channel Response Time Active CN103456378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210180226.5A CN103456378B (en) 2012-06-04 2012-06-04 A kind of Real time auto measure method of protection Channel Response Time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210180226.5A CN103456378B (en) 2012-06-04 2012-06-04 A kind of Real time auto measure method of protection Channel Response Time

Publications (2)

Publication Number Publication Date
CN103456378A CN103456378A (en) 2013-12-18
CN103456378B true CN103456378B (en) 2016-12-07

Family

ID=49738649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210180226.5A Active CN103456378B (en) 2012-06-04 2012-06-04 A kind of Real time auto measure method of protection Channel Response Time

Country Status (1)

Country Link
CN (1) CN103456378B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106205755B (en) * 2016-07-26 2018-08-31 中广核工程有限公司 Reactor protection system Channel Response Time Intelligentized test system and method
CN110617970B (en) * 2018-06-19 2021-08-17 上海汽车集团股份有限公司 Parking response time testing system and method
CN108958225B (en) * 2018-07-27 2021-06-22 中核控制系统工程有限公司 Nuclear power plant safety level DCS platform integration testing device
CN110412379A (en) * 2019-07-31 2019-11-05 惠州市德赛西威汽车电子股份有限公司 A kind of test method of instrument function response time
CN110932955A (en) * 2019-12-05 2020-03-27 福建福清核电有限公司 Signal generating and collecting device for measuring response time of protection system
CN112630567A (en) * 2020-12-14 2021-04-09 山东核电有限公司 Automatic response time testing scheme based on FPGA technology
CN114923510A (en) * 2022-05-10 2022-08-19 中广核核电运营有限公司 Threshold value inspection device and threshold value inspection method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079577A (en) * 1992-06-04 1993-12-15 清华大学 Self-coding digital type rod position measuring system
GB2274539A (en) * 1989-11-02 1994-07-27 Combustion Eng Industrial process parameter measurement
CN201820465U (en) * 2010-08-27 2011-05-04 中核(北京)核仪器厂 System equipment for measuring neutron fluence rate of nuclear power station reactor core
CN102163051A (en) * 2010-12-10 2011-08-24 中国广东核电集团有限公司 Digital control method and system of primary circuit hydrostatic test of pressurized water reactor nuclear power station

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2274539A (en) * 1989-11-02 1994-07-27 Combustion Eng Industrial process parameter measurement
CN1079577A (en) * 1992-06-04 1993-12-15 清华大学 Self-coding digital type rod position measuring system
CN201820465U (en) * 2010-08-27 2011-05-04 中核(北京)核仪器厂 System equipment for measuring neutron fluence rate of nuclear power station reactor core
CN102163051A (en) * 2010-12-10 2011-08-24 中国广东核电集团有限公司 Digital control method and system of primary circuit hydrostatic test of pressurized water reactor nuclear power station

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
大亚湾核电站反应堆T1保护试验装置的国产化开发和应用;张志飞;《中国优秀硕士学位论文全文数据库工程科技II辑》;20111215(第S2期);参见第6页第5段第1行,第10页第2段第1行,第12页第1段第1行,第13页第1-2行,第14页第1段,第15页"3.2 LabVIEW简介"第1段,第39页第2段第1-2行,第48页第3段第4行,第49页第19行 *

Also Published As

Publication number Publication date
CN103456378A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103456378B (en) A kind of Real time auto measure method of protection Channel Response Time
CN104898638B (en) A kind of routine test device of PWR nuclear power plant protection system
CN107064693B (en) Relay protection device outlet matrix test device and test method
CN104332195A (en) Method for measuring reactor control rod drop time
CN102539982A (en) Automatic test system for single event effect test of DC/DC (direct current/direct current) converter and test method
CN107065821A (en) Npp safety level DCS plateform system test devices
CN103235277A (en) Integration adjusting device for online monitoring system of intelligent converting station capacitive device
CN106546278A (en) The statistical test device and method of checking nuclear safe level instrument control platform safety crash rate
CN102074273B (en) Memory homeostasis total dosage effect experiment testing method
CN103344854A (en) Automatic test system and method for logical function device
CN200997633Y (en) Automatic testing system based on graphic testing platform
CN205192882U (en) Steel ball shock -testing equipment
CN113156242A (en) Relay protection outlet matrix detection equipment
CN103116617B (en) A kind of disposal route of integrated circuit test data
CN107064569A (en) Smart mobile phone fingerprint module justifying test system
CN103983935A (en) Indicating instrument detecting system and method
CN103344850A (en) System and method of intelligent substation automatic testing based on test formwork technology
CN103116119A (en) Test board based on hyper memory (HM) 276 stack-type electronic products and test method thereof
CN108614208A (en) Hydraulic actuating mechanism circuit-breaker switching on-off pressure drop data detection device and method
CN104158852A (en) Information interaction detection system for low-voltage meter reading concentrator and local communication module
CN116068437A (en) BMS thermal management and SOX test method
CN210742740U (en) Portable high-precision man-machine interaction verification equipment for airplane temperature control indexes
CN210154474U (en) Nuclear power station pipeline verification test device
CN104181420A (en) Response time testing method and system of nuclear power station ATWS system
CN111176254A (en) Multifunctional signal generating and detecting device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant