CN103452132B - 一种挡墙 - Google Patents

一种挡墙 Download PDF

Info

Publication number
CN103452132B
CN103452132B CN201310398339.7A CN201310398339A CN103452132B CN 103452132 B CN103452132 B CN 103452132B CN 201310398339 A CN201310398339 A CN 201310398339A CN 103452132 B CN103452132 B CN 103452132B
Authority
CN
China
Prior art keywords
front wall
base plate
column
barricade
unloading plat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310398339.7A
Other languages
English (en)
Other versions
CN103452132A (zh
Inventor
徐志栓
陶源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongshan Water Conservancy & Hydropower Surveying Designing And Consulting Co ltd
Original Assignee
Jiangsu Transportation Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Transportation Research Institute Co Ltd filed Critical Jiangsu Transportation Research Institute Co Ltd
Priority to CN201310398339.7A priority Critical patent/CN103452132B/zh
Publication of CN103452132A publication Critical patent/CN103452132A/zh
Application granted granted Critical
Publication of CN103452132B publication Critical patent/CN103452132B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及挡墙领域,尤其为一种内廊式挡墙,包括前墙、底板、立柱和卸荷平台,所述前墙的底边与所述底板固定连接,所述卸荷平台与前墙的上部一侧面水平连接,所述立柱竖直设置在底板上且上端与卸荷平台的下侧面连接。本发明利用卸荷平台,将上部荷载通过立柱传至底板,平台以下土体不再承受上部荷载,减少对前墙的水平土压力,甚至可以达到水平土压力降低25%的效果。从而提高挡墙抗滑、抗倾性能,减少结构偏载程度,改善地基和结构受力状况。本发明无需地基处理,减少土方工程量,既解决工程结构问题,又降低工程造价;避免了开采开山采石对环境造成的破坏。

Description

一种挡墙
技术领域
本发明涉及挡墙领域,尤其为一种内廊式结构的挡墙。
背景技术
在水运、水利等建设中,均需要设置挡墙,以实现使用功能或边坡结构安全,或节约空间。传统的挡墙结构,如图1所示,为了达到整体抗滑、抗倾稳定,通常采用加宽底板D以增加抗力,或采用内摩擦角较大的块石棱体作为墙后回填料,以减小墙后水平土压力。加宽底板一方面会增加挡墙本身的工程量,还会由此增加工作面开挖及墙后回填的工程量,经济性较差;采用块石棱体作为墙后回填料,需要开山采石,对环境会造成破坏。另外,传统的挡墙结构,由于结构偏载,造成底板前趾和后踵应力差很大,当前趾应力超过地基承载能力时,就需要进行地基处理。因此,为了降低工程造价,改善地基应力状况,避免地基处理,以及实现就地取材或充分利用开挖土方,处理后作为墙后回填料,迫切需要一种新的挡墙结构,以实现节约、环保的经济效益和社会效益。
发明内容
本发明目的在于解决的技术现有挡墙存在的上述问题,提供了一种挡墙结构,具体由以下技术方案实现。
一种挡墙,包括前墙、底板、立柱和卸荷平台,所述前墙的底边与所述底板固定连接,所述卸荷平台与前墙的上部一侧面水平连接,所述立柱竖直设置在底板上且上端与卸荷平台的下侧面连接,所述卸荷平台将上部载荷通过立柱传导至底板上以减少上部载荷对前墙的水平压力。
所述的挡墙的进一步设计在于所述卸荷平台的通过若干肋板与所述前墙连接。
所述的挡墙的进一步设计在于所述立柱为圆柱或者方形柱。
本发明利用卸荷平台,将上部荷载通过立柱传至底板,平台以下土体不再承受上部荷载,减少对前墙的水平土压力,甚至可以达到水平土压力降低25%的效果。从而提高挡墙抗滑、抗倾性能,减少结构偏载程度,改善地基和结构受力状况。本发明无需地基处理,减少土方工程量,既解决工程结构问题,又降低工程造价;避免了开采开山采石对环境造成的破坏。
附图说明
图1是现有挡墙结构断面图。
图2是本发明挡墙结构断面图。
图3是本发明图2的A视图。
图4是本发明挡墙结构断面后立面图。
具体实施方式
以下结合说明书附图以及具体实施例对本发明进行进一步说明。
如图1所示,该挡墙,包括前墙1、底板2、立柱3和卸荷平台4,前墙的底边与底板固定连接,卸荷平台4与前墙的上部一侧面水平连接,立柱竖直设置在底板上且上端与卸荷平台的下侧面支承连接。卸荷平台的可根据上部载荷的大小选择使用若干肋板5与前墙连接;立柱3为圆柱或者方形柱(圆形为佳)。卸荷平台4将上部载荷通过立柱3传导至底板2上以减少上部载荷对前墙1的水平压力。
前墙1一般沿长度方向分段设计,分段长度根据地质情况及施工工艺取10m~20m,底板2宽度可取前墙高度的50%+1m进行试算,卸荷平台4后沿可与底板后沿平齐,也可根据需要适当加宽,卸荷平台的高度位置可取前墙高度中部处试算,当平台上部结合工艺设施一并设计时,可适当调整卸荷平台位置。
墙后回填土料的力学性能指标,可参照场址地质勘探资料,或必要处理后的指标,进行试算。
所有荷载,包括土体、水体、前墙结构和使用荷载等,均要根据相关规范要求进行荷载组合。设计过程是先进行地基承载、抗滑、抗倾等整体稳定计算,满足规范要求后,再进行结构细部尺寸及配筋计算。前墙结构前墙与底板、卸荷平台交界处设泄水孔。
试算取值:前墙厚0.3m~0.5m,底板厚0.4m~0.6m,立柱直径0.4m~0.8m,卸荷平台厚0.3m~0.5m,前墙与底板、平台相交处的加强角,可按构造要求取0.2m~0.3m。肋板厚0.2m~0.3m,如前墙上部悬臂部分较小或水平作用力较小,可取消肋板。
本发明应用的一般流程是:形成底板施工必要的作业面,并保持干施工状态;形成前墙及立柱至卸荷平台底面;形成卸荷平台及前墙上部或必要的局部加大处理;墙后回填并压实至预定高度;安装必要的设施。墙后回填料的力学性能指标,应满足设计时的要求,有时需要进行处理。
前墙底板与地基之间,根据地基情况和规范要求,设置必要的垫层结构。前墙分段之间的沉降位移伸缩缝的临土侧、泄水孔的临土侧,应根据回填料情况,必要时应设反滤体。
当本发明结构应用于不同专业工程时,可以:在前墙临空或临水面设置防护、防撞设施,如护舷、护木等;在前墙上部根据使用要求进行局部加大处理,设置专业设施,如系船柱(钩)、爬梯等;对卸荷平台进行局部加大处理,作为设备或塔架基础;在前墙顶面设置护栏等。
本发明利用卸荷平台,将上部荷载通过立柱传至底板,平台以下土体不再承受上部荷载,减少对前墙的水平土压力,甚至可以达到水平土压力降低25%的效果。从而提高挡墙抗滑、抗倾性能,减少结构偏载程度,改善地基和结构受力状况。本发明无需地基处理,减少土方工程量,既解决工程结构问题,又降低工程造价;避免了开采开山采石对环境造成的破坏。

Claims (2)

1.一种挡墙,用于水运和水利建设中,其特征在于包括前墙、底板、立柱和卸荷平台,所述前墙的底边与所述底板固定连接,所述卸荷平台与前墙的上部一侧面水平连接,所述立柱竖直设置在底板上且上端与卸荷平台的下侧面连接,所述卸荷平台可通过若干肋板与所述前墙连接,所述卸荷平台将上部载荷通过立柱传导至底板上以减少上部载荷对前墙的水平压力。
2.根据权利要求1所述的挡墙,其特征在于所述立柱为圆柱或者方形柱。
CN201310398339.7A 2013-09-05 2013-09-05 一种挡墙 Active CN103452132B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310398339.7A CN103452132B (zh) 2013-09-05 2013-09-05 一种挡墙

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310398339.7A CN103452132B (zh) 2013-09-05 2013-09-05 一种挡墙

Publications (2)

Publication Number Publication Date
CN103452132A CN103452132A (zh) 2013-12-18
CN103452132B true CN103452132B (zh) 2016-01-20

Family

ID=49734939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310398339.7A Active CN103452132B (zh) 2013-09-05 2013-09-05 一种挡墙

Country Status (1)

Country Link
CN (1) CN103452132B (zh)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9856622B2 (en) 2016-03-30 2018-01-02 Robert Gordon McIntosh Retaining wall system, method of supporting same, and kit for use in constructing same
CN108560580B (zh) * 2016-04-07 2019-11-05 叶香雄 挡土墙施工方法
CN106638674B (zh) * 2016-12-27 2019-04-02 中信建筑设计研究总院有限公司 一种与主体结构相结合的带锚杆挡土墙及设计方法
CN108678001A (zh) * 2018-08-08 2018-10-19 上海勘测设计研究院有限公司 一种空箱式挡土墙
CA183952S (en) 2018-10-05 2019-08-12 Rocky Mountain Stone Works Ltd Block for a retaining wall
CN109779278A (zh) * 2019-01-16 2019-05-21 广东工业大学 一种城镇挡土墙的加固结构
CN115221594B (zh) * 2022-08-08 2024-02-06 建研地基基础工程有限责任公司 一种基于挡墙抗滑移性能的卸荷平台设计方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86207001U (zh) * 1986-09-13 1987-11-07 湖北省水利厅 T形加翼预制挡土墙构件
KR20090100160A (ko) * 2008-03-19 2009-09-23 주식회사 케이이씨맥 선반형 부벽식 옹벽 및 그 시공방법
KR20110027199A (ko) * 2009-09-10 2011-03-16 (주)주성엔지니어링 피씨벽판을 이용한 선반식 옹벽 구조 및 그 시공방법

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86207001U (zh) * 1986-09-13 1987-11-07 湖北省水利厅 T形加翼预制挡土墙构件
KR20090100160A (ko) * 2008-03-19 2009-09-23 주식회사 케이이씨맥 선반형 부벽식 옹벽 및 그 시공방법
KR20110027199A (ko) * 2009-09-10 2011-03-16 (주)주성엔지니어링 피씨벽판을 이용한 선반식 옹벽 구조 및 그 시공방법

Also Published As

Publication number Publication date
CN103452132A (zh) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103452132B (zh) 一种挡墙
CN201962688U (zh) 地下连续墙码头桩基础结构
CN108277814A (zh) 桩顶扶壁式挡墙支护结构及施工方法
CN101446088A (zh) 一种用于戈壁滩碎石土地区的杆塔基础施工方法
CN105178336A (zh) 一种软弱基底排土场极限承载力的确定方法
CN1804239A (zh) 塌陷区抗变形建筑物基础施工方法
CN205276285U (zh) 一种复合土钉墙支护结构
CN104631453B (zh) 边坡锚杆加固最优入射倾角的测定方法
CN209779666U (zh) 一种岩锥体斜坡上的桥梁基础空间防护结构
CN107620301B (zh) 一种地质加固装置
CN202830994U (zh) 顺层边坡桥梁敦台防护结构
CN106592657B (zh) 一种油罐桩筏基础的纠偏加固方法
CN203346849U (zh) 重力式衡重卸荷式岸壁结构
CN104060605B (zh) 折线形桩基础结构及其基础作用力计算方法和施工方法
CN204703176U (zh) 软土地区坑中坑钢砼沉井
CN208088318U (zh) 桩顶扶壁式挡墙支护结构
CN208328905U (zh) 一种变径抗滑桩结构
CN207017169U (zh) 一种高填路堤涵洞减荷结构
CN202228859U (zh) 滩涂施工设备及其桶形基础
CN203960852U (zh) 人工挖孔桩
CN204919594U (zh) 一种杆架式变压器防沉底盘
CN104120714B (zh) 人工挖孔桩的施工方法
CN205223874U (zh) 一种带有新型临时桥台的应急桥梁
CN203924048U (zh) 折线形桩基础结构
CN205134355U (zh) 用于浅覆盖层风力发电机组的基础结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 210017 Jiangsu, Nanjing, West Gate Street, No. 223

Patentee after: JSTI GROUP Co.,Ltd.

Address before: 210017 Jiangsu, Nanjing, West Gate Street, No. 223

Patentee before: JIANGSU TRANSPORTATION RESEARCH INSTITUTE Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200521

Address after: Card 1901, Hongye Building, No. 6, Changjiang Road, East District, Zhongshan City, Guangdong Province

Patentee after: ZHONGSHAN WATER CONSERVANCY & HYDROPOWER SURVEYING, DESIGNING AND CONSULTING Co.,Ltd.

Address before: 210017 No. 223 Simon Street, Jiangsu, Nanjing

Patentee before: JSTI GROUP Co.,Ltd.

TR01 Transfer of patent right