CN103452098B - A kind of diaphragm wall is to support built-in fitting construction method - Google Patents

A kind of diaphragm wall is to support built-in fitting construction method Download PDF

Info

Publication number
CN103452098B
CN103452098B CN201210168320.9A CN201210168320A CN103452098B CN 103452098 B CN103452098 B CN 103452098B CN 201210168320 A CN201210168320 A CN 201210168320A CN 103452098 B CN103452098 B CN 103452098B
Authority
CN
China
Prior art keywords
fitting
bracing members
support built
diaphragm wall
pieces
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210168320.9A
Other languages
Chinese (zh)
Other versions
CN103452098A (en
Inventor
薛勇
李文斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201210168320.9A priority Critical patent/CN103452098B/en
Publication of CN103452098A publication Critical patent/CN103452098A/en
Application granted granted Critical
Publication of CN103452098B publication Critical patent/CN103452098B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of diaphragm wall to support built-in fitting construction method, it is characterized in that the method comprises the following steps: A, make support built-in fitting in advance; B, with diaphragm wall fabrication of reinforcing cage while this is formed integrally to support installation of embedded parts in reinforcing cage; C, lifting reinforcing cage are seated in the diaphragm wall deep trouth formed in advance, then concreting in deep trouth; D, carry out soil mass of foundation pit excavation construction; E, be excavated to support built-in fitting time cut top layer plain concrete in time, erecting and welding fixing steel plate also installs bracing members.The present invention utilizes support built-in fitting, install convenient, do not need to measure, axial force of the supports can accurate centering, to reach safety, convenient construction, the object of saving duration.

Description

A kind of diaphragm wall is to support built-in fitting construction method
Technical field
The present invention relates to underground construction field, is that the diaphragm wall of shared same diaphragm wall in the middle of a kind of two Adjacent Pits is to support built-in fitting construction method specifically.
Background technology
Share same diaphragm wall in the middle of two Adjacent Pits and make supporting and protection structure, and realize synchronous excavation and construction, for ensureing the safe construction at the shared diaphragm wall vertically needed under multiple tracks supporting condition and foundation ditch, the accurate centering of axial force of the supports of common land wall both sides foundation ditch should be guaranteed, to realize the pressure effect that ground wall only bears supporting member.Reach this point, steel supporting component must be instructed to be in place to measure, but because steel supporting component is long, large heavier again, installed by loop wheel machine and not easily accurately put in place, and the site operation regular hour need be taken, namely at the construction field (site) implement difficulty large, long in time limit, be difficult to accurately be in place.
Summary of the invention
The object of this invention is to provide a kind of diaphragm wall of constructability to support built-in fitting construction method.
To achieve these goals, technical scheme of the present invention is: a kind of diaphragm wall, to support built-in fitting construction method, is characterized in that the method comprises the following steps: A, make support built-in fitting in advance; B, with diaphragm wall fabrication of reinforcing cage while this is formed integrally to support installation of embedded parts in reinforcing cage; C, lifting reinforcing cage are seated in the diaphragm wall deep trouth formed in advance, then concreting in deep trouth; D, carry out soil mass of foundation pit excavation construction; E, be excavated to support built-in fitting time cut top layer plain concrete in time, erecting and welding fixing steel plate also installs bracing members.
The present invention utilizes support built-in fitting, install convenient, do not need to measure, axial force of the supports can accurate centering, to reach safety, convenient construction, the object of saving duration.
Accompanying drawing explanation
Fig. 1 is to support built-in fitting elevation.
Fig. 2 is to support built-in fitting sectional drawing.
Fig. 3 is the sectional view at A place in Fig. 1.
Fig. 4 is the sectional view at B place in Fig. 3.
Fig. 5 is the enlarged drawing at C place in Fig. 2.
Fig. 6 is that diaphragm wall is to support built-in fitting bracing members detail drawing of installation.
Detailed description of the invention
The present invention is described further as follows by reference to the accompanying drawings with case history.
The two pieces of bracing members flange 1 be arranged in parallel are comprised to support built-in fitting, the exterior bottom of two pieces of bracing members flange 1 is respectively equipped with one piece of absolute altitude locating piece 2, be provided with sleeve pipe 6 between two pieces of bracing members flange 1, the two ends, outside of two pieces of bracing members flange 1 are equipped with one piece to support built-in fitting locating piece 4.Also be provided with when some connecting reinforcement 5(make support built-in fitting soldered between described two pieces of bracing members flange 1).Fixing steel plate 3 is arranged on absolute altitude locating piece 2.Bracing members 7 ends rest is on fixing steel plate 3, and described bracing members 7 two pieces of the same side to support built-in fitting locating piece 4 between, described bracing members end is provided with screw hole, screw rod, through after the sleeve pipe 6 screw hole of bracing members end and two pieces of bracing members flange 1, is fixed with pad and nut.
In the middle of certain two engineering shares, supporting and protection structure made by diaphragm wall, and former design scheme is that two foundation ditches of two engineerings are cut the earth, agent structure stage construction, after due to the duration tight, owner requires that namely two engineering synchronism constructions synchronously carry out excavation of foundation pit.
Be designed to realize synchronous construction excavation, adopt diaphragm wall (being called for short ground wall) both sides foundation ditch to realize support, in shared Diaphragm Wall Support Structure, namely devise diaphragm wall to support built-in fitting.
As shown in the figure, entirely wall is made up of three parts support built-in fitting, is respectively built-in fitting, fixing steel plate and to wearing bolt.Built-in fitting comprises the rhombic steel plate in two pieces of bracing members flange 1(of ground wall 8 liang of side external surfaces and the present embodiment), each one piece of the every side of absolute altitude locating piece 2(, for determining fixing steel plate 3 elevation), to support each two pieces of the every side of built-in fitting locating piece 4(, for controlling during fabrication of reinforcing cage support built-in fitting location), connecting reinforcement 5 and sleeve pipe 6(be used for wearing bolt 9), each component mutually welding production forms one, as shown in the figure.Fixing steel plate 3 is triangular steel plate, as shown in the figure, fixing steel plate should be welded into one with absolute altitude locating piece 2 to after cutting top layer plain concrete during support built-in fitting at excavation of foundation pit, bracing members 7 end is shelved by fixing steel plate 3 and is located and be located at two pieces between support built-in fitting locating piece 4, removable bracing members 7 end makes the screw hole of described bracing members end and the bolt hole centering of sleeve pipe 6, after both sides bracing members is in place, screw rod passes through sleeve pipe 6, can install wearing bolt 9 and by fastening nuts diaphragm wall both sides bracing members.
A kind of diaphragm wall, to support built-in fitting construction method, is characterized in that the method comprises the following steps: A, make support built-in fitting in advance; B, with diaphragm wall fabrication of reinforcing cage while this is formed one to support installation of embedded parts in reinforcing cage, mounting method adopts welding or directly shelves and fixes, and only needs to be fixed in reinforcing cage interior; C, lifting reinforcing cage are seated in the diaphragm wall deep trouth formed in advance, then concreting in deep trouth; D, after concrete curing, carry out soil mass of foundation pit excavation construction; E, be excavated to support built-in fitting time cut top layer plain concrete in time, erecting and welding fixing steel plate also installs bracing members.
According to this embodiment, the spacing between described two pieces of bracing members flange 1 is by the THICKNESS CONTROL of ground wall, and the thickness of described bracing members flange 1 is considered by actual conditions, generally can be 18 ~ 22mm, and the described thickness to support built-in fitting locating piece 4 is 8 ~ 12mm.Groove is adopted to weld bottom described absolute altitude locating piece 2 with bottom bracing members flange 1.By absolute altitude locating piece 2, fixing steel plate 3 is welded on bracing members flange 1.Bracing members flange 1 is provided with casing pipe hole opening, and the tube wall of sleeve pipe 6 is welded on the casing pipe hole opening position of bracing members flange 1 by weld all around.As shown in the figure, four angles of described bracing members flange 1 arrange sleeve pipe, and wherein each angle arranges two sleeve pipes, and the caliber of described sleeve pipe is determined by connecting screw rod diameter, and the screw diameter arranged in sleeve pipe is 16 ~ 20mm.Be connected with between described two bracing members flange 1 when some D25 diameter connecting reinforcement 5(make support built-in fitting and weld), the horizontal spacing between two adjacent connecting reinforcements and longitudinal pitch are respectively between 150 ~ 250mm.Connecting reinforcement diameter 20 ~ 30mm.

Claims (1)

1. a diaphragm wall is to support built-in fitting construction method, it is characterized in that the method comprises the following steps: A, in advance make to support built-in fitting, described to support built-in fitting comprise the two pieces of bracing members flange be arranged in parallel, the exterior bottom of two pieces of bracing members flange is respectively equipped with one piece of absolute altitude locating piece, be provided with sleeve pipe between two pieces of bracing members flange, the two ends, outside of two pieces of bracing members flange are equipped with one piece to support built-in fitting locating piece; B, with diaphragm wall fabrication of reinforcing cage while this is formed integrally to support installation of embedded parts in reinforcing cage; C, lifting reinforcing cage are seated in the diaphragm wall deep trouth formed in advance, then concreting in deep trouth; D, carry out soil mass of foundation pit excavation construction; E, be excavated to support built-in fitting time cut top layer plain concrete in time, erecting and welding fixing steel plate also installs bracing members, fixing steel plate is arranged on absolute altitude locating piece, bracing members ends rest is on fixing steel plate, and described bracing members two pieces of the same side to support built-in fitting locating piece between, described bracing members end is provided with screw hole, and screw rod, through after the sleeve pipe the screw hole of bracing members end and two pieces of bracing members flange, is fixed with pad and nut.
CN201210168320.9A 2012-05-28 2012-05-28 A kind of diaphragm wall is to support built-in fitting construction method Active CN103452098B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210168320.9A CN103452098B (en) 2012-05-28 2012-05-28 A kind of diaphragm wall is to support built-in fitting construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210168320.9A CN103452098B (en) 2012-05-28 2012-05-28 A kind of diaphragm wall is to support built-in fitting construction method

Publications (2)

Publication Number Publication Date
CN103452098A CN103452098A (en) 2013-12-18
CN103452098B true CN103452098B (en) 2016-04-27

Family

ID=49734905

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210168320.9A Active CN103452098B (en) 2012-05-28 2012-05-28 A kind of diaphragm wall is to support built-in fitting construction method

Country Status (1)

Country Link
CN (1) CN103452098B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638618A (en) * 2016-12-20 2017-05-10 杭州江润科技有限公司 Construction method of reinforced concrete support structure of diaphgram wall retaining foundation pit

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105568958B (en) * 2015-12-22 2018-07-31 上海市基础工程集团有限公司 Cross section-variable underground continuous wall and construction method
CN106760707B (en) * 2016-11-21 2019-01-29 常州第一建筑集团有限公司 Trench abnormity branch mouth embedded iron construction method
CN106869135B (en) * 2016-12-20 2019-02-15 上海市地矿建设有限责任公司 Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit steel pipe support structure
CN106930297B (en) * 2017-04-25 2022-05-20 宁波市政工程建设集团股份有限公司 Foundation pit steel support bracket pre-embedding device and construction method
CN110173597B (en) * 2019-04-19 2021-06-15 东莞建晖纸业有限公司 Method for quickly installing manhole or pipeline in pulp tank and white water tank of paper mill

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0476123A (en) * 1990-07-19 1992-03-10 Kumagai Gumi Co Ltd Constructing method for underground structure
CN2861284Y (en) * 2005-12-29 2007-01-24 上海市第二建筑有限公司 Structure frame beam and gang-piles round protection connection node in inverse engineering
CN101343869A (en) * 2008-08-19 2009-01-14 上海建工股份有限公司 Underground continuous wall construction method of city-across pipeline
CN201635078U (en) * 2010-01-19 2010-11-17 上海建工(集团)总公司 Supporting end actuating mechanism device of self-adaptation supporting system
CN102116035A (en) * 2009-12-30 2011-07-06 上海市机械施工有限公司 Process for constructing underground structural walls without linings
CN102425172A (en) * 2011-12-05 2012-04-25 中冶天工集团有限公司 Support method for excavating deep foundation pit closely adjacent to high-rise building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0476123A (en) * 1990-07-19 1992-03-10 Kumagai Gumi Co Ltd Constructing method for underground structure
CN2861284Y (en) * 2005-12-29 2007-01-24 上海市第二建筑有限公司 Structure frame beam and gang-piles round protection connection node in inverse engineering
CN101343869A (en) * 2008-08-19 2009-01-14 上海建工股份有限公司 Underground continuous wall construction method of city-across pipeline
CN102116035A (en) * 2009-12-30 2011-07-06 上海市机械施工有限公司 Process for constructing underground structural walls without linings
CN201635078U (en) * 2010-01-19 2010-11-17 上海建工(集团)总公司 Supporting end actuating mechanism device of self-adaptation supporting system
CN102425172A (en) * 2011-12-05 2012-04-25 中冶天工集团有限公司 Support method for excavating deep foundation pit closely adjacent to high-rise building

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638618A (en) * 2016-12-20 2017-05-10 杭州江润科技有限公司 Construction method of reinforced concrete support structure of diaphgram wall retaining foundation pit
CN106638618B (en) * 2016-12-20 2018-10-23 杭州江润科技有限公司 Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit reinforced concrete support construction

Also Published As

Publication number Publication date
CN103452098A (en) 2013-12-18

Similar Documents

Publication Publication Date Title
CN103452098B (en) A kind of diaphragm wall is to support built-in fitting construction method
CN102720201B (en) Support change construction building method implemented by using main structure of building
AU2014407470B2 (en) Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof
CN103821520B (en) The method of fixing mine vertical shaft shaft equipment
KR101687495B1 (en) Partial top-down construction method for building underground structures
CN104131821B (en) A kind of shield tunnel plug-in conduit grooving structure and fixing means thereof
CN101503879A (en) Pre-control method for preventing inclination of sinking well
CN103628572A (en) Project beam-column joint for reverse building method
CN103469798A (en) Pit support structure and construction method thereof
CN102953394B (en) Precise foundation bolt positioning device
CN203547753U (en) Profile steel concrete shaft wall base
CN102493446B (en) Steel tube column capable of preventing concrete spillover and method for mounting steel tube column
CN105604064A (en) Construction method of comprehensive pipeline protection system supporting system
CN108149692B (en) Supporting construction suitable for non-closed foundation ditch
KR101401057B1 (en) Method to build underground structures using the pillars and the stigma and steel beam and slab structures are formed
CN103541371A (en) Bearing platform for heating pipe channels to stride reserved subway station and construction method thereof
CN103133004A (en) Technological process of ground prefabrication and installation of inner shaft wall of freezing shaft
KR20150025409A (en) the tunnel structure using the small diameter steel pipe and the construction method thereof
CN112647969B (en) Traffic tunnel surrounding rock cooperative control system and construction method
KR101618719B1 (en) Top-down underground construction method using the connecting structure of the CFT column
CN207609428U (en) The ground handling well Shed-pipe Advanced Support pre-add solid system of existing object is worn under shield section
CN207717504U (en) A kind of support construction for ultra-large type bifurcated pipe group's water pressure test
KR101619330B1 (en) Horizontal Beam Supporting Bracket for Temporary Soil Retaining Work
CN104120874A (en) Assembly type scaffold and wall connecting piece
KR100912574B1 (en) Retaining wall system using strut assembly and excavating method using the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant