CN103448883A - Installation guiding and temporary fixing device of groined beam of sliding channel - Google Patents
Installation guiding and temporary fixing device of groined beam of sliding channel Download PDFInfo
- Publication number
- CN103448883A CN103448883A CN2013103754665A CN201310375466A CN103448883A CN 103448883 A CN103448883 A CN 103448883A CN 2013103754665 A CN2013103754665 A CN 2013103754665A CN 201310375466 A CN201310375466 A CN 201310375466A CN 103448883 A CN103448883 A CN 103448883A
- Authority
- CN
- China
- Prior art keywords
- cross beam
- slideway cross
- temporary
- supporting bracket
- fastening device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The invention discloses an installation guiding and temporary fixing device of a groined beam of a sliding channel. The installation guiding and temporary fixing device comprises a temporary supporting corbel which is fixedly connected with the groined beam of the sliding channel, and is also connected with a base of a length-adjustable supporting device by bolts. The installation guiding and temporary fixing device disclosed by the invention solves the technical difficulty that after the accurate positioning construction of the groined beam of the sliding channel is finished, the accurate fixation of in-position elevation of the groined beam of the sliding channel is poor and that an unsmooth placing plane of pile tops causes difficult selection of temporary supporting cushion blocks. The installation guiding and temporary fixing device has the characteristics of compact structure and convenience in installation and disassembly.
Description
Technical field
The present invention relates to the arine railway technical field of construction, refer to particularly a kind of slideway cross beam installation guiding and temporary fastening device.
Background technology
In recent years, the Port System that Chinese Water Transportation had formed already was rationally distributed, well arranged, multiple functional, have complementary advantages, national high-grade waterway net also basically forms simultaneously.Lasting vigorous along with water transport market, the increase of ship structure yardstick, the track groups number of comb type side slipway increases thereupon, and the slideway underwater penetration is also deepened thereupon, and this installation to track girder has brought larger challenge.In the prior art, the slideway cross beam is laid in the pile cover top, both sides at pile cover bilge logs cross beam are provided with the pile cover block, and the slideway cross beam is after completing accurate adjustment position construction, usually adopts pad steel-sheet method to carry out the adjustment of absolute altitude in place to the beam section and carry out temporary fixed before building of node concrete under water.But this kind of construction method can't meet the high precision installation requirement that the slideway cross beam gets on the right track (rail top of steel rail absolute altitude error<± 3mm).
Therefore, need be improved prior art.
Summary of the invention
Purpose of the present invention is exactly the deficiency that will solve the above-mentioned background technology, and a kind of compact conformation, the assembling and disassembling guiding of slideway cross beam installation easily and temporary fastening device are provided.
Technical scheme of the present invention is: a kind of slideway cross beam is installed guiding and temporary fastening device, it is characterized in that: it comprises the temporary supporting bracket be fixedly connected with the slideway cross beam, and described temporary supporting bracket is with together with the base of length-adjustable bracing or strutting arrangement is bolted.
In such scheme:
The bottom of described temporary supporting bracket is welded with the Horizontal limiting ring flat-plate, and the base of bracing or strutting arrangement is placed in the Horizontal limiting ring flat-plate.
Described bracing or strutting arrangement is supported in the top of pile cover block.
Described bracing or strutting arrangement is lifting screw, and the base of described lifting screw is with together with the temporary supporting bracket is bolted, and the piston rod of lifting screw is supported in the top of pile cover block.
Pre-buried structure weld together in described temporary supporting bracket and slideway cross beam.
Described pre-buried structure comprises the vertical anchor slab be arranged on slideway cross beam sidewall, described vertical anchor slab one side and temporary supporting bracket weld together, the opposite side of vertical anchor slab and an end weld together that is embedded in the horizontal dowel in the slideway cross beam, laterally the other end of dowel is connected with the anchor plate be embedded in the slideway cross beam.
Described temporary supporting bracket below is provided with the guiding stiffener.
The invention has the advantages that:
1), adopt the method for lifting screw to carry out " accurately fixing " to the absolute altitude in place with the slideway cross beam, avoid carrying out traditional artificial absolute altitude adjustment, can meet the high precision installation requirement that the slideway cross beam gets on the right track, overcome the difficulty that the plane injustice is selected the temporary supporting cushion block of shelving due to pile cover;
2), lifting screw and temporary supporting bracket are connected into to the slideway cross beam temporary fastening device of compact conformation, simplified slideway cross beam temporary fixed working procedure under water, improved the operating efficiency of slideway cross beam;
3), assembling and disassembling is convenient, the present invention can make lifting screw separate with the temporary supporting bracket, facilitates the turnover of lifting screw to use, and has significantly shortened the temporary fixed construction period of slideway cross beam.
The invention solves the slideway cross beam after completing the construction of accurate adjustment position, the slideway cross beam is carried out to " accurately fixing " of absolute altitude in place and injustice that plane is shelved on the stake top is difficult to the technical barrier of selection to the temporary supporting cushion block, and there is the temporary fastening device compact conformation, the characteristics of easy installation and removal.
The accompanying drawing explanation
Fig. 1 is facade structures schematic diagram of the present invention;
Fig. 2 is planar structure schematic diagram of the present invention.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
As shown in Figure 1 and Figure 2, a kind of slideway cross beam of the present invention is installed guiding and temporary fastening device, it comprises the temporary supporting bracket 5 be fixedly connected with slideway cross beam 11, described temporary supporting bracket 5 links together by bolt 4 with the base of length-adjustable bracing or strutting arrangement 7, removing bolt 4 just can make bracing or strutting arrangement 7 separate with temporary supporting bracket 5, facilitate the turnover of bracing or strutting arrangement 7 to use, significantly shortened the temporary fixed construction period of slideway cross beam 11
The bottom of temporary supporting bracket 5 is welded with Horizontal limiting ring flat-plate 6, and the base of bracing or strutting arrangement 7 is arranged in Horizontal limiting ring flat-plate 6, and Horizontal limiting ring flat-plate 6 can carry out level to spacing to lifting screw 7.
Bracing or strutting arrangement 7 can be supported according to actual state the top of pile cover block 10.Bracing or strutting arrangement 7 is lifting screw, and the base of lifting screw and temporary supporting bracket 5 link together by bolt 4, and the piston rod of lifting screw is supported in the top of pile cover block 10.Adopt the method for lifting screw to carry out " accurately fixing " to the absolute altitude in place with slideway cross beam 11, avoid carrying out traditional artificial absolute altitude adjustment, can meet slideway cross beam 11(track) the high precision installation requirement, overcome the difficulty that the plane injustice is selected the temporary supporting cushion block of shelving due to pile cover 9;
Pre-buried structure weld together in temporary supporting bracket 5 and slideway cross beam 11, wherein pre-buried structure comprises the vertical anchor slab 3 on the sidewall that is arranged on slideway cross beam 11, described vertical anchor slab 3 one sides and temporary supporting bracket 5 weld togethers, the opposite side of vertical anchor slab 3 be embedded in slideway cross beam 11 and an end weld together of the horizontal dowel 2 of spaced set, laterally the other end of dowel 2 is connected with the anchor plate 1 be embedded in slideway cross beam 11.
Described temporary supporting bracket 5 belows are provided with guiding stiffener 8, vertical anchor slab 3, temporary supporting bracket 5 and guiding stiffener 8 form one-piece construction by the mode of welding, guiding stiffener 8 has not only been strengthened temporary supporting bracket 5 structures, and can also tentatively be located in 10 guide piecees of shelving on plane of pile cover block as slideway cross beam 11.
When practical operation, after slideway cross beam 11 completes the fine adjustment construction, by the present invention, designed slideway cross beam is installed to lead and is arranged on four toe places of slideway cross beam 11 with temporary fastening device, now operation is pushed up with the lifting screw that temporary supporting bracket 5 links together, make it stretch out piston rod and be supported in the top of pile cover block 10, guarantee that lifting screw and pile cover block 10 hold out against, guarantee that slideway cross beam 11 fine adjustment systems are after off-load, can smoothly the load of slideway cross beam 11 be transformed on lifting screw, by the operation lifting screw, after guaranteeing 11 installations of slideway cross beam, its four toe places are stressed evenly, complete " accurately fixing " of slideway cross beam 11, completing after node concrete is built of slideway cross beam under water, twist and remove bolt 4, lifting screw is removed, make lifting screw can have enough to meet the need use.
Slideway cross beam 11 in the present invention is by four-point supporting, and the height that every some needs prop up pad differs, and corresponding stake top mark height also demand differs, and, by the lifting screw in operation the present invention, can meet the high demand differed of a top mark.
The invention solves slideway cross beam 11 after completing the fine adjustment construction, slideway cross beam 11 is carried out to " accurately fixing " of absolute altitude in place and injustice that plane is shelved on the stake top is difficult to the technical barrier of selection to the temporary supporting cushion block, and there is the temporary fastening device compact conformation, the characteristics of easy installation and removal.
Claims (7)
1. a slideway cross beam is installed guiding and temporary fastening device, it is characterized in that: it comprises the temporary supporting bracket (5) be fixedly connected with slideway cross beam (11), and described temporary supporting bracket (5) links together by bolt (4) with the base of length-adjustable bracing or strutting arrangement (7).
2. slideway cross beam according to claim 1 is installed guiding and temporary fastening device, it is characterized in that: the bottom of described temporary supporting bracket (5) is welded with Horizontal limiting ring flat-plate (6), and the base of bracing or strutting arrangement (7) is arranged in Horizontal limiting ring flat-plate (6).
3. slideway cross beam according to claim 1 is installed guiding and temporary fastening device, and it is characterized in that: described bracing or strutting arrangement (7) is supported in the top of pile cover block (10).
4. slideway cross beam according to claim 3 is installed guiding and temporary fastening device, it is characterized in that: described bracing or strutting arrangement (7) is lifting screw, the base of described lifting screw and temporary supporting bracket (5) link together by bolt (4), and the piston rod of lifting screw is supported in the top of pile cover block (10).
5. slideway cross beam according to claim 1 is installed guiding and temporary fastening device, it is characterized in that: the pre-buried structure weld together in described temporary supporting bracket (5) and slideway cross beam (11).
6. slideway cross beam according to claim 5 is installed guiding and temporary fastening device, it is characterized in that: described pre-buried structure comprises the vertical anchor slab (3) on the sidewall that is arranged on slideway cross beam (11), described vertical anchor slab (3) one sides and temporary supporting bracket (5) weld together, the opposite side of vertical anchor slab (3) and an end weld together that is embedded in the horizontal dowel (2) in slideway cross beam (11), laterally the other end of dowel (2) is connected with the anchor plate (1) be embedded in slideway cross beam (11).
7. slideway cross beam according to claim 6 is installed guiding and temporary fastening device, it is characterized in that: described temporary supporting bracket (5) below is provided with guiding stiffener (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310375466.5A CN103448883B (en) | 2013-08-26 | 2013-08-26 | A kind of slideway cross beam installs guiding and temporary fastening device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310375466.5A CN103448883B (en) | 2013-08-26 | 2013-08-26 | A kind of slideway cross beam installs guiding and temporary fastening device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103448883A true CN103448883A (en) | 2013-12-18 |
CN103448883B CN103448883B (en) | 2016-03-30 |
Family
ID=49731823
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310375466.5A Active CN103448883B (en) | 2013-08-26 | 2013-08-26 | A kind of slideway cross beam installs guiding and temporary fastening device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103448883B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103482042A (en) * | 2013-09-22 | 2014-01-01 | 中交第二航务工程局有限公司 | Mounting and constructing method for deepwater comb-shaped slide cross beam |
CN103879527A (en) * | 2014-03-19 | 2014-06-25 | 中交第二航务工程局有限公司 | Linear control method for deep water high precision mounting of pectination slideway well-shaped beam |
CN104260853A (en) * | 2014-09-15 | 2015-01-07 | 中交第二航务工程局有限公司 | Underwater three-way displacement adjusting device of slide way cross beam |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL99416C (en) * | ||||
SE514307C2 (en) * | 1998-09-01 | 2001-02-05 | Hans Ingmar Granlind | Laying out slipway track for launching boat, by joining U=shaped rail beams end to end with splice sections |
CN201172797Y (en) * | 2008-04-03 | 2008-12-31 | 中铁十一局集团第六工程有限公司 | Portable movable mould frame bridging machine |
CN203497149U (en) * | 2013-08-26 | 2014-03-26 | 中交第二航务工程局有限公司 | Slideway cross beam mounting orientation and temporary fixation device |
-
2013
- 2013-08-26 CN CN201310375466.5A patent/CN103448883B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
NL99416C (en) * | ||||
SE514307C2 (en) * | 1998-09-01 | 2001-02-05 | Hans Ingmar Granlind | Laying out slipway track for launching boat, by joining U=shaped rail beams end to end with splice sections |
CN201172797Y (en) * | 2008-04-03 | 2008-12-31 | 中铁十一局集团第六工程有限公司 | Portable movable mould frame bridging machine |
CN203497149U (en) * | 2013-08-26 | 2014-03-26 | 中交第二航务工程局有限公司 | Slideway cross beam mounting orientation and temporary fixation device |
Non-Patent Citations (3)
Title |
---|
吴鹏程: "沪东造船厂2号船台滑道水下接长工程施工工艺", 《水运工程》, no. 09, 25 September 2002 (2002-09-25) * |
李亮等: "滑道梁多样化施工方案综述", 《现代商贸工业》, no. 23, 31 December 2012 (2012-12-31) * |
郭成喜: "沉箱预制场水下滑道工艺设计与施工", 《山西建筑》, vol. 32, no. 22, 30 November 2006 (2006-11-30) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103482042A (en) * | 2013-09-22 | 2014-01-01 | 中交第二航务工程局有限公司 | Mounting and constructing method for deepwater comb-shaped slide cross beam |
CN103482042B (en) * | 2013-09-22 | 2015-09-02 | 中交第二航务工程局有限公司 | A kind of deep water comb shape slideway cross beam construction method of installation |
CN103879527A (en) * | 2014-03-19 | 2014-06-25 | 中交第二航务工程局有限公司 | Linear control method for deep water high precision mounting of pectination slideway well-shaped beam |
CN104260853A (en) * | 2014-09-15 | 2015-01-07 | 中交第二航务工程局有限公司 | Underwater three-way displacement adjusting device of slide way cross beam |
Also Published As
Publication number | Publication date |
---|---|
CN103448883B (en) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105220769A (en) | Large area bolt-ball net frame integral top lifting construction method | |
CN102587281A (en) | Walking type multi-point jacking-pushing construction method | |
CN103448883A (en) | Installation guiding and temporary fixing device of groined beam of sliding channel | |
CN104831632A (en) | Upper transverse beam and lower transverse beam construction method for bridge cable bent tower | |
CN201560397U (en) | Whole support for steel box girder precise location installation | |
CN203497149U (en) | Slideway cross beam mounting orientation and temporary fixation device | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
EP1835076A1 (en) | Method and arrangement for moving a bridge | |
CN203321529U (en) | Train type rapid lifting and folding work platform for tunnel engineering | |
CN202745364U (en) | Template support structure | |
CN202380732U (en) | Self-load bearing template support device utilizing steel reinforced concrete beam | |
CN103967332A (en) | Construction method of building site barrier | |
CN109629350B (en) | Prestressed seamless connection concrete track beam for empty iron and construction method thereof | |
CN203821878U (en) | Integral horizontal moving device for building with foundation | |
CN203795435U (en) | Diagonal bracing reinforcing structure | |
CN203034605U (en) | Jacking support frame for latticed shell structure | |
CN202705907U (en) | Post-tensioning method pre-stressed girder horizontal girder moving system | |
CN202689585U (en) | Ground fitting up assembly mould of large steel truss | |
MX2021007820A (en) | Floating platform for high-power wind turbines. | |
CN202139543U (en) | Bracket structure used for construction of continuous box girders | |
CN201843352U (en) | Sliding framework platform for large-column gird large-area net frame structure | |
CN205276166U (en) | Guardrail stand positioner | |
CN211364328U (en) | A adjustment type base for installation of contact net channel in tunnel | |
CN201208688Y (en) | Fixture for welding large-sized H section steel structural part | |
CN211713712U (en) | Incremental launching sliding rail device with limiting function for bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |