CN103441435B - 隔离开关大修台车 - Google Patents

隔离开关大修台车 Download PDF

Info

Publication number
CN103441435B
CN103441435B CN201310375514.0A CN201310375514A CN103441435B CN 103441435 B CN103441435 B CN 103441435B CN 201310375514 A CN201310375514 A CN 201310375514A CN 103441435 B CN103441435 B CN 103441435B
Authority
CN
China
Prior art keywords
disconnecting switch
deck plate
plate
fixing seat
chassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310375514.0A
Other languages
English (en)
Other versions
CN103441435A (zh
Inventor
田凤兰
石峰
景中炤
何天骥
杨玮
陈嵩
金凯
王磊
袁博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Original Assignee
State Grid Corp of China SGCC
Zhengzhou Power Supply Co of Henan Electric Power Co
Zhengzhou Huali Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Zhengzhou Power Supply Co of Henan Electric Power Co, Zhengzhou Huali Information Technology Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310375514.0A priority Critical patent/CN103441435B/zh
Publication of CN103441435A publication Critical patent/CN103441435A/zh
Application granted granted Critical
Publication of CN103441435B publication Critical patent/CN103441435B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Push-Button Switches (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

本发明公开了一种隔离开关大修台车,它含有台面板,所述台面板下端设置有支腿,所述台面板上设置有两个固定座,相对于两个所述固定座分别设置有抱箍和卡板,所述抱箍通过支撑杆固定在所述台面板上,所述固定座上设置有连接螺栓。本发明能够进行隔离开关的本体分解、接线座装配检修、触指检修及更换、弹簧检查、伞齿轮装卸、整体等工作,过程更便利,更快捷,降低了劳动强度,另外还可以进行预调试,这样可以有效的减少在安装后调试的难度。

Description

隔离开关大修台车
技术领域:
本发明涉及一种电力系统用隔离开关检修装置,特别是涉及一种隔离开关大修台车。
背景技术:
设备可靠性是电力企业的一项重要综合技术指标,郑州供电公司要求:各基层单位加强技术管理,降低设备停运时间,提高设备可靠性。变电检修部要求:隔离开关解体大修应在60个工时内,目前隔离开关的解体大修平均工时为70个,尚不能满足规定要求,刀闸系统检修耗时对GW5型隔离开关检修效率影响很大,累计百分比达到51.43%,另外传动系统检修耗时比重也比较大,累计百分比达到了35.71%,耗时的主要原因是没有适合GW5型隔离开关检修用的平台车。
发明内容:
本发明所要解决的技术问题是:克服现有技术的不足,提供一种结构简单、使用方便、能够进行多项检测且工作效率高的隔离开关大修台车。
本发明的技术方案是:一种隔离开关大修台车,含有台面板,所述台面板下端设置有支腿,所述台面板上设置有两个固定座,相对于两个所述固定座分别设置有抱箍和卡板,所述抱箍通过支撑杆固定在所述台面板上,所述固定座上设置有连接螺栓。
所述固定座下端与移动板铰接,其上端与移动板之间设置有调节螺栓,所述移动板与支撑槽板滑动连接,并且,所述移动板和支撑槽板之间设置有定位螺栓,所述支撑槽板固定在所述台面板上。所述支撑槽板上设置有条形孔,所述定位螺栓下端位于所述条形孔中。所述支撑杆下端通过底板和螺钉与所述台面板连接。所述卡板为L型或T型,所述卡板固定在垫板上,所述垫板固定在所述台面板上。所述支腿中间设置有托架,所述托架上设置有工具盘。所述支腿为四个,每一支腿下端均设置有行走轮,其中至少一个行走轮设置有刹车机构。
本发明的有益效果是:
1、本发明能够进行隔离开关的本体分解、接线座装配检修、触指检修及更换、弹簧检查、伞齿轮装卸、整体等工作,过程更便利,更快捷,降低了劳动强度,另外还可以进行预调试,这样可以有效的减少在安装后调试的难度。
2、本发明一个台面板上可以设置多套固定座,能够安装多个隔离开关,可以同时进行多种检修和测试,大大提高检修效率。
3、本发明实施前后,主刀闸系统检修工时个数由36降低为18,传动系统检修工时个数由24降低为20,该型号隔离开关的检修总工时下降到平均48工时,提高了隔离开关检修工作效率,缩短了设备的停电时间,提高了电力系统的运行可靠性。
4、本发明设置有行走轮,能够自由移动,满足工程到处流动作业的需求,满足检修人员便于检修的原则,力求降低工作强度。
5、本发明固定座既能水平移动,又能改变倾斜角度,以满足不同规格隔离开关的维修需求。
6、本发明结构简单、使用方便、能够进行多项检测且工作效率高,其适用范围广,易于推广,具有良好的经济效益。
附图说明:
图1为隔离开关大修台车的结构示意图。
具体实施方式:
实施例:参见图1,图中,1-支腿,2-台面板,3-移动板,4-支撑槽板,5-调节螺栓,6-连接螺栓,7-固定座,8-垫板, 9-卡板,10-支撑杆,11-抱箍,12-工具盘。
隔离开关大修台车含有台面板2,台面板2下端设置有支腿1,其中:台面板2上设置有两个固定座7,相对于两个固定座7分别设置有抱箍11和卡板9,抱箍11通过支撑杆10固定在台面板2上,固定座7上设置有连接螺栓6。
固定座7下端与移动板3铰接,其上端与移动板3之间设置有调节螺栓5,调节螺栓5能够调节固定座的倾斜角度,移动板3与支撑槽板4滑动连接,并且,移动板3和支撑槽板4之间设置有定位螺栓(图中未画出),定位螺栓能够保证移动板3和支撑槽板4之间的相对位置,支撑槽板4固定在台面板2上。
根据需要,可以在支撑槽板4上设置有条形孔,定位螺栓下端位于条形孔中,定位螺栓上端通过螺母与移动板3连接。
支撑杆10下端通过底板和螺钉与台面板2连接。卡板9为L型或T型,卡板9固定在垫板8上,垫板8固定在台面板2上。
支腿1中间设置有托架,托架上设置有工具盘12。支腿1为四个(当然也可以为三个),每一支腿1下端均设置有行走轮(图中未画出),便于移动,其中至少一个行走轮设置有刹车机构,便于固定位置。
使用时,一个隔离开关的一端放置在一个固定座7,且通过连接螺栓6固定,该隔离开关的中部卡装在抱箍中,进行部分项目的检修,另一个隔离开关的一端放置在另一个固定座7,且通过连接螺栓6固定,该隔离开关的另一端卡在卡板9上,进行另外部分项目的检修,然后,将两个隔离开关互换位置,完成整个隔离开关的本体分解、接线座装配检修、触指检修及更换、弹簧检查、伞齿轮装卸、整体等工作。
当然,也可以让一个隔离开关在一个固定座7上固定,完成部分项目检修,再换到另一个固定座7上,进行另一部分项目的检测,实现一个一个的检测,根据需要选取。

Claims (7)

1.一种隔离开关大修台车,含有台面板,所述台面板下端设置有支腿,其特征是:所述台面板上设置有两个固定座,相对于两个所述固定座分别设置有抱箍和卡板,所述抱箍通过支撑杆固定在所述台面板上,所述固定座上设置有连接螺栓。
2.根据权利要求1所述的隔离开关大修台车,其特征是:所述固定座下端与移动板铰接,其上端与移动板之间设置有调节螺栓,所述移动板与支撑槽板滑动连接,并且,所述移动板和支撑槽板之间设置有定位螺栓,所述支撑槽板固定在所述台面板上。
3.根据权利要求2所述的隔离开关大修台车,其特征是:所述支撑槽板上设置有条形孔,所述定位螺栓下端位于所述条形孔中。
4.根据权利要求1所述的隔离开关大修台车,其特征是:所述支撑杆下端通过底板和螺钉与所述台面板连接。
5.根据权利要求1所述的隔离开关大修台车,其特征是:所述卡板为L型或T型,所述卡板固定在垫板上,所述垫板固定在所述台面板上。
6.根据权利要求1所述的隔离开关大修台车,其特征是:所述支腿中间设置有托架,所述托架上设置有工具盘。
7.根据权利要求1-6任一项所述的隔离开关大修台车,其特征是:所述支腿为四个,每一支腿下端均设置有行走轮,其中至少一个行走轮设置有刹车机构。
CN201310375514.0A 2013-08-26 2013-08-26 隔离开关大修台车 Active CN103441435B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310375514.0A CN103441435B (zh) 2013-08-26 2013-08-26 隔离开关大修台车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310375514.0A CN103441435B (zh) 2013-08-26 2013-08-26 隔离开关大修台车

Publications (2)

Publication Number Publication Date
CN103441435A CN103441435A (zh) 2013-12-11
CN103441435B true CN103441435B (zh) 2016-09-07

Family

ID=49695117

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310375514.0A Active CN103441435B (zh) 2013-08-26 2013-08-26 隔离开关大修台车

Country Status (1)

Country Link
CN (1) CN103441435B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109787130B (zh) * 2018-12-19 2020-05-01 国网江苏省电力有限公司常州供电分公司 折臂式隔离开关检修方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6630638B1 (en) * 2000-05-26 2003-10-07 Abb Inc. Dead tank drawout breakers
CN201541071U (zh) * 2009-11-19 2010-08-04 河南省电力公司郑州供电公司 隔离开关检修平台
CN201690145U (zh) * 2010-06-07 2010-12-29 河南省电力公司商丘供电公司 隔离开关检修工作台
CN201898293U (zh) * 2010-12-03 2011-07-13 河南省电力公司郑州供电公司 开关大修平台车
CN203014220U (zh) * 2012-12-02 2013-06-19 河南省电力公司郑州供电公司 Gw5隔离开关检修平台

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6630638B1 (en) * 2000-05-26 2003-10-07 Abb Inc. Dead tank drawout breakers
CN201541071U (zh) * 2009-11-19 2010-08-04 河南省电力公司郑州供电公司 隔离开关检修平台
CN201690145U (zh) * 2010-06-07 2010-12-29 河南省电力公司商丘供电公司 隔离开关检修工作台
CN201898293U (zh) * 2010-12-03 2011-07-13 河南省电力公司郑州供电公司 开关大修平台车
CN203014220U (zh) * 2012-12-02 2013-06-19 河南省电力公司郑州供电公司 Gw5隔离开关检修平台

Also Published As

Publication number Publication date
CN103441435A (zh) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103063447B (zh) 一种汽车试验台架
CN105489808B (zh) 一种用于工程车辆的电池组件
CN103441435B (zh) 隔离开关大修台车
CN201455621U (zh) 用于压装机的轴承座拆卸装置
CN203466468U (zh) 多功能检修平台
CN203752022U (zh) 一种机器人小臂分装台架
CN103400948B (zh) 容纳电动商用车电池组的外仓体及电池组的固定结构
CN102419421A (zh) 电动车电机疲劳测试机
CN203527447U (zh) 增压器检修翻转台移动车装置
CN202836982U (zh) 离合踏板及制动踏板总成试验台
CN203079598U (zh) 一种起重机及其支撑机构
CN204249804U (zh) 电动车“u”型电池包布置结构
CN203813273U (zh) 500kV GW16/17型隔离开关综合检修平台
CN202602136U (zh) 一种高压隔离开关检修防护支架
CN202937965U (zh) 一种方向盘振动试验夹紧固定装置
CN204668796U (zh) 串联式圆柱型设备放置/拆装检修车
CN205254497U (zh) 汽车座椅弹簧压入装置
CN205852145U (zh) 一种卡车后尾架三工位焊接工作站及焊接工装
CN203719910U (zh) 一种管式后副车架总成试验装置
CN103645058A (zh) 一种管式后副车架总成试验装置
CN204793776U (zh) Gw4型隔离开关检修工作平台
CN204847863U (zh) 一种加固式起重机端梁行走轮安装台座
CN204308523U (zh) 一种高效无损装轴承装置
CN204230718U (zh) 一种隔离开关静触头检修专用工具
CN2537605Y (zh) 汽车维修工作台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 450006 Huaihe West Road, Henan, China, No. 19, No.

Applicant after: Zhengzhou electric company of State Grid Henan Power Supply Company

Applicant after: Zhengzhou Huali Information Technology Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 100033 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: Zhengzhou Huali Information Technology Co., Ltd.

Applicant before: Henan Electric Power Company Zhengzhou Power Supply Branch

CB03 Change of inventor or designer information

Inventor after: Tian Fenglan

Inventor after: Shi Feng

Inventor after: Jing Zhongzhao

Inventor after: He Tianji

Inventor after: Yang Wei

Inventor after: Chen Song

Inventor after: Jin Kai

Inventor after: Wang Lei

Inventor after: Yuan Bo

Inventor before: Tian Fenglan

Inventor before: He Tianji

Inventor before: Chen Song

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant