CN103437360A - 一种深基坑工程中的不换撑施工方法 - Google Patents

一种深基坑工程中的不换撑施工方法 Download PDF

Info

Publication number
CN103437360A
CN103437360A CN2013103452951A CN201310345295A CN103437360A CN 103437360 A CN103437360 A CN 103437360A CN 2013103452951 A CN2013103452951 A CN 2013103452951A CN 201310345295 A CN201310345295 A CN 201310345295A CN 103437360 A CN103437360 A CN 103437360A
Authority
CN
China
Prior art keywords
deep
deep foundation
foundation ditch
support
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013103452951A
Other languages
English (en)
Other versions
CN103437360B (zh
Inventor
邵孟新
叶建荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG PROV FOUNDATION ENGINEERING Co
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN201310345295.1A priority Critical patent/CN103437360B/zh
Publication of CN103437360A publication Critical patent/CN103437360A/zh
Application granted granted Critical
Publication of CN103437360B publication Critical patent/CN103437360B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种深基坑工程中的不换撑施工方法,此方法在深基坑内设置内支撑后,通过在深基坑环梁处,附加嵌入土层的土钉固定深基坑四周排桩或地下连续墙,然后开挖基坑土方,由下到上逐步进行地下主体结构施工,同时逐步由下而上拆除内支撑,此施工方法能更有效的控制围护结构变形,且无需进行换撑操作,有利于节省工期并降低工程造价,此发明用于深基坑内建筑施工工程领域。

Description

一种深基坑工程中的不换撑施工方法
技术领域
本发明涉及一种建筑施工方法,特别是涉及一种基坑工程施工方法。 
背景技术
近年来,在深基坑支护的施工中,内支撑支护体系得到了广泛的运用,这主要是因为混凝土内支撑具有刚度大、变形小的特点,而钢管内支撑可以回收,且加预压力方便。内支撑支护体系可适用于各种土层,尤其适合在软土地基中采用。 
如图1~图7,现有的内支撑支护体系随着地下主体结构的逐层往上施工,会与地下主体结构产生冲突,需要由下而上地拆除各道内支撑,有时还需进行换撑,让换上去的支撑逐步地取代内支撑结构体系,并发挥临时支撑作用,进而有效的控制围护结构变形,保证临时性的内支撑拆除之后,工程施工能够安全顺利的继续。此施工方法增加了拆除内支撑过程中的换撑施工工序以及换乘的拆除工作,不利于节省工期和降低工程造价。 
发明内容
    为解决上述问题,本发明提供一种能更有效的控制围护结构变形的深基坑工程中的不换撑施工方法。 
本发明解决其技术问题所采用的技术方案是: 
一种深基坑工程中的不换撑施工方法,其特征在于,包括以下步骤:
1)    、沿深基坑四周方向设置排桩或地下连续墙,在深基坑内设置若干顶靠在彼此相对的排桩或地下连续墙间的内支撑;
2)    、在深基坑环梁处,沿深基坑四周设置与排桩或地下连续墙固定连接并嵌入土层的土钉;
3)    、开挖深基坑,在深基坑内进行底部地下主体结构施工;
4)    、拆除深基坑内最底部的内支撑;
5)    、在底部地下主体结构上施工上层地下主体结构;
6)    、循环步骤4)和步骤5)至完成深基坑内部工程的施工。
进一步作为本发明技术方案的改进,步骤1)中在深基坑内沿排桩或者地下连续墙向下设有若干彼此平行的内支撑,各内支撑为钢管支撑或者钢筋混凝土支撑。 
进一步作为本发明技术方案的改进,步骤2)中各土钉沿深基坑四周倾斜向下打入深基坑侧面土层内,各土钉彼此平行。 
进一步作为本发明技术方案的改进,各土钉的顶端与排桩或者地下连续墙固定连接。 
进一步作为本发明技术方案的改进,底部地下主体结构包括底板、衬墙和梁板柱,衬墙紧贴深基坑四周的排桩或者地下连续墙,两相对的衬墙间设有梁板柱。 
本发明的有益效果:此深基坑工程中的不换撑施工方法在深基坑内设置内支撑后,通过在深基坑环梁处,附加嵌入土层的土钉固定深基坑四周排桩或地下连续墙,然后开挖基坑土方,由下到上逐步进行地下主体结构施工,同时逐步由下而上拆除内支撑,此施工方法能更有效的控制围护结构变形,且无需进行换撑操作,有利于节省工期并降低工程造价。 
附图说明
下面结合附图对本发明作进一步说明: 
图1是本发明背景技术及实施例中基坑平面示意图;
图2是本发明背景技术中原始施工步骤初始状态A-A剖面图;
图3是本发明背景技术中原始施工步骤底部主体结构施工初始状态A-A剖面图;
图4是本发明背景技术中原始施工步骤底部主体结构施工完成状态A-A剖面图;
图5是本发明背景技术中原始施工步骤上部主体结构施工状态A-A剖面图;
图6是本发明背景技术中原始施工步骤上部内支撑拆除后状态A-A剖面图;
图7是本发明背景技术中原始施工步骤施工完成后状态A-A剖面图;
图8是本发明实施例施工初始状态A-A剖面图;
图9是本发明实施例底部主体结构施工过程状态A-A剖面图;
图10是本发明实施例底部主体结构施工完成状态A-A剖面图;
图11是本发明实施例上部内支撑拆除后状态A-A剖面图;
图12是本发明实施例施工完成后状态A-A剖面图。
具体实施方式
参照图1~图12,本发明为一种深基坑工程中的不换撑施工方法,其特征在于,包括以下步骤: 
1)    、沿深基坑四周方向设置排桩或地下连续墙,在深基坑内设置若干顶靠在彼此相对的排桩或地下连续墙间的内支撑1;
2)    、在深基坑环梁处,沿深基坑四周设置与排桩或地下连续墙固定连接并嵌入土层的土钉2;
3)    、开挖深基坑,在深基坑内进行底部地下主体结构3施工;
4)    、拆除深基坑内最底部的内支撑;
5)    、在底部地下主体结构3上施工上层地下主体结构4;
6)    、循环步骤4)和步骤5)至完成深基坑内部工程的施工。
此深基坑工程中的不换撑施工方法在深基坑内设置内支撑1后,通过在深基坑环梁处,附加嵌入土层的土钉2固定深基坑四周排桩或地下连续墙,然后开挖基坑土方,由下到上逐步进行地下主体结构施工,同时逐步由下而上拆除内支撑1,此施工方法能更有效的控制围护结构变形,且无需进行换撑操作,有利于节省工期并降低工程造价。 
作为本发明优选的实施方式,步骤1)中在深基坑内沿排桩或者地下连续墙向下设有若干彼此平行的内支撑1,各内支撑1为钢管支撑或者钢筋混凝土支撑。 
根据各深基坑深度的不同,可由下而上间隔一定的距离设置若干彼此平行的内支撑1,从而在设置土钉前使得深基坑四周的排桩或者地下连续墙稳定。 
作为本发明优选的实施方式,步骤2)中各土钉2沿深基坑四周倾斜向下打入深基坑侧面土层内,各土钉2彼此平行。 
作为本发明优选的实施方式,各土钉2的顶端与排桩或者地下连续墙固定连接。 
土钉2倾斜向下钉入深基坑侧面的土层内,与深基坑的里面成一定的倾斜角度,从而,在土钉2嵌入土层后,通过四周的土钉2能更好的控制深基坑围护结构的变形。 
作为本发明优选的实施方式,底部地下主体结构包括底板、衬墙和梁板柱,衬墙紧贴深基坑四周的排桩或者地下连续墙,两相对的衬墙间设有梁板柱。 
地下主体结构由下而上进行逐层搭建,并由下而上逐层拆除内支撑1,土钉2在此过程中发挥临时支撑的作用,进而保证临时的内支撑1拆除之后,围护结构变形能符合深基坑内建筑施工的规定。 
当然,本发明创造并不局限于上述实施方式,熟悉本领域的技术人员在不违背本发明精神的前提下还可作出等同变形或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。 

Claims (5)

1.一种深基坑工程中的不换撑施工方法,其特征在于,包括以下步骤:
1)、沿深基坑四周方向设置排桩或地下连续墙,在深基坑内设置若干顶靠在彼此相对的排桩或地下连续墙间的内支撑;
2)、在深基坑环梁处,沿深基坑四周设置与排桩或地下连续墙固定连接并嵌入土层的土钉;
3)、开挖深基坑,在深基坑内进行底部地下主体结构施工;
4)、拆除深基坑内最底部的内支撑;
5)、在底部地下主体结构上施工上层地下主体结构;
6)、循环步骤4)和步骤5)至完成深基坑内部工程的施工。
2.根据权利要求1所述的深基坑工程中的不换撑施工方法,其特征在于:所述步骤1)中在深基坑内沿排桩或者地下连续墙向下设有若干彼此平行的内支撑,各所述内支撑为钢管支撑或者钢筋混凝土支撑。
3.根据权利要求1所述的深基坑工程中的不换撑施工方法,其特征在于:所述步骤2)中各土钉沿深基坑四周倾斜向下打入深基坑侧面土层内,各所述土钉彼此平行。
4.根据权利要求3所述的深基坑工程中的不换撑施工方法,其特征在于:各所述土钉的顶端与排桩或者地下连续墙固定连接。
5.根据权利要求1所述的深基坑工程中的不换撑施工方法,其特征在于:所述底部地下主体结构包括底板、衬墙和梁板柱,所述衬墙紧贴深基坑四周的排桩或者地下连续墙,两相对的所述衬墙间设有梁板柱。
CN201310345295.1A 2013-08-08 2013-08-08 一种深基坑工程中的不换撑施工方法 Active CN103437360B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310345295.1A CN103437360B (zh) 2013-08-08 2013-08-08 一种深基坑工程中的不换撑施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310345295.1A CN103437360B (zh) 2013-08-08 2013-08-08 一种深基坑工程中的不换撑施工方法

Publications (2)

Publication Number Publication Date
CN103437360A true CN103437360A (zh) 2013-12-11
CN103437360B CN103437360B (zh) 2016-12-28

Family

ID=49691069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310345295.1A Active CN103437360B (zh) 2013-08-08 2013-08-08 一种深基坑工程中的不换撑施工方法

Country Status (1)

Country Link
CN (1) CN103437360B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594361A (zh) * 2015-01-14 2015-05-06 济南轨道交通集团有限公司 一种工字型围护桩以及围护结构兼做主体结构的施工方法
CN105369813A (zh) * 2015-10-14 2016-03-02 河海大学 一种土工模袋式支撑架设方法
CN111305225A (zh) * 2020-03-09 2020-06-19 中铁科建工程有限公司 一种地下防护结构的工程施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4911582A (en) * 1987-06-01 1990-03-27 Schnabel Foundation Company Concrete replacement wall and method of constructing the wall
CN1348037A (zh) * 2000-10-18 2002-05-08 首钢总公司 短土钉连续墙基坑支护方法
CN101718094A (zh) * 2009-11-10 2010-06-02 朱奎 一种带地下室建筑物的基坑支护施工方法
CN202055249U (zh) * 2010-12-30 2011-11-30 江苏江中集团有限公司 一种微型管桩结合复合土钉墙支护结构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4911582A (en) * 1987-06-01 1990-03-27 Schnabel Foundation Company Concrete replacement wall and method of constructing the wall
CN1348037A (zh) * 2000-10-18 2002-05-08 首钢总公司 短土钉连续墙基坑支护方法
CN101718094A (zh) * 2009-11-10 2010-06-02 朱奎 一种带地下室建筑物的基坑支护施工方法
CN202055249U (zh) * 2010-12-30 2011-11-30 江苏江中集团有限公司 一种微型管桩结合复合土钉墙支护结构

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋克选: "排桩内支撑联合土钉支护体系的数值模拟", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 6, 15 June 2011 (2011-06-15), pages 16 - 19 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594361A (zh) * 2015-01-14 2015-05-06 济南轨道交通集团有限公司 一种工字型围护桩以及围护结构兼做主体结构的施工方法
CN104594361B (zh) * 2015-01-14 2016-08-24 济南轨道交通集团有限公司 一种工字型围护桩以及围护结构兼做主体结构的施工方法
CN105369813A (zh) * 2015-10-14 2016-03-02 河海大学 一种土工模袋式支撑架设方法
CN111305225A (zh) * 2020-03-09 2020-06-19 中铁科建工程有限公司 一种地下防护结构的工程施工方法

Also Published As

Publication number Publication date
CN103437360B (zh) 2016-12-28

Similar Documents

Publication Publication Date Title
CN203320532U (zh) 一种紧邻深基坑附近桩基防护装置
CN104947681B (zh) 一种超大超深地下室基坑的施工方法
CN103912134B (zh) 既有建筑原位地下空间结构及施工方法
CN102653945A (zh) 基础托换结构及其施工方法
CN207228186U (zh) 建筑加固纠偏的注浆复合地基
CN103882869A (zh) 一种用于基坑围护的斜向支撑桩结构及其施工方法
CN103790393B (zh) 一种既有建筑结构整体置换的施工方法
CN106368219A (zh) 一种深基坑的支护加固结构与施工方法
CN105155548A (zh) 一种拉索式双排桩(墙)支护结构
CN103437360A (zh) 一种深基坑工程中的不换撑施工方法
CN209509554U (zh) 既有建筑物下新增地下室用托换结构
CN105178358A (zh) 一种逆作法竖向支承体系及其施工方法
CN203499695U (zh) 繁华城区浅埋暗挖隧道加固结构
CN205399397U (zh) 一种用于逆作法的变截面墙式竖向支承结构
CN205188999U (zh) 一种逆作法竖向支承体系
CN101979777B (zh) 一种现浇空芯方桩的组合型地下连续墙板的施工方法
CN102465534A (zh) 相邻双坑的施工方法
JP2002364006A (ja) 水中基礎の構築工法
CN110397018A (zh) 一种适用于软土地区的建筑地基加固方法
CN105421488A (zh) 地下复合围护体系中基础底板换撑的施工方法
CN105239579A (zh) 软土深基坑变形的封堵墙式控制方法
CN105297797A (zh) 一种用于地下空间开发中既有建筑物原位保护的环箍支护形式
CN105862902A (zh) 钢-混凝土嵌套复合筒基础结构及其施工设备和施工方法
CN203066083U (zh) 相邻的两个基坑的支护结构
CN212175798U (zh) 一种深基坑整体支撑装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Applicant after: Foundation Design Group Co., Ltd of Guangdong Province

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Applicant before: Guangdong Prov. Foundation Engineering Co.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGDONG PROV. FOUNDATION ENGINEERING CO. TO: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant