CN103437347B - 钢管分支桩及施工方法 - Google Patents

钢管分支桩及施工方法 Download PDF

Info

Publication number
CN103437347B
CN103437347B CN201310308679.6A CN201310308679A CN103437347B CN 103437347 B CN103437347 B CN 103437347B CN 201310308679 A CN201310308679 A CN 201310308679A CN 103437347 B CN103437347 B CN 103437347B
Authority
CN
China
Prior art keywords
steel pipe
pile
hollow steel
branch
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310308679.6A
Other languages
English (en)
Other versions
CN103437347A (zh
Inventor
孙天明
程依祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang CTB Corrugated Steel Web Co., Ltd.
Original Assignee
Zhejiang Ctb Corrugated Steel Web Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Ctb Corrugated Steel Web Co Ltd filed Critical Zhejiang Ctb Corrugated Steel Web Co Ltd
Priority to CN201310308679.6A priority Critical patent/CN103437347B/zh
Publication of CN103437347A publication Critical patent/CN103437347A/zh
Application granted granted Critical
Publication of CN103437347B publication Critical patent/CN103437347B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

本发明涉及混凝土摩擦桩,公开一种钢管分支桩及施工方法,钢管分支桩,包括钢管(1),所述的钢管(1)上布置开孔(11),开孔(11)内布置有向钢管(1)外延伸的分支桩(3)。施工方法包括在钢管(1)上开孔(11),然后通过开孔(11)向大地中打入分支桩(3)。本发在钢管桩上设置向钢管桩外延伸,插入大地中的树桩,增大了摩擦桩整体与大地的接触面积,提高了摩擦桩的摩擦力,另一方面,当摩擦桩发生下沉等问题时,可以通过进入桩内,进行打贯穿孔,布置树桩、树榴等方式对桩体进行二次维护和加固。

Description

钢管分支桩及施工方法
技术领域
本发明涉及混凝土摩擦桩,尤其涉及一种钢管分支桩及施工方法。
背景技术
摩擦桩是靠桩身表面和原地质土壤的摩擦力来承担上部结构的重量,现有的摩擦桩的桩中心部位为混凝土,因为其不与大地接触,因此起不到应有的作用,反而增加了摩擦桩的重量,抵消了一部分的摩擦力。另外,由于摩擦桩的外壁为圆形,其与大地的接触面积小,摩擦力也小。
发明内容
本发明针对现有技术中的摩擦桩为实心桩,重量重,摩擦桩外壁与大地的接触面积小,摩擦力小,摩擦桩容易下沉等缺点,提供了一种空心摩擦桩外部设置分支分支桩的方式,增大了摩擦桩与大地的接触面积,提高了摩擦桩的摩擦力的钢管分支桩及施工方法。
为了解决上述技术问题,本发明通过下述技术方案得以解决:
钢管分支桩,包括波形空心钢管,所述的波形空心钢管上布置开孔,开孔内布置有向波形空心钢管外延伸的分支桩。
作为优选,所述的分支桩的一端位于波形空心钢管内,另一端穿过波形空心钢管插入大地中。
作为优选,所述的波形空心钢管外设置混凝土桩,混凝土桩上还设有与波形空心钢管的开孔相通的混凝土维护孔。
作为优选,所述的分支桩穿过波形空心钢管与混凝土桩插入大地中。
作为优选,所述的混凝土维护孔外设置树瘤,树瘤为混凝土。
作为优选,所述的分支桩与混凝土桩的外壁的夹角a小于等于90°。
作为优选,所述的钢管为波形钢板围成的波形钢管。
作为优选,所述的分支桩为钢管、钢柱或树桩。
钢管分支桩施工方法,包括上述的钢管分支桩,还包括以下步骤:
a、将钢筋笼和波形空心钢管同时放入打好的桩孔内;或先放钢筋笼再放波形空心钢管;
b、在波形空心钢管与桩孔之间浇筑混凝土,生成混凝土桩;
c、待混凝土桩凝固后,抽去波形空心钢管内的水,并在波形空心钢管内打贯穿孔,贯穿孔连通波形空心钢管与大地;
d、通过贯穿孔打入分支桩,直至分支桩插入大地中。
作为优选,所述的步骤c中,通过贯穿孔高压灌注混凝土形成树瘤。
本分支桩也可以在发现空心桩不均匀沉降时采用,作为一种后期补救的强化措施。维护孔的设置,也可以做成预埋式压浆导管,导管固定在钢管桩上。需要增加承载力时,进行压浆。压浆前应堵住压浆导管,以防止地下水进入压浆导管。
本发在钢管桩上设置向钢管桩外延伸,插入大地中的分支桩,增大了摩擦桩整体与大地的接触面积,提高了摩擦桩的摩擦力,另一方面,当摩擦桩发生下沉等问题时,可以通过进入桩内,进行打贯穿孔,布置分支桩、树瘤等方式对桩体进行二次维护和加固。
附图说明
图1为本发明实施例1的结构示意图。
图2为本发明实施例2的结构示意图。
图3为本发明实施例3的结构示意图。
图4为本发明实施例1的俯视图。
其中1—波形空心钢管、2—混凝土桩、3—分支桩、4—下人孔、5—大地、6—树瘤、11—开孔、21—混凝土维护孔。
具体实施方式
下面结合附图1至附图4与具体实施方式对本发明作进一步详细描述:
实施例1
钢管分支桩,如图1、4所示,包括波形空心钢管1,所述的波形空心钢管1上布置开孔11,开孔11内布置有向波形空心钢管1外延伸的分支桩3。
分支桩3的一端位于波形空心钢管1内,另一端穿过波形空心钢管1插入大地5中。波形空心钢管1外设置混凝土桩2,混凝土桩2上还设有与波形空心钢管1的开孔11相通的混凝土维护孔21。
分支桩3穿过波形空心钢管1与混凝土桩2插入大地5中。
分支桩3与混凝土桩2的外壁的夹角a等于90°。钢管分支桩的上部还设有下人孔4。分支桩3为钢管。
钢管分支桩施工方法,包括上述的钢管分支桩,还包括以下步骤:
a、将钢筋笼和波形空心钢管1同时放入打好的桩孔内;
b、在波形空心钢管1与桩孔之间浇筑混凝土,生成混凝土桩2;
c、待混凝土桩2凝固后,抽去波形空心钢管1内的水,并在波形空心钢管1内打贯穿孔,贯穿孔连通波形空心钢管1与大地5;
d、通过贯穿孔打入分支桩3,直至分支桩3插入大地5中。
实施例2
钢管分支桩,如图2所示,包括波形空心钢管1,所述的波形空心钢管1上布置开孔11,开孔11内布置有向波形空心钢管1外延伸的分支桩3。
分支桩3的一端位于波形空心钢管1内,另一端穿过波形空心钢管1插入大地5中。波形空心钢管1外设置混凝土桩2,混凝土桩2上还设有与波形空心钢管1的开孔11相通的混凝土维护孔21。
分支桩3穿过波形空心钢管1与混凝土桩2插入大地5中。
分支桩3与混凝土桩2的外壁的夹角a等于70°。钢管分支桩的上部还设有下人孔4。波形空心钢管1为波形钢板围成的波形钢管。波形钢管的纵向截面为直线型。分支桩3树桩。
钢管分支桩施工方法,包括上述的钢管分支桩,还包括以下步骤:
a、或先放钢筋笼再放波形空心钢管1;
b、在波形空心钢管1与桩孔之间浇筑混凝土,生成混凝土桩2;
c、待混凝土桩2凝固后,抽去波形空心钢管1内的水,并在波形空心钢管1内打贯穿孔,贯穿孔连通波形空心钢管1与大地5;
d、通过贯穿孔打入分支桩3,直至分支桩3插入大地5中。
实施例3
钢管分支桩,如图3所示,包括波形空心钢管1,所述的波形空心钢管1上布置开孔11,开孔11内布置有向波形空心钢管1外延伸的分支桩3。
分支桩3的一端位于波形空心钢管1内,另一端穿过波形空心钢管1插入大地5中。波形空心钢管1外设置混凝土桩2,混凝土桩2上还设有与波形空心钢管1的开孔11相通的混凝土维护孔21。
分支桩3穿过波形空心钢管1与混凝土桩2插入大地5中。
分支桩3与混凝土桩2的外壁的夹角a等于70°。波形空心钢管分支桩的上部还设有下人孔4。波形空心钢管1为波形钢板围成的波形钢管。波形钢管的纵向截面为波形,波形钢管为空心,通过波形钢板折弯而成,其纵向截面形状也与现有的多种波形钢板的截面相同,波形空心钢管也可以通过一体浇筑成型。
混凝土维护孔21外设置树瘤6,树瘤6为混凝土。分支桩3为钢柱。
钢管分支桩施工方法,包括上述的钢管分支桩,还包括以下步骤:
a、将波形空心钢管1放入打好的桩孔内;
b、在波形空心钢管1与桩孔之间放置钢筋笼并浇筑混凝土,生成混凝土桩2;
c、待混凝土桩2凝固后,抽去波形空心钢管1内的水,并在波形空心钢管1内打贯穿孔,贯穿孔连通波形空心钢管1与大地5;
d、通过贯穿孔打入分支桩3,直至分支桩3插入大地5中。
所述的步骤c中,通过贯穿孔高压灌注混凝土形成树瘤6。通过设置树瘤,增大了混凝土桩2的外壁与大地的接触面积,提高了摩擦桩整体的摩擦力。
分支桩3由波形空心钢管1上的开孔11插入,穿过混凝土桩2上的混凝土维护孔21进入土壤中,由于混凝土维护孔21为斜设,因此,分支桩5插入后,分支桩5的上端51即与混凝土桩2连接端离地表距离较近,分支桩5的下端51即与土壤接触端离地表距离较远。当摩擦桩发生下沉时,斜设的分支桩5在遇到附近的大地中存在的硬物如石块或岩石时,能够将摩擦桩牢牢的卡住,阻止摩擦桩继续下沉。
同时,待混凝土桩2凝固后,抽去波形空心钢管1内的水,并在波形空心钢管1内打贯穿孔,贯穿孔连通波形空心钢管1与大地;通过通孔高压灌注混凝土形成树瘤6。
总之,以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所作的均等变化与修饰,皆应属本发明专利的涵盖范围。

Claims (2)

1.钢管分支桩施工方法,包括钢管分支桩,钢管分支桩包括波形空心钢管(1),所述的波形空心钢管(1)上布置开孔(11),开孔(11)内布置有向波形空心钢管(1)外延伸的分支桩(3),其特征在于:还包括以下步骤:
a、将钢筋笼和波形空心钢管(1)同时放入打好的桩孔内;或先放钢筋笼再放波形空心钢管(1);
b、在波形空心钢管(1)与桩孔之间浇筑混凝土,生成混凝土桩(2);
c、待混凝土桩(2)凝固后,抽去波形空心钢管(1)内的水,并在波形空心钢管(1)内打贯穿孔,贯穿孔连通波形空心钢管(1)与大地(5);
d、通过贯穿孔打入分支桩(3),直至分支桩(3)插入大地(5)中。
2.根据权利要求1所述的钢管分支桩施工方法,其特征在于:所述的步骤c中,通过贯穿孔高压灌注混凝土形成树瘤(6)。
CN201310308679.6A 2013-07-18 2013-07-18 钢管分支桩及施工方法 Active CN103437347B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310308679.6A CN103437347B (zh) 2013-07-18 2013-07-18 钢管分支桩及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310308679.6A CN103437347B (zh) 2013-07-18 2013-07-18 钢管分支桩及施工方法

Publications (2)

Publication Number Publication Date
CN103437347A CN103437347A (zh) 2013-12-11
CN103437347B true CN103437347B (zh) 2016-06-29

Family

ID=49691056

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310308679.6A Active CN103437347B (zh) 2013-07-18 2013-07-18 钢管分支桩及施工方法

Country Status (1)

Country Link
CN (1) CN103437347B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106626032A (zh) * 2016-11-29 2017-05-10 金陵科技学院 一种整体式内凸起空心抗拔桩及其制备方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001040660A (ja) * 1999-08-03 2001-02-13 Modern Material:Kk 鋼管杭の構造
JP3564684B2 (ja) * 2000-09-22 2004-09-15 株式会社設計室ソイル 合成杭の構築方法
CN102493439A (zh) * 2011-11-25 2012-06-13 唐瑞文 建筑基础桩构件
CN102691295A (zh) * 2012-05-30 2012-09-26 张永忠 丁齿混凝土管桩及其施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001040660A (ja) * 1999-08-03 2001-02-13 Modern Material:Kk 鋼管杭の構造
JP3564684B2 (ja) * 2000-09-22 2004-09-15 株式会社設計室ソイル 合成杭の構築方法
CN102493439A (zh) * 2011-11-25 2012-06-13 唐瑞文 建筑基础桩构件
CN102691295A (zh) * 2012-05-30 2012-09-26 张永忠 丁齿混凝土管桩及其施工方法

Also Published As

Publication number Publication date
CN103437347A (zh) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103437346B (zh) 带树瘤的钢管桩及施工方法
CN101205717A (zh) 一种超深地下连续墙接头
CN103485333B (zh) 波形空心钢管摩擦桩及施工方法
CN103883796A (zh) 泥砂淤泥区手掘式顶管施工装置及方法
CN206530363U (zh) 一种可维护式铁路隧底结构外排水系统
CN203834491U (zh) 一种用于水中淤泥层中深基坑施工的围堰
CN102535519A (zh) 地下连续墙工字钢接头结构及其施工方法
CN202881958U (zh) 一种含有降水功能的基坑支护结构
CN103741705B (zh) 双层桶盖吸力式桶桩复合基础及施工方法
CN205857173U (zh) 一种应用在水上灌注桩的新型钢护筒护套
CN103437347B (zh) 钢管分支桩及施工方法
CN203757177U (zh) 泥砂淤泥区手掘式顶管施工装置
CN206220112U (zh) 长短协力控沉劲性复合桩体系
CN102434718B (zh) 一种顶管机始发的端头加固方法
CN100577924C (zh) 桩底后注浆方法
CN203583465U (zh) 带树瘤的钢管桩
CN203613562U (zh) 一种地下连续墙柔性接头
CN101691753B (zh) 一种pcc桩桩模及超长pcc桩的施工方法
CN204959733U (zh) 灌注桩钢筋笼结构
CN105040677B (zh) 基坑预制桩与现浇叠合内衬墙箍筋的连接方法
CN203487529U (zh) 波形空心钢管摩擦桩
CN206784369U (zh) 射水管以及应用该射水管的桩板
CN202124857U (zh) 一种劈裂桩
CN205742219U (zh) 一种新型咬合桩支护结构
CN204456092U (zh) 一种围护桩

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD.

Free format text: FORMER OWNER: HANGZHOU BOSHU CIVIL ENGINEERING TECHNOLOGY CO., LTD.

Effective date: 20141128

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311215 HANGZHOU, ZHEJIANG PROVINCE TO: 311200 HANGZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20141128

Address after: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou

Applicant after: Hangzhou Li Yang Steel Structure Co., Ltd.

Address before: Hangzhou City, Zhejiang province 311215 Xiaoshan economic and Technological Development Zone, North Building 2 room 1711 Ning'an

Applicant before: Hangzhou Boshu Civil Engineering Technology Co., Ltd.

ASS Succession or assignment of patent right

Owner name: ZHEJIANG CTB CORRUGATED STEEL WEB CO., LTD.

Free format text: FORMER OWNER: HANGZHOU YANGLI STEEL STRUCTURE CO., LTD.

Effective date: 20150227

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311200 HANGZHOU, ZHEJIANG PROVINCE TO: 314422 HANGZHOU, ZHEJIANG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150227

Address after: 314422, No. 168-2, village, town, Hangzhou, Xiaoshan District, Zhejiang

Applicant after: Zhejiang CTB Corrugated Steel Web Co., Ltd.

Address before: 311200 Nanyang Economic Development Zone, Xiaoshan District, Zhejiang, Hangzhou

Applicant before: Hangzhou Li Yang Steel Structure Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant