CN103437337A - Method for reinforcing soft soil foundation in cushion layer replacement mode - Google Patents

Method for reinforcing soft soil foundation in cushion layer replacement mode Download PDF

Info

Publication number
CN103437337A
CN103437337A CN2013103657985A CN201310365798A CN103437337A CN 103437337 A CN103437337 A CN 103437337A CN 2013103657985 A CN2013103657985 A CN 2013103657985A CN 201310365798 A CN201310365798 A CN 201310365798A CN 103437337 A CN103437337 A CN 103437337A
Authority
CN
China
Prior art keywords
filler
changed
filling
filling out
soft soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103657985A
Other languages
Chinese (zh)
Inventor
丁荣林
梁浩
王小丽
沈彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
State Grid Corp of China SGCC
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd, State Grid Corp of China SGCC, State Grid Shanghai Electric Power Co Ltd filed Critical SHANGHAI URBAN POWER SUPPLY DESIGN Co Ltd
Priority to CN2013103657985A priority Critical patent/CN103437337A/en
Publication of CN103437337A publication Critical patent/CN103437337A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention relates to a method for reinforcing soft soil foundation in a cushion layer replacement mode. The method for reinforcing the soft soil foundation in the cushion layer replacement mode comprises the steps that (1) a position to be excavated is marked out in the soft soil foundation and an excavator is arranged at the position to be excavated; (2) a pit slot is excavated through the excavator and a soil layer and surface dust are cleaned up; (3) filling-replacement filling materials are prepared; (4) the filling-replacement filling materials are filled in the pit slot and are paved flatly and smoothly; (5) a vibration roller is used for grinding the pit slot filled with the filled filling-replacement filling materials; (6) the surface of the filling-replacement filling materials is kept being wet after being grinded, maintenance is started after the filling-replacement filling materials are finally coagulated, and the maintenance time is 30 to 40 days. Compared with the prior art, the method for reinforcing the soft soil foundation in the cushion layer replacement mode enables the soft soil foundation to be high in reinforcing quality, high in intensity, convenient to construct, low in cost, and significant in economical benefit.

Description

The method of filling out bed course mode reinforcing soft ground is changed in a kind of employing
Technical field
The present invention relates to a kind of method of reinforcing soft ground, especially relate to a kind of employing and change the method for filling out bed course mode reinforcing soft ground.
Background technology
Along with the power grid construction develop rapidly, the basic engineering of transmission line of electricity, be related to the safe operation of circuit, more is related to investment and the comprehensive benefit of engineering.Basic pattern commonly used is at present: 1. slab foundation; 2. these two kinds of patterns of bored pile foundation.Wherein the straight column type basis is generally used for geological condition area preferably, and bored concrete pile foundation is generally used for the geology unfavorable areas such as river embankment, weak soil.
At soft soil areas, because its pole and tower foundation design not only will meet general pole and tower foundation designing requirement, also should meet the requirements such as column foot sedimentation amount, gradient, so the soft soil areas pole and tower foundation is designed with its particularity.Because there were many weak points in China in the research aspect the processing of soft soil areas ground and pole and tower foundation thereof in the past, cause soft soil areas pole and tower foundation design level lower, compare the gap that existence is larger with international most advanced level, the ratio of the cost of its foundation the line is busy road overall investment is generally in 25% left and right, what have is even higher, and the not research of carrying out ground stabilization and processing of system, therefore the soft soil areas pole and tower foundation has become link very weak in transmission line construction, ground is processed and design optimization is soft soil areas work transmission line key subjects in the urgent need to address.
At present, in soft clay area, use board-like shallow foundation that following problem is arranged:
(1) bearing capacity of foundation soil of bearing stratum is lower, the overburden layer of shallow-layer is thicker, caused for general steel tower shallow foundation (slab foundation) and compared and need to take larger area, darker embedded depth of foundation with other areas, the excavated volume of the cubic metre of earth and stone is large, and concrete and amount of reinforcement are also large.
(2) the slab foundation baseplate width is large, and basis is subject to external disturbance large, as inhomogeneous preloading or excavation fish pond, ditch etc. are arranged near the tower position, all can cause the stability of basic foundation to be damaged.
(3) for larger steel towers of foundation bearing capacity such as same tower four loops, 500kV circuits, if adopt slab foundation, baseplate width can be very large, and even slab foundation can't meet design requirement, and therefore all needs to adopt bored pile foundation completely.And pile foundation belongs to deep foundation, investment cost is large, its cost is slab foundation 2~4 times, this makes the foundation cost of whole piece circuit very high.
Therefore, under current background, how to enlarge the scope of application of shallow foundation, how the ground of shallow foundation is taked to suitable foundation treatment mode, reduce the shallow foundation floor space, reduce basic material usage, reduce the usage ratio of bored pile in circuit, make shallow foundation have more reasonability and economy at aspects such as floor space, comprehensive costs, will become key one ring of control engineering cost.
Summary of the invention
Purpose of the present invention is exactly to provide the employing simple, that reduce cost of production, reliable construction quality of a kind of job practices to change the method for filling out bed course mode reinforcing soft ground in order to overcome the defect that above-mentioned prior art exists.
Purpose of the present invention can be achieved through the following technical solutions:
The method of filling out bed course mode reinforcing soft ground is changed in a kind of employing, and the method comprises the following steps:
(1) mark the position that will excavate on soft foundation, and excavator is placed in to place to be dug;
(2) excavation hole groove: adopt excavator to excavate the hole groove, and soil layer and the surface dust that will cheat in groove are removed clean;
(3) filler is changed in preparation:
The material of following weight portion is stirred to form with mixer and change filler: 100 parts, water, 90~130 parts of cement, 150~190 parts, flyash, rubble or 1500~2500 parts;
(4) filler paving: will change filler and insert in the groove of hole, and it is smooth to pave;
(5) roll: use vibratory roller to be rolled filling in the hole groove that changes filler;
(6) maintenance: roll the surface wettability that filler is changed in rear maintenance, to after changing filler final set, starting maintenance, curing time is 30~40 days.
The degree of depth of described hole groove is 0.5~3 meter.
The described filler of step (4) the concrete steps that pave are: needs are changed to the hole bottom land layer watering of filling out and soak, use road roller precompressed 1~2 time; Then layering paves, and according to the needs that pave of shallow principle after first dark, changes the position of filling out, and every layer of THICKNESS CONTROL paved is at 40~50cm.
The described concrete steps that roll of step (5) are: use vibratory roller to be rolled, while rolling, trailing wheel overlapping 1/2 is taken turns wide, trailing wheel must surpass the seam crossing of two sections, and rear wheel load is complete when wide, is one time, roll 7~10 times, meet the requirements of compactness and stop.
Compared with prior art, the present invention has the following advantages and beneficial effect:
1. with other Ground Treatment mode, compare, the inventive method can be saved great deal of steel; In the present invention, change filler and easily configure, cost is lower;
2. work progress of the present invention is simple, does not need expensive plant equipment, and construction quality is easy to control and guarantee, and can carry out the larger area reinforcement of soft soil.
3. method cost of the present invention is low, remarkable in economical benefits.
4. applied widely to soft foundation of method of the present invention, the grounds such as mud, mucky soil, cohesive soil, silt, loess, sand, artificial earth fill and gravelly soil are all used method of the present invention.
The specific embodiment
Below in conjunction with specific embodiment, the present invention is described in detail.
Embodiment
The method of filling out bed course mode reinforcing soft ground is changed in a kind of employing, and the method comprises the following steps:
(1) mark the position that will excavate on soft foundation, and excavator is placed in to place to be dug;
(2) excavation hole groove: adopt excavator to excavate the hole groove, the degree of depth of hole groove is 0.5~3 meter, and soil layer and the surface dust that will cheat in groove are removed clean;
(3) filler is changed in preparation:
The material of following weight portion is stirred to form with mixer and change filler: 100 parts, water, 90~130 parts of cement, 150~190 parts, flyash, rubble or 1500~2500 parts;
(4) filler paving: needs are changed to the hole bottom land layer watering of filling out wetting, use road roller precompressed 1~2 time; Then layering paves, and according to the needs that pave of shallow principle after first dark, changes the position of filling out, and every layer of THICKNESS CONTROL paved is at 40~50cm;
(5) roll: use vibratory roller to be rolled, while rolling, trailing wheel overlapping 1/2 is taken turns wide, and trailing wheel must surpass the seam crossing of two sections, and rear wheel load is complete when wide, is one time, rolls 7~10 times, meets the requirements of compactness and stops;
(6) maintenance: roll the surface wettability that filler is changed in rear maintenance, to after changing filler final set, starting maintenance, curing time is 30~40 days.

Claims (4)

1. the method for filling out bed course mode reinforcing soft ground is changed in an employing, it is characterized in that, the method comprises the following steps:
(1) mark the position that will excavate on soft foundation, and excavator is placed in to place to be dug;
(2) excavation hole groove: adopt excavator to excavate the hole groove, and soil layer and the surface dust that will cheat in groove are removed clean;
(3) filler is changed in preparation:
The material of following weight portion is stirred to form with mixer and change filler: 100 parts, water, 90~130 parts of cement, 150~190 parts, flyash, rubble or 1500~2500 parts;
(4) filler paving: will change filler and insert in the groove of hole, and it is smooth to pave;
(5) roll: use vibratory roller to be rolled filling in the hole groove that changes filler;
(6) maintenance: roll the surface wettability that filler is changed in rear maintenance, to after changing filler final set, starting maintenance, curing time is 30~40 days.
2. the method for filling out bed course mode reinforcing soft ground is changed in a kind of employing according to claim 1, it is characterized in that, the degree of depth of described hole groove is 0.5~3 meter.
3. the method for filling out bed course mode reinforcing soft ground is changed in a kind of employing according to claim 1, it is characterized in that, the described filler of step (4) the concrete steps that pave are:
Needs are changed to the hole bottom land layer watering of filling out and soak, use road roller precompressed 1~2 time; Then layering paves, and according to the needs that pave of shallow principle after first dark, changes the position of filling out, and every layer of THICKNESS CONTROL paved is at 40~50cm.
4. the method for filling out bed course mode reinforcing soft ground is changed in a kind of employing according to claim 1, it is characterized in that, the described concrete steps that roll of step (5) are:
Use vibratory roller to be rolled, while rolling, trailing wheel overlapping 1/2 is taken turns wide, and trailing wheel must surpass the seam crossing of two sections, and rear wheel load is complete when wide, is one time, rolls 7~10 times, meets the requirements of compactness and stops.
CN2013103657985A 2013-08-21 2013-08-21 Method for reinforcing soft soil foundation in cushion layer replacement mode Pending CN103437337A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103657985A CN103437337A (en) 2013-08-21 2013-08-21 Method for reinforcing soft soil foundation in cushion layer replacement mode

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103657985A CN103437337A (en) 2013-08-21 2013-08-21 Method for reinforcing soft soil foundation in cushion layer replacement mode

Publications (1)

Publication Number Publication Date
CN103437337A true CN103437337A (en) 2013-12-11

Family

ID=49691046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103657985A Pending CN103437337A (en) 2013-08-21 2013-08-21 Method for reinforcing soft soil foundation in cushion layer replacement mode

Country Status (1)

Country Link
CN (1) CN103437337A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018485A (en) * 2014-06-18 2014-09-03 东南大学 Bed course replacing and filling and carbonization reinforcing method of soft soil foundation
CN105297700A (en) * 2015-10-15 2016-02-03 中国建筑第八工程局有限公司 Method for treating sludge or quicksand foundation
CN106638544A (en) * 2016-12-26 2017-05-10 中冶天工集团有限公司 Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN108894209A (en) * 2018-06-26 2018-11-27 中国电力工程顾问集团华东电力设计院有限公司 The processing method and application of liquefied silt ground
CN109868700A (en) * 2019-01-23 2019-06-11 杜毅 A kind of highway engineering construction soft groundsill reinforcing equipment and reinforcement means
CN112095381A (en) * 2020-09-17 2020-12-18 中国十七冶集团有限公司 Construction method for soft roadbed treatment
CN113356176A (en) * 2021-07-15 2021-09-07 重庆尚源建筑景观设计有限公司 Soft foundation treatment method
CN113417273A (en) * 2021-06-29 2021-09-21 中铁十八局集团第一工程有限公司 Silt stratum underground pipe gallery foundation sand replacement and filling reinforcement method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61106817A (en) * 1984-10-31 1986-05-24 Shinwa Kousetsu Kk Method of replacing ground with crushed stones
CN101265701A (en) * 2007-03-16 2008-09-17 张伯谦 Soft soil foundation reinforcing means
CN101974898A (en) * 2010-11-03 2011-02-16 成都四海岩土工程有限公司 Roller compacted concrete cushion changing and filling method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61106817A (en) * 1984-10-31 1986-05-24 Shinwa Kousetsu Kk Method of replacing ground with crushed stones
CN101265701A (en) * 2007-03-16 2008-09-17 张伯谦 Soft soil foundation reinforcing means
CN101974898A (en) * 2010-11-03 2011-02-16 成都四海岩土工程有限公司 Roller compacted concrete cushion changing and filling method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
蒋国忠: "换填垫层法在地基处理中的应用及效果", 《丽水学院学报》 *
裴利剑等: "《地基基础工程施工》", 31 December 2010, 科学出版社 *
雷兵荣: "浅谈换填垫层法在建筑地基处理中的应用", 《中国水运》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104018485A (en) * 2014-06-18 2014-09-03 东南大学 Bed course replacing and filling and carbonization reinforcing method of soft soil foundation
CN105297700A (en) * 2015-10-15 2016-02-03 中国建筑第八工程局有限公司 Method for treating sludge or quicksand foundation
CN105297700B (en) * 2015-10-15 2018-06-29 中国建筑第八工程局有限公司 A kind of mud, drift sand ground processing method
CN106638544A (en) * 2016-12-26 2017-05-10 中冶天工集团有限公司 Anti-seepage and anti-cracking construction method for ultra-large reinforced concrete bio-oxidation pond in cold area
CN108894209A (en) * 2018-06-26 2018-11-27 中国电力工程顾问集团华东电力设计院有限公司 The processing method and application of liquefied silt ground
CN109868700A (en) * 2019-01-23 2019-06-11 杜毅 A kind of highway engineering construction soft groundsill reinforcing equipment and reinforcement means
CN112095381A (en) * 2020-09-17 2020-12-18 中国十七冶集团有限公司 Construction method for soft roadbed treatment
CN112095381B (en) * 2020-09-17 2021-11-02 中国十七冶集团有限公司 Construction method for soft roadbed treatment
CN113417273A (en) * 2021-06-29 2021-09-21 中铁十八局集团第一工程有限公司 Silt stratum underground pipe gallery foundation sand replacement and filling reinforcement method
CN113356176A (en) * 2021-07-15 2021-09-07 重庆尚源建筑景观设计有限公司 Soft foundation treatment method

Similar Documents

Publication Publication Date Title
CN103437337A (en) Method for reinforcing soft soil foundation in cushion layer replacement mode
CN106836186B (en) A kind of construction technology of utilizing solidified earth from sludge
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN103422497A (en) Method for reinforcing soft soil foundation by using cement-soil mixing pile
CN103422511A (en) Reinforcement method for transmission tower shallow base foundation under composite soft soil foundation
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN100398752C (en) Drid area grit gravel grit gravel stone river current ecological repairing river course infiltration reduction method
CN103276649B (en) Side is had to limit layering many thickness Stone Filled Embankment construction method
CN105804007B (en) A kind of reinforced earth quaywall structure based on the soft base of beach
CN103437340A (en) Method for strengthening soft foundation through high-pressure jet grouting
CN110306565B (en) Road ecological slope protection system and construction method
CN110144783B (en) Roadbed construction method
CN103806432A (en) Method for treating foundations in slope filling and digging joint part of wet and soft zone in loess region
CN106930231A (en) A kind of construction method of the engineering flood bank reinforcing that is applied to pass the flood period
CN106049379B (en) Interim electricity-generating method and enrockment self bursting dam during the construction hysteresis of spillway downstream
CN105781556A (en) Construction method for shield to penetrate through shallow-covered urban landscape lake downwards
CN105019425A (en) Construction method of drainage body and solidified layer combined foundation structure
CN113818402A (en) Reinforcing and reinforcing structure of clay core rockfill dam and construction method thereof
CN103276717B (en) The method of composite earthwork synthetic materials reinforcement cushion soft soil foundation
CN102251499B (en) Ecological permeability reducing method and ecological permeability reducing soil for river
CN112813756A (en) Roadbed based on municipal soft soil and construction method
CN108316237B (en) Revetment retaining wall
CN102116007B (en) Isolation waterproof filling method for treating surface layer of highway foundation
CN206220108U (en) Cut Slopes of Expansive Soil reinforced earth back-pressure antiseepage supporting construction
AU2021102288A4 (en) Composite Replacement Structure and Treatment for Soft Base of Coastal Mudflat

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131211