CN103434976B - 阀外风冷系统电机更换装置 - Google Patents

阀外风冷系统电机更换装置 Download PDF

Info

Publication number
CN103434976B
CN103434976B CN201310409579.2A CN201310409579A CN103434976B CN 103434976 B CN103434976 B CN 103434976B CN 201310409579 A CN201310409579 A CN 201310409579A CN 103434976 B CN103434976 B CN 103434976B
Authority
CN
China
Prior art keywords
motor
lifting platform
rod
manual lifting
adjusting screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310409579.2A
Other languages
English (en)
Other versions
CN103434976A (zh
Inventor
张斌
韦鹏
窦俊廷
徐辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Ningxia Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Ningxia Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Ningxia Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310409579.2A priority Critical patent/CN103434976B/zh
Publication of CN103434976A publication Critical patent/CN103434976A/zh
Application granted granted Critical
Publication of CN103434976B publication Critical patent/CN103434976B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Motor Or Generator Cooling System (AREA)

Abstract

本发明涉及一种阀外风冷系统电机更换装置。其特点是:包括手动升降平台(5),在该手动升降平台(5)底部安装有万向轮(6),在该手动升降平台(5)的顶部安装有至少2个定位架(4),在每个定位架(4)上均安装有调节螺杆(1),该调节螺杆(1)的一端设有旋转把手而其另一端从定位架(4)中穿过后与电机固定卡套(2)连接,并且该调节螺杆(1)与定位架(4)之间采用螺纹连接。采用本发明的更换装置后,即解决了现场电机更换的难题,消除了设备隐患,又带来了安全效益。经过实地试用证明,更换1台风机仅需1.6个小时,大大减小更换电机所用时间,可在保证直流系统安全稳定运行的同时,对异常电机及时进行更换。

Description

阀外风冷系统电机更换装置
技术领域
本发明涉及一种阀外风冷系统电机更换装置。
背景技术
目前电力系统中的换流站采用阀外风冷系统对内冷水进行冷却,保证换流阀工作在适当温度范围内。例如某换流站每极共配置24台风机。据数据统计2011年至2012年夏季09:00-17:30,每套外风冷系统24台风机均全部启动。由于电机长时间连续运行,加之其处于户外恶劣工况下,导致其异常率较高。若出现电机故障退出运行的情况,将会减小阀冷系统冷却容量,或若更换故障电机用时过长,将会造成换流阀进阀温度持续上升,造成直流系统降功率,甚至闭锁直流系统等电网事故的发生。
据统计,采用传统工艺更换1台电机需3.4个小时,而根据试验,在夏季极热天气条件下,减少1台风机4小时便可导致降功率。为确保直流系统的安全稳定运行,常常在夏季夜间气温较低时对异常风机进行更换。虽然在一定程度上,确保了直流系统输送容量不受影响,但仍然具有极大的安全隐患。
发明内容
本发明的目的是提供一种阀外风冷系统电机更换装置,能够安全快速的更换阀外风冷系统电机,显著提高工作效率。
一种阀外风冷系统电机更换装置,其特别之处在于:包括手动升降平台,在该手动升降平台底部安装有万向轮,在该手动升降平台的顶部安装有至少2个定位架,在每个定位架上均安装有调节螺杆,该调节螺杆的一端设有旋转把手而其另一端从定位架中穿过后与电机固定卡套连接,并且该调节螺杆与定位架之间采用螺纹连接。
其中在手动升降平台底部安装有6个或8个万向轮。
其中在在手动升降平台的顶部安装有3个定位架。
其中电机固定卡套套装在调节螺杆上并且其与调节螺杆之间采用间隙配合。
其中电机固定卡套为一弧形板,在该弧形板上还覆盖有一层橡胶或塑料。
其中在在该手动升降平台的顶部设有固定槽,在该固定槽内铺设有木板。
采用本发明的更换装置后,即解决了现场电机更换的难题,消除了设备隐患,又带来了安全效益。经过实地试用证明,更换1台风机仅需1.6个小时,大大减小更换电机所用时间,可在保证直流系统安全稳定运行的同时,对异常电机及时进行更换,既保证了直流输送功率,又消除了安全隐患,保障了直流系统安全稳定运行。
附图说明
附图1为本发明的结构示意图。
具体实施方式
如图1所示,本发明是一种阀外风冷系统电机更换装置,包括手动升降平台5,在该手动升降平台5底部安装有万向轮6,在该手动升降平台5的顶部安装有3个定位架4,该3个定位架4间隔120°均匀分布。在每个定位架4上均安装有调节螺杆1,该调节螺杆1的一端设有旋转把手而其另一端从定位架4中穿过后与电机固定卡套2连接,并且该调节螺杆1与定位架4之间采用螺纹连接。其中电机固定卡套2套装在调节螺杆1上并且其与调节螺杆1之间采用间隙配合,使电机固定卡套2不受调节螺杆1旋转的影响。电机固定卡套2采用一块与待更换电机表面相应的弧形板,在该弧形板上还覆盖有一层橡胶或塑料,从而减轻电机与手动升降平台5之间的冲击。
其中在手动升降平台5底部安装有6个或8个万向轮6,经过试用证明,由于待更换电机重量较大,传统的4个万向轮6支撑力不足,需要增加2个或4个万向轮6或辅助支撑轮。另外在该手动升降平台5的顶部设有固定槽3,在该固定槽3内铺设有木板,也具有一定的缓冲作用。
本发明的使用方法是:
首先将手动升降平台5推至检修现场并放置在即将更换的电机下方,将万向轮6上的锁紧装置踩下从而固定,用手顺时针摇动手动升降平台5上的升降控制摇把,缓慢的升起平台直至固定槽3内的木板接触到电机底座。旋转调节螺杆1,通过电机固定卡套2将电机固定,防止其径向倾斜。拆除电机底座上的4个固定螺栓,同时拆除电机连接动力电缆、皮带等附件。逆时针转动手动升降平台5的升降控制摇把,缓慢降下故障电机,此过程一人操作,一人监护,防止由于剧烈晃动导致电机侧倾。最后将手动升降平台5推至一次备品库,用行吊将电机吊下,同时将新电机放在平台上,重复第1步进行电机安装即可。

Claims (1)

1.一种阀外风冷系统电机更换装置,其特征在于:包括手动升降平台(5),在该手动升降平台(5)底部安装有万向轮(6),在该手动升降平台(5)的顶部安装有至少2个定位架(4),在每个定位架(4)上均安装有调节螺杆(1),该调节螺杆(1)的一端设有旋转把手而其另一端从定位架(4)中穿过后与电机固定卡套(2)连接,并且该调节螺杆(1)与定位架(4)之间采用螺纹连接;
其中在手动升降平台(5)底部安装有6个或8个万向轮(6);
其中在在手动升降平台(5)的顶部安装有3个定位架(4);
其中电机固定卡套(2)套装在调节螺杆(1)上并且其与调节螺杆(1)之间采用间隙配合;
其中电机固定卡套(2)为一弧形板,在该弧形板上还覆盖有一层橡胶或塑料;
其中在在该手动升降平台(5)的顶部设有固定槽(3),在该固定槽(3)内铺设有木板。
CN201310409579.2A 2013-08-29 2013-09-10 阀外风冷系统电机更换装置 Expired - Fee Related CN103434976B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310409579.2A CN103434976B (zh) 2013-08-29 2013-09-10 阀外风冷系统电机更换装置

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
CN201310382831 2013-08-29
CN201310382831.5 2013-08-29
CN201310409579.2A CN103434976B (zh) 2013-08-29 2013-09-10 阀外风冷系统电机更换装置

Publications (2)

Publication Number Publication Date
CN103434976A CN103434976A (zh) 2013-12-11
CN103434976B true CN103434976B (zh) 2015-11-18

Family

ID=49688730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310409579.2A Expired - Fee Related CN103434976B (zh) 2013-08-29 2013-09-10 阀外风冷系统电机更换装置

Country Status (1)

Country Link
CN (1) CN103434976B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626266B (zh) * 2018-11-30 2023-06-23 国网河南省电力公司超高压公司 一种立式悬吊式电机的检修平台
CN110104584A (zh) * 2019-05-27 2019-08-09 武汉博腾电力工程有限公司 一种壁挂式电控箱安装辅材架
CN111099516A (zh) * 2019-12-10 2020-05-05 国网浙江省电力有限公司丽水供电公司 一种遥控升降小车
CN111661788A (zh) * 2020-06-12 2020-09-15 嘉兴昂司派新能源有限公司 一种电力设备在维修时可以自由调节角度的辅助装置
CN113843740A (zh) * 2021-10-19 2021-12-28 国网天津市电力公司 更换变压器风扇电机的专用托盘

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2381629Y (zh) * 1999-06-15 2000-06-07 烟台开发区奔腾汽车钣金设备有限公司 移动式液压举升机
CN201120830Y (zh) * 2007-12-05 2008-09-24 北京铁道工程机电技术研究所 一种铁道机车车辆及动车组轮对更换装置
CN101659384A (zh) * 2009-09-03 2010-03-03 江苏省电力公司无锡供电公司 手动液压升降台
CN103128779A (zh) * 2013-01-28 2013-06-05 重庆航星玻璃技术有限公司 装饰条嵌槽自动切槽机及其加工工艺
CN203254100U (zh) * 2013-05-07 2013-10-30 江苏精一电气科技有限公司 地沟表面板焊接定位装置
CN203486842U (zh) * 2013-09-10 2014-03-19 国家电网公司 阀外风冷系统电机更换装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2381629Y (zh) * 1999-06-15 2000-06-07 烟台开发区奔腾汽车钣金设备有限公司 移动式液压举升机
CN201120830Y (zh) * 2007-12-05 2008-09-24 北京铁道工程机电技术研究所 一种铁道机车车辆及动车组轮对更换装置
CN101659384A (zh) * 2009-09-03 2010-03-03 江苏省电力公司无锡供电公司 手动液压升降台
CN103128779A (zh) * 2013-01-28 2013-06-05 重庆航星玻璃技术有限公司 装饰条嵌槽自动切槽机及其加工工艺
CN203254100U (zh) * 2013-05-07 2013-10-30 江苏精一电气科技有限公司 地沟表面板焊接定位装置
CN203486842U (zh) * 2013-09-10 2014-03-19 国家电网公司 阀外风冷系统电机更换装置

Also Published As

Publication number Publication date
CN103434976A (zh) 2013-12-11

Similar Documents

Publication Publication Date Title
CN103434976B (zh) 阀外风冷系统电机更换装置
CN105977864B (zh) 一种多功能电力输电线路用高空作业工作台
CN203486842U (zh) 阀外风冷系统电机更换装置
CN106532447A (zh) 一种便于移动和固定的电力柜
CN205035031U (zh) 一种液压升降装置
CN203911307U (zh) 一种隔离开关静触头维护装置
CN104518469A (zh) 一种柔性母线装配的工装及使用方法
CN204661180U (zh) 一种塔式起重机
CN203335038U (zh) 一种抽油机
CN203747309U (zh) 高压线地线升降装置
CN206323019U (zh) 一种移动型配电柜
CN204793852U (zh) 一种带电安装驱鸟器装置
CN203877854U (zh) 一种高空作业机用底盘
CN204760830U (zh) 一种隔离开关检修工作架
CN203760911U (zh) 一种输电线路带电异物处理器
CN204333854U (zh) 铁塔t接电缆用固定装置
CN203886047U (zh) 高处作业安全带悬挂支架
CN103606846B (zh) 一种带电更换绝缘子串作业用高强度绝缘绳支撑组件
CN209389484U (zh) 一种用于企业生产的供配电装置
CN201921846U (zh) 钢丝绳滑轮清槽器
CN204304356U (zh) 一种柔性母线装配的工装
CN203545517U (zh) 隔离开关瓷瓶提升装置
CN203396394U (zh) 一种分体式杆塔倾斜检测系统
CN217966799U (zh) 一种齿轮箱油泵电机联轴器减震花键更换工装
CN207294039U (zh) 一种高海拔悬吊式电机快速更换平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151118

Termination date: 20170910