CN103422671B - The construction method of integrated technique show house for building engineering construction - Google Patents

The construction method of integrated technique show house for building engineering construction Download PDF

Info

Publication number
CN103422671B
CN103422671B CN201310382995.8A CN201310382995A CN103422671B CN 103422671 B CN103422671 B CN 103422671B CN 201310382995 A CN201310382995 A CN 201310382995A CN 103422671 B CN103422671 B CN 103422671B
Authority
CN
China
Prior art keywords
show
engineering
integrated technique
construction
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310382995.8A
Other languages
Chinese (zh)
Other versions
CN103422671A (en
Inventor
龙海斌
邹友清
张华�
刘琦江
王震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201310382995.8A priority Critical patent/CN103422671B/en
Publication of CN103422671A publication Critical patent/CN103422671A/en
Application granted granted Critical
Publication of CN103422671B publication Critical patent/CN103422671B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Instructional Devices (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses the construction method of a kind of building engineering construction integrated technique show house, comprise the steps: a, according to construction project to be built feature, integrated design technique show house, draft integrated technique show house all process steps, special process, characteristic portion and inspection of quality requirement, make construction technology panel according to the included each branch subdivisional work of this integrated technique show house and characteristic portion, thin portion node; B, select a suitable place planning to build architectural engineering place periphery, unwrapping wire is oriented integrated technique show house and peripheral planar profile, and smooth location doing hardens; C, front and back order between connecting according to each branch subdivisional work and each branch subdivisional work are progressively made into an integrated technique show house successively, and at its corresponding Sign Board of hanging up integrated technique content that show house is shown everywhere, and by construction technology panel once mounting at integrated technique show house periphery. The integrated model of the present invention and panel, lead the way for engineering construction provides quality control model.

Description

The construction method of integrated technique show house for building engineering construction
Technical field
The present invention relates to a kind of building engineering construction model, especially relate to a kind of scene of holding concurrently tell somebody what one's real intentions are construction method and the integrated technique show house of the building engineering construction integrated technique show house that training and model show.
Background technology
For a long time, operate lack of standardization, level of skill and improve problem slowly for solving construction one line operating personnel, the modes such as that each construction enterprises take is conventionally oral, written word are confided a technological secret and pre-job training way, but different because of the individual degree of understanding, on-site construction operations subdivisional work perception, quality etc. out is all difficult to the promising result that reaches unified; In recent years, various places are imitateed the building engineering quality model system of leading the way of carrying out one after another, i.e. actual according to engineering in the model programme of work making quality in kind model of leading the way, mix scene photograph, the explanatory note of the aspects such as corresponding procedure technology simultaneously, the form of telling somebody what one's real intentions are is more directly perceived, clear, be easy to understand and grasp the model also gradually moulding of programme of work of leading the way. But, the form of a telling somebody what one's real intentions are part is above that piecemeal is told somebody what one's real intentions are before each operation construction, sample making is in engineering in kind, after completing, last operation carries out the sample making of operation, affect construction speed, for large-area Group Buildings, the engineering physical location of selection is restricted by all factors such as duration, training education number, training time, safety; Though another part can be told somebody what one's real intentions are together before each operation construction, each model is independently produced on the horizontal plane in same place, causes floor space large, can not demonstrate intuitively the linking of each model room, also affects land use rate. The quality in kind model that How to choose is desirable, can meet quality sample project, can tell somebody what one's real intentions are again, training education even as check and accept reference, higher innovation requirement has been proposed.
Summary of the invention
The object of the present invention is to provide a kind of high concentration, suit measures to local conditions, floor space is little, more intuitively, can meet that the different construction of each branch subdivisional work teams and groups confide a technological secret simultaneously simultaneously, construction method and the integrated technique show house of the building engineering construction integrated technique show house of education and training function before class.
The construction method of integrated technique show house for this building engineering construction disclosed by the invention, comprises the steps:
A, according to construction project to be built feature, emphasis, difficult point, the floor space of integrated design technique show house, the number of plies, building height, draft all process steps between the included each branch subdivisional work of integrated technique show house and the subdivisional work connection of each branch, privileged sites, thin portion's node and inspection of quality requirement, and each branch subdivisional work and the characteristic portion included according to this integrated technique show house, thin portion node is made construction technology panel, the characteristic portion of integrated technique show house takes stepped layering to cut open the mode of showing, construction technology panel content comprises construction technology process, construction way, CCP, common quality defect control and quality standard,
Branch's subdivisional work comprises main structural engineering, Decorating Project, roofworks, plumbing and heating engineering, electrical engineering and specific engineering;
Wherein the displaying of main structural engineering comprises following content: form work engineering selects representational beam, plate, wall, post, staircase component to show splicing, reinforcing, joint node processing and the support system of template; Reinforced bar engineering selects representational Vierendeel girder, continuous beam, sleeper, shear wall and characteristic portion to show; Concrete works selects representational shear wall, frame column, beam, plate, staircase component to show; Secondary structure engineering selects representational infilled wall to show;
Wherein the displaying of Decorating Project comprises following content: in interior wall just fills and shows, three kinds of metopes represent way: generally plaster, common wall brick and toilet wall brick interior wall; Thin portion node selects wall extension steel wire to show; Ground is shown three kinds and is represented way: general room floor leveling and passageway, toilet floor tile; Decoration of exterior wall selects representational glass curtain wall decoration of exterior wall face to show; Door and window engineering displaying door window hole dead size, door and window are fixed and exterior window waterproof sealing and the processing of thin portion;
Wherein the displaying of roofworks comprises following content: select representational I level waterproof accessible roof to carry out stepped layering and cut open and show displaying;
Wherein the displaying of water supply and sewage work comprises following content: select representational feedwater and toilet drainage to show;
Wherein the displaying of electrical engineering comprises following content: select representational wall surface line pipeline box set aside pre-embedded and line pipeline box to install and show;
Wherein the displaying of specific engineering comprises following content: select that the finished product step of handrail staircase structure construction stage is marked time, half space, stair formwork erecting show;
B, select a suitable place planning to build architectural engineering place periphery, unwrapping wire is oriented integrated technique show house and peripheral planar profile, and smooth location doing hardens;
C, front and back order between connecting according to the each branch subdivisional work described in step a and each branch subdivisional work are progressively made into an integrated technique show house successively, and hang up the Sign Board of integrated technique content that show house is shown, and construction technology panel is arranged on to integrated technique show house periphery successively at integrated technique show house each branch subdivisional work and characteristic portion, thin portion Nodes.
The mode that the present invention combines with panel explanatory note by integrated model in kind, integrate construction model, operating process, CCP, common quality defect control and acceptance criteria etc., engineering construction feature, the key feature of operation, detail structure are shown typically, embody the operation easier of each operation, at the bottom of supplementing pen friends, reach examination, tell somebody what one's real intentions are and train the object developing simultaneously, effectively ensure construction quality. , single engineering model is combined together, each inter process is connected each other meanwhile, and interface is high-visible, and concealed work set aside pre-embedded is shown simultaneously, need complete interface divisions of responsibility more clear and definite, concrete when each operation is told somebody what one's real intentions are.
Brief description of the drawings
Fig. 1 is integrated technique show house plan structure schematic diagram of the present invention.
Fig. 2 is integrated technique show house ground floor plan of the present invention.
Fig. 3 is integrated technique show house plate floor plan of the present invention.
Fig. 4 is integrated technique show house side elevational view of the present invention.
Fig. 5 is integrated technique show house wall of the present invention 1 elevation.
Fig. 6 is integrated technique show house wall of the present invention 2 elevation.
Fig. 7 is integrated technique show house wall of the present invention 3 elevation.
Fig. 8 is integrated technique show house form bracing system drawing of the present invention.
Fig. 9 is integrated technique show house frame column dress mould drawing of the present invention.
Figure 10 is integrated technique show house plate reinforced bar support of the present invention and steel pipe buried in advance drawing.
Detailed description of the invention
The construction method of integrated technique show house for this building engineering construction disclosed by the invention, comprises the steps:
A, according to construction project to be built feature, emphasis, difficult point, the floor space of integrated design technique show house, the number of plies, building height, draft all process steps between the included each branch subdivisional work of integrated technique show house and the subdivisional work connection of each branch, privileged sites, thin portion's node and inspection of quality requirement, and each branch subdivisional work and the characteristic portion included according to this integrated technique show house, thin portion node is made construction technology panel, the characteristic portion of integrated technique show house takes stepped layering to cut open the mode of showing, construction technology panel content comprises construction technology process, construction way, CCP, common quality defect control and quality standard,
Branch's subdivisional work comprises main structural engineering, Decorating Project, roofworks, plumbing and heating engineering, electrical engineering and specific engineering;
Wherein the displaying of main structural engineering comprises following content: form work engineering selects representational beam, plate, wall, post, staircase component to show splicing, reinforcing, joint node processing and the support system of template; Reinforced bar engineering selects representational Vierendeel girder, continuous beam, sleeper, shear wall and characteristic portion to show; Concrete works selects representational shear wall, frame column, beam, plate, staircase component to show; Secondary structure engineering selects representational infilled wall to show;
Wherein the displaying of Decorating Project comprises following content: in interior wall just fills and shows, three kinds of metopes represent way: generally plaster, common wall brick and toilet wall brick interior wall; Thin portion node selects wall extension steel wire to show; Ground is shown three kinds and is represented way: general room floor leveling and passageway, toilet floor tile; Decoration of exterior wall selects representational glass curtain wall decoration of exterior wall face to show; Door and window engineering displaying door window hole dead size, door and window are fixed and exterior window waterproof sealing and the processing of thin portion;
Wherein the displaying of roofworks comprises following content: select representational I level waterproof accessible roof to carry out stepped layering and cut open and show displaying;
Wherein the displaying of water supply and sewage work comprises following content: select representational feedwater and toilet drainage to show;
Wherein the displaying of electrical engineering comprises following content: select representational wall surface line pipeline box set aside pre-embedded and line pipeline box to install and show;
Wherein the displaying of specific engineering comprises following content: select that the finished product step of handrail staircase structure construction stage is marked time, half space, stair formwork erecting show;
B, select a suitable place planning to build architectural engineering place periphery, unwrapping wire is oriented integrated technique show house and peripheral planar profile, and smooth location doing hardens;
C, front and back order between connecting according to the each branch subdivisional work described in step a and each branch subdivisional work are progressively made into an integrated technique show house successively, and hang up the Sign Board of integrated technique content that show house is shown, and construction technology panel is arranged on to integrated technique show house periphery successively at integrated technique show house each branch subdivisional work and characteristic portion, thin portion Nodes.
Encourage complex building as specific embodiment taking certain wound master craftsman of the Spring and Autumn period, it comprises underground 3 layers, 27 layers on the ground, construction area 102411 ㎡, height overall 99.3m, seismic fortification intensity 6 is spent, frame structure antidetonation grade is three grades, and shear wall antidetonation grade is secondary, and Concrete In Structures strength grade is C50~C30.
With the construction method of the supporting building engineering construction of this complex building with integrated technique show house, comprise the steps:
1, according to this complex building feature and heavy difficult point, the floor space that designs this integrated technique show house is 70 ㎡ (as shown in Figure 1), the number of plies is one deck, building height is 3.5 meters, the included each branch subdivisional work of integrated technique show house and the each branch subdivisional work all process steps between connecting subsequently, privileged sites, thin portion's node and inspection of quality requirement, and each branch subdivisional work and the characteristic portion included according to this integrated technique show house, thin portion node is made construction technology panel, the mode that integrated technique show house characteristic portion takes stepped layering to dissect, construction technology panel content comprises construction technology process, construction way, CCP, common quality defect control and quality standard, its main contents comprise:
A, main structural engineering
A1, concrete structure engineering
(1) form work engineering: select representational beam, plate, wall, post, staircase component to show splicing, reinforcing, joint node processing and the support system of template, template adopts the thick clad can wood plywood of 15mm, 10mm clad can bamboo plywood. The wooden a tree, used in making timber for boats of stupefied employing 50 × 70 in shear wall and beam form, outer stupefied employing φ 48 steel pipes, wear Screw arbor with nut at both-ends in body of wall, outer clip butterfly button; The wooden a tree, used in making timber for boats of stupefied use 50 × 70 in post mould, outer stupefied employing 8# channel-section steel, with φ 14 Screw arbor with nut at both-ends, pad clamping. Whole form bracing system all adopts key slot type support for shuttering, as shown in Figure 8, Figure 9.
Technique panel arranges content:
1) construction technology operating process: eject the assembled and reinforcing → beam bottom board of wall, post, upper strata beam forms control line → set up falsework → wall column formwork and side form is installed and reinforcings → plate bed die installs and absolute altitude adjustment → reinforcement installation, examination, the dismounting of build → wall column formwork of concrete dismounting → beam side dismounting → beam slab bed die on bottom surface;
2) construction way: 1. eject shear wall, post and superstructure beam center line, sideline and template on bottom surface control line is installed; 2. adopt " pipe fitting unification " key slot type steel pipe frame to set up falsework, regulate push rod height according to floor height; 3. wall column root arranges mortar leakage prevention presser feet bar, and template is stood on presser feet bar, fixes wooden a tree, used in making timber for boats by spacing, and carries out drawing reinforcing with steel pipe, and inside arranges mortar pad control sectional dimension; 4. according to support rail height at the bottom of structure floor height and deck-molding adjusting beam, lay beam bottom mother plate, mounting rail side template after beam steel bar colligation completes, soffit of girder height is greater than 50cm Screw arbor with nut at both-ends reinforcing is set, and inside arranges mortar pad control sectional dimension; 5. lay template die plate according to absolute altitude; 6. colligation slab muscle, tissue are checked and accepted and casting concrete; 7. after having built 24h, remove wall column formwork and beam side, after issuing form removal order, remove beam slab bed die;
3) CCP
1. template belongs to circulation material, after use, should clear up in time the concrete residue that template surface bonds, and brushing releasing agent, changes in time the template of corner damage, surface peeling; 2. falsework bottom arranges cushion block, and control damages bottom surface, and vertical pole ' s span should meet calculation requirement, and sweep the floor bar and horizon bar must not lack; 3. at the bottom of beam, vertical rod should arrange skid-prevention button, avoids support rail at the bottom of beam to glide; 4. span of the beam and the plank be greater than 4 meters should be according to 1 ‰ ~ 3 ‰ arch cambers; 5. falsework is forbidden being connected with external scaffolding, avoids occurring overall unstability;
4) common quality defect control
1. wall column root spillage: wall column formwork root arranges presser feet bar, increases template bottom and basal plane contact area, stops up gap, effectively reduces spillage;
2. external corner spillage: to block spillage passage as principle, a side rail a tree, used in making timber for boats is moved to 1.5cm outward, pressed another side rail a tree, used in making timber for boats;
3. flange and to fall edges of boards not straight: adopt square steel or angle steel to make typified form, bolt splicing spreading;
4. the swollen mould of wall column formwork root: when wall column is reinforced, the stupefied liftoff control of first master is highly 15cm, and the stupefied spacing of Xia San road master is slightly less than top (principle reducing with highly linear according to lateral pressure);
5) quality standard
Should meet template acceptance of subdivisional work regulation in the requirement of engineering " form work engineering special scheme " and " concrete structure engineering construction quality acceptance specification (version in 2011) " GB50204-2002.
(2) reinforced bar engineering: select representational KL1, KL2, LL1, AZ1, AZ2, shear wall Q4 absolute altitude 1.75m with upper part, slab muscle and privileged sites as the stair reinforced bar engineering of itemizing, as shown in Figure 3. Fully show that reinforcing bar binding, anchoring are connected (as muscle straight thread connections at the bottom of the flash butt welding of KL2 longitudinal rib, KL1 beam, the vertical muscle straight thread of Fig. 5 frame column, electroslag pressure welding connection) with reinforcing bar, plate muscle support (whole slab muscle employing mortar pad, levels reinforcing bar support with supporting steel bar) etc. as shown in figure 10.
Technique panel arranges content: a, reinforcing bar binding technological process, construction point, requirement; B, reinforcing bar connect: straight thread connects (containing straight thread processing) technological process, key points for operation; C, beam, plate muscle cushion block are put and the requirement such as supporting steel bar installation.
(3) concrete works: select the members such as representational shear wall, frame column, beam, plate, stair to show, as Fig. 3, Fig. 4 (comprising shear wall Q4,1 cast-in-situ stair and 2 cast-in-situ stair half space concretes).
Technique panel arranges content: the genetic analysis of general appearance mass defect and the prevention such as rotten of concreting operational procedure (vibrate, receipts face, press polish etc.) and honeycomb, pitted skin, pillar.
A2, secondary structure engineering
Select representative two secondary members to comprise that detail structure requirement shows as ways such as air entrained concrete piece infilled wall and sintering shale brick infilled wall (build on bottom, top, door-window opening reserved), constructional column, lintel, Wo Liang. As shown in Figure 5.
Technique panel arranges content: explanation, constructional column way, the brick method in walling junction, the requirement of full of mortar degree are built in masonry technological process, top.
B, Decorating Project
(1) interior wall just fills: this integrated technique show house show in three kinds of metopes represent way: generally plaster, common wall brick, with toilet wall brick interior wall. Generally plaster and common brick interior wall way model as got rid of slurry, ash cake model in Fig. 5; Shown in Fig. 6, comprise that 8 linked network models, 9 external corners are plastered, 10 internal wall brick models, 11 inner corner trims are plastered model, the stepped layering of each operation is cutd open and is shown.
Technique panel arranges content: technological process and way require as follows: the horizontal absolute altitude control line → base treatment of bullet → sprinkle water is moistening → do ash cake → brush the wiping of thick 1:1 cement mortar tack coat → subsides of plain cement mortar → 12 thick 1:3 cement mortar bottoming broomings (smearing at twice) → 4 glazed tile → white cement to stitch. Adopt the bottoming of the thick 1:0.1 lime of 2 ㎜ fine sand slurry, smear the thick 1:3 lime mortar of 18 ㎜; In toilet, metope way is as follows: the thick 1:1 cement mortar of plain water slurry one time+3~4 ㎜ of 15 thick 1:3 cement mortar+brush adds proportion 20% building adhesive edge and pastes the thick glazed tile of+4~5 ㎜, white cement jointing.
Thin portion node: as figure " wall extension steel wire ", constructional column, collar tie beam, structural beams periphery are hung steel wire. And different materials matrix junction hangs alkali-resistant glass fiber mesh construction: base treatment is carried out in matrix junction, and cleaning metope dirt, and it is moistening to water in advance; Seam difference of height using polymer mortar levelling between different matrix; Lay grid cloth, and lap width between each basic unit should not be less than 150mm; That glass fiber net is pressed into is smooth in mortar, straight, do not reveal net, hollowing not.
(2) ground: this integrated technique show house shows that three kinds, ground represents way: general room floor leveling and passageway, toilet floor tile. As shown in Figure 2, select 2.3m*1.6m ground to make indoor ground brick flooring model, each operation layering interval 500 ㎜ do stepped layering and dissect displaying, and specific practice is divided three process: the thick 1:2 cement sand plaster press polish+surface layer of the thick plain-water slurry of 10 ㎜ binder course+20 ㎜ 1m*1m face brick. Accomodation ground model as shown in Figure 2, specific practice is as follows: the thick 1:3 cement mortar screeding to falls of 250 thick cast-in-place concrete basic unit → thinnest part 15 is floating → and completely sticky → 1.2 thick polymer cement waterproof paints of 1.3 thick special binding materials for 0.7 thick polyethylene polypropylene fibre composite of water-proof coiled material, brush base treatment agent one time → 1.2 thick synthetic macromolecular waterproof coatings, the heavy back brick paving real scene shooting of the brush thick 1:4 dry of base treatment agent one time → 20 cement mortar → 8 is flat, the jointing of color tile jointing agent.
Technique panel arranges content: construction process flow, quality requirement and quality standard, toilet antiseep strategic point.
(3) decoration of exterior wall: select representational glass curtain wall decoration of exterior wall face to show, external wall outer insulation is the thick ultra-fine inorganic fibre of 45mm, concrete structure as shown in Figure 7, comprises 12 exterior-wall heat insulation models and 13-curtain wall model (keel and glass surface layer).
Technique panel arranges content: heat-insulating layer construction process operating process, key Quality Control and quality acceptance standard, the pre-buried and construction technique flow process of curtain wall, common quality defect control and quality standard.
(4) door and window engineering: select representational door and window engineering model displaying door window hole dead size, door and window to fix and the key point such as exterior window waterproof sealing and thin portion process, as shown in Fig. 2, Fig. 5, Fig. 6.
Technique panel arranges content: door and window reserved opening size and installation arrange requirement, erection of doors and windows construction technology process, antiseep control point.
C, roofworks
Select representational I level waterproof accessible roof to carry out stepped layering and dissect displaying, as shown in Figure 3, way is as follows: the 2. wet paving of 1.2 thick CPS-CL reaction bonded type macromolecules waterproof roll (one side) → 3. 20 thick (thinnest part) foam concrete (1:3) cement sand plaster, local finding slope → 4. 20 thick 1:2.5 cement mortar screeding layers → 5. hard rock wool plate 90 ㎜ → 6. dry paving polyester fiber non-woven fabric one deck → 7. join A4 ㎜ hand-drawn wire in 40 thick C20 pea gravel concretens, two-way middle distance 150 → 8. 25 thick 1:4 dry cement → 9. 10 heavy back bricks are paved and are made real. The each inter process successively wide hierarchical process of interval approximately 300 ㎜ is shown step profile, has fully shown each operation material, way requirement.
The every 6m*6m of roofing arranges a dividing joint, wide 20 ㎜ of dividing joint, and blast pipe is installed in dividing joint and dividing joint intersection.
As shown in Figure 5, way comprises that the anti-bank of 150 high parapet, parapet waterproof, 100 high parapets bear down on one and lightning protection device to parapet model.
Technique panel arranges content: roofworks marches into the arena that material appearance is rechecked, technological operation flow process and operation key point, the technological process of parapet way.
D, water supply and sewage work
Select representational feedwater and toilet drainage to show, as shown in Figure 3, install to, water drain casing tube through position in plumbing.
Technique panel arranges content: the pre-buried reserved and pipeline construction technique of plumbing.
E, electrical engineering
Select representational wall surface line pipeline box set aside pre-embedded and line pipeline box to install and show, as Fig. 3-and Figure 10 as shown in, pre-buried electric wiring pipeline sleeve pipe, mounting box in the time of cast-in-situ floor, shear force wall reinforcing steel bar colligation.
Electric finished product relative position indicates: socket box is installed terrain clearance and is not less than 300 ㎜, and being close to side by side spacing between terminal box is 5 ㎜, between forceful electric power and light current box, is not less than 500 ㎜.
Rear block partition wall pipe arrangement, as shown in 7 wire casings, line box, socket model in Fig. 5.
Technique panel arranges content: when Bars In Poured Concrete Slab gut line is pre-buried, cast-in-place concrete floor is at template Zhi Haohou, carries out positioning marking before not spreading reinforcing bar, lays pipe, box, and fix after the colligation of reinforcing bar spacer screen paves. The pipe diameter being embedded in when fixing in concrete can not exceed 1/2 of concrete thickness; The pipe way laying side by side, apart from being not less than 25mm, makes pipe all have concrete parcel around. In the time of pepe laying, principle is the pipe first laying with bending, after lay the pipe of straight length.
When cast-in-place shear wall inner tube is pre-buried, lay in the middle of two-layer bar-mat reinforcement along nearest path, after assembling reinforcement, position, then pipeline and reinforcing bar are fixed, by box and template fix tightly, carry out in time earthing jumper, and connect with box, by pipe, box and reinforcing bar fixation, rear portion withstands in opposite side template, make box be gripped jail by template clamp, firm box prevents displacement. If the contradictory bar bending colligation that impact can be installed of box location and bar-mat reinforcement, increases and ties up additional bar at casing place, in case the weakening of casing place to strength of wall body is set. When the steel pipe laying has with reinforcing bar the time of conflict, vertical reinforcing bar can be bent right and left along metope, transverse steel is bending up and down.
F, specific engineering---stair model
This engineering, except design and installation elevator, is designed with handrail stair simultaneously. Handrail stair quality comprises that impression quality control is one of construction key points and difficulties, model selects that the finished product step of handrail staircase structure construction stage is marked time, half space, stair formwork erecting (containing reinforcing bar binding) be for showing content, as shown in Figure 2, Figure 3, Figure 4, represent that model is respectively 1 cast-in-situ stair model, 2 cast-in-situ stair half space models, 3 closed stair formwork erecting models.
Technique panel arranges content:
(1) technological process of stair formwork erecting plate and stair reinforcement fabrication, installation requirement;
(2) ensure that finished product step is marked time, the crucial control measure of half space impression quality.
2, on this complex building north, selected place's field is as the ground of building of integrated technique show house of the present invention, and unwrapping wire is oriented integrated technique show house and peripheral planar profile, before show house construction, and first smooth location, hardened ground.
3, be progressively made into successively an integrated technique show house according to the front and back order between each branch subdivisional work and the subdivisional work connection of each branch, and hang up the Sign Board of integrated technique content that show house is shown at integrated technique show house each branch subdivisional work and characteristic portion, thin portion Nodes, simultaneously, in integrated technique model landlord, west, three, north outset part mounting bracket, by the technique panel once mounting after making on support, for education before class, tell somebody what one's real intentions are and train etc.

Claims (1)

1. a construction method for integrated technique show house for building engineering construction, comprises the steps:
A, according to construction project to be built feature, emphasis, difficult point, the floor space of integrated design technique show house, the number of plies, building height, draft all process steps between the included each branch subdivisional work of integrated technique show house and the subdivisional work connection of each branch, privileged sites, thin portion's node and inspection of quality requirement, and each branch subdivisional work and the characteristic portion included according to this integrated technique show house, thin portion node is made construction technology panel, the characteristic portion of integrated technique show house takes stepped layering to cut open the mode of showing, construction technology panel content comprises construction technology process, construction way, CCP, common quality defect control and quality standard,
Branch's subdivisional work comprises main structural engineering, Decorating Project, roofworks, plumbing and heating engineering, electrical engineering and specific engineering;
Wherein the displaying of main structural engineering comprises following content: form work engineering selects representational beam, plate, wall, post, staircase component to show splicing, reinforcing, joint node processing and the support system of template; Reinforced bar engineering selects representational Vierendeel girder, continuous beam, sleeper, shear wall and characteristic portion to show; Concrete works selects representational shear wall, frame column, beam, plate, staircase component to show; Secondary structure engineering selects representational infilled wall to show;
Wherein the displaying of Decorating Project comprises following content: in interior wall just fills and shows, three kinds of metopes represent way: generally plaster, common wall brick and toilet wall brick interior wall; Thin portion node selects wall extension steel wire to show; Ground is shown three kinds and is represented way: general room floor leveling and passageway, toilet floor tile; Decoration of exterior wall selects representational glass curtain wall decoration of exterior wall face to show; Door and window engineering displaying door window hole dead size, door and window are fixed and exterior window waterproof sealing and the processing of thin portion;
Wherein the displaying of roofworks comprises following content: select representational I level waterproof accessible roof to carry out stepped layering and cut open and show displaying;
Wherein the displaying of water supply and sewage work comprises following content: select representational feedwater and toilet drainage to show;
Wherein the displaying of electrical engineering comprises following content: select representational wall surface line pipeline box set aside pre-embedded and line pipeline box to install and show;
Wherein the displaying of specific engineering comprises following content: select that the finished product step of handrail staircase structure construction stage is marked time, half space, stair formwork erecting show;
B, select a suitable place planning to build architectural engineering place periphery, unwrapping wire is oriented integrated technique show house and peripheral planar profile, and smooth location doing hardens;
C, front and back order between connecting according to the each branch subdivisional work described in step a and each branch subdivisional work are progressively made into an integrated technique show house successively, and hang up the Sign Board of integrated technique content that show house is shown, and construction technology panel is arranged on to integrated technique show house periphery successively at integrated technique show house each branch subdivisional work and characteristic portion, thin portion Nodes.
CN201310382995.8A 2013-08-29 2013-08-29 The construction method of integrated technique show house for building engineering construction Active CN103422671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310382995.8A CN103422671B (en) 2013-08-29 2013-08-29 The construction method of integrated technique show house for building engineering construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310382995.8A CN103422671B (en) 2013-08-29 2013-08-29 The construction method of integrated technique show house for building engineering construction

Publications (2)

Publication Number Publication Date
CN103422671A CN103422671A (en) 2013-12-04
CN103422671B true CN103422671B (en) 2016-05-04

Family

ID=49648013

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310382995.8A Active CN103422671B (en) 2013-08-29 2013-08-29 The construction method of integrated technique show house for building engineering construction

Country Status (1)

Country Link
CN (1) CN103422671B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104032955A (en) * 2014-06-20 2014-09-10 中建五局第三建设有限公司 Construction method for construction engineering quality model guide
CN110778117B (en) * 2019-11-05 2020-10-30 深圳市维业装饰集团股份有限公司 Construction method of integrated process template house for building engineering construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556323A (en) * 1946-02-28 1951-06-12 Herman A Feigelman Folding toy
US4429486A (en) * 1981-09-24 1984-02-07 Minilife A/S Construction and method for models with interlocking tab/slot assembly
CN102653971A (en) * 2012-04-10 2012-09-05 江苏环亚建设工程有限公司 Public building interior decoration engineering sample construction method
CN102758504A (en) * 2012-07-12 2012-10-31 振华集团(昆山)建设工程有限公司 Method for constructing wet-operation details of completely-decorated housings

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2556323A (en) * 1946-02-28 1951-06-12 Herman A Feigelman Folding toy
US4429486A (en) * 1981-09-24 1984-02-07 Minilife A/S Construction and method for models with interlocking tab/slot assembly
CN102653971A (en) * 2012-04-10 2012-09-05 江苏环亚建设工程有限公司 Public building interior decoration engineering sample construction method
CN102758504A (en) * 2012-07-12 2012-10-31 振华集团(昆山)建设工程有限公司 Method for constructing wet-operation details of completely-decorated housings

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
城乡建设》.2013,第20卷(第6期), *
张学明.商品住宅工程实施工程质量样板引路的实践与体会.《世界华商经济年鉴&#8226 *

Also Published As

Publication number Publication date
CN103422671A (en) 2013-12-04

Similar Documents

Publication Publication Date Title
CN103410332B (en) A kind of concrete hollow block reinforcement wall construction technology
CN104358341B (en) Building brickwork and masonry construction method of building brickwork
CN102116061A (en) Masonry construction method for filling wall core pillar, core girder and building blocks into framework structure
CN102777045A (en) Construction method for assembling light energy-saving composite wallboards on separation wall
CN106121231A (en) A kind of skyscraper interts cross construction method
CN111734126A (en) Single-curved-surface fair-faced concrete textured roof template system and construction method thereof
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN103306497B (en) Shock prevention and strengthening construction method for existing brickwork dwelling house fabricated structure
CN106894538A (en) Filling wall and agent structure concrete integral shaping method
CN108130992A (en) Rubble plate, styrofoam and porous brick compound thermal-insulating decorative external wall construction engineering method
CN103422671B (en) The construction method of integrated technique show house for building engineering construction
CN109989554A (en) A kind of skyscraper assembled piping shaft and preparation method thereof and installation method
CN207092318U (en) A kind of steel structure keel builds the outer Curtain Wall of brick by laying bricks or stones
CN102758488A (en) Construction method of indoor sound insulation system of full-decoration housing
JP4004056B2 (en) Construction method of pre-insulated prestressed building using precast concrete body
CN102677908A (en) Construction method of outer wall splitting decoration bricks of filling wall
CN109339355A (en) The construction method of the aluminium sheet roofing waterproofing node of structural slab is done using ALC plate
CN106223497A (en) A kind of operational approach of Applying Steel Structures To A Villa integrated system
JP4063829B2 (en) Exterior insulation building with prestressed precast concrete body
JP4063831B2 (en) Exterior insulation prestressed building structure
CN218815449U (en) Container formula VR AR quality model experience shop
CN112282145B (en) Manufacturing process of light concrete light steel frame PC embedded cast-in-place wall
DiPaola Paso Robles Residence
CN113700158A (en) HA external formwork cast-in-place concrete composite insulation board
Reyes et al. Miami-Dade County Public Schools

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant