CN103422470A - Geotextile reinforced protecting reverse filtering material and reinforced reverse filtering and bridge pier protecting construction methods thereof - Google Patents
Geotextile reinforced protecting reverse filtering material and reinforced reverse filtering and bridge pier protecting construction methods thereof Download PDFInfo
- Publication number
- CN103422470A CN103422470A CN2013103792385A CN201310379238A CN103422470A CN 103422470 A CN103422470 A CN 103422470A CN 2013103792385 A CN2013103792385 A CN 2013103792385A CN 201310379238 A CN201310379238 A CN 201310379238A CN 103422470 A CN103422470 A CN 103422470A
- Authority
- CN
- China
- Prior art keywords
- reinforced bar
- filtration material
- geotextiles
- earthworking reinforced
- skeleton
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000000463 material Substances 0.000 title claims abstract description 138
- 238000001914 filtration Methods 0.000 title claims abstract description 130
- 239000004746 geotextile Substances 0.000 title claims abstract description 122
- 238000010276 construction Methods 0.000 title abstract description 9
- 239000004033 plastic Substances 0.000 claims abstract description 15
- 229920003023 plastic Polymers 0.000 claims abstract description 15
- 239000004576 sand Substances 0.000 claims abstract description 8
- 238000009940 knitting Methods 0.000 claims description 16
- 238000003466 welding Methods 0.000 claims description 15
- 229910001220 stainless steel Inorganic materials 0.000 claims description 11
- 239000004677 Nylon Substances 0.000 claims description 8
- 238000005260 corrosion Methods 0.000 claims description 8
- 230000007797 corrosion Effects 0.000 claims description 8
- 229920001778 nylon Polymers 0.000 claims description 8
- 230000003014 reinforcing effect Effects 0.000 claims description 8
- 239000000945 filler Substances 0.000 claims description 6
- 239000011248 coating agent Substances 0.000 claims description 3
- 238000000576 coating method Methods 0.000 claims description 3
- 239000002184 metal Substances 0.000 claims description 2
- 239000010935 stainless steel Substances 0.000 claims description 2
- 239000010410 layer Substances 0.000 claims 2
- 239000011229 interlayer Substances 0.000 claims 1
- 239000004744 fabric Substances 0.000 abstract description 13
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 9
- 230000008901 benefit Effects 0.000 abstract description 5
- 239000004575 stone Substances 0.000 abstract description 5
- 230000035939 shock Effects 0.000 abstract 2
- 238000011010 flushing procedure Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 8
- 239000002131 composite material Substances 0.000 description 7
- 238000000034 method Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 3
- 238000009987 spinning Methods 0.000 description 3
- 239000006185 dispersion Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007667 floating Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004753 textile Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
- 239000008207 working material Substances 0.000 description 1
Images
Landscapes
- Revetment (AREA)
Abstract
The invention discloses a geotextile reinforced protecting reverse filtering material and a geotextile reinforced reverse filtering construction method and a bridge pier protecting construction method thereof. The geotextile reinforced protecting reverser filtering material comprises geotextile fabrics and a skeleton, wherein the skeleton is fixedly connected with at least one layer of geotextile fabric. The invention also discloses the geotextile reinforced reverse filtering construction method of the geotextile reinforced protecting reverse filtering material and the bridge pier protecting construction method of the geotextile reinforced protecting reverse filtering material. The geotextile reinforced protecting reverse filtering material has the advantages that the structure is simple, the splicing is convenient, and the paving is easy; by utilizing the characteristics of large contact area of the geotextile fabric and high strength and dispersed stress of the skeleton, the stress of large stone blocks is dispersed, so the sand stones can integrally settle, and the stone throwing uniformity is realized; and in the bridge pier protection, the material is covered on the water flow flushing area at the periphery of a bridge pier, so the shock energy of the water flow is reduced, the reverse filtering function of the geotextile fabric is utilized, the soil grains under the covering surface cannot be flushed away by the water flow, and the shock on the bridge pier by the foreign matters is reduced by utilizing the elasticity of the geotextile reinforced protecting reserve filtering material with enhanced mechanical property on the bidirectional-tension plastic geotextile grid skeleton.
Description
Technical field
The invention belongs to the earth working material technical field, be specifically related to Earthworking reinforced bar protection filtration material and geotechnique thereof and reinforce anti-filter job practices and Bridge Pier job practices.
Background technology
Composite earthwork cloth also is soft raft.The upper strata of soft raft is anti-filter geotechnique layer of cloth, lower floor is woven layer of cloth, upper and lower is sewn into some cell cubes between two-layer, and each cell cube periphery charges sand and forms the sash shape with main rib and auxiliary rib, its main rib is perpendicular to water (flow) direction, and auxiliary rib is along water (flow) direction.At present composite earthwork cloth reclaim land from the sea and Bridge Pier in be widely applied.Because complex geotechnical textile soft row shape matter for filling sand has good flexibility, in the jackstone process, can automatically regulate whole shape, form the ability of good guard wire and carrying stone, there is certain shore protection, river bottom protection function.But floating, the gauffer of meeting in construction, inconvenience is used; In the jackstone process, due to the softness of soft raft self, can make material because weight is former thereby sink in mud, do not have respective action.When composite earthwork cloth is applied to Bridge Pier, sand pocket and soft raft etc. can be resisted the downward whirlpool that the preshoot of bridge pier pier is struck waters and miscarried and give birth to, and to reach the effect that obviously reduces the pier foundation scour depth, and is protected around can reaching pier footing.But when current are very fast, isostere can produce under water and agitate, thereby wash in a pan the silt under empty isostere, lose safeguard function, even washed away by current, although though soft raft is river bottom protection filtration material preferably, can adapt to River Bed and change the whole antiseepage river bottom protection effect of playing, but large for the water yield, flow velocity is large, washes away address and hydrological regime serious, the mud layer depth and do not have good effect.
Summary of the invention
The aspects such as land-based area post-processed, the soft foundation that a kind of applicable beach, dykes and dams, cofferdam, hydraulic reclamation form processed, the bottom of needs protection, bulkhead wall, bridge pier are provided during purpose of the present invention
The Earthworking reinforced bar protection filtration material used; Use this material can the reduction of erection time, also can strengthen reinforcement, protection, soft foundation treatment effect, reduce construction costs saving investment.
A kind of Earthworking reinforced bar protection filtration material, comprise geotextiles and skeleton, and skeleton is fixedly connected with one deck geotextiles at least.
In order to obtain better result of use, described geotextiles is two-layer; Described two-layer geotextiles is separately fixed at the both sides of skeleton; Described geotextiles is one or more combinations that have in the geotextiles spun, braided geotextile, non-woven geotextile; Described skeleton is the grid with some strength and rigidity; Described skeleton is the grid with intensity and/or rigidity; Described grid is plastic grid or stainless steel metal grid; Described geotextiles is by knitting, anchor, bonding, welding or fasten to connect with skeleton and be fixedly connected with; The geotextiles of described Earthworking reinforced bar protection filtration material middle part is fixedly connected with skeleton, and its edge is opening-like, and the geotextiles of its edge is not connected with skeleton; The geotextiles of described Earthworking reinforced bar protection filtration material and skeleton not connecting portion width are 5-20 centimetre; The same layer geotextiles of described Earthworking reinforced bar protection filtration material is comprised of at least two geotextiles, geotextiles is fixedly connected on skeleton by the position, intermediate portion, the edge of every geotextiles is stacked mutually, and stacked position is opening-like, and the geotextiles at stacked position is not connected with skeleton; The laminated section bit width of the geotextiles of described Earthworking reinforced bar protection filtration material is 5-20 centimetre.
The invention provides a kind of reinforcing anti-filter job practices of Earthworking reinforced bar protection filtration material, the steps include:
A, Earthworking reinforced bar is protected to filtration material be laid on the working face such as the land-based area that beach, dykes and dams, cofferdam, hydraulic reclamation form, the bottom that needs protection, bridge pier;
B, by corrosion-resistant connecting material through Earthworking reinforced bar protection filtration material both sides fixedly the skeleton of geotextiles at least one Earthworking reinforced bar protection filtration material connected into to integral body;
C, the fillers such as sandstone are thrown on the upper strata of Earthworking reinforced bar protection filtration material, reached requirement of engineering to filler.
In order to obtain better technique effect, in step b, described corrosion-resistant connecting material is nylon rope or stainless steel wire; Before step c, fixing weight on Earthworking reinforced bar protection filtration material; Described Earthworking reinforced bar protection filtration material is fixed on skeleton by two above geotextiles, every geotextiles edge is stacked, stacked position does not connect, described weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material; The stacked position, two adjacent geotextiles edges of described Earthworking reinforced bar protection filtration material is by knitting, anchor, bonding, welding or fasten in succession and connect; The loose geotextiles in described adjacent Earthworking reinforced bar protection filtration material both sides of the edge is by knitting, anchor, bonding, welding or fasten in succession and connect; Different with hydrological regime according to geology, can need any combination according to design by spinning geotextiles, braided geotextile and non-woven geotextile, by knitting, fasten and connect, paste and be connected to the skeleton both sides, in step c, nylon rope is fixed on the colligations such as sandbag, cement interlocking segment on material through plastic grid.
The present invention also provides a kind of Bridge Pier job practices of Earthworking reinforced bar protection filtration material, the steps include:
A, by corrosion-resistant connecting material, through skeleton, some Earthworking reinforced bars protection filtration materials are connected into to integral body;
B, weight is fixed on Earthworking reinforced bar protection filtration material;
C, Earthworking reinforced bar is protected to filtration material around coating bridge pier.
In order to obtain better technique effect, in step b, throwing sandstone or sand pocket between Earthworking reinforced bar protection filtration material and bridge pier; In step b, described corrosion-resistant connecting material is nylon rope or stainless steel wire; Described Earthworking reinforced bar protection filtration material is fixed on skeleton by two above geotextiles, every geotextiles edge is stacked, stacked position does not connect, in step b, described weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material; The stacked position, two adjacent geotextiles edges of described Earthworking reinforced bar protection filtration material is by knitting, anchor, bonding, welding or fasten in succession and connect; The loose geotextiles in described adjacent Earthworking reinforced bar protection filtration material both sides of the edge is by knitting, anchor, bonding, welding or fasten in succession and connect.
Earthworking reinforced bar protection filtration material of the present invention, have simple in structure, splicing is convenient, be easy to the advantage of laying, the grid chief who takes full advantage of composite earthwork cloth and there is some strength and rigidity, in the beach construction, utilize the composite earthwork cloth contact area large and have that the grid intensity of some strength and rigidity is high, the characteristics of force dispersion, the pressure of ratchel is scatter, make Earthworking reinforced bar protection filtration material bulk settling, even to guarantee jackstone, sandstone is layered on non-woven geotextile simultaneously, has avoided spinning geotextiles and has been scratched; In Bridge Pier, it covers peripheral current scour place of bridge pier, spin geotextiles outwardly, can cut down the impact energy of current, can utilize the reverse filter effect of non-woven geotextile again, grogs under coverage rate is not washed away by current, utilize the mechanical property of biaxial tension Plastics Geogrids skeleton to strengthen the elasticity that Earthworking reinforced bar protects filtration material simultaneously, alleviate the impact of foreign object to bridge pier.
The accompanying drawing explanation
Fig. 1 is Earthworking reinforced bar protection filtration material structural representation of the present invention;
Fig. 2 is Earthworking reinforced bar protection filtration material geotextiles laminated section bit architecture schematic diagram of the present invention.
The specific embodiment
Below in conjunction with accompanying drawing, the present invention is described in detail.
A kind of Earthworking reinforced bar protection filtration material, comprise one deck geotextiles 1 and skeleton 2, and geotextiles is fixed on a side of skeleton, and geotextiles is preferably by knitting, anchor, bonding, welding or fastens to connect with skeleton and is fixedly connected with.
A kind of Earthworking reinforced bar protection filtration material, comprise two-layer geotextiles 1 and skeleton 2, skeleton 2 is fixed on the centre of two-layer geotextiles, and wherein geotextiles has been preferably and has spun geotextiles, braided geotextile or non-woven geotextile, and skeleton is preferably biaxial tension Plastics Geogrids or steel mesh reinforcement; Have the geotextiles spun and nonwoven geotechnique to be preferably the both sides that knitted is connected on the biaxial tension Plastics Geogrids, all the other are with embodiment 1.
Embodiment 3
The geotextiles 1 of the edge 5-20 centimetre wide part of Earthworking reinforced bar protection filtration material is not fixedly connected with skeleton 2, is preferably 7-15 centimetre of wide edge, and geotextiles 1 and skeleton 2 are anchored by holdfast 3, and all the other are with embodiment 1 or 2.
Embodiment 4
The geotextiles of Earthworking reinforced bar protection each side of filtration material forms and is fixed on skeleton 2 by two above geotextiles 1, every geotextiles 1 edge is stacked, and stacked position does not connect, laminated section bit width 5-20 centimetre, be preferably 7-15 centimetre, all the other are with embodiment 1 or 2.
Embodiment 5
The geotechnique of embodiment 3 Earthworking reinforced bar protection filtration materials reinforces the anti-filter job practices, and step is:
A, Earthworking reinforced bar is protected to filtration material pave on working face;
B, through the grid of biaxial tension Plastics Geogrids, that the connection of at least one Earthworking reinforced bar protection filtration material is in aggregates by stainless steel wire or nylon rope;
C, the fillers such as sandstone are thrown on the upper strata of Earthworking reinforced bar protection filtration material, reached requirement of engineering to filler.
In step a, be preferably geotextiles one side of Earthworking reinforced bar protection filtration material towards beach; In step b, the splicing of Earthworking reinforced bar protection filtration material is in aggregates, after by the grid that passes the biaxial tension Plastics Geogrids by stainless steel wire or nylon rope, that the connection of at least one Earthworking reinforced bar protection filtration material is in aggregates, the loose geotextiles 1 at adjacent work reinforcement protection filtration material edge is sewed up to connection; In step c, the upper strata that is preferably Earthworking reinforced bar protection filtration material is non-woven geotextile.By geotextiles one side of Earthworking reinforced bar being protected to filtration material, be layered on beach, utilize the skeleton function of biaxial tension Plastics Geogrids, the pressure of ratchel can be scatter, make Earthworking reinforced bar protection filtration material bulk settling, and avoid the local subsidence in the soft raft use, even to guarantee jackstone.Non-woven geotextile one side of Earthworking reinforced bar protection filtration material, towards riprap layer, can avoid the irregular angle of stone to scratch performance and the result of use that the skeleton of the geotextiles spun and biaxial tension Plastics Geogrids is arranged and affect Earthworking reinforced bar protection filtration material.
Embodiment 7
Each side of Earthworking reinforced bar protection filtration material in embodiment 6 is fixed on skeleton by two above geotextiles, every geotextiles edge is stacked, stacked position does not connect, before being preferably step c, by weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material; Be preferably, after fixing weight, stacked position, edge is by knitting, anchor, bonding, welding or fasten in succession and connect, and the loose geotextiles in both sides of the edge is by knitting, anchor, bonding, welding or fasten in succession and connect.
Embodiment 8
The Bridge Pier job practices of the Earthworking reinforced bar protection filtration material of embodiment 1 or embodiment 2, step is:
A, through the grid of stainless steel wire network framework, that the connection of polylith Earthworking reinforced bar protection filtration material is in aggregates by stainless steel wire or nylon rope;
B, weight is fixed on Earthworking reinforced bar protection filtration material;
C, Earthworking reinforced bar is protected to filtration material around coating bridge pier.
In step b, be preferably weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material; Be preferably stacked position, two adjacent geotextiles edges by knitting, anchor, bonding, welding or fasten in succession and connect; Be preferably the loose geotextiles in adjacent Earthworking reinforced bar protection filtration material both sides of the edge by knitting, anchor, bonding, welding or fasten in succession and connect; In step b, be preferably Earthworking reinforced bar protection filtration material spin geotextiles one side dorsad abutment surface to water (flow) direction; In step b, be preferably throwing sandstone or sand pocket between Earthworking reinforced bar protection filtration material and bridge pier; Be preferably non-woven geotextile one side of Earthworking reinforced bar protection filtration material towards bridge pier, can act on well by the filterability of non-woven geotextile, make near the sandstone of bridge pier do not washed away by current, do not affect again the motion of current simultaneously; Earthworking reinforced bar protection filtration material spin geotextiles one side towards water (flow) direction, owing to spinning the geotextiles surface compact, can reduce resistance to water-flow, smoothly current direction bridge pier both sides are shunted.And the biaxial tension Plastics Geogrids of Earthworking reinforced bar protection filtration material or stainless steel wire network framework can be supported with, to spin geotextiles indeformable under the impact of current; Fill sandstone or sand pocket in the middle of Earthworking reinforced bar protection filtration material and bridge pier; not only can protect bridge pier; also can further support Earthworking reinforced bar protection filtration material indeformable, prevent that Earthworking reinforced bar protection filtration material is out of shape and makes the stressed increase of bridge pier, affects bridge pier safety simultaneously.
Earthworking reinforced bar protection filtration material of the present invention, have simple in structure, splicing is convenient, be easy to the advantage of laying, take full advantage of composite earthwork cloth and the biaxial tension Plastics Geogrids chief, in the beach construction, utilize that the composite earthwork cloth contact area is large and biaxial tension Plastics Geogrids intensity is high, the characteristics of force dispersion, the pressure of ratchel is scatter, make Earthworking reinforced bar protection filtration material bulk settling, even to guarantee jackstone; In Bridge Pier, it covers peripheral current scour place of bridge pier, spin the geotextiles outside to current, can cut down the impact energy of current, can utilize the reverse filter effect of non-woven geotextile again, grogs under coverage rate is not washed away by current, utilize the mechanical property of biaxial tension Plastics Geogrids skeleton to strengthen the elasticity that Earthworking reinforced bar protects filtration material simultaneously, alleviate the impact of foreign object to bridge pier.
Claims (23)
1. Earthworking reinforced bar protection filtration material, comprise geotextiles and skeleton, it is characterized in that: skeleton is fixedly connected with one deck geotextiles at least.
2. Earthworking reinforced bar as claimed in claim 1 protects filtration material, and it is characterized in that: described geotextiles is at least bilayer.
3. Earthworking reinforced bar as claimed in claim 2 protection filtration material is characterized in that: the interlayer of described at least two-layer geotextiles is fixed with skeleton.
4. Earthworking reinforced bar as claimed in claim 1 or 2 protects filtration material, and it is characterized in that: described geotextiles is one or more combinations that have in the geotextiles spun, braided geotextile, non-woven geotextile.
5. Earthworking reinforced bar as claimed in claim 1 or 2 protects filtration material, and it is characterized in that: described skeleton is the grid with some strength and rigidity.
6. Earthworking reinforced bar as claimed in claim 5 protects filtration material, and it is characterized in that: described grid is plastic grid or stainless steel metal grid.
7. Earthworking reinforced bar as claimed in claim 1 or 2 protection filtration material is characterized in that: described geotextiles is by knitting, anchor, bonding, welding or fasten to connect with skeleton and be fixedly connected with.
8. Earthworking reinforced bar as claimed in claim 1 or 2 protects filtration material, it is characterized in that: the geotextiles of described Earthworking reinforced bar protection filtration material middle part is fixedly connected with skeleton, and its edge is opening-like, and the geotextiles of its edge is not connected with skeleton.
9. Earthworking reinforced bar as claimed in claim 8 protects filtration material, it is characterized in that: the geotextiles of described Earthworking reinforced bar protection filtration material and skeleton not connecting portion width are 5-20 centimetre.
10. Earthworking reinforced bar as claimed in claim 1 or 2 protects filtration material, it is characterized in that: the same layer geotextiles of described Earthworking reinforced bar protection filtration material is comprised of at least two geotextiles, geotextiles is fixedly connected on skeleton by the position, intermediate portion, the edge of every geotextiles is stacked mutually, stacked position is opening-like, and the geotextiles at stacked position is not connected with skeleton.
11. Earthworking reinforced bar protection filtration material as claimed in claim 10 is characterized in that: the laminated section bit width of the geotextiles of described Earthworking reinforced bar protection filtration material is 5-20 centimetre.
12. the reinforcing anti-filter job practices of an Earthworking reinforced bar protection filtration material claimed in claim 1, the steps include:
A, Earthworking reinforced bar is protected to filtration material be laid on working face;
B, by corrosion-resistant connecting material through Earthworking reinforced bar protection filtration material both sides fixedly the skeleton of geotextiles at least one Earthworking reinforced bar protection filtration material connected into to integral body;
C, filler is thrown on the upper strata of Earthworking reinforced bar protection filtration material, reached requirement of engineering to filler.
13. the reinforcing anti-filter job practices of Earthworking reinforced bar protection filtration material as claimed in claim 12, it is characterized in that: in step b, described corrosion-resistant connecting material is nylon rope or stainless steel wire.
14. the reinforcing anti-filter job practices of Earthworking reinforced bar as claimed in claim 12 protection filtration material is characterized in that: before step c, fixing weight on Earthworking reinforced bar protection filtration material.
15. the reinforcing anti-filter job practices of Earthworking reinforced bar protection filtration material as claimed in claim 14, it is characterized in that: described Earthworking reinforced bar protection filtration material is fixed on skeleton by two above geotextiles, every geotextiles edge is stacked, stacked position does not connect, described weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material.
16. the reinforcing anti-filter job practices of Earthworking reinforced bar as claimed in claim 15 protection filtration material is characterized in that: the stacked position, two adjacent geotextiles edges of described Earthworking reinforced bar protection filtration material is by knitting, anchor, bonding, welding or fasten in succession and connect.
17. the reinforcing anti-filter job practices of Earthworking reinforced bar as claimed in claim 12 protection filtration material is characterized in that: the loose geotextiles in described adjacent Earthworking reinforced bar protection filtration material both sides of the edge is by knitting, anchor, bonding, welding or fasten in succession and connect.
18. the Bridge Pier job practices of an Earthworking reinforced bar protection filtration material claimed in claim 1, the steps include:
A, by corrosion-resistant connecting material, through skeleton, some Earthworking reinforced bars protection filtration materials are connected into to integral body;
B, weight is fixed on Earthworking reinforced bar protection filtration material;
C, Earthworking reinforced bar is protected to filtration material around coating bridge pier.
19. the Bridge Pier job practices of Earthworking reinforced bar protection filtration material as claimed in claim 18 is characterized in that: in step b, throwing sandstone or sand pocket between Earthworking reinforced bar protection filtration material and bridge pier.
20. the Bridge Pier job practices of Earthworking reinforced bar protection filtration material as claimed in claim 18, it is characterized in that: in step b, described corrosion-resistant connecting material is nylon rope or stainless steel wire.
21. the Bridge Pier job practices of Earthworking reinforced bar protection filtration material as claimed in claim 18, it is characterized in that: described Earthworking reinforced bar protection filtration material is fixed on skeleton by two above geotextiles, every geotextiles edge is stacked, stacked position does not connect, in step b, described weight be fixed on Earthworking reinforced bar protection filtration material both sides of the edge fixedly the skeleton of geotextiles or/and on the skeleton at the stacked position, two adjacent geotextiles edges of Earthworking reinforced bar protection filtration material.
22. the Bridge Pier job practices of Earthworking reinforced bar as claimed in claim 21 protection filtration material is characterized in that: the stacked position, two adjacent geotextiles edges of described Earthworking reinforced bar protection filtration material is by knitting, anchor, bonding, welding or fasten in succession and connect.
23. the Bridge Pier job practices of Earthworking reinforced bar as claimed in claim 21 protection filtration material is characterized in that: the loose geotextiles in described adjacent Earthworking reinforced bar protection filtration material both sides of the edge is by knitting, anchor, bonding, welding or fasten in succession and connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310379238.5A CN103422470B (en) | 2013-08-28 | 2013-08-28 | Earthworking reinforced bar protection filtration material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310379238.5A CN103422470B (en) | 2013-08-28 | 2013-08-28 | Earthworking reinforced bar protection filtration material |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103422470A true CN103422470A (en) | 2013-12-04 |
CN103422470B CN103422470B (en) | 2015-10-21 |
Family
ID=49647819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310379238.5A Expired - Fee Related CN103422470B (en) | 2013-08-28 | 2013-08-28 | Earthworking reinforced bar protection filtration material |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103422470B (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846780A (en) * | 2015-05-22 | 2015-08-19 | 南京长江河道工程建设处 | Concrete block tied soft geogrid mattress |
CN105603933A (en) * | 2015-11-11 | 2016-05-25 | 郭岳 | Geotechnical reinforcement protective reversed filtering material and method for reinforcing dam by geotechnical reinforcement protective reversed filtering material |
CN105839611A (en) * | 2016-05-18 | 2016-08-10 | 浩珂科技有限公司 | Reinforced three-dimensional geotechnical pad |
CN106120648A (en) * | 2016-08-05 | 2016-11-16 | 郭岳 | A kind of reinforcement protection filtration material |
CN106284210A (en) * | 2016-08-05 | 2017-01-04 | 郭岳 | Reinforcement protection filtration material and processing method thereof |
CN106381839A (en) * | 2016-10-10 | 2017-02-08 | 郭岳 | Reinforced protection anti-filtration material and concrete interlocking block weighted reinforced protection anti-filtration material |
CN107916618A (en) * | 2017-11-17 | 2018-04-17 | 成都益佳平科技有限公司 | A kind of bridge pier prior-warning device mounting bracket |
CN108487045A (en) * | 2018-02-06 | 2018-09-04 | 西南交通大学 | A kind of adaptive pier subsidence protective device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2605302Y (en) * | 2003-03-27 | 2004-03-03 | 上海航道勘察设计研究院 | Sand ribbed soft configuration |
KR100631385B1 (en) * | 2003-07-31 | 2006-10-04 | 최종선 | construction method of nature embankment |
CN201128880Y (en) * | 2007-11-15 | 2008-10-08 | 中交第一公路工程局有限公司 | Hold hoops and support integrated structure for circular single pier |
CN101289860A (en) * | 2008-04-10 | 2008-10-22 | 中交三航局第二工程有限公司 | Underwater slope protection construction method for foundation ditch in water |
CN202247837U (en) * | 2011-09-13 | 2012-05-30 | 北京高能时代环境技术股份有限公司 | Composite geotechnical filter screen with reverse filtration effect |
CN203569528U (en) * | 2013-08-28 | 2014-04-30 | 郭岳 | Geotexile reinforcement protection filtering material |
-
2013
- 2013-08-28 CN CN201310379238.5A patent/CN103422470B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2605302Y (en) * | 2003-03-27 | 2004-03-03 | 上海航道勘察设计研究院 | Sand ribbed soft configuration |
KR100631385B1 (en) * | 2003-07-31 | 2006-10-04 | 최종선 | construction method of nature embankment |
CN201128880Y (en) * | 2007-11-15 | 2008-10-08 | 中交第一公路工程局有限公司 | Hold hoops and support integrated structure for circular single pier |
CN101289860A (en) * | 2008-04-10 | 2008-10-22 | 中交三航局第二工程有限公司 | Underwater slope protection construction method for foundation ditch in water |
CN202247837U (en) * | 2011-09-13 | 2012-05-30 | 北京高能时代环境技术股份有限公司 | Composite geotechnical filter screen with reverse filtration effect |
CN203569528U (en) * | 2013-08-28 | 2014-04-30 | 郭岳 | Geotexile reinforcement protection filtering material |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846780A (en) * | 2015-05-22 | 2015-08-19 | 南京长江河道工程建设处 | Concrete block tied soft geogrid mattress |
CN105603933A (en) * | 2015-11-11 | 2016-05-25 | 郭岳 | Geotechnical reinforcement protective reversed filtering material and method for reinforcing dam by geotechnical reinforcement protective reversed filtering material |
CN105839611A (en) * | 2016-05-18 | 2016-08-10 | 浩珂科技有限公司 | Reinforced three-dimensional geotechnical pad |
CN106120648A (en) * | 2016-08-05 | 2016-11-16 | 郭岳 | A kind of reinforcement protection filtration material |
CN106284210A (en) * | 2016-08-05 | 2017-01-04 | 郭岳 | Reinforcement protection filtration material and processing method thereof |
CN106381839A (en) * | 2016-10-10 | 2017-02-08 | 郭岳 | Reinforced protection anti-filtration material and concrete interlocking block weighted reinforced protection anti-filtration material |
CN107916618A (en) * | 2017-11-17 | 2018-04-17 | 成都益佳平科技有限公司 | A kind of bridge pier prior-warning device mounting bracket |
CN108487045A (en) * | 2018-02-06 | 2018-09-04 | 西南交通大学 | A kind of adaptive pier subsidence protective device |
Also Published As
Publication number | Publication date |
---|---|
CN103422470B (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103422470B (en) | Earthworking reinforced bar protection filtration material | |
Lee et al. | Geotextile tubes as submerged dykes for shoreline management in Malaysia | |
KR100817471B1 (en) | Stone net for river bulkhead and this construction technique | |
Heibaum | Geosynthetics for waterways and flood protection structures–Controlling the interaction of water and soil | |
KR100993335B1 (en) | Revetment protection works using gabion and construction method thereof | |
KR20160027646A (en) | Bank and method for the same using the geotextiles tube law for preventing coastal erosion | |
JP2013241745A (en) | Method of constructing earthquake-resistant tide embankment according to embankment reinforced earth | |
CN110219281B (en) | Dyke foot anti-impact flexible protection pad structure | |
CN203569528U (en) | Geotexile reinforcement protection filtering material | |
CN205711966U (en) | A kind of Multi-purpose soft row | |
CN205382463U (en) | Quick concatenation formula geotechnique adds anti - filter media of muscle protection material | |
CN101581083B (en) | Method for constructing composite river bottom protection with steel sheet piles and soft mattresses for artificial island | |
KR20110046209A (en) | Method Of Construction For Scour Prevension And Reinforcement Of Bridge Pier, And Structure Of The Same | |
CN209194504U (en) | A kind of reinforcement river bottom protection geotechnique pad | |
JP5547528B2 (en) | Reinforcement structure of embankment | |
JP5882438B1 (en) | Seawall | |
CN206267097U (en) | For the concrete hinge soft raft structure of antiscour protection works under water | |
JP6676462B2 (en) | Embankment reinforcement method | |
CN212000894U (en) | Reinforced reverse filter liner type riprap revetment sand filling pipe bag | |
CN210857103U (en) | Novel water conservancy prevention of seepage ecological waterproof dykes and dams | |
CN205934847U (en) | Riverbed and sea bed scour prevention quilt | |
CN111305153A (en) | Reinforced reverse filter liner type riprap revetment sand filling pipe bag | |
CN106480853A (en) | The ground work sand bowel bag that can be arranged for erosion control with many | |
Heibaum et al. | Geotextile bags for sole permanent bank protection | |
Heerten et al. | Environmental benefits of sand filled geotextile structures for coastal applications |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151021 |