CN103410163A - 一种风车安装船的桩腿的制造工艺 - Google Patents

一种风车安装船的桩腿的制造工艺 Download PDF

Info

Publication number
CN103410163A
CN103410163A CN2013103627566A CN201310362756A CN103410163A CN 103410163 A CN103410163 A CN 103410163A CN 2013103627566 A CN2013103627566 A CN 2013103627566A CN 201310362756 A CN201310362756 A CN 201310362756A CN 103410163 A CN103410163 A CN 103410163A
Authority
CN
China
Prior art keywords
spud leg
pile leg
section
leg section
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103627566A
Other languages
English (en)
Inventor
杨亮
管伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANTONG ZHONGXIN STEEL CONSTRUCTION HEAVY INDUSTRIES Co Ltd
Original Assignee
NANTONG ZHONGXIN STEEL CONSTRUCTION HEAVY INDUSTRIES Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANTONG ZHONGXIN STEEL CONSTRUCTION HEAVY INDUSTRIES Co Ltd filed Critical NANTONG ZHONGXIN STEEL CONSTRUCTION HEAVY INDUSTRIES Co Ltd
Priority to CN2013103627566A priority Critical patent/CN103410163A/zh
Publication of CN103410163A publication Critical patent/CN103410163A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种风车安装船的桩腿的制造工艺,所述桩腿包括第一桩腿段、第二桩腿段、第三桩腿段、第四桩腿段、第五桩腿段、第六桩腿段,以及第七桩腿段;桩腿的制造工艺的包括如下步骤:(1)将所述第一桩腿段与第二桩腿段预合拢,以制得第一桩腿组件;(2)将所述第三桩腿段与第四桩腿段,以及第五桩腿段预合拢,且所述第四桩腿段位于所述第三桩腿段与第五桩腿段之间,以制得第二桩腿组件;(3)将所述第六桩腿段与第七桩腿段预合拢,以制得第三桩腿组件;(4)所述第三桩腿组件、第二桩腿组件,以及第一桩腿组件进行顺序吊装合拢,以制得桩腿。采用本发明提供的一种风车安装船的桩腿的制造工艺能够制得机械性能较高的桩腿。

Description

一种风车安装船的桩腿的制造工艺
技术领域
本发明涉及一种风车安装船,具体涉及一种风车安装船的桩腿的制造工艺。
背景技术
海洋风车安装船是以常规船舶运输、自航与海洋平台的自升、起重船的起重等多船功能变为一船独立完成为概念设计的新船,主要用于海上风力发电机的运输与吊装。即用此船装载风力发电设备,航行至作业海域,完成精确定位,桩腿控制系统把船体抬升为海洋工作平台,用甲板上的两台吊车起重安装。
海洋风车安装船工作时,需要将风车安装船的桩腿插入到海床中。固定在海床中的风车安装船的桩腿的稳固性直接会影响船体在海洋中的站立稳定性能。
现有风车安装船的桩腿的截面主要为四边形,且所述桩腿重量为300.65吨。由于桩腿的截面主要为四边形,故桩腿与海床的接触面比较少,以及所述桩腿重量仅仅为300.65吨。如何制得机械性能较高的桩腿是人们有待解决的技术问题之一。
发明内容
为解决上述技术问题,本发明提供了一种风车安装船的桩腿的制造工艺,以制得机械性能较高的桩腿。
为达到上述目的,本发明的技术方案如下:
一种风车安装船的桩腿的制造工艺,所述桩腿包括第一桩腿段、第二桩腿段、第三桩腿段、第四桩腿段、第五桩腿段、第六桩腿段,以及第七桩腿段;桩腿的制造工艺的包括如下步骤:
(1)将所述第一桩腿段与第二桩腿段预合拢,以制得第一桩腿组件;
(2)将所述第三桩腿段与第四桩腿段,以及第五桩腿段预合拢,且所述第四桩腿段位于所述第三桩腿段与第五桩腿段之间,以制得第二桩腿组件;
(3)将所述第六桩腿段与第七桩腿段预合拢,以制得第三桩腿组件;
(4)所述第三桩腿组件、第二桩腿组件,以及第一桩腿组件进行顺序吊装合拢,以制得桩腿。
通过上述技术方案,本发明提供的一种风车安装船的桩腿的制造工艺能够制得机械性能较高的桩腿。
具体实施方式
下面将对本发明实施例中的技术方案进行清楚、完整地描述。
本发明所提供的一种风车安装船的桩腿的制造工艺,所述桩腿包括第一桩腿段、第二桩腿段、第三桩腿段、第四桩腿段、第五桩腿段、第六桩腿段,以及第七桩腿段;所述桩腿的制造工艺的包括如下步骤:
(1)将所述第一桩腿段与第二桩腿段预合拢,以制得第一桩腿组件;
(2)将所述第三桩腿段与第四桩腿段,以及第五桩腿段预合拢,且所述第四桩腿段位于所述第三桩腿段与第五桩腿段之间,以制得第二桩腿组件;
(3)将所述第六桩腿段与第七桩腿段预合拢,以制得第三桩腿组件;
(4)所述第三桩腿组件、第二桩腿组件,以及第一桩腿组件进行顺序吊装合拢,以制得桩腿。
本发明提供的一种风车安装船的桩腿的制造工艺能够制得机械性能较高的桩腿。
预合拢时,应该搭设遮阳蓬,防止由于太阳的照射造成各个桩腿段或各个桩腿组件产生温差导致装配、焊接工程产生变形。焊接时,应该采取上、下、左、右同时对称的施焊的原则。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。

Claims (1)

1.一种风车安装船的桩腿的制造工艺,其特征在于,所述桩腿包括第一桩腿段、第二桩腿段、第三桩腿段、第四桩腿段、第五桩腿段、第六桩腿段,以及第七桩腿段;桩腿的制造工艺的包括如下步骤:
(1)将所述第一桩腿段与第二桩腿段预合拢,以制得第一桩腿组件;
(2)将所述第三桩腿段与第四桩腿段,以及第五桩腿段预合拢,且所述第四桩腿段位于所述第三桩腿段与第五桩腿段之间,以制得第二桩腿组件;
(3)将所述第六桩腿段与第七桩腿段预合拢,以制得第三桩腿组件;
(4)所述第三桩腿组件、第二桩腿组件,以及第一桩腿组件进行顺序吊装合拢,以制得桩腿。
CN2013103627566A 2013-08-20 2013-08-20 一种风车安装船的桩腿的制造工艺 Pending CN103410163A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103627566A CN103410163A (zh) 2013-08-20 2013-08-20 一种风车安装船的桩腿的制造工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103627566A CN103410163A (zh) 2013-08-20 2013-08-20 一种风车安装船的桩腿的制造工艺

Publications (1)

Publication Number Publication Date
CN103410163A true CN103410163A (zh) 2013-11-27

Family

ID=49603201

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103627566A Pending CN103410163A (zh) 2013-08-20 2013-08-20 一种风车安装船的桩腿的制造工艺

Country Status (1)

Country Link
CN (1) CN103410163A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351197A (zh) * 2015-07-13 2017-01-25 烟台中集来福士海洋工程有限公司 液压插销式自升平台的桩腿合拢方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3851482A (en) * 1973-05-25 1974-12-03 Ihc Holland Le Tourneau Marine Sectionalized leg for drilling platform and method of assembling same
US3859806A (en) * 1972-09-05 1975-01-14 Exxon Production Research Co Offshore platform
CN201010897Y (zh) * 2006-12-08 2008-01-23 大连船舶重工集团有限公司 用于桩腿分段建造的组合胎架装置
CN102168417A (zh) * 2010-02-25 2011-08-31 烟台来福士海洋工程有限公司 自升式钻井平台桁架式桩腿合拢方法
CN102416554A (zh) * 2011-09-28 2012-04-18 南通润邦海洋工程装备有限公司 风电安装船桩腿的制作工艺
CN102717248A (zh) * 2012-07-05 2012-10-10 南通中远船务工程有限公司 一种八边形桩腿分段合拢精度设计方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3859806A (en) * 1972-09-05 1975-01-14 Exxon Production Research Co Offshore platform
US3851482A (en) * 1973-05-25 1974-12-03 Ihc Holland Le Tourneau Marine Sectionalized leg for drilling platform and method of assembling same
CN201010897Y (zh) * 2006-12-08 2008-01-23 大连船舶重工集团有限公司 用于桩腿分段建造的组合胎架装置
CN102168417A (zh) * 2010-02-25 2011-08-31 烟台来福士海洋工程有限公司 自升式钻井平台桁架式桩腿合拢方法
CN102416554A (zh) * 2011-09-28 2012-04-18 南通润邦海洋工程装备有限公司 风电安装船桩腿的制作工艺
CN102717248A (zh) * 2012-07-05 2012-10-10 南通中远船务工程有限公司 一种八边形桩腿分段合拢精度设计方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106351197A (zh) * 2015-07-13 2017-01-25 烟台中集来福士海洋工程有限公司 液压插销式自升平台的桩腿合拢方法

Similar Documents

Publication Publication Date Title
CN102704452B (zh) 具有多类型桩腿的超大型自升式风电安装船及其设计方法
CN202040026U (zh) 一种海上能源综合利用系统
CN202295230U (zh) 浮式海上风电基础
CN204610156U (zh) 海上风机单桩基础集成式附属结构
SE544127C2 (en) Floating semi-submersible wind energy platform with t-shaped pontoon and its assembly
Tsai et al. Strategies for the development of offshore wind technology for far-east countries–a point of view from patent analysis
CN202247872U (zh) 风电安装船桩靴
CN104961043A (zh) 一种浮吊及其多功能吊钩、多功能吊钩组
CN107571975A (zh) 一种海上风电安装平台
Athanasia et al. The offshore wind market deployment: forecasts for 2020, 2030 and impacts on the European supply chain development
KR20160019034A (ko) 기동성 해상 풍력 터빈
CN103938603B (zh) 安装船平台连续升降装置及其升降方法
CN109911127B (zh) 一种母子式安装船及其在海上风机安装的应用
CN103410163A (zh) 一种风车安装船的桩腿的制造工艺
KR101313250B1 (ko) 플로팅 도크 및 이를 이용한 해양설비의 건조방법
CN104369846A (zh) 可移动的海上核电平台
KR20120139931A (ko) 잭업 플랫폼의 스퍼드 캔 탈부착 방법 및 시스템
CN201943059U (zh) 整体式海上升压站结构
CN202072417U (zh) 半潜式起重作业平台
CN204452860U (zh) 一种可移动的海上核电平台
CN106930312A (zh) 具有内部牺牲阳极结构的海上风机单桩基础
CN102733362A (zh) 海洋风电安装船超大吨位塔头平台吊装方法
CN203239493U (zh) 一种海洋潮汐能发电机组
CN103407553A (zh) 一种风车安装船的桩腿
CN105239572A (zh) 一种大直径单桩风机基础结构海上施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131127