CN103400203A - Electric vehicle charging station load prediction method based on support vector machine - Google Patents

Electric vehicle charging station load prediction method based on support vector machine Download PDF

Info

Publication number
CN103400203A
CN103400203A CN201310306730XA CN201310306730A CN103400203A CN 103400203 A CN103400203 A CN 103400203A CN 201310306730X A CN201310306730X A CN 201310306730XA CN 201310306730 A CN201310306730 A CN 201310306730A CN 103400203 A CN103400203 A CN 103400203A
Authority
CN
China
Prior art keywords
charging station
day
prediction
load
support vector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310306730XA
Other languages
Chinese (zh)
Other versions
CN103400203B (en
Inventor
别朝红
戎晓雪
刘文鹏
孙刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Jiaotong University
Original Assignee
Xian Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Jiaotong University filed Critical Xian Jiaotong University
Priority to CN201310306730.XA priority Critical patent/CN103400203B/en
Publication of CN103400203A publication Critical patent/CN103400203A/en
Application granted granted Critical
Publication of CN103400203B publication Critical patent/CN103400203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an electric vehicle charging station load prediction method based on a support vector machine. The electric vehicle charging station load prediction method based on the support vector machine comprises the following steps of: collecting charging station load before a prediction day and historical data of factors which affect the charging station load; constructing a training sample set according to the historical data; training by the training sample set to obtain the Lagrange multiplier of a support vector machine regression function; according to the Lagrange multiplier, establishing a support vector machine prediction model; and substituting the prediction sample set into the support vector machine prediction model to obtain a charging station load prediction value. According to the electric vehicle charging station load prediction method based on the support vector machine, which is disclosed by the invention, the electric vehicle charging station load prediction precision can be effectively improved, and a more reliable basis is provided for an electric power dispatching department to regulate a dispatching plan, regulate system reserve capacity and optimize the generator set capacity.

Description

A kind of load forecasting method of electric automobile charging station based on support vector machine
Technical field
The invention belongs to electric automobile charging station load prediction field.
Background technology
The tradition fuel-engined vehicle not only consumes non-renewable energy resources in a large number, is also one of main source of Present Global greenhouse gas emission and the local pollution of the environment.Because electric automobile replaces fuel oil with electric power, playing great function aspect the solution energy and environmental crisis, electric automobile just progressively moves towards the large-scale application stage by development.But that large-scale electric vehicle charging electric load has is high-power, undulatory property and the characteristics such as uncertain, and this controls for safe operation, Optimized Operation and the trend of electrical network and has all brought very large challenge.Therefore predict significant to the load of electric automobile charging station.
After electric automobile is popularized on a large scale, its charging load will be very large, power scheduling department can be according to predicting the outcome that electric automobile charging station is loaded, adjust operation plan, adjustment System margin capacity, optimize genset and exert oneself etc., can reduce operating cost, strengthen security, reliability and the controllability of system.
At present, the electric automobile charging station load prediction is according to electric automobile during traveling characteristic and battery charging/discharging characteristic.At first predict that according to the characteristics of travelling of electric automobile it arrives time and the battery dump energy of charging station charging, utilize the charging characteristic curve of these data and battery to determine each charge power constantly of every electric automobile, and then obtain total charge power of charging station.This fado is used for the electric automobile charging station initial operation stage, and historical load information is less, and the data of grasp only have the situation of charge-discharge characteristic of time, mileage and the battery of electric automobile operation.Present charging station load forecasting method substantially all is based on this method.Yet Vehicle Driving Cycle has very large randomness and uncontrollability, causes vehicle, to time and the battery dump energy of charging station charging, very large randomness is arranged, and therefore, this method precision that predicts the outcome is lower.
Summary of the invention
The object of the present invention is to provide a kind of load forecasting method of electric automobile charging station based on support vector machine, be intended to solve tradition and only utilize the not enough problem of precision of the charging station load forecasting method of electric automobile during traveling characteristic and battery charge characteristic prediction load, improve adaptivity and the engineering practicability of electric automobile charging station load forecasting method.
For achieving the above object, the present invention has adopted following technical scheme:
A kind of load forecasting method of electric automobile charging station based on support vector machine, this Forecasting Methodology comprises the following steps:
1) charging station load and the historical data that affect factor of charging station load before Collection and Forecast Day, described factor comprise all attributes, red-letter day attribute, temperature, weather condition, charging station service vehicle number and the charging set number that works;
2) each affect the value of the factor of charging station load to determine prediction day, and wherein, temperature and weather condition determine according to weather forecast, and the several data that provide according to charging station of charging station service vehicle number and normal operation charging set are definite;
3) to historical data and step 2) value determined makes normalized;
4) after step 3), historical data and step 2 that utilization and prediction day k are constantly corresponding) definite value structure training sample set and forecast sample collection;
5) utilize the training sample set training to obtain the Lagrange multiplier of the support vector machine regression function constantly corresponding with k, according to described Lagrange multiplier, set up the SVM prediction model constantly corresponding with k;
6) forecast sample collection substitution SVM prediction model is obtained the charging station load prediction value constantly corresponding with k;
7) repeating step 4), to step 6), obtain predicting a day charging station load prediction value corresponding to each moment.
Described all attributes are designated as W, W ∈ { 1,2,3,4,5,6,7}, W=1 corresponding Monday, W=2 corresponding Tu., W=3 corresponding Wednesday, W=4 corresponding Thursday, W=5 corresponding Friday, W=6 corresponding Saturday, W=7 corresponding Sun.; Red-letter day, attribute was designated as F, and { 0,1}, if get F=1 red-letter day, otherwise get F=0 to F ∈; Weather condition is designated as A, A ∈ 1,2,3}, and the A=1 correspondence is fine, and A=2 is corresponding cloudy, the corresponding sleet of A=3.
Described historical data for before prediction day in 100-200 days the electric automobile charging station data-base recording about the charging station load and the data message that affect factor that charging station loads.Determine the number of times of prediction in a day according to the step-length of prediction, all use the data message of corresponding moment correspondence to train at every turn, obtain the SVM prediction model in this moment, and with the charging station load value in this this moment of model prediction (when for example prediction step is 10 minutes, can obtain 144 SVM prediction models every day, the charging station load prediction value in measurable 144 moment).
Before historical data is made normalized, the historical data that gathers is scanned, if when in historical data, one day, charging station load constantly was for negative value, with modified value, replace negative value, modified value is the mean value of forward and backward two days of described one day corresponding charging station constantly load.
The construction method of described training sample set is: the front 10 days k charging station load value L={L constantly that gets i day I-1, k, L I-2, k, L I-3, k, L I-4, k, L I-5, k, L I-6, k, L I-7, k, L I-8, k, L I-9, k, L I-10, k, all attribute W of i day i, i day attribute F in red-letter day i, i day temperature T i, i day weather condition A i, i day charging station service vehicle counts B iAnd the charging set that works i day is counted C iInput vector as i day k training sample constantly:
x i,k={L i-1,k,L i-2,k,L i-3,k,L i-4,k,L i-5,k,L i-6,k,L i-7,k,L i-8,k,L i-9,k,L i-10,k,W i,F i,T i,A i,B i,C i}
Get i day k charging station load L constantly i,kTarget output value as training sample:
y i,k=L i,k
Can obtain by that analogy input vector and the target output value of the training sample of day any time, the training sample set of any time arbitrarily
Figure BDA00003540881100043
I=11,12 ..., N, N are the collection number of days of historical data.
The construction method of described forecast sample collection is: the front 10 days k charging station load value L={L constantly that gets prediction day (M day) M-1, k, L M-2, k, L M-3, k, L M-4, k, L M-5, k, L M-6, k, L M-7, k, L M-8, k, L M-9, k, L M-10, k, the prediction day all attribute W M, the prediction day attribute F in red-letter day M, the prediction day temperature T M, the prediction day weather condition A M, a prediction day charging station service vehicle counts B MAnd a prediction day normal operation charging set is counted C MAs the input vector of k forecast sample constantly, M=N+1:
x k={L M-1,k,L M-2,k,L M-3,k,L M-4,k,L M-5,k,L M-6,k,L M-7,k,L M-8,k,L M-9,k,L M-10,k,W M,F M,T M,A M,B M,C M}
Obtain by that analogy the forecast sample collection of any time.
The mathematical model that be used for Support Vector Machines Optimized parameter constantly corresponding with k is:
max Σ i = 11 N α i , k - 1 2 Σ i = 11 N Σ j = 11 N y i , k y j , k α i , k α j , k ( φ ( x i , k ) · φ ( x j , k ) )
s . t . Σ i - 11 N y i , k α i , k = 0
0≤α i,k≤C,i=11,12,...,N
α i,kAnd α j,kThe mathematical model i that is used for the Support Vector Machines Optimized parameter and j Lagrange multiplier that expression is constantly corresponding with k, C represents penalty factor.
The SVM prediction model constantly corresponding with k is:
f ( x k ) = Σ i = 11 N α i , k * y i , k ( φ ( x k ) · φ ( x i , k ) ) + y j , k - Σ i = 11 N α i , k * y i , k ( φ ( x i , k ) · φ ( x j , k ) )
Wherein, x kThe input vector of expression forecast sample, N represents the collection number of days of historical data,
Figure BDA00003540881100052
The optimal value of i the Lagrange multiplier that the expression basis mathematical model optimizing that be used for Support Vector Machines Optimized parameter corresponding with the k moment obtains, x j,kConcentrate for k training sample constantly, be positioned at the input vector of support vector position j, y j,kFor k training sample is constantly concentrated, be positioned at the target output value of support vector position j, φ () is illustrated under input and the inseparable condition of output linearity, and lower dimensional space is to the mapping of higher dimensional space, φ (x) can not occur separately, but with inner product φ (x i,k) φ (x j,k) form occur,, therefore model does not need to know the concrete form of φ (x), only need know its inner product φ (x i,k) φ (x j,k) form get final product, note φ (x i,k) φ (x j,k)=K (x i,k, x j,k), φ (x k) φ (x i,k)=K (x k, x i,k), K (x i,k, x j,k) and K (x k, x i,k) express support for the kernel function that vector machine adopts.
Due to the high dimension (16 dimension) of input sample, described kernel function adopts gaussian kernel function, and for example concrete form is K (x i,k, x j,k)=exp (|| x i,k-x j,k|| 2/ 2 σ 2).
Described Forecasting Methodology is further comprising the steps of: call figure interface display instrument, the form of prediction day each charging station load prediction value constantly with curve represented.
Beneficial effect of the present invention is embodied in:
the present invention utilizes support vector machine (SVM) method, factor (all attributes of traditional impact load have been considered, red-letter day attribute, temperature, weather condition) and the new influence factor of bringing after electric automobile access (the electric automobile number of charging station service, the charging set number of charging station normal operation), each charging station load constantly of prediction electric automobile charging station, can effectively improve the precision of electric automobile charging station load prediction, for power scheduling department adjusts operation plan, the adjustment System margin capacity, optimizing genset exerts oneself etc. more reliable foundation is provided.
In order further to reduce the impact of non-True Data on predicated error in historical data, the present invention first carries out pre-service to historical data, replaces the negative value in historical charging station load, and the data that recycling was processed are trained and predict.Result shows, is taking the pre-service front and back, and the mean absolute error of prediction is reduced to 103.836 by 166.402, and root-mean-square error is reduced to 0.101 by 0.141.
The present invention adopts heuritic approach, and when historical data is 100-200 days, training sample set and forecast sample while concentrating historical load to choose the charging station load of front 10 days, the charging station load error that prediction obtains is less, and computing velocity is very fast.
Description of drawings
Fig. 1 is electric automobile charging station load forecasting method process flow diagram of the present invention;
Fig. 2 is the electric automobile charging station load prediction curve.
Embodiment
The invention will be further described below in conjunction with accompanying drawing.
The present invention utilizes support vector machine (SVM) method, consider the charging load of the information prediction electric automobile charging stations such as charging set number, temperature, weather information and association attributes of electric automobile number, the charging station normal operation of the service of electric automobile charging station historical load, charging station, method of this prediction electric automobile charging station charging load is specific as follows:
1) sample chooses
Identical with conventional electric power load, the electric automobile charging station load also has certain periodicity and continuity, and different is, and charging load value and the electric automobile of charging station service and the quantity of charging set have obvious relation., by the analysis to the charging station historical data, determine that the input vector of training sample set and forecast sample collection comprises: certain is the charging station load value in the front 10 day corresponding moment constantly; All attributes on the same day, red-letter day attribute; The temperature on the same day, weather condition; The same day charging station service vehicle number and normal operation charging set number.
The present invention is used the prediction historical data of 150 days a few days ago as training sample, and training obtains after the SVM model, the electric automobile charging station load of prediction day being predicted.
2) correction of historical sample (pre-service)
Failure and other reasons due to electric automobile charging station data acquisition communication system, make the power (i.e. load) of the part charging set that collects be negative value, and then cause having error between the historical data of charging station historical data library storage and actual, historical data value, namely there be " bad point " (being non-True Data) in historical data.In order to prevent the precision of these " bad point " impact prediction results, the present invention revises " bad point ".Because charging station load has certain periodicity, so the present invention is with the modified value of the mean value conduct " bad point " of synchronization charging station load on the two before and after it.
3) to the sample normalized
The order of magnitude and the variation range of each sample data differ greatly, and in order to prevent the less data of variation range, by variation range larger data submerge and computation process, are overflowed, and the present invention carries out normalized to training sample set and forecast sample collection.
4) sample training and prediction
Utilize training sample set to train the Lagrange multiplier that obtains with each constantly corresponding support vector machine regression function, according to the SVM prediction model that Lagrange multiplier is set up and each is constantly corresponding; Forecast sample collection substitution SVM prediction model is obtained and each constantly corresponding charging station load prediction value;
Setting up rational SVM model is gordian technique of the present invention, and the process of specifically setting up of this model is as follows:
4a) the ultimate principle of support vector machine (SVM)
A given training sample set
Figure BDA00003540881100083
x iFor input vector, y iFor target output value, n is the number of training sample, and support vector machine returns and can be used to find input vector x iWith corresponding output valve y iBetween relation.When the pass between sample output and input vector while being non-linear, SVM is not the relation of directly finding input and output, but first by Nonlinear Mapping φ (x): R N→ R mThe input space is mapped to high-dimensional feature space, and then realizes linear regression in high-dimensional feature space:
f(x)=(w,φ(x))+b (1)
In formula (1), w is weighted value, and b is deviation.SVM adopts structural risk minimization principle, and w and b are trained by formula (2):
min | | w | | 2 2 + c Σ i = 1 n ξ i
s.t.y i[(w·φ(x) i)+b]≥1-ξ i (2)
ξ i≥0 i=1,...n
In the objective function of formula (2), first is the regularization part, and second is the experience error.Coefficient C is penalty factor.The Lagrangian function of structure following formula, result is:
L ( w , b , ξ ) = | | w | | 2 2 + c Σ i = 1 n ξ i - Σ i = 1 n α i ( y i ( w · φ ( x ) i ) + b - 1 + ξ i ) - Σ i = 1 n β i ξ i - - - ( 3 )
α=(α wherein 1..., α n), β=(β 1..., β n), α i〉=0, β i〉=0, i=1,2 ... n.
According to KKT(Karush-Kuhn-Tucker) condition, ask respectively formula (3) to w, b and ξ iPartial differential, will obtain w, b, α i, β iAnd ξ iRelation:
w = Σ i = 1 n α i y i φ ( x i ) - - - ( 4 )
b = y j - Σ i = 1 n α i y i ( φ ( x i ) · φ ( x j ) )
In formula (4) substitution formula (3), can be with the problem reduction of formula (2), and application Wolfe antithesis skill is (referring to A.Smola and B.Scholkopf, A tutorial on support vector regression, NeuroCOLT Tech.Rep.TR1998-030, Royal Holloway College, London, U.K., 1998.) be converted into its dual problem:
max Σ i = 1 n α i - 1 2 Σ i = 1 n Σ j = 1 n y i y j α i α j ( φ ( x i ) · φ ( x j ) )
s . t . Σ i - 1 n y i α i = 0 - - - ( 5 )
0≤α i≤C i=1,2,...,n
In formula (5), introduce kernel function K (x i, x j)=(φ (x i) φ (x j)), thereby only need determine function K (x i, x j),, in the situation that need not determine φ (x) expression, can obtain corresponding decision function.Application formula (5) is trained training sample set, obtains under optimal condition
Figure BDA00003540881100095
Utilize formula (4) to try to achieve w *, b *,, with its substitution formula (1), get final product to obtain the SVM regression function:
f ( x ) = Σ i = 1 n α i * y i ( φ ( x ) · φ ( x i ) ) + y j - Σ i = 1 n α i * y i ( φ ( x i ) · φ ( x j ) ) - - - ( 6 )
4b) determine the input sample of support vector machine (SVM)
Identical with the conventional electric power load, the electric automobile charging station load also has certain periodicity and continuity, and different is that charging load value and the electric automobile quantity of operation and the quantity of charging set etc. have obvious relation.The present invention, by the analysis to the charging station historical data, determines that the input vector of training sample set and forecast sample collection comprises:
1) be the periodicity of performance charging load, choose certain front 10 days constantly corresponding charging load value L={L constantly 1, L 2, L 3, L 4, L 5, L 6, L 7, L 8, L 9, L 10;
2) all attribute W ∈ { 1,2,3,4,5,6,7} on the same day;
3) the attribute F ∈ in red-letter day on the same day 0,1}(gets F=1 red-letter day, otherwise gets F=0);
4) the weather condition A ∈ on the same day the fine F=1 that gets of 1,2,3}(weather, the moon is got F=2, sleet is got F=3);
5) temperature T on the same day;
6) the vehicle number B of planning operation on the same day;
The charging set that 7) can normally use the same day is counted C.
Comprehensive above seven parts can obtain the training sample set of support vector machine (SVM) and the input vector of forecast sample collection: 16 dimension input vector { L 1, L 2, L 3, L 4, L 5, L 6, L 7, L 8, L 9, L 10, W, F, A, T, B, C}.
4c) the SVM model is established and performing step
The quality of SVM forecast model depends on selected kernel function and parameter to a great extent.Input dimension of the present invention higher (16 dimension), number of training is very large simultaneously, and at the premium properties that solves on the higher-dimension large sample problem, the present invention chooses gaussian kernel function and sets up the SVM model based on gaussian kernel function, and parameter is chosen as C=100.
After having set up the SVM model, use the prediction above-mentioned historical information of 150 days a few days ago as training sample, training obtains after the SVM forecast model, the electric automobile charging station load being predicted.The specific implementation process as shown in Figure 1.
1) charging station load and the historical data that affect factor of charging station load before Collection and Forecast Day, described factor comprise all attributes, red-letter day attribute, temperature, weather condition, charging station service vehicle number and the charging set number that works;
The historical data of 2) charging station that gathers being loaded scans, if when in historical data, one day, charging station load constantly was for negative value, with modified value, replace negative value, modified value is the mean value of charging station load of the corresponding moment of forward and backward two days of described one day;
3) determine that prediction day, each affected the value of the factor of charging station load, wherein, temperature and weather condition (are for example determined according to weather forecast, temperature is got the maximal value of forecast), the several data that provide according to charging station of charging station service vehicle number and normal operation charging set (are for example determined, charging station service vehicle number is definite by the intended services vehicle number that charging station receives, and normal operation charging set number equals the charging set number that works the previous day);
4) historical data and the definite value of step 3) are made normalized;
5) after step 4), the value of utilizing the historical data constantly corresponding with prediction day k and step 3) to determine builds training sample set and forecast sample collection;
6) utilize the training sample set training to obtain the Lagrange multiplier of the support vector machine regression function constantly corresponding with k, according to described Lagrange multiplier, set up the SVM prediction model constantly corresponding with k;
7) forecast sample collection substitution SVM prediction model is obtained the charging station load prediction value constantly corresponding with k;
8) repeating step 5), to step 7), obtain predicting a day charging station load prediction value corresponding to each moment.
9) after prediction is completed, call figure interface display instrument, the form of prediction day each charging station load prediction value constantly with curve represented, simultaneously each predicted value constantly is stored in database.
The construction method of training sample set is: the front 10 days k charging station load value L={L constantly that gets i day I-1, k, L I-2, k, L I-3, k, L I-4, k, L I-5, k, L I-6, k, L I-7, k, L I-8, k, L I-9, k, L I-10, k, all attribute W of i day i, i day attribute F in red-letter day i, i day temperature T i, i day weather condition A i, i day charging station service vehicle counts B iAnd the charging set that works i day is counted C iInput vector as i day k training sample constantly:
x i,k={L i-1,k,L i-2,k,L i-3,k,L i-4,k,L i-5,k,L i-6,k,L i-7,k,L i-8,k,L i-9,k,L i-10,k,W i,F i,T i,A i,B i,C i}
Get i day k charging station load L constantly i, kTarget output value as training sample:
y i,k=L i,k
Can obtain by that analogy input vector and the target output value of the training sample of day any time, the training sample set of any time arbitrarily
Figure BDA00003540881100123
K=1,2...144, i=11,12 ..., N, N are the collection number of days of historical data.
The construction method of forecast sample collection is: the front 10 days k charging station load value L={L constantly that gets prediction day (M day) M-1, k, L M-2, k, L M-3, k, L M-4, k, L M-5, k, L M-6, k, L M-7, k, L M-8, k, L M-9, k, L M-10, k, the prediction day all attribute W M, the prediction day attribute F in red-letter day M, the prediction day temperature T M, the prediction day weather condition A M, a prediction day charging station service vehicle counts B MAnd a prediction day normal operation charging set is counted C MAs the input vector of k forecast sample constantly, M=N+1:
x k={L M-1,k,L M-2,k,L M-3,k,L M-4,k,L M-5,k,L M-6,k,L M-7,k,L M-8,k,L M-9,k,L M-10,k,W M,F M,T M,A M,B M,C M}
Obtain by that analogy the forecast sample collection of any time.
The mathematical model that be used for Support Vector Machines Optimized parameter constantly corresponding with k is:
max Σ i = 11 N α i , k - 1 2 Σ i = 11 N Σ j = 11 N y i , k y j , k α i , k α j , k ( φ ( x i , k ) · φ ( x j , k ) )
s . t . Σ i - 11 N y i , k α i , k = 0
0≤α i,k≤C,i=11,12,...,N,k=1,2,...,144
α i,kAnd α j,kThe mathematical model i that is used for the Support Vector Machines Optimized parameter and j Lagrange multiplier that expression is constantly corresponding with k.
The SVM prediction model constantly corresponding with k is:
f ( x k ) = Σ i = 11 N α i , k * y i , k ( φ ( x k ) · φ ( x i , k ) ) + y j , k - Σ i = 11 N α i , k * y i , k ( φ ( x i , k ) · φ ( x j , k ) )
Wherein, x kThe input vector of expression forecast sample, N represents the collection number of days of historical data,
Figure BDA00003540881100132
The optimal value of i the Lagrange multiplier that the expression basis mathematical model optimizing that be used for Support Vector Machines Optimized parameter corresponding with the k moment obtains, x j,kConcentrate for k training sample constantly, be positioned at the input vector of support vector position j, y j,kFor k training sample is constantly concentrated, be positioned at the target output value of support vector position j, φ () is illustrated under input and the inseparable condition of output linearity, and lower dimensional space is to the mapping of higher dimensional space, φ (x) can not occur separately, but with inner product φ (x i,k) φ (x j,k) form occur,, therefore model does not need to know the concrete form of φ (x), only need know its inner product φ (x i,k) φ (x j,k) form get final product, note φ (x i,k) φ (x j,k)=K (x i,k, x j,k), φ (x k) φ (x i,k)=K (x k, x i,k), K (x i,k, x j,k) and K (x k, x i,k) expressing support for the kernel function that vector machine adopts, C represents penalty factor.
Due to the high dimension (16 dimension) of input sample, described kernel function adopts gaussian kernel function, and for example concrete form is K (x i,k, x j,k)=exp (|| x i,k-x j,k|| 2/ 2 σ 2).
Compare with the method for tradition application electric automobile during traveling Predicting Performance Characteristics charging station load, the present invention adopts the SVM forecast model based on pretreated historical data can effectively improve the precision of electric automobile charging station load prediction, and error reduces level such as table 1.By finding out in table, all have clear improvement on mean absolute error and two indexs of root-mean-square error based on the more traditional method based on the Vehicle Driving Cycle characteristic of the charging station load prediction of SVM model: mean absolute error reduces by 69.9%, and root-mean-square error reduces by 64.5%.The charging station load sequence of two kinds of method predictions and actual charging station load sequence such as Fig. 2, curve in figure shows, charging station based on SVM forecast model load prediction curve of the present invention is substantially identical with actual charging station load curve tendency, and predicted value and actual value approach; And based on the charging station load prediction curve of electric automobile during traveling characteristic and the peak value time of occurrence of actual charging station load curve, differ larger, and between its predicted value and actual value, error is more obvious.
Table 1 is based on electric automobile during traveling Predicting Performance Characteristics and SVM forecast result of model
Figure BDA00003540881100141
The present invention, take certain electric automobile charging station as example, illustrates that this invention is in the validity that improves electric automobile charging station load prediction precision.Based on electric automobile during traveling characteristic and SVM model prediction electric automobile charging station next day load sequence, the error level of two kinds of methods is as shown in table 1 respectively, predicts the outcome and charges the load actual value as shown in Figure 2.Result shows, based on the charging station load prediction of SVM model,, being significantly improved than the prediction based on ride characteristic aspect precision of prediction, all has clear improvement on mean absolute error and two indexs of root-mean-square error.
Travelling of electric automobile has very large randomness, and its time and battery dump energy to the charging station charging also has very large randomness, causes the method precision of traditional application electric automobile during traveling Predicting Performance Characteristics charging station load lower.Promote the growth of time along with electric automobile, the historical informations such as the charging load in the charging station database, electric automobile quantity, charging set quantity are very sufficient.The present invention is directed to deficiency and problem that prior art exists, application support vector machine (Support Vector Machines, SVM) method, consider each factor that affects electric automobile charging station, comprise historical charging load, all attributes, red-letter day attribute, temperature, weather condition, the vehicle number of operation, the charging pile number of normal operation etc., the prediction charging station is loaded.The method can effectively improve the precision of electric automobile charging station load prediction, has simultaneously stronger versatility and engineering adaptability.
The present invention is docked with electric automobile charging station database (iNova database), can realize the prediction of charging station load.Utilize method of the present invention can effectively improve the precision of electric automobile charging station load prediction, improve adaptivity and the engineering practicability of electric automobile charging station load forecasting method, for power scheduling department adjusts operation plan, adjustment System margin capacity, optimizes genset and exert oneself etc. more reliable foundation is provided.The present invention can output in database predicting the outcome in addition, and the form with curve represents simultaneously, facilitates the secondary treating of data and intuitively represents.

Claims (9)

1. load forecasting method of the electric automobile charging station based on support vector machine, it is characterized in that: this Forecasting Methodology comprises the following steps:
1) charging station load and the historical data that affect factor of charging station load before Collection and Forecast Day, described factor comprise all attributes, red-letter day attribute, temperature, weather condition, charging station service vehicle number and the charging set number that works;
2) each affect the value of the factor of charging station load to determine prediction day, and wherein, temperature and weather condition determine according to weather forecast, and the several data that provide according to charging station of charging station service vehicle number and normal operation charging set are definite;
3) to historical data and step 2) value determined makes normalized;
4) after step 3), historical data and step 2 that utilization and prediction day k are constantly corresponding) definite value structure training sample set and forecast sample collection;
5) utilize the training sample set training to obtain the Lagrange multiplier of the support vector machine regression function constantly corresponding with k, according to described Lagrange multiplier, set up the SVM prediction model constantly corresponding with k;
6) forecast sample collection substitution SVM prediction model is obtained the charging station load prediction value constantly corresponding with k;
7) repeating step 4), to step 6), obtain predicting a day charging station load prediction value corresponding to each moment.
2. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 1, it is characterized in that: described all attributes are designated as W, W ∈ { 1,2,3,4,5,6,7}, W=1 corresponding Monday, W=2 corresponding Tu., W=3 corresponding Wednesday, W=4 corresponding Thursday, W=5 corresponding Friday, W=6 corresponding Saturday, W=7 corresponding Sun.; Red-letter day, attribute was designated as F, and { 0,1}, if get F=1 red-letter day, otherwise get F=0 to F ∈; Weather condition is designated as A, A ∈ 1,2,3}, and the A=1 correspondence is fine, and A=2 is corresponding cloudy, the corresponding sleet of A=3.
3. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 1 is characterized in that: described historical data for electric automobile charging station data-base recording in before prediction day 100-200 days about the charging station load and the data message that affect factor that charging station loads.
4. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 1, it is characterized in that: before historical data is made normalized, the historical data that gathers is scanned, when if in historical data, one day, charging station load constantly was for negative value, with modified value, replace negative value, modified value is the mean value of forward and backward two days of described one day corresponding charging station constantly load.
5. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 1, it is characterized in that: the construction method of described training sample set is: the front 10 days k charging station load value L={L constantly that gets i day I-1, k, L I-2, k, L I-3, k, L I-4, k, L I-5, k, L I-6, k, L I-7, k, L I-8, k, L I-9, k, L I-10, k, all attribute W of i day i, i day attribute F in red-letter day i, i day temperature T i, i day weather condition A i, i day charging station service vehicle counts B iAnd the charging set that works i day is counted C iInput vector as i day k training sample constantly:
x i,k={L i-1,k,L i-2,k,L i-3,k,L i-4,k,L i-5,k,L i-6,k,L i-7,k,L i-8,k,L i-9,k,L i-10,k,W i,F i,T i,A i,B i,C i}
Get i day k charging station load L constantly i,kTarget output value as training sample:
y i,k=L i,k
The training sample set of any time
Figure FDA00003540881000032
I=11,12 ..., N, N are the collection number of days of historical data.
6. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 5, it is characterized in that: the construction method of described forecast sample collection is: the front 10 days k charging station load value L={L constantly that gets prediction day M-1, k, L M-2, k, L M-3, k, L M-4, k, L M-5, k, L M-6, k, L M-7, k, L M-8, k, L M-9, k, L M-10, k, the prediction day all attribute W M, the prediction day attribute F in red-letter day M, the prediction day temperature T M, the prediction day weather condition A M, a prediction day charging station service vehicle counts B MAnd a prediction day normal operation charging set is counted C MAs the input vector of k forecast sample constantly, M=N+1:
x k={L M-1,k,L M-2,k,L M-3,k,L M-4,k,L M-5,k,L M-6,k,L M-7,k,L M-8,k,L M-9,k,L M-10,k,W M,F M,T M,A M,B M,C M}
7. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 6, it is characterized in that: the SVM prediction model constantly corresponding with k is:
f ( x k ) = Σ i = 11 N α i , k * y i , k ( φ ( x k ) · φ ( x i , k ) ) + y j , k - Σ i = 11 N α i , k * y i , k ( φ ( x i , k ) · φ ( x j , k ) )
Wherein, x kThe input vector of expression forecast sample, N represents the collection number of days of historical data,
Figure FDA00003540881000033
The optimal value that represents i Lagrange multiplier, x j,kConcentrate for k training sample constantly, be positioned at the input vector of support vector position j, y j,kConcentrate for k training sample constantly, be positioned at the target output value of support vector position j, φ (x i,k) φ (x j,k)=K (x i,k, x j,k), φ (x k) φ (x i,k)=K (x k, x i,k), K (x i,k, x j,k) and K (x k, x i,k) express support for the kernel function that vector machine adopts.
8. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 7, it is characterized in that: described kernel function adopts gaussian kernel function.
9. a kind of load forecasting method of electric automobile charging station based on support vector machine according to claim 1, it is characterized in that: described Forecasting Methodology is further comprising the steps of: call figure interface display instrument, the form of prediction day each charging station load prediction value constantly with curve represented.
CN201310306730.XA 2013-07-19 2013-07-19 A kind of electric automobile charging station load forecasting method based on support vector machine Active CN103400203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310306730.XA CN103400203B (en) 2013-07-19 2013-07-19 A kind of electric automobile charging station load forecasting method based on support vector machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310306730.XA CN103400203B (en) 2013-07-19 2013-07-19 A kind of electric automobile charging station load forecasting method based on support vector machine

Publications (2)

Publication Number Publication Date
CN103400203A true CN103400203A (en) 2013-11-20
CN103400203B CN103400203B (en) 2016-07-06

Family

ID=49563820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310306730.XA Active CN103400203B (en) 2013-07-19 2013-07-19 A kind of electric automobile charging station load forecasting method based on support vector machine

Country Status (1)

Country Link
CN (1) CN103400203B (en)

Cited By (26)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104022552A (en) * 2014-06-16 2014-09-03 南方电网科学研究院有限责任公司 Intelligent detection method for electric vehicle charging control
CN104581779A (en) * 2014-12-11 2015-04-29 华为技术有限公司 Business processing method and device
EP3179421A1 (en) 2015-12-10 2017-06-14 Schneider Electric Industries SAS Method for managing power in a charging station for electric vehicles
CN107145986A (en) * 2017-05-24 2017-09-08 北京中电普华信息技术有限公司 A kind of charge capacity Forecasting Methodology and device
CN107180272A (en) * 2017-04-28 2017-09-19 华南理工大学 The electric automobile parking lot charging method controlled based on energy consumption
CN107730059A (en) * 2017-11-29 2018-02-23 成都思晗科技股份有限公司 The method of transformer station's electricity trend prediction analysis based on machine learning
CN107834678A (en) * 2017-08-17 2018-03-23 山东电工豪迈节能科技有限公司 Application of the one-variable linear regression Frequency Measurement Algorithm in DC charging motor
CN108022014A (en) * 2017-12-05 2018-05-11 国网山东省电力公司济南供电公司 A kind of Load Prediction In Power Systems method and system
CN108304976A (en) * 2018-03-06 2018-07-20 西安交通大学 A kind of electric system fining load prediction and analysis method
CN108363024A (en) * 2018-03-01 2018-08-03 万帮充电设备有限公司 A kind of method and apparatus of charging pile localization of fault
CN108932558A (en) * 2018-05-18 2018-12-04 国网江苏省电力有限公司徐州供电分公司 A kind of opening type Electric Transit charging station load forecasting method
CN109242220A (en) * 2018-11-16 2019-01-18 国家电网有限公司 Charging station transaction power predicating method, device, electronic equipment and storage medium
CN109325631A (en) * 2018-10-15 2019-02-12 华中科技大学 Electric car charging load forecasting method and system based on data mining
CN109460620A (en) * 2018-11-14 2019-03-12 国网湖北省电力有限公司电力科学研究院 A kind of electric automobile charging station typical charge part throttle characteristics acquisition methods
CN110046787A (en) * 2019-01-15 2019-07-23 重庆邮电大学 A kind of urban area charging demand for electric vehicles spatio-temporal prediction method
CN110889527A (en) * 2018-09-07 2020-03-17 国网甘肃省电力公司电力科学研究院 Electric vehicle charging load prediction method based on LSTM neural network
CN111242403A (en) * 2019-11-08 2020-06-05 武汉旌胜科技有限公司 Charging load prediction method and device for charging station and storage medium
CN111898822A (en) * 2020-07-30 2020-11-06 东北电力大学 Charging load interval prediction method based on multi-correlation-day scene generation
CN112036436A (en) * 2020-07-23 2020-12-04 国网江苏省电力有限公司检修分公司 Data noise processing method and processing system of phase modulator oil temperature prediction system
CN112149915A (en) * 2020-10-09 2020-12-29 国网江苏省电力有限公司无锡供电分公司 Charging load prediction method and system for charging station
CN112339615A (en) * 2020-09-25 2021-02-09 南京金龙客车制造有限公司 Fuel cell passenger car endurance mileage prediction method based on online support vector machine
CN112508301A (en) * 2020-12-21 2021-03-16 北京梧桐车联科技有限责任公司 Method and device for predicting charging load of electric vehicle, and storage medium
CN114256834A (en) * 2020-09-23 2022-03-29 湖南京能新能源科技有限公司 Charging pile output power control method based on power grid peak-valley load
CN114523876A (en) * 2020-11-05 2022-05-24 丰田自动车株式会社 Vehicle state prediction device and storage medium
CN116722528A (en) * 2023-05-07 2023-09-08 国网湖北省电力有限公司营销服务中心(计量中心) Intelligent power grid load prediction method based on electric automobile alternating current V2G
CN112339615B (en) * 2020-09-25 2024-06-04 南京金龙客车制造有限公司 Fuel cell bus endurance mileage prediction method based on online support vector machine

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
ZHAO MINGFU 等: "《Research of battery capacity fiber on-line intelligent testing technology based on SVM》", 《THE 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION》 *
王奔 等: "《支持向量机在短期负荷预测中的应用概况》", 《电力系统及其自动化学报》 *
胡国伟 等: "《基于PSASP/UPI环境的电动汽车充电站优化规划》", 《中国电力》 *

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104022552A (en) * 2014-06-16 2014-09-03 南方电网科学研究院有限责任公司 Intelligent detection method for electric vehicle charging control
CN104022552B (en) * 2014-06-16 2016-08-31 南方电网科学研究院有限责任公司 A kind of intelligent detecting method controlled for charging electric vehicle
CN104581779A (en) * 2014-12-11 2015-04-29 华为技术有限公司 Business processing method and device
CN104581779B (en) * 2014-12-11 2018-11-30 华为技术有限公司 A kind of method for processing business and device
US10040365B2 (en) 2015-12-10 2018-08-07 Schneider Electric Industries Sas Method for managing power in a charging station for electric vehicles
CN107020963A (en) * 2015-12-10 2017-08-08 施耐德电器工业公司 Method for managing power in the charging station of electric vehicle
CN107020963B (en) * 2015-12-10 2021-07-23 施耐德电器工业公司 Method for managing power in a charging station of an electric vehicle
EP3179421A1 (en) 2015-12-10 2017-06-14 Schneider Electric Industries SAS Method for managing power in a charging station for electric vehicles
CN107180272A (en) * 2017-04-28 2017-09-19 华南理工大学 The electric automobile parking lot charging method controlled based on energy consumption
CN107180272B (en) * 2017-04-28 2018-11-02 华南理工大学 Electric vehicle parking lot charging method based on energy consumption control
CN107145986A (en) * 2017-05-24 2017-09-08 北京中电普华信息技术有限公司 A kind of charge capacity Forecasting Methodology and device
CN107834678A (en) * 2017-08-17 2018-03-23 山东电工豪迈节能科技有限公司 Application of the one-variable linear regression Frequency Measurement Algorithm in DC charging motor
CN107730059A (en) * 2017-11-29 2018-02-23 成都思晗科技股份有限公司 The method of transformer station's electricity trend prediction analysis based on machine learning
CN108022014A (en) * 2017-12-05 2018-05-11 国网山东省电力公司济南供电公司 A kind of Load Prediction In Power Systems method and system
CN108022014B (en) * 2017-12-05 2021-06-01 国网山东省电力公司济南供电公司 Power system load prediction method and system
CN108363024A (en) * 2018-03-01 2018-08-03 万帮充电设备有限公司 A kind of method and apparatus of charging pile localization of fault
CN108304976A (en) * 2018-03-06 2018-07-20 西安交通大学 A kind of electric system fining load prediction and analysis method
CN108932558A (en) * 2018-05-18 2018-12-04 国网江苏省电力有限公司徐州供电分公司 A kind of opening type Electric Transit charging station load forecasting method
CN108932558B (en) * 2018-05-18 2021-09-28 国网江苏省电力有限公司徐州供电分公司 Load prediction method for externally-open type electric bus charging station
CN110889527A (en) * 2018-09-07 2020-03-17 国网甘肃省电力公司电力科学研究院 Electric vehicle charging load prediction method based on LSTM neural network
CN110889527B (en) * 2018-09-07 2023-04-07 国网甘肃省电力公司电力科学研究院 Electric vehicle charging load prediction method based on LSTM neural network
CN109325631A (en) * 2018-10-15 2019-02-12 华中科技大学 Electric car charging load forecasting method and system based on data mining
CN109460620A (en) * 2018-11-14 2019-03-12 国网湖北省电力有限公司电力科学研究院 A kind of electric automobile charging station typical charge part throttle characteristics acquisition methods
CN109242220A (en) * 2018-11-16 2019-01-18 国家电网有限公司 Charging station transaction power predicating method, device, electronic equipment and storage medium
CN110046787A (en) * 2019-01-15 2019-07-23 重庆邮电大学 A kind of urban area charging demand for electric vehicles spatio-temporal prediction method
CN111242403A (en) * 2019-11-08 2020-06-05 武汉旌胜科技有限公司 Charging load prediction method and device for charging station and storage medium
CN111242403B (en) * 2019-11-08 2023-05-05 武汉旌胜科技有限公司 Charging load prediction method, device equipment and storage medium for charging station
CN112036436A (en) * 2020-07-23 2020-12-04 国网江苏省电力有限公司检修分公司 Data noise processing method and processing system of phase modulator oil temperature prediction system
CN112036436B (en) * 2020-07-23 2024-02-13 国网江苏省电力有限公司检修分公司 Data noise processing method and processing system of camera oil temperature prediction system
CN111898822B (en) * 2020-07-30 2022-06-03 东北电力大学 Charging load interval prediction method based on multi-correlation-day scene generation
CN111898822A (en) * 2020-07-30 2020-11-06 东北电力大学 Charging load interval prediction method based on multi-correlation-day scene generation
CN114256834A (en) * 2020-09-23 2022-03-29 湖南京能新能源科技有限公司 Charging pile output power control method based on power grid peak-valley load
CN112339615A (en) * 2020-09-25 2021-02-09 南京金龙客车制造有限公司 Fuel cell passenger car endurance mileage prediction method based on online support vector machine
CN112339615B (en) * 2020-09-25 2024-06-04 南京金龙客车制造有限公司 Fuel cell bus endurance mileage prediction method based on online support vector machine
CN112149915B (en) * 2020-10-09 2022-08-05 国网江苏省电力有限公司无锡供电分公司 Charging load prediction method and system for charging station
CN112149915A (en) * 2020-10-09 2020-12-29 国网江苏省电力有限公司无锡供电分公司 Charging load prediction method and system for charging station
CN114523876A (en) * 2020-11-05 2022-05-24 丰田自动车株式会社 Vehicle state prediction device and storage medium
CN112508301A (en) * 2020-12-21 2021-03-16 北京梧桐车联科技有限责任公司 Method and device for predicting charging load of electric vehicle, and storage medium
CN112508301B (en) * 2020-12-21 2024-05-17 北京梧桐车联科技有限责任公司 Method, device and storage medium for predicting charge load of electric vehicle
CN116722528A (en) * 2023-05-07 2023-09-08 国网湖北省电力有限公司营销服务中心(计量中心) Intelligent power grid load prediction method based on electric automobile alternating current V2G

Also Published As

Publication number Publication date
CN103400203B (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN103400203A (en) Electric vehicle charging station load prediction method based on support vector machine
CN109599861B (en) Power supply structure planning method of power supply of transmission-end power grid considering local load peak regulation capacity
CN112186743B (en) Dynamic power system economic dispatching method based on deep reinforcement learning
Cau et al. Energy management strategy based on short-term generation scheduling for a renewable microgrid using a hydrogen storage system
Zhao et al. Capacity allocation of a hybrid energy storage system for power system peak shaving at high wind power penetration level
CN103241130B (en) Energy management method and system for electric bus charging and swap station
CN104836259B (en) Multi-energy resource ship micro-grid real-time energy optimal scheduling method
CN103997091B (en) A kind of scale electric automobile intelligent charge control method
CN107453381B (en) Electric car cluster power regulating method and system based on two stages cross-over control
Gao et al. Economic dispatch containing wind power and electric vehicle battery swap station
CN111064214A (en) Power distribution network optimal scheduling method based on electric vehicle two-stage rolling strategy
CN107392462A (en) A kind of grid-connected dispatching method of electric automobile for considering sort feature
Wu et al. Hydrogen energy storage system for demand forecast error mitigation and voltage stabilization in a fast-charging station
Lu et al. Online optimization of energy management strategy for FCV control parameters considering dual power source lifespan decay synergy
Hu et al. Energy Management Optimization Method of Plug-In Hybrid-Electric Bus Based on Incremental Learning
CN114692965A (en) Electric vehicle cluster schedulable potential prediction method and device based on digital-analog hybrid driving
Shang et al. Computational performance analysis for centralized coordinated charging methods of plug‐in electric vehicles: From the grid operator perspective
Ramadan et al. Robust control for techno‐economic efficient energy management of fuel cell hybrid electric vehicles
CN103077291A (en) Battery charge and discharge process digital simulation method capable of setting initial state of charge
CN113283166B (en) Retired power battery residual value optimization method
Idris et al. The Integration of Electric Vehicle with Power Generation Sector: A Scenario Analysis Based on Supply and Demand in Malaysia
CN114291067A (en) Hybrid electric vehicle convex optimization energy control method and system based on prediction
Li et al. Impacts of EVs on power system operation: Guangdong case, China
CN113807566A (en) Community energy scheduling method based on renewable energy and uncertain internal load
Arrinda et al. Using a second-life battery to optimize the levelized cost of electricity in CO2 neutral microgrid

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant