CN103394683A - Molten iron desulphurization line based online reladling system - Google Patents

Molten iron desulphurization line based online reladling system Download PDF

Info

Publication number
CN103394683A
CN103394683A CN2013103769406A CN201310376940A CN103394683A CN 103394683 A CN103394683 A CN 103394683A CN 2013103769406 A CN2013103769406 A CN 2013103769406A CN 201310376940 A CN201310376940 A CN 201310376940A CN 103394683 A CN103394683 A CN 103394683A
Authority
CN
China
Prior art keywords
tank switching
molten iron
reladling
excluding hood
dust excluding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013103769406A
Other languages
Chinese (zh)
Inventor
崔荣峰
杨云周
杨莹莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN2013103769406A priority Critical patent/CN103394683A/en
Publication of CN103394683A publication Critical patent/CN103394683A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Refinement Of Pig-Iron, Manufacture Of Cast Iron, And Steel Manufacture Other Than In Revolving Furnaces (AREA)

Abstract

The invention discloses a molten iron desulphurization line based online reladling system. The system at least comprises a control unit, a movable execution unit, a molten iron desulphurization trolley connected with the movable execution unit, a hoist connected with the movable execution unit and a dust collection device connected with the movable execution unit, wherein the dust collection device is connected with a reladling dedusting cover and a static rail weighbridge is arranged below the reladling dedusting cover. According to the scheme, the invention provides a molten iron desulphurization line based online reladling device; the reladling device is arranged on a molten iron desulphurization line; the molten iron desulphurization trolley serves as the carrier of empty molten iron ladles; and the static rail weighbridge serves as a metering device before and after reladling. The system disclosed by the invention is compact in process equipment arrangement and low in investment cost and operating cost, therefore, the system is suitable for not only the process arrangement of new workshops but also the transformation process arrangement of steelmaking workshops and has a very good application prospect.

Description

Based on the online tank switching system on the desulfurizing iron line
Technical field
The present invention relates to the process for making technical field, relate in particular to a kind of based on the online tank switching system on the desulfurizing iron line.
Background technology
The foundation of molten iron ladle pouring facility is mainly based on following two factors:
(1) blast-melted mismatch problem with tank and steely iron water pot;
(2) " a tank system " hot metal supply is adopted in workshop, solves hot-metal bottle and tank problem.
For the steelshop that adopts the desulfurizing iron facility, no matter take KR Desulfurization by stirring method or Desulfurization by injecting method, all need take to have the desulfurizing iron chassis of hydraulic pressure tilt functions, realize transportation and the tilt functions of hot-metal bottle.It is reinforced across interior that the molten iron ladle pouring facility is arranged in workshop, not only take reinforced across usable floor area, but also need to increase the one-time investment of molten iron weighing chassis, be worth steel mill reducing thinking aspect one-time investment and operating cost.
Summary of the invention
For the problems referred to above, the object of the present invention is to provide a kind ofly based on the online tank switching system on the desulfurizing iron line, meet the molten iron ladle pouring facility and arranged high requirement to the space, workshop, and reduced the construction investment of workshop to the molten iron ladle pouring facility.
For achieving the above object, of the present invention a kind of based on the online tank switching system on the desulfurizing iron line, comprise at least:
Be set up in the crane that is used for the suspended mobile hot-metal bottle in the high vacancy of factory building;
Be placed in the tank switching dust excluding hood that the facility floor place is used for carrying out the tank switching operation, this tank switching dust excluding hood connects a dust arrester;
The desulfurizing iron chassis that can shift out at tank switching dust excluding hood station place shift-in;
And, a static state railroad track scale is set below the tank switching dust excluding hood.
Preferably, but also be provided with the containment facilities of the desulfurizing iron chassis of a fixed placement in the tank switching dust excluding hood at described tank switching dust excluding hood place.
Beneficial effect of the present invention is:
1, this online tank switching system process characteristics of compact layout, reasonable, the scope of application is wider, not only applicable " a tank system " molten iron direct-furnish technique, also applicable blast furnace and converter hot-metal bottle mismatch problem;
2, layout on-line tank switching facility, not only reduced the one-time investment of molten iron ladle pouring facility, but also significantly expanded reinforced across usable floor area;
3, this scheme proposes a kind of online tank switching facility based on the desulfurizing iron line, and this tank switching facility is arranged on the desulfurizing iron line, utilizes the carrier of desulfurizing iron chassis as the hot-metal bottle slack tank, and static state railroad track scale is as the metering device before and after tank switching.This invented technology facility characteristics of compact layout, cost of investment is low, operating cost is lower, not only is fit to newly-built workshop technology arrangement, but also be fit to the steelshop reforming technology, arranges that good application prospect is arranged.
Description of drawings
Fig. 1 is the described technology arrangement figure based on the online tank switching system on the desulfurizing iron line of the embodiment of the present invention.
The specific embodiment
The present invention will be further described below in conjunction with Figure of description.
As shown in Figure 1, the embodiment of the present invention is described a kind of based on the online tank switching system on the desulfurizing iron line, at least comprise control module, mobile performance element, and the desulfurizing iron chassis that is connected in described mobile performance element, be connected in the crane of described mobile performance element, be connected in the dust arrester of described mobile performance element, described dust arrester connects a tank switching dust excluding hood; One static state railroad track scale is set below the tank switching dust excluding hood.Described control module is mainly used in sending the control of equipment moving operation, and mobile performance element is mainly to chassis, and the mobile equipment of the needs such as crane moves.
Arrange one overheadly in factory building, crane is set on overhead.One tank switching dust excluding hood is set on the factory building bottom surface, the tank switching dust excluding hood connects a dust arrester, is used for dedusting when the tank switching molten iron.One static state railroad track scale is set below the tank switching dust excluding hood.In addition, but also be provided with the containment facilities of the desulfurizing iron chassis of a fixed placement in the tank switching dust excluding hood at described tank switching dust excluding hood place.
The operation principle of native system is:
When the molten iron ladle pouring operation need to be carried out in workshop, desulfurizing iron chassis 2 was left to the interior tank switching station of tank switching dust excluding hood 3 from the desulfurization station, and dust arrester 6 starts thereupon.At this moment, the desulfurizing iron chassis 2 that 4 pairs of static state railroad track scales are equipped with sky hot-metal bottle 7 carries out static weighing one time, after weighing finishes, the hot-metal bottle that the interior casting crane 1 of main building will be equipped with molten iron carries out the tank switching operation, the flue dust that the tank switching process produces is fully absorbed by dust arrester 6, after tank switching finished, 4 pairs of static state railroad track scales were equipped with desulfurizing iron chassis 2 and carry out the secondary static weighing, and the difference of twice weighing is the weight of molten iron in hot-metal bottle.After weighing finished, desulfurizing iron chassis 2 was left, and dust arrester 6 cuts out, and can select three process routes this moment:
(1) casting crane hangs out hot-metal bottle, can directly be blended into converter;
(2) casting crane hangs out hot-metal bottle, leaves in reinforced across interior wait temporarily;
(3) the desulfurizing iron chassis under weight of molten iron, composition, the satisfactory precondition of temperature, moves to the desulfurization station and carries out the molten iron pre-treatment job.
This scheme proposes a kind of online tank switching facility based on the desulfurizing iron line, and this tank switching facility is arranged on the desulfurizing iron line, utilizes the carrier of desulfurizing iron chassis as the hot-metal bottle slack tank, and static state railroad track scale is as the metering device before and after tank switching.This invented technology facility characteristics of compact layout, cost of investment is low, operating cost is lower, not only is fit to newly-built workshop technology arrangement, but also be fit to the steelshop reforming technology, arranges that good application prospect is arranged.
Above; be only preferred embodiment of the present invention, but protection scope of the present invention is not limited to this, anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement, within all should being encompassed in protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain that claim was defined.

Claims (2)

1. one kind based on the online tank switching system on the desulfurizing iron line, it is characterized in that, comprises at least:
Be set up in the crane that is used for the suspended mobile hot-metal bottle in the high vacancy of factory building;
Be placed in the tank switching dust excluding hood that the facility floor place is used for carrying out the tank switching operation, this tank switching dust excluding hood connects a dust arrester;
The desulfurizing iron chassis that can shift out at tank switching dust excluding hood station place shift-in;
And, a static state railroad track scale is set below the tank switching dust excluding hood.
2. according to claim 1ly based on the online tank switching system on the desulfurizing iron line, it is characterized in that, but also be provided with the containment facilities of the desulfurizing iron chassis of a fixed placement in the tank switching dust excluding hood at described tank switching dust excluding hood place.
CN2013103769406A 2013-08-26 2013-08-26 Molten iron desulphurization line based online reladling system Pending CN103394683A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013103769406A CN103394683A (en) 2013-08-26 2013-08-26 Molten iron desulphurization line based online reladling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013103769406A CN103394683A (en) 2013-08-26 2013-08-26 Molten iron desulphurization line based online reladling system

Publications (1)

Publication Number Publication Date
CN103394683A true CN103394683A (en) 2013-11-20

Family

ID=49558509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013103769406A Pending CN103394683A (en) 2013-08-26 2013-08-26 Molten iron desulphurization line based online reladling system

Country Status (1)

Country Link
CN (1) CN103394683A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107138723A (en) * 2017-06-15 2017-09-08 中冶华天南京工程技术有限公司 A kind of molten iron ladle pouring system and method based on the remaining steel line of return
CN107175325A (en) * 2017-06-15 2017-09-19 中冶华天工程技术有限公司 A kind of system and method using remaining steel line of return off-line baking hot-metal bottle

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002079368A (en) * 2000-09-05 2002-03-19 Nisshin Steel Co Ltd Apparatus provided with preheating device and tilting device for ladle
CN201931077U (en) * 2011-01-31 2011-08-17 储鸿文 Overturn device for hot-metal ladle
CN102814493A (en) * 2012-09-13 2012-12-12 中冶华天南京工程技术有限公司 Environment-friendly molten iron transferring system
CN202910291U (en) * 2012-11-12 2013-05-01 鞍钢集团工程技术有限公司 Novel molten iron transport trolley
CN203495209U (en) * 2013-08-26 2014-03-26 中冶华天南京工程技术有限公司 On-line tank tilting system based on molten iron desulfuration line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002079368A (en) * 2000-09-05 2002-03-19 Nisshin Steel Co Ltd Apparatus provided with preheating device and tilting device for ladle
CN201931077U (en) * 2011-01-31 2011-08-17 储鸿文 Overturn device for hot-metal ladle
CN102814493A (en) * 2012-09-13 2012-12-12 中冶华天南京工程技术有限公司 Environment-friendly molten iron transferring system
CN202910291U (en) * 2012-11-12 2013-05-01 鞍钢集团工程技术有限公司 Novel molten iron transport trolley
CN203495209U (en) * 2013-08-26 2014-03-26 中冶华天南京工程技术有限公司 On-line tank tilting system based on molten iron desulfuration line

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107138723A (en) * 2017-06-15 2017-09-08 中冶华天南京工程技术有限公司 A kind of molten iron ladle pouring system and method based on the remaining steel line of return
CN107175325A (en) * 2017-06-15 2017-09-19 中冶华天工程技术有限公司 A kind of system and method using remaining steel line of return off-line baking hot-metal bottle
CN107138723B (en) * 2017-06-15 2023-01-13 中冶华天南京工程技术有限公司 Molten iron reladling system and method based on residual steel return line
CN107175325B (en) * 2017-06-15 2023-07-18 中冶华天工程技术有限公司 System and method for off-line baking of hot-metal ladle by utilizing residual steel return line

Similar Documents

Publication Publication Date Title
CN103433474A (en) Two-way conveying system for blast furnace molten iron conveying process of conveying ladle to bottom without stopping
CN101514379B (en) Hot metal ladle car on-line molten iron desulphurization pretreatment system
CN101280347A (en) Blast furnace-converter interface 'compact one tank mode' process
CN101108419A (en) System and technique for transporting rail heterotype considerable tank truck
CN105238891A (en) Direct connection type process for iron making and steel making interface
CN203495209U (en) On-line tank tilting system based on molten iron desulfuration line
CN103394683A (en) Molten iron desulphurization line based online reladling system
CN101249560B (en) Iron melt transfer system
CN204171351U (en) The slide gate nozzle watering time ladle assists blocking device more
CN102912083A (en) Melted iron desulfuration and slag skimming product line system
CN102554202A (en) Multifunctional cover closing and removing device for foundry ladle
CN204265790U (en) The device of converter platform and slag car duplex technique
CN102181589A (en) Method for tipping molten slag in airtight system
CN104801699A (en) Method and system for realizing one-ladle-system rotation and production buffer of hot metal ladles
CN201825966U (en) Ladle slag-pot mixed-loading vehicle
CN204311077U (en) A kind of Iron Melt Transport System
CN101538621B (en) Molten iron pretreatment slag removing device and process thereof
CN203209680U (en) Device for controlling of covering and uncovering of steel ladle in whole steelmaking process
CN103924015B (en) Realize equipment combination and the method at the interface of steel zero
CN206779449U (en) The system of steel line of return off-line baking hot-metal bottle more than a kind of utilization
CN205008563U (en) Ladle adds covers device
CN206936362U (en) A kind of molten iron ladle pouring system based on the remaining steel line of return
CN205590745U (en) Vacuum refining device
GB1073766A (en) Steel plant
CN203751325U (en) Molten iron transportation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131120