CN107138723A - A kind of molten iron ladle pouring system and method based on the remaining steel line of return - Google Patents
A kind of molten iron ladle pouring system and method based on the remaining steel line of return Download PDFInfo
- Publication number
- CN107138723A CN107138723A CN201710450113.5A CN201710450113A CN107138723A CN 107138723 A CN107138723 A CN 107138723A CN 201710450113 A CN201710450113 A CN 201710450113A CN 107138723 A CN107138723 A CN 107138723A
- Authority
- CN
- China
- Prior art keywords
- molten iron
- return
- hot
- steel
- carriage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B22—CASTING; POWDER METALLURGY
- B22D—CASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
- B22D41/00—Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
- B22D41/12—Travelling ladles or similar containers; Cars for ladles
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Mechanical Engineering (AREA)
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
- Carbon Steel Or Casting Steel Manufacturing (AREA)
- Treatment Of Steel In Its Molten State (AREA)
Abstract
The invention discloses a kind of molten iron ladle pouring system and method based on the remaining steel line of return.Including:The charging be arrangeding in parallel across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang return cars on carriage-returning track;The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system includes dust treatment plant and meausring apparatus;Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, the weight of molten iron that dust treatment plant weigh again after the completion of molten iron ladle pouring, tank switching and calculate tank switching according to weighing twice is opened after weighing, remaining steel return car is outputed into molten iron ladle pouring system after weighing.The invention is very worth to be subject to promotion and application in steel mill upgrading project from now on no matter for making steel newly-built workshop or transforming workshop suffers from good economic benefit and social benefit.
Description
Technical field
It is existing using workshop the present invention relates to the exploitation of a kind of molten iron ladle pouring process based on the remaining steel line of return and device
Steel of having a surplus returns to car as the carrier of hot-metal bottle used in molten iron line, realizes the online tank switching of hot-metal bottle, belongs to process for making field.
Background technology
The foundation of molten iron ladle pouring facility is based primarily upon following two factors:
The mismatch problem of blast-melted use tank and steely iron water pot;
Workshop uses " a tank system " hot metal supply, solves the problems, such as hot-metal bottle and tank.
Molten iron ladle pouring facility is routinely arranged in workshop charging across interior, do not only take up charging across usable floor area, but also need
Increase the one-time investment of molten iron weighing chassis, be worth steel mill to be thought deeply in terms of reduction one-time investment and operating cost.It is remaining
Steel returns to car as remaining steel and returns to special-purpose vehicle, and utilization rate is very low, improves work of the utilization rate to steelshop that remaining steel returns to car
Skill direct motion and equipment control are highly beneficial.
Molten iron ladle pouring station is the necessary links in large-scale steel mill's production, for receiving the fish torpedo ladle molten iron in ironworks, and is poured into
Hot-metal bottle, after weighing, pours into pneumatic steelmaking.Molten iron weighing result is the important number needed for automation of converter steelmaking model is calculated
According to directly influencing the control accuracy and STEELMAKING PRODUCTION rate steel-making cost of automatic Steelmaking system.In traditional steel making operation,
Above-mentioned weight of molten iron data are generally gathered using manual method, because influence factor is more so there is error, directly influenced
The control accuracy of automatic Steelmaking.Therefore, ladle pouring station molten iron on-line weighing is realized, there is important meaning for pneumatic steelmaking production
Justice.
The innovation and creation returning to car using remaining steel carries out the online tank switching of hot-metal bottle, not only reduces equipment and disposably throws
Money, also improves the utilization rate of equipment and installations that Yu Gang returns to car, increases charging across the space of technological operation.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of molten iron ladle pouring system based on the remaining steel line of return, including:It is arranged in parallel
Charging across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang on carriage-returning track
Return to car;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system includes powder
Dirt processing unit and meausring apparatus;
Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, and dust processing is opened after weighing
Device carries out the weight of molten iron for weighing again after the completion of molten iron ladle pouring, tank switching and calculating tank switching according to weighing twice, after weighing
Remaining steel return car is outputed into molten iron ladle pouring system.
Further, the meausring apparatus includes the static state railroad track scale for being arranged on rail inferior portion.
Further, the dust treatment plant include half-sealed cover and dust processor, the half-sealed cover by except
Dirt pipe is connected with dust processor.
Further, it is provided with electric butterfly valve in the dust removing tube;When the when of falling steel electric butterfly valve unlatching, steel terminates electronic
Butterfly valve is closed.
Further, the opening passed in and out for hot-metal bottle is offered before and after the half-sealed cover on cover wall.
Further, the charging is additionally included in hot-metal bottle track across the interior hot-metal ladle and carriage track having for transporting molten iron
Road, Yu Gang return the charging of handling hot-metal bottle between carriage-returning track and smelting furnace across crane.
Further, the remaining steel is returned and Yu Gang return cars is provided with carriage-returning track, and the remaining steel is returned to be provided with car
To motor and the torque cable drum of motor power transmission.
Further, the remaining steel return carriage-returning track end extend to charging across one end be provided with accident pulley, the thing
Therefore steel wire is equipped with pulley;When remaining steel, which returns to car, mechanically or electrically accident occurs, described steel wire one end passes through pulley and institute
Crane connection is stated, the other end returns to car with the remaining steel and is connected, and the crane is returned remaining steel by accident pulley using steel wire rope
Carriage return is pulled out from half-sealed cover.
Many-sided utilization of the invention that car is returned to remaining steel so that the invention plant process characteristics of compact layout, reasonable, applicable model
Enclose relatively wide, be not only applicable " a tank system " molten iron direct-furnish technique, be also applicable blast furnace and converter hot-metal bottle mismatch problem;Online
Arrange tank switching facility, not only reduce the one-time investment of molten iron ladle pouring facility, but also significantly expanded charging across make
With area, increase the space of technological operation in workshop.
To reach above-mentioned purpose, a kind of method of the molten iron ladle pouring device based on the remaining steel line of return as described above of the present invention,
It the described method comprises the following steps:
S1:Empty first hot-metal bottle is returned carriage-returning track along remaining steel and transported to half-sealed cover by Yu Gang return cars;It is simultaneously static
Track scale is weighed to empty first hot-metal bottle;
S2:Hot-metal ladle and carriage will be equipped with the second hot-metal bottle of molten iron along hot-metal ladle and carriage rail transport to steelshop feed across
It is interior;
S3:Second hot-metal bottle is hung to above half-sealed cover and pours into molten iron in the first hot-metal bottle by crane;Institute is opened simultaneously
State the electric butterfly valve between dust removing tube and dust treatment plant;Tank switching closes electric butterfly valve after terminating;
S4:Empty second hot-metal bottle is hung and is back on hot-metal ladle and carriage by crane;Static state railroad track scale is to first equipped with molten iron simultaneously
Hot-metal bottle is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle, and is kept a record;
S6:Yu Gang return cars return carriage-returning track along remaining steel and output half-sealed cover, and first hot-metal bottle of the crane equipped with molten iron is hung
Iron making is carried out to converter, after iron making, crane, which hangs empty first hot-metal bottle, to be back on Yu Gang return cars.
Many-sided utilization of the invention that car is returned to remaining steel so that the invention plant process characteristics of compact layout, reasonable, applicable model
Enclose relatively wide, be not only applicable " a tank system " molten iron direct-furnish technique, be also applicable blast furnace and converter hot-metal bottle mismatch problem;Online
Arrange tank switching facility, not only reduce the one-time investment of molten iron ladle pouring facility, but also significantly expanded charging across make
With area, increase the space of technological operation in workshop.
And the flue dust that the present invention is produced molten iron ladle pouring process using molten iron ladle pouring facility is removed completely, solves steel-making
The problem of environmental pollution of factory;No matter good economic benefit and society's effect are suffered from for making steel newly-built workshop or transforming workshop
Benefit, it is very worth to be subject to promotion and application in steel mill upgrading project from now on.
Brief description of the drawings
A kind of craftworks CAD system figures of the molten iron ladle pouring based on the remaining steel line of return of Fig. 1;
Fig. 2 A-A sectional views.
1, converter;2, Yu Gang return carriage-returning track;3, dust removing tube;4, Yu Gang return to car;5, half-sealed cover;6, crane;7,
Hot-metal ladle and carriage track;8, hot-metal ladle and carriage;9, hot-metal bottle;10, accident pulley;11, electric butterfly valve;12, torque cable drum;13,
Static state railroad track scale.
It should be noted that these accompanying drawings and word description are not intended as the design model for limiting the present invention in any way
Enclose, but be that those skilled in the art illustrate idea of the invention by reference to specific embodiment.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention
In accompanying drawing, the technical scheme in embodiment is clearly and completely described, following examples be used for illustrate the present invention, but
It is not limited to the scope of the present invention.
In the description of the invention, it is necessary to explanation, the orientation or position of the instruction such as term " on ", " under ", " interior ", " outer "
It is, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description to put relation, rather than
Indicate or imply that the device or element of meaning there must be specific orientation, with specific azimuth configuration and operation, therefore can not
It is interpreted as limitation of the present invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " company
Connect " it should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or it is integrally connected;It can be machine
Tool is connected or electrically connected;Can be joined directly together, can also be indirectly connected to by intermediary.For this area
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
Referring to shown in Fig. 1-2, the present invention provides a kind of molten iron ladle pouring system based on the remaining steel line of return, including:It is parallel to set
The charging put across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track 2;Yu Gang is returned to be provided with carriage-returning track 2
Yu Gang returns to car 4;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track 2;The molten iron ladle pouring system includes
Dust treatment plant and meausring apparatus;
Wherein, Yu Gang returns car 4 transports empty hot-metal bottle 9 to molten iron ladle pouring system and weighed, and is opened after weighing at dust
The weight of molten iron that device weigh again after the completion of molten iron ladle pouring, tank switching and calculate tank switching according to weighing twice is managed, is weighed
Remaining steel return car 4 is outputed into molten iron ladle pouring system afterwards.
It is preferred that, the dust treatment plant include half-sealed cover 5 and dust processor, the half-sealed cover 5 by except
Dirt pipe 3 is connected with dust processor.
It is preferred that, the remaining steel is returned and Yu Gang return cars 4 is provided with carriage-returning track 2, and the remaining steel is returned to be provided with car 4
To motor and the torque cable drum 12 of motor power transmission.The motor that Yu Gang returns to car 4 is that reducing motor, the car body speed of service are 0
~30m/min, mode of braking are dynamic braking.
It is preferred that, the meausring apparatus includes the static state railroad track scale 13 for being arranged on rail inferior portion.
Static state railroad track scale 13 is arranged on the remaining steel line of return, returning to car 4 to the remaining steel before and after tank switching weighs, pre-post difference
Value is molten iron ladle pouring weight.
It is preferred that, the important technological parameters of the device of static state railroad track scale 13 and requirement:
(1) all steel claims object table face;
(2) maximum safe overload:130%FS;
(3) scale division value:100kg;
(4) base form:Shallow foundation is cheated;
(5) sensor:Column type sensor, precision:IV grade -0.3%;
(6) weighing apparatus speed≤30m/min is crossed.
Torque cable drum 12 on Yu Gang return cars 4 gives motor power transmission, and the remaining steel of motor driving returns to car 4 by empty first iron
Water pot 9 returns the row of carriage-returning track 2 to feeding across carrying out molten iron ladle pouring operation in interior molten iron ladle pouring system along remaining steel, and tank switching is completed
Afterwards, Yu Gang, which returns to car 4 and will be equipped with the first hot-metal bottle 9 of molten iron, transports molten iron ladle pouring system, convenient the first molten iron equipped with molten iron
Tank 9 carries out iron making, after iron making, and Yu Gang returns to car 4 and transports empty first hot-metal bottle 9.
The present embodiment extends the remaining steel line of return, by the use of remaining steel return car 4 as the carrier of the slack tank of hot-metal bottle 9, not only workshop
Technology arrangement is compact, reasonable, and the scope of application is wider, is not only applicable " a tank system " molten iron direct-furnish technique, is also applicable blast furnace and steel-making
The hot-metal bottle mismatch problem of stove 1.Layout on-line tank switching facility, not only reduces the one-time investment of molten iron ladle pouring facility, and
And also significantly expanded charging across usable floor area.
It is provided with simultaneously in tank switching position, static weighing equipment and dust processing equipment, reduces setting for molten iron weighing chassis
Standby investment, solves the problem of environmental pollution of steel mill;
Embodiment 2
On the basis of embodiment 1, electric butterfly valve 11 is provided with the present embodiment dust removing tube 3;When the when of falling steel electric butterfly valve
11 open, and steel terminates electric butterfly valve 11 and closed.
Electric butterfly valve 11 between the front opening molten iron ladle pouring system and dust treatment plant of tank switching;Tank switching is closed after terminating
Electric butterfly valve 11;The flue dust that tank switching is produced then carries out dust pelletizing system by dust removing tube 3 and is acted upon rear qualified discharge.
Embodiment 3
Offer and passed in and out for hot-metal bottle 9 on cover wall on the basis of embodiment 2, before and after the present embodiment half-sealed cover 5
Opening.
Two openings, one is used for the turnover that remaining steel returns to car 4, and another is used for the operation of tank switching, can be simultaneously to needing
Two hot-metal bottles 9 of tank switching are wanted while being operated, the time is saved.And different operations are carried out in both direction, are also saved
The utilization in place.
Embodiment 4
On the basis of embodiment 3, the charging is additionally included in across the interior hot-metal ladle and carriage track 7 having for transporting molten iron
Hot-metal ladle and carriage track 7, Yu Gang return the charging of handling hot-metal bottle 9 between carriage-returning track 2 and smelting furnace across crane 6.
Yu Gang returns to car 4 and returns empty first hot-metal bottle 9 in the row of carriage-returning track 2 to the half-sealed cover 5 of front and rear perforate along remaining steel,
Stop.The second hot-metal bottle 9 that hot-metal ladle and carriage 8 will be equipped with molten iron is transported to steelshop charging across interior along hot-metal ladle and carriage track 7.Hang
The second hot-metal bottle 9 that car 6 will be equipped with molten iron is hung to dedusting butterfly valve before the progress molten iron ladle pouring operation of the top of half-sealed cover 5, tank switching
Open, dust pelletizing system starts, the flue dust that tank switching is produced then carries out dust pelletizing system by dust removing tube 3 and is acted upon rear qualified discharge.
After the completion of tank switching, the second empty hot-metal bottle 9 is hung and is back on hot-metal ladle and carriage 8 by crane 6.Meanwhile, according to static track
The weighing result of weighing apparatus 13, Yu Gang return cars 4 return carriage-returning track 2 along Yu Gang and output half-sealed cover 5, and crane 6 will be equipped with after tank switching
First hot-metal bottle 9 of molten iron is hung to converter 1 and carries out iron making, after iron making, and the first empty hot-metal bottle 9 is hung and is back to Yu Gang by crane 6
Return to car 4.
Embodiment 5
On the basis of embodiment 4, remaining steel described in the present embodiment return the end of carriage-returning track 2 extend to charging across one end set
Have and be equipped with steel wire on accident pulley 10, the accident pulley 10;When remaining steel, which returns to car 4, mechanically or electrically accident occurs, institute
State steel wire one end to be connected with the crane 6 through pulley, the other end returns to car 4 with the remaining steel and is connected, and the crane 6 utilizes steel
Cord is pulled out remaining steel return car 4 from half-sealed cover 5 by accident pulley 10.
Prevent Yu Gang return cars 4 from mechanically or electrically accident occur and can not output half-sealed cover 5 so that follow-up work can not be completed
Make.
Embodiment 6
A kind of method of molten iron ladle pouring device based on the remaining steel line of return as described in above-mentioned any embodiment, methods described bag
Include following steps:
S1:Empty first hot-metal bottle 9 is returned carriage-returning track 2 along remaining steel and transported to half-sealed cover 5 by Yu Gang return cars 4;Simultaneously
13 pairs of first hot-metal bottles of sky 9 of static state railroad track scale are weighed;
S2:The second hot-metal bottle 9 that hot-metal ladle and carriage 8 will be equipped with molten iron is transported to steelshop charging along hot-metal ladle and carriage track 7
Across interior;
S3:Second hot-metal bottle 9 is hung to the top of half-sealed cover 5 and pours into molten iron in the first hot-metal bottle 9 by crane 6;Beat simultaneously
Drive the electric butterfly valve 11 between the dust removing tube 3 and dust treatment plant;Tank switching closes electric butterfly valve 11 after terminating;
S4:Empty second hot-metal bottle 9 is hung and is back on hot-metal ladle and carriage 8 by crane 6;13 pairs of static state railroad track scale is equipped with molten iron simultaneously
First hot-metal bottle 9 is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle 9, and is kept a record;
S6:Yu Gang return cars 4 return carriage-returning track 2 along remaining steel and output half-sealed cover 5, and crane 6 is equipped with the first molten iron of molten iron
Tank 9 is hung to converter 1 and carries out iron making, after iron making, and crane 6, which hangs empty first hot-metal bottle 9, to be back on Yu Gang return cars 4.
The course of work of the present embodiment:
Yu Gang returns to car 4 and travelled to tank switching region, and-the handling hot-metal bottle 9 of dust removal installation startup-crane 6 progress tank switching-falls
After tank, Yu Gang return cars 4 output tank switching dust excluding hood-crane 6 and empty hot-metal bottle 9 are hung back into 8-crane of hot-metal ladle and carriage 6 by full molten iron
Tank 9 hangs Yu Gang return car 4-Yu Gang return cars 4 and returned.
The present embodiment extends the remaining steel line of return, by the use of remaining steel return car 4 as the carrier of the slack tank of hot-metal bottle 9, not only workshop
Technology arrangement is compact, reasonable, and the scope of application is wider, is not only applicable " a tank system " molten iron direct-furnish technique, is also applicable blast furnace and steel-making
The mismatch problem of hot-metal bottle 9 of stove 1.Layout on-line tank switching facility, not only reduces the one-time investment of molten iron ladle pouring facility, and
And also significantly expanded charging across usable floor area.
It is provided with simultaneously in tank switching position, static weighing equipment and dust processing equipment, reduces setting for molten iron weighing chassis
Standby investment, solves the problem of environmental pollution of steel mill;
More than, only presently preferred embodiments of the present invention, but protection scope of the present invention is not limited thereto, and it is any to be familiar with sheet
Those skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in should all be covered
Within protection scope of the present invention.Therefore, the protection domain that protection scope of the present invention should be defined by claim is defined.
Claims (9)
1. a kind of molten iron ladle pouring system based on the remaining steel line of return, it is characterised in that including:The charging be arrangeding in parallel across and stove
Across, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang return cars on carriage-returning track;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system is included at dust
Manage device and meausring apparatus;
Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, and dust treatment plant is opened after weighing
The weight of molten iron for weighing again after the completion of molten iron ladle pouring, tank switching and calculating tank switching according to weighing twice is carried out, will be remaining after weighing
Steel returns to car and outputs molten iron ladle pouring system.
2. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the meausring apparatus
Static state railroad track scale including being arranged on rail inferior portion.
3. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the dust processing
Device includes half-sealed cover and dust processor, and the half-sealed cover is connected by dust removing tube with dust processor.
4. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 3, it is characterised in that in the dust removing tube
It is provided with electric butterfly valve;When the when of falling steel electric butterfly valve open, steel terminate electric butterfly valve closing.
5. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 3, it is characterised in that the half-sealed cover
The opening passed in and out for hot-metal bottle is offered on front and rear cover wall.
6. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the charging is across interior
There is the hot-metal ladle and carriage track for transporting molten iron, be additionally included in hot-metal ladle and carriage track, Yu Gang and return between carriage-returning track and smelting furnace
The charging of handling hot-metal bottle is across crane.
7. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the remaining steel is returned
Yu Gang is provided with track road and returns to car, the remaining steel returns to the torque coil of cable being provided with car to motor and motor power transmission
Cylinder.
8. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 7, it is characterised in that the remaining steel is returned
Car track end extend to charging across one end be provided with accident pulley, the accident pulley and be equipped with steel wire;When remaining steel is returned
When mechanically or electrically accident occurs in car, described steel wire one end is connected through pulley with the crane, and the other end is returned with the remaining steel
Carriage return is connected, and the crane is pulled out remaining steel return car from half-sealed cover by accident pulley using steel wire rope.
9. a kind of method of molten iron ladle pouring device based on the remaining steel line of return as described in claim 1-8 is any, it is characterised in that
It the described method comprises the following steps:
S1:Empty first hot-metal bottle is returned carriage-returning track along remaining steel and transported to half-sealed cover by Yu Gang return cars;While static track
Weighing apparatus is weighed to empty first hot-metal bottle;
S2:The second hot-metal bottle that hot-metal ladle and carriage will be equipped with molten iron feeds across interior along hot-metal ladle and carriage rail transport to steelshop;
S3:Second hot-metal bottle is hung to above half-sealed cover and pours into molten iron in the first hot-metal bottle by crane;Removed open simultaneously described in
Electric butterfly valve between dirt pipe and dust treatment plant;Tank switching closes electric butterfly valve after terminating;
S4:Empty second hot-metal bottle is hung and is back on hot-metal ladle and carriage by crane;Static state railroad track scale is to the first molten iron equipped with molten iron simultaneously
Tank is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle, and is kept a record;
S6:Yu Gang return cars return carriage-returning track along remaining steel and output half-sealed cover, and first hot-metal bottle of the crane equipped with molten iron is hung to refining
Steel stove carries out iron making, after iron making, and crane, which hangs empty first hot-metal bottle, to be back on Yu Gang return cars.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710450113.5A CN107138723B (en) | 2017-06-15 | 2017-06-15 | Molten iron reladling system and method based on residual steel return line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710450113.5A CN107138723B (en) | 2017-06-15 | 2017-06-15 | Molten iron reladling system and method based on residual steel return line |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107138723A true CN107138723A (en) | 2017-09-08 |
CN107138723B CN107138723B (en) | 2023-01-13 |
Family
ID=59782547
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710450113.5A Active CN107138723B (en) | 2017-06-15 | 2017-06-15 | Molten iron reladling system and method based on residual steel return line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107138723B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110339898A (en) * | 2019-04-19 | 2019-10-18 | 清远结加沥青改性材料科技有限公司 | A kind of tire milling production technology of high-effective dust-removing |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB9113756D0 (en) * | 1990-06-28 | 1991-08-14 | Hitachi Shipbuilding Eng Co | Tundish exchange apparatus for a continuous casting equipment |
CN101249558A (en) * | 2008-03-28 | 2008-08-27 | 重庆钢铁(集团)有限责任公司 | One tank to end technique for iron-smelting to steel-smelting |
CN103333980A (en) * | 2013-07-12 | 2013-10-02 | 鞍钢股份有限公司 | Method for recycling casting residues |
CN103394683A (en) * | 2013-08-26 | 2013-11-20 | 中冶华天南京工程技术有限公司 | Molten iron desulphurization line based online reladling system |
CN203495209U (en) * | 2013-08-26 | 2014-03-26 | 中冶华天南京工程技术有限公司 | On-line tank tilting system based on molten iron desulfuration line |
CN105382249A (en) * | 2015-12-22 | 2016-03-09 | 中冶京诚工程技术有限公司 | Tilting type hot metal charging transport vehicle |
CN206936362U (en) * | 2017-06-15 | 2018-01-30 | 中冶华天南京工程技术有限公司 | A kind of molten iron ladle pouring system based on the remaining steel line of return |
-
2017
- 2017-06-15 CN CN201710450113.5A patent/CN107138723B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB9113756D0 (en) * | 1990-06-28 | 1991-08-14 | Hitachi Shipbuilding Eng Co | Tundish exchange apparatus for a continuous casting equipment |
CN101249558A (en) * | 2008-03-28 | 2008-08-27 | 重庆钢铁(集团)有限责任公司 | One tank to end technique for iron-smelting to steel-smelting |
CN103333980A (en) * | 2013-07-12 | 2013-10-02 | 鞍钢股份有限公司 | Method for recycling casting residues |
CN103394683A (en) * | 2013-08-26 | 2013-11-20 | 中冶华天南京工程技术有限公司 | Molten iron desulphurization line based online reladling system |
CN203495209U (en) * | 2013-08-26 | 2014-03-26 | 中冶华天南京工程技术有限公司 | On-line tank tilting system based on molten iron desulfuration line |
CN105382249A (en) * | 2015-12-22 | 2016-03-09 | 中冶京诚工程技术有限公司 | Tilting type hot metal charging transport vehicle |
CN206936362U (en) * | 2017-06-15 | 2018-01-30 | 中冶华天南京工程技术有限公司 | A kind of molten iron ladle pouring system based on the remaining steel line of return |
Non-Patent Citations (4)
Title |
---|
中国重型机械工业协会: "《《中国重型机械选型手册 冶金及重型锻压设备》》", 31 March 2015, 冶金工业出版社 * |
中国钢铁工业协会信息统计部等: "《中国钢铁工业大黄页 下 2005-2006 第2版》", 30 April 2006, 中国财政经济出版社 * |
国家安全监管总局: "《冶金行业较大危险因素辨识与防范指导手册》", 31 January 2017, 煤炭工业出版社 * |
国家环境保护局: "《钢铁工业废气治理》", 31 July 1992, 中国环境科学出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110339898A (en) * | 2019-04-19 | 2019-10-18 | 清远结加沥青改性材料科技有限公司 | A kind of tire milling production technology of high-effective dust-removing |
Also Published As
Publication number | Publication date |
---|---|
CN107138723B (en) | 2023-01-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109482850B (en) | Numerical control quantitative weighing type multi-station continuous casting machine | |
CN106270469B (en) | A kind of steel ingot intelligence running gate system | |
CN101942537B (en) | On-line detection method of blast furnace slag quantity | |
CN103472811A (en) | Steelmaking second-stage process control system and steelmaking second-stage process control method | |
CN107381354A (en) | One kind driving intelligent weighing method | |
CN101486088B (en) | Hot-metal bottle combined cover and method thereof for adding and lifting cover | |
CN101280347A (en) | Blast furnace-converter interface 'compact one tank mode' process | |
CN206936362U (en) | A kind of molten iron ladle pouring system based on the remaining steel line of return | |
CN107138723A (en) | A kind of molten iron ladle pouring system and method based on the remaining steel line of return | |
CN109773171A (en) | A kind of high temperature aluminum ferrous metal liquid feed line | |
CN211645307U (en) | Device for adding scrap steel into molten iron tank on molten iron transportation line | |
CN206779449U (en) | The system of steel line of return off-line baking hot-metal bottle more than a kind of utilization | |
CN203209680U (en) | Device for controlling of covering and uncovering of steel ladle in whole steelmaking process | |
CN103343632A (en) | Compact hot metal conveying system | |
JP3213241U (en) | Out-of-furnace molten steel dephosphorization system | |
CN215250992U (en) | Return iron adding device for closed electric furnace | |
CN203751325U (en) | Molten iron transportation system | |
CN203495209U (en) | On-line tank tilting system based on molten iron desulfuration line | |
CN215481017U (en) | Blast furnace-converter production system | |
CN219443423U (en) | Molten iron transfer system suitable for sand lined iron mold production | |
CN207243927U (en) | A kind of energy-efficient KR Desulfurzing Agents For Pre Treatment of Hot Metal distribution devices | |
CN103394683A (en) | Molten iron desulphurization line based online reladling system | |
CN203361705U (en) | Compact type molten iron transportation system | |
CN211071742U (en) | Automatic wire feeding billboard device for spheroidizing | |
CN103769568A (en) | Molten iron conveying system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20221209 Address after: 210019 the Fuchun River East Street, Jianye District, Nanjing, Jiangsu 18 Applicant after: HUATIAN NANJING ENGINEERING & TECHNOLOGY CORPORATION, MCC Applicant after: HUATIAN ENGINEERING & TECHNOLOGY CORPORATION, MCC Address before: 210019 18 East Street, Fuchunjiang, Jianye District, Nanjing City, Jiangsu Province Applicant before: HUATIAN NANJING ENGINEERING & TECHNOLOGY CORPORATION, MCC |
|
GR01 | Patent grant | ||
GR01 | Patent grant |