CN107138723A - A kind of molten iron ladle pouring system and method based on the remaining steel line of return - Google Patents

A kind of molten iron ladle pouring system and method based on the remaining steel line of return Download PDF

Info

Publication number
CN107138723A
CN107138723A CN201710450113.5A CN201710450113A CN107138723A CN 107138723 A CN107138723 A CN 107138723A CN 201710450113 A CN201710450113 A CN 201710450113A CN 107138723 A CN107138723 A CN 107138723A
Authority
CN
China
Prior art keywords
molten iron
return
hot
steel
carriage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710450113.5A
Other languages
Chinese (zh)
Other versions
CN107138723B (en
Inventor
崔荣峰
钱永辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huatian Engineering and Technology Corp MCC
Original Assignee
Huatian Engineering and Technology Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huatian Engineering and Technology Corp MCC filed Critical Huatian Engineering and Technology Corp MCC
Priority to CN201710450113.5A priority Critical patent/CN107138723B/en
Publication of CN107138723A publication Critical patent/CN107138723A/en
Application granted granted Critical
Publication of CN107138723B publication Critical patent/CN107138723B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/12Travelling ladles or similar containers; Cars for ladles
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21CPROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
    • C21C5/00Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Mechanical Engineering (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
  • Carbon Steel Or Casting Steel Manufacturing (AREA)
  • Treatment Of Steel In Its Molten State (AREA)

Abstract

The invention discloses a kind of molten iron ladle pouring system and method based on the remaining steel line of return.Including:The charging be arrangeding in parallel across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang return cars on carriage-returning track;The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system includes dust treatment plant and meausring apparatus;Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, the weight of molten iron that dust treatment plant weigh again after the completion of molten iron ladle pouring, tank switching and calculate tank switching according to weighing twice is opened after weighing, remaining steel return car is outputed into molten iron ladle pouring system after weighing.The invention is very worth to be subject to promotion and application in steel mill upgrading project from now on no matter for making steel newly-built workshop or transforming workshop suffers from good economic benefit and social benefit.

Description

A kind of molten iron ladle pouring system and method based on the remaining steel line of return
Technical field
It is existing using workshop the present invention relates to the exploitation of a kind of molten iron ladle pouring process based on the remaining steel line of return and device Steel of having a surplus returns to car as the carrier of hot-metal bottle used in molten iron line, realizes the online tank switching of hot-metal bottle, belongs to process for making field.
Background technology
The foundation of molten iron ladle pouring facility is based primarily upon following two factors:
The mismatch problem of blast-melted use tank and steely iron water pot;
Workshop uses " a tank system " hot metal supply, solves the problems, such as hot-metal bottle and tank.
Molten iron ladle pouring facility is routinely arranged in workshop charging across interior, do not only take up charging across usable floor area, but also need Increase the one-time investment of molten iron weighing chassis, be worth steel mill to be thought deeply in terms of reduction one-time investment and operating cost.It is remaining Steel returns to car as remaining steel and returns to special-purpose vehicle, and utilization rate is very low, improves work of the utilization rate to steelshop that remaining steel returns to car Skill direct motion and equipment control are highly beneficial.
Molten iron ladle pouring station is the necessary links in large-scale steel mill's production, for receiving the fish torpedo ladle molten iron in ironworks, and is poured into Hot-metal bottle, after weighing, pours into pneumatic steelmaking.Molten iron weighing result is the important number needed for automation of converter steelmaking model is calculated According to directly influencing the control accuracy and STEELMAKING PRODUCTION rate steel-making cost of automatic Steelmaking system.In traditional steel making operation, Above-mentioned weight of molten iron data are generally gathered using manual method, because influence factor is more so there is error, directly influenced The control accuracy of automatic Steelmaking.Therefore, ladle pouring station molten iron on-line weighing is realized, there is important meaning for pneumatic steelmaking production Justice.
The innovation and creation returning to car using remaining steel carries out the online tank switching of hot-metal bottle, not only reduces equipment and disposably throws Money, also improves the utilization rate of equipment and installations that Yu Gang returns to car, increases charging across the space of technological operation.
The content of the invention
In view of the above-mentioned problems, the present invention provides a kind of molten iron ladle pouring system based on the remaining steel line of return, including:It is arranged in parallel Charging across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang on carriage-returning track Return to car;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system includes powder Dirt processing unit and meausring apparatus;
Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, and dust processing is opened after weighing Device carries out the weight of molten iron for weighing again after the completion of molten iron ladle pouring, tank switching and calculating tank switching according to weighing twice, after weighing Remaining steel return car is outputed into molten iron ladle pouring system.
Further, the meausring apparatus includes the static state railroad track scale for being arranged on rail inferior portion.
Further, the dust treatment plant include half-sealed cover and dust processor, the half-sealed cover by except Dirt pipe is connected with dust processor.
Further, it is provided with electric butterfly valve in the dust removing tube;When the when of falling steel electric butterfly valve unlatching, steel terminates electronic Butterfly valve is closed.
Further, the opening passed in and out for hot-metal bottle is offered before and after the half-sealed cover on cover wall.
Further, the charging is additionally included in hot-metal bottle track across the interior hot-metal ladle and carriage track having for transporting molten iron Road, Yu Gang return the charging of handling hot-metal bottle between carriage-returning track and smelting furnace across crane.
Further, the remaining steel is returned and Yu Gang return cars is provided with carriage-returning track, and the remaining steel is returned to be provided with car To motor and the torque cable drum of motor power transmission.
Further, the remaining steel return carriage-returning track end extend to charging across one end be provided with accident pulley, the thing Therefore steel wire is equipped with pulley;When remaining steel, which returns to car, mechanically or electrically accident occurs, described steel wire one end passes through pulley and institute Crane connection is stated, the other end returns to car with the remaining steel and is connected, and the crane is returned remaining steel by accident pulley using steel wire rope Carriage return is pulled out from half-sealed cover.
Many-sided utilization of the invention that car is returned to remaining steel so that the invention plant process characteristics of compact layout, reasonable, applicable model Enclose relatively wide, be not only applicable " a tank system " molten iron direct-furnish technique, be also applicable blast furnace and converter hot-metal bottle mismatch problem;Online Arrange tank switching facility, not only reduce the one-time investment of molten iron ladle pouring facility, but also significantly expanded charging across make With area, increase the space of technological operation in workshop.
To reach above-mentioned purpose, a kind of method of the molten iron ladle pouring device based on the remaining steel line of return as described above of the present invention, It the described method comprises the following steps:
S1:Empty first hot-metal bottle is returned carriage-returning track along remaining steel and transported to half-sealed cover by Yu Gang return cars;It is simultaneously static Track scale is weighed to empty first hot-metal bottle;
S2:Hot-metal ladle and carriage will be equipped with the second hot-metal bottle of molten iron along hot-metal ladle and carriage rail transport to steelshop feed across It is interior;
S3:Second hot-metal bottle is hung to above half-sealed cover and pours into molten iron in the first hot-metal bottle by crane;Institute is opened simultaneously State the electric butterfly valve between dust removing tube and dust treatment plant;Tank switching closes electric butterfly valve after terminating;
S4:Empty second hot-metal bottle is hung and is back on hot-metal ladle and carriage by crane;Static state railroad track scale is to first equipped with molten iron simultaneously Hot-metal bottle is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle, and is kept a record;
S6:Yu Gang return cars return carriage-returning track along remaining steel and output half-sealed cover, and first hot-metal bottle of the crane equipped with molten iron is hung Iron making is carried out to converter, after iron making, crane, which hangs empty first hot-metal bottle, to be back on Yu Gang return cars.
Many-sided utilization of the invention that car is returned to remaining steel so that the invention plant process characteristics of compact layout, reasonable, applicable model Enclose relatively wide, be not only applicable " a tank system " molten iron direct-furnish technique, be also applicable blast furnace and converter hot-metal bottle mismatch problem;Online Arrange tank switching facility, not only reduce the one-time investment of molten iron ladle pouring facility, but also significantly expanded charging across make With area, increase the space of technological operation in workshop.
And the flue dust that the present invention is produced molten iron ladle pouring process using molten iron ladle pouring facility is removed completely, solves steel-making The problem of environmental pollution of factory;No matter good economic benefit and society's effect are suffered from for making steel newly-built workshop or transforming workshop Benefit, it is very worth to be subject to promotion and application in steel mill upgrading project from now on.
Brief description of the drawings
A kind of craftworks CAD system figures of the molten iron ladle pouring based on the remaining steel line of return of Fig. 1;
Fig. 2 A-A sectional views.
1, converter;2, Yu Gang return carriage-returning track;3, dust removing tube;4, Yu Gang return to car;5, half-sealed cover;6, crane;7, Hot-metal ladle and carriage track;8, hot-metal ladle and carriage;9, hot-metal bottle;10, accident pulley;11, electric butterfly valve;12, torque cable drum;13, Static state railroad track scale.
It should be noted that these accompanying drawings and word description are not intended as the design model for limiting the present invention in any way Enclose, but be that those skilled in the art illustrate idea of the invention by reference to specific embodiment.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in embodiment is clearly and completely described, following examples be used for illustrate the present invention, but It is not limited to the scope of the present invention.
In the description of the invention, it is necessary to explanation, the orientation or position of the instruction such as term " on ", " under ", " interior ", " outer " It is, based on orientation shown in the drawings or position relationship, to be for only for ease of the description present invention and simplify description to put relation, rather than Indicate or imply that the device or element of meaning there must be specific orientation, with specific azimuth configuration and operation, therefore can not It is interpreted as limitation of the present invention.
In the description of the invention, it is necessary to illustrate, unless otherwise clearly defined and limited, term " installation ", " company Connect " it should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or it is integrally connected;It can be machine Tool is connected or electrically connected;Can be joined directly together, can also be indirectly connected to by intermediary.For this area For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
Referring to shown in Fig. 1-2, the present invention provides a kind of molten iron ladle pouring system based on the remaining steel line of return, including:It is parallel to set The charging put across and charging aisle, connection charging across with charging aisle more than steel return carriage-returning track 2;Yu Gang is returned to be provided with carriage-returning track 2 Yu Gang returns to car 4;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track 2;The molten iron ladle pouring system includes Dust treatment plant and meausring apparatus;
Wherein, Yu Gang returns car 4 transports empty hot-metal bottle 9 to molten iron ladle pouring system and weighed, and is opened after weighing at dust The weight of molten iron that device weigh again after the completion of molten iron ladle pouring, tank switching and calculate tank switching according to weighing twice is managed, is weighed Remaining steel return car 4 is outputed into molten iron ladle pouring system afterwards.
It is preferred that, the dust treatment plant include half-sealed cover 5 and dust processor, the half-sealed cover 5 by except Dirt pipe 3 is connected with dust processor.
It is preferred that, the remaining steel is returned and Yu Gang return cars 4 is provided with carriage-returning track 2, and the remaining steel is returned to be provided with car 4 To motor and the torque cable drum 12 of motor power transmission.The motor that Yu Gang returns to car 4 is that reducing motor, the car body speed of service are 0 ~30m/min, mode of braking are dynamic braking.
It is preferred that, the meausring apparatus includes the static state railroad track scale 13 for being arranged on rail inferior portion.
Static state railroad track scale 13 is arranged on the remaining steel line of return, returning to car 4 to the remaining steel before and after tank switching weighs, pre-post difference Value is molten iron ladle pouring weight.
It is preferred that, the important technological parameters of the device of static state railroad track scale 13 and requirement:
(1) all steel claims object table face;
(2) maximum safe overload:130%FS;
(3) scale division value:100kg;
(4) base form:Shallow foundation is cheated;
(5) sensor:Column type sensor, precision:IV grade -0.3%;
(6) weighing apparatus speed≤30m/min is crossed.
Torque cable drum 12 on Yu Gang return cars 4 gives motor power transmission, and the remaining steel of motor driving returns to car 4 by empty first iron Water pot 9 returns the row of carriage-returning track 2 to feeding across carrying out molten iron ladle pouring operation in interior molten iron ladle pouring system along remaining steel, and tank switching is completed Afterwards, Yu Gang, which returns to car 4 and will be equipped with the first hot-metal bottle 9 of molten iron, transports molten iron ladle pouring system, convenient the first molten iron equipped with molten iron Tank 9 carries out iron making, after iron making, and Yu Gang returns to car 4 and transports empty first hot-metal bottle 9.
The present embodiment extends the remaining steel line of return, by the use of remaining steel return car 4 as the carrier of the slack tank of hot-metal bottle 9, not only workshop Technology arrangement is compact, reasonable, and the scope of application is wider, is not only applicable " a tank system " molten iron direct-furnish technique, is also applicable blast furnace and steel-making The hot-metal bottle mismatch problem of stove 1.Layout on-line tank switching facility, not only reduces the one-time investment of molten iron ladle pouring facility, and And also significantly expanded charging across usable floor area.
It is provided with simultaneously in tank switching position, static weighing equipment and dust processing equipment, reduces setting for molten iron weighing chassis Standby investment, solves the problem of environmental pollution of steel mill;
Embodiment 2
On the basis of embodiment 1, electric butterfly valve 11 is provided with the present embodiment dust removing tube 3;When the when of falling steel electric butterfly valve 11 open, and steel terminates electric butterfly valve 11 and closed.
Electric butterfly valve 11 between the front opening molten iron ladle pouring system and dust treatment plant of tank switching;Tank switching is closed after terminating Electric butterfly valve 11;The flue dust that tank switching is produced then carries out dust pelletizing system by dust removing tube 3 and is acted upon rear qualified discharge.
Embodiment 3
Offer and passed in and out for hot-metal bottle 9 on cover wall on the basis of embodiment 2, before and after the present embodiment half-sealed cover 5 Opening.
Two openings, one is used for the turnover that remaining steel returns to car 4, and another is used for the operation of tank switching, can be simultaneously to needing Two hot-metal bottles 9 of tank switching are wanted while being operated, the time is saved.And different operations are carried out in both direction, are also saved The utilization in place.
Embodiment 4
On the basis of embodiment 3, the charging is additionally included in across the interior hot-metal ladle and carriage track 7 having for transporting molten iron Hot-metal ladle and carriage track 7, Yu Gang return the charging of handling hot-metal bottle 9 between carriage-returning track 2 and smelting furnace across crane 6.
Yu Gang returns to car 4 and returns empty first hot-metal bottle 9 in the row of carriage-returning track 2 to the half-sealed cover 5 of front and rear perforate along remaining steel, Stop.The second hot-metal bottle 9 that hot-metal ladle and carriage 8 will be equipped with molten iron is transported to steelshop charging across interior along hot-metal ladle and carriage track 7.Hang The second hot-metal bottle 9 that car 6 will be equipped with molten iron is hung to dedusting butterfly valve before the progress molten iron ladle pouring operation of the top of half-sealed cover 5, tank switching Open, dust pelletizing system starts, the flue dust that tank switching is produced then carries out dust pelletizing system by dust removing tube 3 and is acted upon rear qualified discharge.
After the completion of tank switching, the second empty hot-metal bottle 9 is hung and is back on hot-metal ladle and carriage 8 by crane 6.Meanwhile, according to static track The weighing result of weighing apparatus 13, Yu Gang return cars 4 return carriage-returning track 2 along Yu Gang and output half-sealed cover 5, and crane 6 will be equipped with after tank switching First hot-metal bottle 9 of molten iron is hung to converter 1 and carries out iron making, after iron making, and the first empty hot-metal bottle 9 is hung and is back to Yu Gang by crane 6 Return to car 4.
Embodiment 5
On the basis of embodiment 4, remaining steel described in the present embodiment return the end of carriage-returning track 2 extend to charging across one end set Have and be equipped with steel wire on accident pulley 10, the accident pulley 10;When remaining steel, which returns to car 4, mechanically or electrically accident occurs, institute State steel wire one end to be connected with the crane 6 through pulley, the other end returns to car 4 with the remaining steel and is connected, and the crane 6 utilizes steel Cord is pulled out remaining steel return car 4 from half-sealed cover 5 by accident pulley 10.
Prevent Yu Gang return cars 4 from mechanically or electrically accident occur and can not output half-sealed cover 5 so that follow-up work can not be completed Make.
Embodiment 6
A kind of method of molten iron ladle pouring device based on the remaining steel line of return as described in above-mentioned any embodiment, methods described bag Include following steps:
S1:Empty first hot-metal bottle 9 is returned carriage-returning track 2 along remaining steel and transported to half-sealed cover 5 by Yu Gang return cars 4;Simultaneously 13 pairs of first hot-metal bottles of sky 9 of static state railroad track scale are weighed;
S2:The second hot-metal bottle 9 that hot-metal ladle and carriage 8 will be equipped with molten iron is transported to steelshop charging along hot-metal ladle and carriage track 7 Across interior;
S3:Second hot-metal bottle 9 is hung to the top of half-sealed cover 5 and pours into molten iron in the first hot-metal bottle 9 by crane 6;Beat simultaneously Drive the electric butterfly valve 11 between the dust removing tube 3 and dust treatment plant;Tank switching closes electric butterfly valve 11 after terminating;
S4:Empty second hot-metal bottle 9 is hung and is back on hot-metal ladle and carriage 8 by crane 6;13 pairs of static state railroad track scale is equipped with molten iron simultaneously First hot-metal bottle 9 is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle 9, and is kept a record;
S6:Yu Gang return cars 4 return carriage-returning track 2 along remaining steel and output half-sealed cover 5, and crane 6 is equipped with the first molten iron of molten iron Tank 9 is hung to converter 1 and carries out iron making, after iron making, and crane 6, which hangs empty first hot-metal bottle 9, to be back on Yu Gang return cars 4.
The course of work of the present embodiment:
Yu Gang returns to car 4 and travelled to tank switching region, and-the handling hot-metal bottle 9 of dust removal installation startup-crane 6 progress tank switching-falls After tank, Yu Gang return cars 4 output tank switching dust excluding hood-crane 6 and empty hot-metal bottle 9 are hung back into 8-crane of hot-metal ladle and carriage 6 by full molten iron Tank 9 hangs Yu Gang return car 4-Yu Gang return cars 4 and returned.
The present embodiment extends the remaining steel line of return, by the use of remaining steel return car 4 as the carrier of the slack tank of hot-metal bottle 9, not only workshop Technology arrangement is compact, reasonable, and the scope of application is wider, is not only applicable " a tank system " molten iron direct-furnish technique, is also applicable blast furnace and steel-making The mismatch problem of hot-metal bottle 9 of stove 1.Layout on-line tank switching facility, not only reduces the one-time investment of molten iron ladle pouring facility, and And also significantly expanded charging across usable floor area.
It is provided with simultaneously in tank switching position, static weighing equipment and dust processing equipment, reduces setting for molten iron weighing chassis Standby investment, solves the problem of environmental pollution of steel mill;
More than, only presently preferred embodiments of the present invention, but protection scope of the present invention is not limited thereto, and it is any to be familiar with sheet Those skilled in the art the invention discloses technical scope in, the change or replacement that can be readily occurred in should all be covered Within protection scope of the present invention.Therefore, the protection domain that protection scope of the present invention should be defined by claim is defined.

Claims (9)

1. a kind of molten iron ladle pouring system based on the remaining steel line of return, it is characterised in that including:The charging be arrangeding in parallel across and stove Across, connection charging across with charging aisle more than steel return carriage-returning track;Yu Gang, which is returned, is provided with Yu Gang return cars on carriage-returning track;
The material returns across interior remaining steel and molten iron ladle pouring system is provided with carriage-returning track;The molten iron ladle pouring system is included at dust Manage device and meausring apparatus;
Wherein, Yu Gang returns to empty hot-metal bottle to the molten iron ladle pouring system of car transport and weighed, and dust treatment plant is opened after weighing The weight of molten iron for weighing again after the completion of molten iron ladle pouring, tank switching and calculating tank switching according to weighing twice is carried out, will be remaining after weighing Steel returns to car and outputs molten iron ladle pouring system.
2. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the meausring apparatus Static state railroad track scale including being arranged on rail inferior portion.
3. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the dust processing Device includes half-sealed cover and dust processor, and the half-sealed cover is connected by dust removing tube with dust processor.
4. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 3, it is characterised in that in the dust removing tube It is provided with electric butterfly valve;When the when of falling steel electric butterfly valve open, steel terminate electric butterfly valve closing.
5. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 3, it is characterised in that the half-sealed cover The opening passed in and out for hot-metal bottle is offered on front and rear cover wall.
6. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the charging is across interior There is the hot-metal ladle and carriage track for transporting molten iron, be additionally included in hot-metal ladle and carriage track, Yu Gang and return between carriage-returning track and smelting furnace The charging of handling hot-metal bottle is across crane.
7. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 1, it is characterised in that the remaining steel is returned Yu Gang is provided with track road and returns to car, the remaining steel returns to the torque coil of cable being provided with car to motor and motor power transmission Cylinder.
8. a kind of molten iron ladle pouring system based on the remaining steel line of return as claimed in claim 7, it is characterised in that the remaining steel is returned Car track end extend to charging across one end be provided with accident pulley, the accident pulley and be equipped with steel wire;When remaining steel is returned When mechanically or electrically accident occurs in car, described steel wire one end is connected through pulley with the crane, and the other end is returned with the remaining steel Carriage return is connected, and the crane is pulled out remaining steel return car from half-sealed cover by accident pulley using steel wire rope.
9. a kind of method of molten iron ladle pouring device based on the remaining steel line of return as described in claim 1-8 is any, it is characterised in that It the described method comprises the following steps:
S1:Empty first hot-metal bottle is returned carriage-returning track along remaining steel and transported to half-sealed cover by Yu Gang return cars;While static track Weighing apparatus is weighed to empty first hot-metal bottle;
S2:The second hot-metal bottle that hot-metal ladle and carriage will be equipped with molten iron feeds across interior along hot-metal ladle and carriage rail transport to steelshop;
S3:Second hot-metal bottle is hung to above half-sealed cover and pours into molten iron in the first hot-metal bottle by crane;Removed open simultaneously described in Electric butterfly valve between dirt pipe and dust treatment plant;Tank switching closes electric butterfly valve after terminating;
S4:Empty second hot-metal bottle is hung and is back on hot-metal ladle and carriage by crane;Static state railroad track scale is to the first molten iron equipped with molten iron simultaneously Tank is weighed;
S5:The weight of molten iron of tank switching is calculated by being weighed twice to hot-metal bottle, and is kept a record;
S6:Yu Gang return cars return carriage-returning track along remaining steel and output half-sealed cover, and first hot-metal bottle of the crane equipped with molten iron is hung to refining Steel stove carries out iron making, after iron making, and crane, which hangs empty first hot-metal bottle, to be back on Yu Gang return cars.
CN201710450113.5A 2017-06-15 2017-06-15 Molten iron reladling system and method based on residual steel return line Active CN107138723B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710450113.5A CN107138723B (en) 2017-06-15 2017-06-15 Molten iron reladling system and method based on residual steel return line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710450113.5A CN107138723B (en) 2017-06-15 2017-06-15 Molten iron reladling system and method based on residual steel return line

Publications (2)

Publication Number Publication Date
CN107138723A true CN107138723A (en) 2017-09-08
CN107138723B CN107138723B (en) 2023-01-13

Family

ID=59782547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710450113.5A Active CN107138723B (en) 2017-06-15 2017-06-15 Molten iron reladling system and method based on residual steel return line

Country Status (1)

Country Link
CN (1) CN107138723B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110339898A (en) * 2019-04-19 2019-10-18 清远结加沥青改性材料科技有限公司 A kind of tire milling production technology of high-effective dust-removing

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9113756D0 (en) * 1990-06-28 1991-08-14 Hitachi Shipbuilding Eng Co Tundish exchange apparatus for a continuous casting equipment
CN101249558A (en) * 2008-03-28 2008-08-27 重庆钢铁(集团)有限责任公司 One tank to end technique for iron-smelting to steel-smelting
CN103333980A (en) * 2013-07-12 2013-10-02 鞍钢股份有限公司 Recycling method of casting slag
CN103394683A (en) * 2013-08-26 2013-11-20 中冶华天南京工程技术有限公司 Molten iron desulphurization line based online reladling system
CN203495209U (en) * 2013-08-26 2014-03-26 中冶华天南京工程技术有限公司 On-line tank tilting system based on molten iron desulfuration line
CN105382249A (en) * 2015-12-22 2016-03-09 中冶京诚工程技术有限公司 Rollover-type iron charging transport vehicle
CN206936362U (en) * 2017-06-15 2018-01-30 中冶华天南京工程技术有限公司 A kind of molten iron ladle pouring system based on the remaining steel line of return

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9113756D0 (en) * 1990-06-28 1991-08-14 Hitachi Shipbuilding Eng Co Tundish exchange apparatus for a continuous casting equipment
CN101249558A (en) * 2008-03-28 2008-08-27 重庆钢铁(集团)有限责任公司 One tank to end technique for iron-smelting to steel-smelting
CN103333980A (en) * 2013-07-12 2013-10-02 鞍钢股份有限公司 Recycling method of casting slag
CN103394683A (en) * 2013-08-26 2013-11-20 中冶华天南京工程技术有限公司 Molten iron desulphurization line based online reladling system
CN203495209U (en) * 2013-08-26 2014-03-26 中冶华天南京工程技术有限公司 On-line tank tilting system based on molten iron desulfuration line
CN105382249A (en) * 2015-12-22 2016-03-09 中冶京诚工程技术有限公司 Rollover-type iron charging transport vehicle
CN206936362U (en) * 2017-06-15 2018-01-30 中冶华天南京工程技术有限公司 A kind of molten iron ladle pouring system based on the remaining steel line of return

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
中国重型机械工业协会: "《《中国重型机械选型手册 冶金及重型锻压设备》》", 31 March 2015, 冶金工业出版社 *
中国钢铁工业协会信息统计部等: "《中国钢铁工业大黄页 下 2005-2006 第2版》", 30 April 2006, 中国财政经济出版社 *
国家安全监管总局: "《冶金行业较大危险因素辨识与防范指导手册》", 31 January 2017, 煤炭工业出版社 *
国家环境保护局: "《钢铁工业废气治理》", 31 July 1992, 中国环境科学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110339898A (en) * 2019-04-19 2019-10-18 清远结加沥青改性材料科技有限公司 A kind of tire milling production technology of high-effective dust-removing

Also Published As

Publication number Publication date
CN107138723B (en) 2023-01-13

Similar Documents

Publication Publication Date Title
CN101942537B (en) On-line detection method of blast furnace slag quantity
CN103472811A (en) Steelmaking second-stage process control system and steelmaking second-stage process control method
CN106270469B (en) A kind of steel ingot intelligence running gate system
CN109482850B (en) Numerical control quantitative weighing type multi-station continuous casting machine
CN107381354A (en) One kind driving intelligent weighing method
CN101280347A (en) Blast furnace-converter interface 'compact one tank mode' process
CN101486088B (en) Hot-metal bottle combined cover and method thereof for adding and lifting cover
CN206936362U (en) A kind of molten iron ladle pouring system based on the remaining steel line of return
CN107138723A (en) A kind of molten iron ladle pouring system and method based on the remaining steel line of return
CN106647602A (en) Random automatic sampling device and sampling method for vehicle-loaded seed material
CN102912083A (en) Melted iron desulfuration and slag skimming product line system
CN206779449U (en) The system of steel line of return off-line baking hot-metal bottle more than a kind of utilization
CN203209680U (en) Device for controlling of covering and uncovering of steel ladle in whole steelmaking process
CN103343632A (en) Compact hot metal conveying system
JP3213241U (en) Out-of-furnace molten steel dephosphorization system
CN215250992U (en) Return iron adding device for closed electric furnace
CN211645307U (en) Device for adding scrap steel into molten iron tank on molten iron transportation line
CN203751325U (en) Molten iron transportation system
CN203495209U (en) On-line tank tilting system based on molten iron desulfuration line
CN215481017U (en) Blast furnace-converter production system
CN207243927U (en) A kind of energy-efficient KR Desulfurzing Agents For Pre Treatment of Hot Metal distribution devices
CN219443423U (en) Molten iron transfer system suitable for sand lined iron mold production
CN103394683A (en) Molten iron desulphurization line based online reladling system
CN203361705U (en) Compact type molten iron transportation system
CN211071742U (en) Automatic wire feeding billboard device for spheroidizing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221209

Address after: 210019 the Fuchun River East Street, Jianye District, Nanjing, Jiangsu 18

Applicant after: HUATIAN NANJING ENGINEERING & TECHNOLOGY CORPORATION, MCC

Applicant after: HUATIAN ENGINEERING & TECHNOLOGY CORPORATION, MCC

Address before: 210019 18 East Street, Fuchunjiang, Jianye District, Nanjing City, Jiangsu Province

Applicant before: HUATIAN NANJING ENGINEERING & TECHNOLOGY CORPORATION, MCC

GR01 Patent grant
GR01 Patent grant