CN103381620A - Concrete precast pile stream curing pool - Google Patents

Concrete precast pile stream curing pool Download PDF

Info

Publication number
CN103381620A
CN103381620A CN2013102608197A CN201310260819A CN103381620A CN 103381620 A CN103381620 A CN 103381620A CN 2013102608197 A CN2013102608197 A CN 2013102608197A CN 201310260819 A CN201310260819 A CN 201310260819A CN 103381620 A CN103381620 A CN 103381620A
Authority
CN
China
Prior art keywords
guide
sealed tank
water sealed
reinforcing bar
chi gai
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102608197A
Other languages
Chinese (zh)
Other versions
CN103381620B (en
Inventor
张日红
严天龙
向安乐
邱风雷
王树峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Zhong Chun hi tech Limited by Share Ltd
Original Assignee
ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd filed Critical ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority to CN201310260819.7A priority Critical patent/CN103381620B/en
Publication of CN103381620A publication Critical patent/CN103381620A/en
Application granted granted Critical
Publication of CN103381620B publication Critical patent/CN103381620B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention discloses a concrete precast pile stream curing pool comprising a plurality of pool bodies (101), wherein water seal tanks (2) are arranged on the outer sides of the top ends of the four side walls of each pool body (101), surround the pool body (101) and are communicated with one another; the two adjacent side walls of every two adjacent pool bodies (101) share the same water seal tank (2); each pool body is provided by a pool cover (7); a cover rim (701) is arranged on the edge of each pool cover (7) and extends downwards into the corresponding water seal tank (2); guiding and positioning devices, which are used for guiding and positioning the pool covers (7) in the process that the pool covers (7) are lifted to cover the pool bodies (101), are arranged in the water seal tanks (2) on the outer sides of the top ends of the side walls of the pool bodies (101) or on the pool covers (7). According to the concrete precast pile stream curing pool, the pool covers (7) can be positioned accurately and the water seal tanks can be prevented from being deformed due to collision.

Description

The concrete precast pile steam curing pond
Technical field
The present invention relates to a kind of concrete precast pile steam curing pond.
Background technology
At present, in order to improve fast the intensity of prefabricated pile, excite the chemical property of gel rubber material in the production procedure of concrete precast pile, be unable to do without this link of steam curing.steam curing is mainly the concrete precast pile after moulding to be put into curing pool and pass into steam to carry out maintenance, in order to prevent that steam from leaking, curing pool need to seal by Chi Gai, the horizontal cross-section that curing pool generally comprises several intervals settings is the pond body of rectangle, the outside, top of four sidewalls of each pond body is equipped with the water sealed tank that surrounds the pond body and be interconnected, the adjacent two side of adjacent pool body shares a water sealed tank, be equipped with a Chi Gai for the rectangle that covers the pond body on each pond body, the edge of each Chi Gai is equipped with the cover rim to downward-extension, when concrete precast pile is carried out maintenance, put into a certain amount of water in water sealed tank, then with driving, Chi Gai being lifted into makes Chi Gai cover curing pool on curing pool, and the cover rim that makes Chi Gai immerses in the water of water sealed tank, make curing pool sealed by water seal.
there is following shortcoming in the steam curing pond of above prior art: when Jiang Chigai is lifted on curing pool, Chi Gai is difficult to accurate location, namely more difficult cover rim with Chi Gai is placed on the appropriate location in water sealed tank, if a Chi Gai is positioned with deviation, will affect the placement of adjacent Chi Gai, and be positioned with at Chi Gai the process of after deviation, the position of Chi Gai being adjusted, the cover rim of Chi Gai is than the cell wall that is easier to collide water sealed tank, thereby make the water sealed tank distortion, the water sealed tank distortion can make water sealed tank and install between the concrete bed of this water sealed tank and produce the gap, thereby the steam in curing pool is leaked by this gap, make the sealing effectiveness of this curing pool relatively poor.
Summary of the invention
Technical problem to be solved by this invention is to provide the pond lid can accurately be located, and can avoid water sealed tank to be subjected to collision-deformed concrete precast pile steam curing pond.
for solving the problems of the technologies described above, concrete precast pile steam curing pond provided by the invention, it comprises that the horizontal cross-section that several intervals arrange is the pond body of rectangle, the outside, top of four sidewalls of each pond body is equipped with the water sealed tank that surrounds the pond body and be interconnected, the adjacent two side of adjacent pool body shares a water sealed tank, be equipped with a Chi Gai for the rectangle that covers the pond body on each pond body, the edge of each Chi Gai is equipped with the cover rim that extends downwardly in water sealed tank, in the water sealed tank in the outside, top of four sidewalls of described each pond body or each pond covers to be equipped with for hang the process that is covered on Chi Tishang at Jiang Chigai carries out the guide locating device provided of guide-localization to Chi Gai.
After adopting above structure, the present invention compared with prior art has advantages of following:
When Jiang Chigai is lifted into Chi Tishang, Chi Gai is by guide locating device provided guide-localization effect, the pond lid can accurately be located, make the position of Chi Gai can not produce deviation, can not affect the placement of adjacent pool lid, and can avoid situation about after there is deviation the position of Chi Gai, the position of Chi Gai being adjusted, the situation that also just can avoid Chi Gai to collide the cell wall of water sealed tank when adjusting the position and water sealed tank is out of shape, prevent from water sealed tank and install between the concrete bed of this water sealed tank producing the gap, can avoid steam therefore to leak.
as improvement, be equipped with at least one first guide and limit skewback in the water sealed tank in the outside, top of described guide locating device provided four sidewalls that refer to each pond body, one straight flange of each the first guide and limit skewback all is fixed on a close cell wall of each self-corresponding pond body of water sealed tank, and another straight flange of each the first guide and limit skewback all is fixed in the bottom land of water sealed tank, like this, when lifting the pond lid, if be placed into the position of cover rim in the process of water sealed tank at the cover rim of Jiang Chigai, deviation is arranged, the cover rim of Chi Gai will be fallen on the first guide and limit skewback, and glide along the first guide and limit skewback, this moment, the first guide and limit skewback was built guide effect to the pond, and after the cover rim of Chi Gai slides into the bottom land of water sealed tank under the first guide and limit skewback, make the pond cover accurately locate, this moment, the first guide and limit skewback was built accurate positioning action to the pond, this is guide locating device provided simple in structure, be skillfully constructed, result of use is good, and first the guide and limit skewback also can play reinforcement effect to water sealed tank, improve the intensity of water sealed tank, make water sealed tank be not easy distortion.
As improvement, be equipped with three pairs of the first guide and limit skewbacks in water sealed tank on two sidewalls that extend along its length of described each pond body, be equipped with two pairs of the first guide and limit skewbacks in the water sealed tank on the sidewall that two broad ways of each pond body are extended; Like this, the cover rim of Chi Gai can be glided along the first guide and limit skewback more stably, further promoted guide locating device provided guide-localization effect, make guide locating device provided result of use better, and make the first guiding skewback better to the consolidation effect of water sealed tank, make the more difficult distortion of water sealed tank.
as improvement, described water sealed tank is channel-section steel and makes, be equipped with at least one second guide and limit skewback on the cover rim of described guide locating device provided four sides that refer to each Chi Gai, one straight flange of each the second guide and limit skewback all is fixed on the medial surface of cover rim, and another straight flange of each the second guide and limit skewback all is fixed in the lower surface of Chi Gai, like this, when lifting the pond lid, if be placed into the position of cover rim in the process of water sealed tank at the cover rim of Jiang Chigai, deviation is arranged, the upper end that the second guide and limit skewback will be fallen the cell wall of water sealed tank, make the second guide and limit skewback slip in water sealed tank downwards, also just make the cover rim of Chi Gai slip in water sealed tank downwards, this moment, the second guide and limit skewback was built guide effect to the pond, and after sliding into the bottom land of water sealed tank under the cover rim of Chi Gai, make the pond cover accurately locate, this moment, the second guide and limit skewback was built accurate positioning action to the pond, this is guide locating device provided simple in structure, be skillfully constructed, result of use is good, and second the guide and limit skewback also can build reinforcement effect to the pond, improve the intensity of Chi Gai, make Chi Gai be not easy distortion.
As improvement, be equipped with three pairs of the second guide and limit skewbacks on the cover rim of two sides that extend along its length of described each Chi Gai, be equipped with two pairs of the second guide and limit skewbacks on the cover rim of the side that two broad ways of each Chi Gai are extended; Like this, the cover rim of Chi Gai can be glided in water sealed tank more stably, further promoted guide locating device provided guide-localization effect, make guide locating device provided result of use better, and make the second guiding skewback better to the consolidation effect of Chi Gai, make the more difficult distortion of pond lid.
as improvement, be equipped with at least one directive wheel or bearing on the cover rim of described guide locating device provided four sides that refer to each Chi Gai, each directive wheel or bearing are all on the rotatable medial surface that is arranged on cover rim, like this, when lifting the pond lid, if be placed into the position of cover rim in the process of water sealed tank at the cover rim of Jiang Chigai, deviation is arranged, directive wheel or bearing will be fallen the upper end of the cell wall of water sealed tank, make directive wheel or bearing roll in water sealed tank downwards along the medial surface of the cell wall of water sealed tank, also just make the cover rim of Chi Gai slip in water sealed tank downwards, this moment, directive wheel or bearing were built guide effect to the pond, and after sliding into the bottom land of water sealed tank under the cover rim of Chi Gai, make the pond cover accurately locate, this moment, directive wheel or bearing were built accurate positioning action to the pond, this is guide locating device provided simple in structure, be skillfully constructed, result of use is good, and directive wheel or bearing are when rolling on the medial surface of the cell wall of water sealed tank, frictional force is less, make the cover rim of Chi Gai glide comparatively steady, be convenient to the lifting operation of Chi Gai.
As improvement, be equipped with three pairs of directive wheels or bearing on the cover rim of two sides that extend along its length of described each Chi Gai, be equipped with two pairs of directive wheels or bearing on the side that two broad ways of each Chi Gai are extended; Like this, the cover rim of Chi Gai can be glided in water sealed tank more stably, further promoted guide locating device provided guide-localization effect, make guide locating device provided result of use better.
Described cover rim refers to that the edge of the lower surface of each Chi Gai all is welded with the rectangular frame that is made of the inverted L-shaped angle steel; The rectangular frame that the inverted L-shaped angle steel consists of can be built reinforcement effect to the pond, makes the strength increase of Chi Gai, makes Chi Gai be not easy distortion.
As improvement, described concrete precast pile curing pool also comprises the main muscle of being located at on the framework of steel reinforcement in the concrete bed of fixing water sealed tank, all be welded with the rectangular frame that is consisted of by the steel plate along cell wall to downward-extension on the lateral surface of two cell walls of described water sealed tank, the lower end of steel plate and the welding of the upper end of main muscle; Due between the cell wall of steel plate and water sealed tank by being welded and fixed, when water sealed tank is collided distortion, be not easy to produce the gap between the cell wall of water sealed tank and steel plate, can avoid steam to leak.
Be provided with many group concrete-bar components between described two block plates, every group of concrete-bar component includes the first reinforcing bar, the second reinforcing bar and the 3rd reinforcing bar, described the second reinforcing bar and the 3rd reinforcing bar are arranged in a crossed manner, weld with the upper end of main muscle respectively the lower end of the second reinforcing bar and the 3rd reinforcing bar, weld with two block plates respectively the upper end of the second reinforcing bar and the 3rd reinforcing bar, described the first reinforcing bar is horizontally disposed with and offsets with the downside of the bottom land of water sealed tank, the two ends of the first reinforcing bar respectively with the upper end welding of the second reinforcing bar and the 3rd reinforcing bar; Like this, concrete-bar component plays reinforcement effect to two block plates, makes the position of two block plates more firm, and below water sealed tank during casting concrete concrete-bar component can play pre-support effect to water sealed tank.
Description of drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is that A-A in figure is to view;
Fig. 3 is the structural representation that adds in Fig. 2 after upper storage reservoir covers;
Fig. 4 is the structural representation of embodiment two;
Fig. 5 is the structural representation of embodiment three;
Fig. 6 is the enlarged drawing of B in Fig. 2.
Wherein, 1, curing pool; 101, pond body; 102, at the bottom of the pond; 103, sidewall; 2, water sealed tank; 201, bottom land; 202, cell wall; 3, main muscle; 4, the first guide and limit skewback; 401, the second guide and limit skewback; 402, directive wheel; 5, the first reinforcing bar; 501, the second reinforcing bar; 502, the 3rd reinforcing bar; 6, steel plate; 7, Chi Gai; 701, inverted L-shaped angle steel; 8, concrete bed.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described in more detail.
Embodiment one
by Fig. 1, Fig. 2, shown in Figure 3, concrete precast pile steam curing pond of the present invention comprises that the horizontal cross-section that several intervals arrange is the pond body 101 of rectangle, the outside, top of four sidewalls 103 of each pond body 101 is equipped with the water sealed tank 2 that surrounds pond body 101 and be interconnected, the adjacent two side 103 of adjacent pool body 101 shares a water sealed tank 2, be equipped with a pond lid 7 for the rectangle that covers pond body 101 on each pond body 101, the edge of each pond lid 7 is equipped with the cover rim 701 that extends downwardly in water sealed tank 2, be equipped with in the water sealed tank 2 in the outside, top of four sidewalls of described each pond body 101 for hang the process that is covered on pond body 101 at Jiang Chigai 7 pond lid 7 is carried out the guide locating device provided of guide-localization.
be equipped with at least one first guide and limit skewback 4 in the water sealed tank 2 in the outside, top of described guide locating device provided four sidewalls 103 that refer to each pond body 101, namely from shown in Fig. 1 visual angle, the upper side wall of each pond body 101, lower wall, left side wall, be equipped with at least one first guide and limit skewback 4 in water sealed tank 2 on right side wall, usually, the quantity of the first guide and limit skewback 4 on four sidewalls 103 equates, and each the first guide and limit skewback 4 is symmetrical set, the line of the first guide and limit skewback 4 that is to say the correspondence on upper side wall and lower wall is vertical with lower wall with upper side wall, the line of the first spacing skewback 4 of wire of the correspondence on left side wall and right side wall is vertical with right side wall with left side wall, one straight flange (upper side edge) of each the first guide and limit skewback 4 all is fixed on a close cell wall 202 of each self-corresponding pond body 101 of water sealed tank 2, another straight flange (lower side) of each the first guide and limit skewback 4 all is fixed in the bottom land 201 of water sealed tank 2, usually, the U-shaped groove that water sealed tank 2 is made for channel-section steel, one straight flange of each the first guide and limit skewback 4 and cell wall 202 welding, another straight flange of each the first guide and limit skewback 4 and bottom land 201 welding.
be equipped with three pairs of the first guide and limit skewbacks 4 in water sealed tank 2 on two sidewalls 103 that extend along its length of described each pond body 101, be equipped with two pairs of the first guide and limit skewbacks 4 in water sealed tank 2 on the sidewall 103 that two broad ways of each pond body 101 are extended, the line that is to say two of each pond body 101 three couples the first guide and limit skewbacks 4 in the water sealed tank 2 on the sidewalls 103 that extend the along its length all sidewall 103 with the extension along its length of pond body 101 is vertical, the line of two couples the first guide and limit skewback 4 in the water sealed tank 2 on the sidewall 103 that two broad ways of each pond body 101 are extended is all vertical with the sidewall 103 that the broad ways of pond body 101 is extended.
Described cover rim 701 refers to that the edge of the lower surface of each pond lid 7 all is welded with the rectangular frame that is made of inverted L-shaped angle steel 701, and the side to downward-extension of inverted L-shaped angle steel 701 extends in water sealed tank 2.
Described concrete precast pile curing pool also comprises the main muscle 3 of being located at on the framework of steel reinforcement in the concrete bed 8 of fixing water sealed tank 2, all be welded with the rectangular frame that is consisted of by the steel plate 6 along cell wall 202 to downward-extension on the lateral surface of two cell walls 202 of described water sealed tank 2, the upper end welding of the lower end of steel plate 6 and main muscle 3.
Making by No. 45 steel with steel plate 6 of described inverted L-shaped angle steel 701, described pond lid 7 is fabricated from iron.
be provided with many group concrete-bar components between described two block plates 6, every group of concrete-bar component includes the first reinforcing bar 5, the second reinforcing bar 501, with the second reinforcing bar 502, described the second reinforcing bar 501 and the 3rd reinforcing bar 502 are arranged in a crossed manner, weld with the upper end of main muscle 3 respectively the lower end of the second reinforcing bar 501 and the 3rd reinforcing bar 502, weld with two block plates 6 respectively the upper end of the second reinforcing bar 501 and the 3rd reinforcing bar 502, described the first reinforcing bar 5 is horizontally disposed with and offsets with the downside of the bottom land 201 of water sealed tank 2, weld with the upper end of the second reinforcing bar 501 and the 3rd reinforcing bar 502 respectively at the two ends of the first reinforcing bar 5.
Embodiment two
by shown in Figure 4, described water sealed tank 2 is channel-section steel and makes, be equipped with at least one second guide and limit skewback 401 on the cover rim 701 of described guide locating device provided four sides that refer to each pond lid 7, that is to say, the upper side edge of each Chi Tichi lid 7, lower side, the limit, left side, be equipped with at least one second guide and limit skewback 401 on cover rim 701 on right edge, usually, the quantity of the second guide and limit skewback 401 on the cover rim 701 of 7 four sides of each pond lid equates, and each the second guide and limit skewback 401 is symmetrical set, the line of the second guide and limit skewback 401 that is to say the correspondence on upper side edge and lower side is vertical with lower side with upper side edge, the line of the first spacing skewback 4 of wire of the correspondence on left side limit and right edge is vertical with right edge with the limit, left side, one straight flange of each the second guide and limit skewback 401 all is fixed on the medial surface of cover rim 701, and another straight flange of each the second guide and limit skewback 401 all is fixed in the lower surface of pond lid 7.
be equipped with three pairs of the second guide and limit skewbacks 401 on the cover rim 701 of two sides that extend along its length of described each pond lid 7, be equipped with two pairs of the second guide and limit skewbacks 401 on the cover rim 701 of the side that two broad ways of each pond lid 7 are extended, all to cover the side of 7 extension along its length vertical with the pond for the line that is to say three couples the second guide and limit skewback 401 in the cover rim 701 on two sides that extend along its length of each pond lid 7, the line of two couples the second guide and limit skewback 401 on the cover rim 701 on the side that two broad ways of each pond lid 7 are extended is all vertical with the side that the broad ways of pond lid 7 is extended.
The remainder structure of the present embodiment is consistent with embodiment 1.
Embodiment three
by shown in Figure 5, be equipped with at least one directive wheel 402 or bearing on the cover rim 701 of described guide locating device provided four sides that refer to each pond lid 7, that is to say, the upper side edge of each Chi Tichi lid 7, lower side, the limit, left side, be equipped with at least one directive wheel 402 or bearing on cover rim 701 on right edge, usually, directive wheel 402 on the cover rim 701 of 7 four sides of each pond lid or the quantity of bearing equate, and each directive wheel 402 or bearing are symmetrical set, the line that is to say the directive wheel 402 of the correspondence on upper side edge and lower side or bearing is vertical with lower side with upper side edge, the directive wheel 402 of the correspondence on left side limit and right edge or the line of bearing are vertical with right edge with the limit, left side, each directive wheel 402 or bearing are all on the rotatable medial surface that is arranged on cover rim 701, each directive wheel 402 or bearing are all fixed by mount pad, usually, each directive wheel 402 or bearing are arranged on the position near the lower end of cover rim 701, can make like this guide-localization better effects if of directive wheel 402 or bearing.
be equipped with three pairs of directive wheels 402 or bearing on the cover rim 701 of two sides that extend along its length of described each pond lid 7, be equipped with two pairs of directive wheels 402 or bearing on the side that two broad ways of each pond lid 7 are extended, all to cover the side of 7 extension along its length vertical with the pond for the line that is to say the three pairs of directive wheels 402 in the cover rim 701 on two sides that extend along its length of each pond lid 7 or bearing, three pairs of directive wheels 402 of two couples on cover rim 701 on the side that two broad ways of each pond lid 7 are extended or the line of bearing are all vertical with the side that the broad ways of pond lid 7 is extended.
The remainder structure of the present embodiment is consistent with embodiment 1.

Claims (10)

1. concrete precast pile steam curing pond, it comprises that the horizontal cross-section that several intervals arrange is the pond body (101) of rectangle, the outside, top of four sidewalls (103) of each pond body (101) is equipped with the water sealed tank (2) that surrounds pond body (101) and be interconnected, the adjacent two side (103) of adjacent pool body (101) shares a water sealed tank (2), be equipped with a Chi Gai (7) for the rectangle that covers pond body (101) on each pond body (101), the edge of each Chi Gai (7) is equipped with the cover rim (701) that extends downwardly in water sealed tank (2), it is characterized in that: be equipped with for hang the process that is covered on pond body (101) at Jiang Chigai (7) in the water sealed tank (2) outside the top of four sidewalls of described each pond body (101) or on each Chi Gai (7) Chi Gai (7) is carried out the guide locating device provided of guide-localization.
2. concrete precast pile steam curing pond according to claim 1, it is characterized in that: be equipped with at least one first guide and limit skewback (4) in the water sealed tank (2) in the outside, top of described guide locating device provided four sidewalls (103) that refer to each pond body (101), one straight flange of each the first guide and limit skewback (4) all is fixed on a close cell wall (202) of each self-corresponding pond body (101) of water sealed tank (2), and another straight flange of each the first guide and limit skewback (4) all is fixed in the bottom land (201) of water sealed tank (2).
3. concrete precast pile steam curing pond according to claim 2, it is characterized in that: be equipped with three pairs of the first guide and limit skewbacks (4) in the water sealed tank (2) on two sidewalls (103) that extend along its length of described each pond body (101), be equipped with two pairs of the first guide and limit skewbacks (4) in the water sealed tank (2) on the sidewall (103) that two broad ways of each pond body (101) are extended.
4. concrete precast pile steam curing pond according to claim 1, it is characterized in that: described water sealed tank (2) is channel-section steel and makes; Be equipped with at least one second guide and limit skewback (401) on the cover rim (701) of described guide locating device provided four sides that refer to each Chi Gai (7), one straight flange of each the second guide and limit skewback (401) all is fixed on the medial surface of cover rim (701), and another straight flange of each the second guide and limit skewback (401) all is fixed in the lower surface of Chi Gai (7).
5. concrete precast pile steam curing pond according to claim 4, it is characterized in that: be equipped with three pairs of the second guide and limit skewbacks (401) on the cover rim (701) of two sides that extend along its length of described each Chi Gai (7), be equipped with two pairs of the second guide and limit skewbacks (401) on the cover rim (701) of the side that two broad ways of each Chi Gai (7) are extended.
6. concrete precast pile steam curing pond according to claim 1, it is characterized in that: be equipped with at least one directive wheel (402) or bearing on the cover rim (701) of described guide locating device provided four sides that refer to each Chi Gai (7), each directive wheel (402) or bearing are all on the rotatable medial surface that is arranged on cover rim (701).
7. concrete precast pile steam curing pond according to claim 6, it is characterized in that: be equipped with three pairs of directive wheels (402) or bearing on the cover rim (701) of two sides that extend along its length of described each Chi Gai (7), be equipped with two pairs of directive wheels (402) or bearing on the side that two broad ways of each Chi Gai (7) are extended.
8. according to claim 1 or 4 or 5 or 6 or 7 described concrete precast pile steam curing ponds is characterized in that: described cover rim (701) refers to that the edge of the lower surface of each Chi Gai (7) all is welded with the rectangular frame that is made of inverted L-shaped angle steel (701).
9. concrete precast pile steam curing pond according to claim 1, it is characterized in that: described concrete precast pile curing pool also comprises the main muscle (3) of being located at on the framework of steel reinforcement in the concrete bed (8) of fixing water sealed tank (2), all be welded with the rectangular frame that is consisted of by the steel plate (6) along cell wall (202) to downward-extension on the lateral surface of two cell walls (202) of described water sealed tank (2), the upper end welding of the lower end of steel plate (6) and main muscle (3).
10. concrete precast pile steam curing pond according to claim 9, it is characterized in that: be provided with many group concrete-bar components between described two block plates (6), every group of concrete-bar component includes the first reinforcing bar (5), the second reinforcing bar (501), with the 3rd reinforcing bar (502), described the second reinforcing bar (501) and the 3rd reinforcing bar (502) are arranged in a crossed manner, weld with the upper end of main muscle (3) respectively the lower end of the second reinforcing bar (501) and the 3rd reinforcing bar (502), weld with two block plates (6) respectively the upper end of the second reinforcing bar (501) and the 3rd reinforcing bar (502), described the first reinforcing bar (5) is horizontally disposed with and offsets with the downside of the bottom land (201) of water sealed tank (2), weld with the upper end of the second reinforcing bar (501) and the 3rd reinforcing bar (502) respectively at the two ends of the first reinforcing bar (5).
CN201310260819.7A 2013-06-27 2013-06-27 Concrete precast pile stream curing pool Active CN103381620B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310260819.7A CN103381620B (en) 2013-06-27 2013-06-27 Concrete precast pile stream curing pool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310260819.7A CN103381620B (en) 2013-06-27 2013-06-27 Concrete precast pile stream curing pool

Publications (2)

Publication Number Publication Date
CN103381620A true CN103381620A (en) 2013-11-06
CN103381620B CN103381620B (en) 2015-05-06

Family

ID=49489661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310260819.7A Active CN103381620B (en) 2013-06-27 2013-06-27 Concrete precast pile stream curing pool

Country Status (1)

Country Link
CN (1) CN103381620B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104162931A (en) * 2014-08-08 2014-11-26 新兴河北工程技术有限公司 Movable health-care pool cover
CN104842442A (en) * 2015-04-23 2015-08-19 广西北流市智宇陶瓷自动化设备有限公司 Steam maintenance pond
CN106865387A (en) * 2017-03-09 2017-06-20 广东易佳梯科技有限公司 A kind of elevator hoistways prefabricated component

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10264129A (en) * 1997-03-28 1998-10-06 Ohbayashi Corp Curing equipment of precast concrete member
CN201202280Y (en) * 2008-05-30 2009-03-04 中冶天工建设有限公司 Fair-faced curing apparatus
CN201669781U (en) * 2010-04-30 2010-12-15 北京榆构有限公司 Prefabricated part steam curing pond with translation pond cover
CN203371641U (en) * 2013-06-27 2014-01-01 中淳高科桩业股份有限公司 Concrete preformed pile steam maintenance tank

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10264129A (en) * 1997-03-28 1998-10-06 Ohbayashi Corp Curing equipment of precast concrete member
CN201202280Y (en) * 2008-05-30 2009-03-04 中冶天工建设有限公司 Fair-faced curing apparatus
CN201669781U (en) * 2010-04-30 2010-12-15 北京榆构有限公司 Prefabricated part steam curing pond with translation pond cover
CN203371641U (en) * 2013-06-27 2014-01-01 中淳高科桩业股份有限公司 Concrete preformed pile steam maintenance tank

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104162931A (en) * 2014-08-08 2014-11-26 新兴河北工程技术有限公司 Movable health-care pool cover
CN104842442A (en) * 2015-04-23 2015-08-19 广西北流市智宇陶瓷自动化设备有限公司 Steam maintenance pond
CN106865387A (en) * 2017-03-09 2017-06-20 广东易佳梯科技有限公司 A kind of elevator hoistways prefabricated component

Also Published As

Publication number Publication date
CN103381620B (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN103381620B (en) Concrete precast pile stream curing pool
CN202466600U (en) Foundation pit supporting structure with steel sheet pile and inner supports
CN106958253A (en) A kind of new type of deep-water combined steel plate pile cofferdam construction method
CN204052739U (en) Make the adjustable locator of major diameter bridge pile foundation steel reinforcement cage
CN203371641U (en) Concrete preformed pile steam maintenance tank
CN206034426U (en) Pour into double reinforcement cage structure of pile foundation
CN103552654B (en) The universal combined support jig of a kind of ship superstructure
CN104948228B (en) Construction method of large high-precision anti-radiation tunnel shielding iron structure
CN105525749A (en) Large-formwork casting construction method for transformer station accident oil pool
CN202627494U (en) Device for locating and supporting prefabricated concrete structure laminated slab
CN203371640U (en) Concrete precast pile steam curing pool
CN203498850U (en) Raft foundation reinforcement support of super high-rising building
CN206220359U (en) A kind of support heel for reinforced bar and support system
CN205296164U (en) Fill ability of swimming slip form construction device
CN204530498U (en) Bridge jacking servicing unit
CN211735417U (en) Bridge underwater bearing platform filling device
CN102092087A (en) Steam-curing bottom plate
CN207524824U (en) A kind of transporting precast beams frame
CN202672498U (en) Floor rib internal stressing reinforcing steel bar limiting support of one-way dense rib steel formwork supporting die
CN105822063A (en) L-shaped special-shaped post formwork and formwork supporting method
CN206467557U (en) Soil pressure and the Integral Abutment structure for sedimentation of banketing after console
CN205978255U (en) Spring -supported seat
CN220038942U (en) Foundry goods waterlogging caused by excessive rainfall device
CN102436908A (en) Iron core for transformer
CN204017634U (en) A kind of pedestal of absorption tower

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180918

Address after: 315100 No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang

Patentee after: Ningbo Zhong Chun hi tech Limited by Share Ltd

Address before: 315145 Zhongchun High-tech Pile Co., Ltd. of South Kaihang Road, Yinzhou District, Ningbo City, Zhejiang Province

Patentee before: Zhongchun Gaoke Pile Industry Co., Ltd.

TR01 Transfer of patent right