CN103366309B - 基于低影响开发的城市雨水利用规模确定方法 - Google Patents
基于低影响开发的城市雨水利用规模确定方法 Download PDFInfo
- Publication number
- CN103366309B CN103366309B CN201310263090.9A CN201310263090A CN103366309B CN 103366309 B CN103366309 B CN 103366309B CN 201310263090 A CN201310263090 A CN 201310263090A CN 103366309 B CN103366309 B CN 103366309B
- Authority
- CN
- China
- Prior art keywords
- magnanimity
- urban
- water surface
- surface ratio
- permeability rate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A10/00—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
- Y02A10/40—Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
Landscapes
- Sewage (AREA)
Abstract
本发明公开一种基于低影响开发(low-impact?development,简称LID)的城市雨水利用规模确定方法。利用城市雨洪模型,计算城市开发前的洪峰、洪量和汇流时间;建立洪峰、汇流时间与城市水面率和透水率之间的相关关系,确定修复雨洪关系(以洪峰和汇流时间为标准)时的一组水面率和透水率;将该组水面率和透水率代入城市雨洪模型,得到此时的洪量;利用该洪量和开发前的洪量,即可确定城市雨水的利用规模。本发明不但能够实现LID措施的目标,使得城市开发后洪水过程的洪峰、洪量和汇流时间均与开发前相近,降低城市的洪涝灾害风险;同时可增加城市水资源量,避免盲目利用雨水资源,对缺水地区城市具有重要作用。
Description
技术领域
本发明涉及一种城市雨水利用规模的确定方法,属于雨水综合利用、洪涝灾害防治和给水排水技术领域。
背景技术
随着我国城市化进程的加剧,城区不透水面大幅增加,雨水下渗能力显著下降,城市洪水特征为峰高、量大、峰提前,大大提高了城市洪涝灾害风险。与此同时,在一些缺水城市,雨水资源尤显宝贵,一些小型、局部的非标准性雨水利用工程也逐步应用,但是如何确定这些雨洪控制利用设施的合理规模以达到相应的目的,是雨洪控制利用设施的推广应用遇到的一个亟待解决的问题。
目前,我国雨洪控制利用设施的规模多是从系统角度考虑,综合利用排水管网、泵站、雨洪调蓄池,使整个排水系统投资最经济。
低影响开发(low-impactdevelopment,简称LID)被认为能够有效修复传统的雨洪资源排泄及输送系统所破坏的水文机制,其设计策略是以能够维持或者恢复区域开发前的水文机制为目标,通过分布式的截留及生物滞留池、渗透铺设、绿色屋面、雨水花园、植被浅沟等措施,减少不透水性表面的面积,并通过延长径流路径、增加径流时间的措施来实现对径流的储存、入渗以及地下水的补给,改变径流排泄量的大小等,以实现城市雨洪资源化利用及河道生态环境保护功能。
通过利用低影响开发的措施,确定雨水利用规模,既可以修复城市雨洪关系,对城市雨水径流的径流峰值控制、径流总量控制、径流污染控制,又可以增加城市水资源,避免盲目利用雨水资源,对缺水地区城市具有重要作用。
发明内容
发明目的:针对现有技术中存在的问题,本发明提供一种基于低影响开发的城市雨水利用规模确定方法。
技术方案:本发明所述的基于低影响开发的城市雨水利用规模确定方法,具体步骤如下:
(1)利用城市雨洪模型,计算城市开发前的洪峰、洪量和汇流时间;(2)建立洪峰、汇流时间与城市水面率和透水率之间的相关关系,确定修复雨洪关系(以洪峰和汇流时间为标准)时的一组水面率和透水率;(3)将该组水面率和透水率代入城市雨洪模型,得到此时的洪量;(4)利用该洪量和开发前的洪量,即可确定城市雨水的利用规模。
(1)建立城市雨洪模型,包括降雨、产流、坡面汇流、管网汇流及河网汇流等模块,将城市开发前的水面率、透水率代入模型计算得到此时的洪峰、洪量和汇流时间;
(2)在城市化的过程中,水面率和透水率不断发生改变,计算相应的洪峰和汇流时间,建立洪峰和汇流时间与城市水面率和透水率之间的定量关系;
(3)根据低影响开发的理念,要将城市化后的洪水过程修复成开发前的过程。选取洪峰、汇流时间为主要决定因素,令上述定量关系与开发前的洪量和洪峰建立联系,确定一组水面率和透水率。
(4)将该组水面率和透水率代入城市雨洪模型,得到在城市开发后洪峰和汇流时间与开发前相差不大时的洪量;
(5)利用该洪量和开发前的洪量,即可确定城市雨水的利用规模。
本发明采用上述技术方案,具有以下有益效果:
(1)在城市发生暴雨时,基于低影响开发理念确定合理的城市雨水利用规模,可以将城市化的雨洪关系修复到开发前的水平,大大降低城市面临的洪涝灾害风险。
(2)利用低影响开发措施,减少城市雨水污染。
(3)利用低影响开发措施,增加城市水资源,同时补偿地下水源。
(4)本发明计算均可通过程序实现,简便易懂,有助于避免雨水利用规模确定的盲目性,适于推广。
附图说明
图1为基于低影响开发的城市雨水利用规模确定流程图;
图2为城市洪水过程线洪峰与水面率的相关关系图;
图3为城市洪水过程线洪峰与透水率的相关关系图;
图4为城市洪水过程线汇流时间与水面率的相关关系图;
图5为城市洪水过程线汇流时间与透水率的相关关系图。
具体实施方式
下面结合具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。
南京某流域在上世纪80年底为未开发区,水面率为8.7%,透水率高达87.3%,而在近期快速城市化过程中,水面率迅速下降至2.58%,不透水率已经达到20.78%。根据总体规划,该区域2020年水面率为2.24%,不透水率高达61.02%。
(1)根据图1,建立该流域城市雨洪模型,其中上游山丘区采用推理公式或单位线入流,下游以非恒定流计算。计算得到开发前的洪峰流量为321.9m3/s、汇流时间为26.02h,洪量为2424万m3,其中汇流时间等于流量过程线的一阶原点矩与径流过程线的一阶原点矩之差。
(2)根据图1,改变开发后的水面率和透水率值,代入城市雨洪模型,计算相应的洪峰和汇流时间,建立两者之间的相关关系,见图2、图3、图4、图5。
(3)根据洪峰与水面率和透水率之间的相关关系,建立整合模型,即建立函数式
Qm=f(CWSR,PSP),式中,Qm为洪峰,CWSR和PSP分别为水面率和透水率,
Qm=a1CWSR·PSP2+a2PSP2+a3CWSR·PSP+a4CWSR+a5PSP+a6
(4)同理,可以确定T=g(CWSR,PSP),式中,T为汇流时间,
T=b1CWSR·PSP+b2CWSR+b3PSP+b4
(5)利用优化拟合,确定上述函数式的参数,见表1。
Qm参数 | 取值 | T参数 | 取值 |
a1 | 4596.901 | b1 | 8.925 |
a2 | -155.820 | b2 | 10.681 |
a3 | -3830.240 | b3 | 3.046 |
a4 | 407.527 | b4 | 21.835 |
a5 | 124.793 | ||
a6 | 334.456 |
(6)将开发前的洪峰和汇流时间值赋予Qm和T的函数表达式,联解方程组可以得到此时的CWSR为15.22%,PSP为62.2%。
(7)将CWSR和PSP取值代入模型,计算得到此时的洪量为2417万m3。
(8)最终确定城市雨水利用规模为2424-2417=7万m3。
Claims (4)
1.基于低影响开发的城市雨水利用规模确定方法,其特征在于,步骤如下:(1)利用城市雨洪模型,计算城市开发前的洪峰、洪量和汇流时间;(2)建立洪峰、汇流时间与城市水面率和透水率之间的相关关系,确定修复雨洪关系时的一组水面率和透水率;
根据洪峰与水面率和透水率之间的相关关系,建立整合模型,即建立函数式Qm=f(CWSR,PSP),式中,Qm为洪峰,洪峰单位为立方米每秒,符号是m3/s,CWSR和PSP分别为水面率和透水率,
Qm=a1CWSR·PSP2+a2PSP2+a3CWSR·PSP+a4CWSR+a5PSP+a6
同理,可以确定T=g(CWSR,PSP),式中,T为汇流时间,汇流时间单位为小时,符号是h;
T=b1CWSR·PSP+b2CWSR+b3PSP+b4
利用优化拟合,确定上述函数式的参数:a1、a2、a3、a4、a5、a6、b1、b2、b3、b4;
(3)将该组水面率和透水率代入城市雨洪模型,得到此时的洪量;(4)利用该洪量和开发前的洪量,即可确定城市雨水的利用规模。
2.根据权利要求1所述的基于低影响开发的城市雨水利用规模确定方法,其特征在于:以修复雨洪关系为目标,确定水面率和透水率。
3.根据权利要求1所述的基于低影响开发的城市雨水利用规模确定方法,其特征在于:以洪水过程线的洪峰和汇流时间为控制,确定水面率和透水率。
4.根据权利要求1所述的基于低影响开发的城市雨水利用规模确定方法,其特征在于:由洪峰和汇流时间确定的水面率和透水率,计算洪量,再结合开发前的洪量确定城市雨水的利用规模。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310263090.9A CN103366309B (zh) | 2013-06-27 | 2013-06-27 | 基于低影响开发的城市雨水利用规模确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310263090.9A CN103366309B (zh) | 2013-06-27 | 2013-06-27 | 基于低影响开发的城市雨水利用规模确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103366309A CN103366309A (zh) | 2013-10-23 |
CN103366309B true CN103366309B (zh) | 2016-06-08 |
Family
ID=49367589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310263090.9A Active CN103366309B (zh) | 2013-06-27 | 2013-06-27 | 基于低影响开发的城市雨水利用规模确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103366309B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105975672A (zh) * | 2016-04-29 | 2016-09-28 | 河海大学 | 一种小流域设计洪水计算方法 |
CN108288102B (zh) * | 2017-01-10 | 2022-02-22 | 黄玉珠 | 基于海绵城市建设的低影响开发设施优化配置方法 |
CN111047072B (zh) * | 2019-11-13 | 2022-10-14 | 河海大学 | 一种基于低影响开发理论的长江中下游地区水系规划方法 |
CN112287536B (zh) * | 2020-10-22 | 2021-09-07 | 三峡大学 | 一种基于复式洪水过程校正流域不透水率的方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102605852A (zh) * | 2012-03-22 | 2012-07-25 | 西安理工大学 | 基于低影响开发的城市雨水渗透生态系统 |
CN103073111A (zh) * | 2013-02-01 | 2013-05-01 | 北京建筑工程学院 | 城市道路雨水径流生态协同处理装置及方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050273300A1 (en) * | 2003-09-29 | 2005-12-08 | Patwardhan Avinash S | Method and system for water flow analysis |
-
2013
- 2013-06-27 CN CN201310263090.9A patent/CN103366309B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102605852A (zh) * | 2012-03-22 | 2012-07-25 | 西安理工大学 | 基于低影响开发的城市雨水渗透生态系统 |
CN103073111A (zh) * | 2013-02-01 | 2013-05-01 | 北京建筑工程学院 | 城市道路雨水径流生态协同处理装置及方法 |
Non-Patent Citations (2)
Title |
---|
基于SWMM模型的低影响开发雨洪控制效果模拟;王文亮;《中国给水排水》;20121101;第28卷(第21期);全文 * |
基于低影响开发模式的雨水利用分析;张运超;《水电能源科学》;20120325;第30卷(第3期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103366309A (zh) | 2013-10-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203188340U (zh) | 截流式综合排水体制下的城市排水系统 | |
CN104480994B (zh) | 一种城市绿地广场雨水收集再利用系统 | |
CN103366309B (zh) | 基于低影响开发的城市雨水利用规模确定方法 | |
CN111695305A (zh) | 一种无实测水文资料情况下雨源型河流的水面线计算方法 | |
CN104462774A (zh) | 基于水箱模型的城市道路及低洼地区积水预报方法 | |
CN103473435A (zh) | 城市雨水排水调蓄计算模型及方法 | |
CN204401686U (zh) | 一种绿地雨水收集再利用系统 | |
CN111931330A (zh) | 一种无管网资料城区的管网排水过程概化计算方法 | |
CN108824593B (zh) | 一种针对复杂雨水管网的快速多目标工程优化设计方法 | |
CN204098195U (zh) | 分散串联型雨水调蓄池改造的旧雨水管道系统 | |
CN203878651U (zh) | 垂直深层雨水调蓄收集系统 | |
CN103374904B (zh) | 农田排灌模式转换节地节水方法 | |
CN203174745U (zh) | 雨水竖向分区排水系统 | |
CN103184761A (zh) | 雨水竖向分区排水系统 | |
CN202157297U (zh) | 闸控型城市雨洪调控及利用系统 | |
CN105404760B (zh) | 恒定非均匀流条件下雨水设计流量的计算方法 | |
CN112049185A (zh) | 一种多级分布式城市雨水综合利用系统及其构建方法 | |
CN203947519U (zh) | 多功能雨水存储池 | |
Huo et al. | Effectiveness evaluation of LIDs through SWMM: A case study of typical urban unit in Handan, China | |
CN204385860U (zh) | 一种供道路旁树木用水的透水砼蓄水池 | |
CN103526798A (zh) | 一种雨水收集系统 | |
CN206128253U (zh) | 一种城市排水管网集雨窖池 | |
CN205474682U (zh) | 一种可控式道路雨水收集及防路面雨水淤积系统 | |
CN205242594U (zh) | 一种集雨水预处理与溢流于一体的成品雨水口 | |
CN104268409A (zh) | 一种地面集水时间的计算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20131023 Assignee: Zhejiang Hehai zhongkong Information Technology Co.,Ltd. Assignor: HOHAI University Contract record no.: X2022320000021 Denomination of invention: Determination method of urban rainwater utilization scale based on low impact development Granted publication date: 20160608 License type: Common License Record date: 20220121 |