CN103362116A - 地基压密注浆施工方法 - Google Patents

地基压密注浆施工方法 Download PDF

Info

Publication number
CN103362116A
CN103362116A CN2013102735544A CN201310273554A CN103362116A CN 103362116 A CN103362116 A CN 103362116A CN 2013102735544 A CN2013102735544 A CN 2013102735544A CN 201310273554 A CN201310273554 A CN 201310273554A CN 103362116 A CN103362116 A CN 103362116A
Authority
CN
China
Prior art keywords
grouting
construction
seal face
coil
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102735544A
Other languages
English (en)
Inventor
顾仲宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Urban And Rural Construction Foundation Engineering Co Ltd
Original Assignee
Zhenjiang Urban And Rural Construction Foundation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Urban And Rural Construction Foundation Engineering Co Ltd filed Critical Zhenjiang Urban And Rural Construction Foundation Engineering Co Ltd
Priority to CN2013102735544A priority Critical patent/CN103362116A/zh
Publication of CN103362116A publication Critical patent/CN103362116A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种地基压密注浆施工方法,属于建筑施工技术领域。它包括以下步骤:(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为45-55cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面;(2)在封浆面以内,排布注浆管,进行注浆施工。采用上述的方法后,由于由外而内逐圈排布的注浆管,施工时,对排布外围的注浆管进行注浆后形成封浆面确保了固结材料不会流失,同时加入的水玻璃强化了固结效果,加入的粉煤灰,节省了水泥,节省了造价,同时施工方法的科学合理,不但节约了材料成本,而且提高了地基承载率。

Description

地基压密注浆施工方法
 
技术领域
    本发明涉及一种地基压密注浆施工方法,属于建筑施工技术领域。
背景技术
在土质较松散的场地,例如大型厂房的室内地坪,难以保证安装的稳定性,需要常常需要对地基进行固结处理,传统采用的压密注浆,工艺不尽合理,施工过程中的施工粘结材料(水泥浆)容易流失,造成固结效果差,材料损耗大,不但造成了成本的浪费而且也降低了地基承载率。
发明内容
本发明要解决的技术问题是提供一种不但能够节约材料成本,而且能够提高地基承载率的地基压密注浆施工方法。
为了解决上述技术问题,本发明的地基压密注浆施工方法,包括以下步骤:
(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为45-55cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面;
(2)在封浆面以内,排布注浆管,进行注浆施工。
所述步骤2中封浆面以内的注浆管由外而内逐圈排列,注浆施工时,也由外而内逐圈进行。
所述步骤1中形成封浆面的水泥浆中加入水泥总重量1-1.5%的水玻璃。
所述步骤2中内圈注浆材料在水泥浆中加入水泥重量9-12%的一级粉煤灰。
采用上述的方法后,由于由外而内逐圈排布的注浆管,施工时,对排布外围的注浆管进行注浆后形成封浆面确保了固结材料不会流失,同时加入的水玻璃强化了固结效果,加入的粉煤灰,节省了水泥,节省了造价,同时施工方法的科学合理,不但节约了材料成本,而且提高了地基承载率。
具体实施方式
下面结合具体实施方式,对本发明的地基压密注浆施工方法作进一步详细说明。
实施例一:
本发明的地基压密注浆施工方法,包括以下步骤:
(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为45cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面,形成封浆面的水泥浆中加入水泥总重量1-1.5%的水玻璃,强化固结效果;
(2)在封浆面以内,排布注浆管,进行注浆施工,封浆面以内的注浆管由外而内逐圈排列,注浆施工时,也由外而内逐圈进行。
进一步的可以在内圈注浆材料在水泥浆中加入水泥重量9%的一级粉煤灰,节省水泥,节省造价。
实施例二:
本发明的地基压密注浆施工方法,包括以下步骤:
(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为55cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面,形成封浆面的水泥浆中加入水泥总重量1-1.5%的水玻璃,强化固结效果。
(2)在封浆面以内,排布注浆管,进行注浆施工,封浆面以内的注浆管由外而内逐圈排列,注浆施工时,也由外而内逐圈进行。
进一步的可以在内圈注浆材料在水泥浆中加入水泥重量12%的一级粉煤灰,节省水泥,节省造价。
实施例三:
本发明的地基压密注浆施工方法,包括以下步骤:
(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为50cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面,形成封浆面的水泥浆中加入水泥总重量1.2%的水玻璃,强化固结效果。
(2)在封浆面以内,排布注浆管,进行注浆施工,封浆面以内的注浆管由外而内逐圈排列,注浆施工时,也由外而内逐圈进行。
进一步的可以在内圈注浆材料在水泥浆中加入水泥重量10%的一级粉煤灰,节省水泥,节省造价。
    实践证明,本实施例中所采用的施工原料的比例最合适,某工厂8000的地坪,采用本实施例的方法后,其地基承载率提高120KN/m,与传统的方法相比,水泥材料节省30%。
当然,上述说明并非是对本发明的限制,本发明也并不仅限于上述举例,本技术领域的技术人员在本发明的实质范围内所做出的变化、添加或替换,也应属于本发明的保护范围。

Claims (4)

1.一种地基压密注浆施工方法,其特征在于,包括以下步骤:
(1)在待施工的范围内,先对外围排布注浆管,注浆管的间距为45-55cm,然后进行注浆,注浆完毕固化48小时后形成封闭的封浆面;
(2)在封浆面以内,排布注浆管,进行注浆施工。
2.按照权利要求1所述的地基压密注浆施工方法,其特征在于:所述步骤2中封浆面以内的注浆管由外而内逐圈排列,注浆施工时,也由外而内逐圈进行。
3.按照权利要求1所述的地基压密注浆施工方法,其特征在于:所述步骤1中形成封浆面的水泥浆中加入水泥总重量1-1.5%的水玻璃。
4.按照权利要求1所述的地基压密注浆施工方法,其特征在于:所述步骤2中内圈注浆材料在水泥浆中加入水泥重量9-12%的一级粉煤灰。
CN2013102735544A 2013-07-02 2013-07-02 地基压密注浆施工方法 Pending CN103362116A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102735544A CN103362116A (zh) 2013-07-02 2013-07-02 地基压密注浆施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102735544A CN103362116A (zh) 2013-07-02 2013-07-02 地基压密注浆施工方法

Publications (1)

Publication Number Publication Date
CN103362116A true CN103362116A (zh) 2013-10-23

Family

ID=49364322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102735544A Pending CN103362116A (zh) 2013-07-02 2013-07-02 地基压密注浆施工方法

Country Status (1)

Country Link
CN (1) CN103362116A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978802A (zh) * 2017-04-14 2017-07-25 中国电建集团成都勘测设计研究院有限公司 用于软弱、破碎地基岩体灌浆加固处理方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1749490A (zh) * 2005-10-09 2006-03-22 中国水电顾问集团华东勘测设计研究院 一种用高密度少浆量少段量注浆加固的地基及其注浆方法
JP2006226058A (ja) * 2005-02-21 2006-08-31 Kyokado Eng Co Ltd 地盤注入工法および注入管装置
CN101701459A (zh) * 2009-10-16 2010-05-05 上海宝钢工程技术有限公司 对潮间带软土地基处理形成施工作业面的方法
CN102108701A (zh) * 2009-12-29 2011-06-29 贵阳铝镁设计研究院 无压注浆加固柱周土的方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006226058A (ja) * 2005-02-21 2006-08-31 Kyokado Eng Co Ltd 地盤注入工法および注入管装置
CN1749490A (zh) * 2005-10-09 2006-03-22 中国水电顾问集团华东勘测设计研究院 一种用高密度少浆量少段量注浆加固的地基及其注浆方法
CN101701459A (zh) * 2009-10-16 2010-05-05 上海宝钢工程技术有限公司 对潮间带软土地基处理形成施工作业面的方法
CN102108701A (zh) * 2009-12-29 2011-06-29 贵阳铝镁设计研究院 无压注浆加固柱周土的方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106978802A (zh) * 2017-04-14 2017-07-25 中国电建集团成都勘测设计研究院有限公司 用于软弱、破碎地基岩体灌浆加固处理方法

Similar Documents

Publication Publication Date Title
CN101445340B (zh) 一种自洁式透水砖及其制备方法
CN104341133A (zh) 一种高炉粒化矿渣透水砖的制备方法
CN103015721B (zh) 厨卫间预留洞口防渗漏施工方法
CN103290753A (zh) 纳米复合环保透水砖及其生产方法
CN101956357A (zh) 一种双层免烧透水砖及其制造方法
CN104153401A (zh) 抗浮锚杆防水施工方法
CN105347732A (zh) 一种抗冻耐久的树脂混凝土复合透水地砖
CN102234185B (zh) 防水永凝液及其制备工艺
CN103242009B (zh) 一种桥台渗水料无砂混凝土块及其制作工艺
CN104098306B (zh) 一种免烧透水砖及其制备方法
CN103572786B (zh) 一种桩头节点防水处理装置及其施工方法
CN103362116A (zh) 地基压密注浆施工方法
CN106555371B (zh) 园区大面积透水混凝土道路施工工艺
CN104129948B (zh) 利用煤炉渣或矿渣制作的反滤块及其制备方法
CN103121830B (zh) 一种生态地面砖
CN110469189A (zh) 园林石墙施工方法
CN201943060U (zh) 一种河床深厚覆盖层闸坝基础的加固结构
CN203924139U (zh) 混凝土构件
CN104234425A (zh) 一种剪力墙结构免抹灰工艺
CN107443548A (zh) 一种水渠渠槽预制件的生产方法
CN102515663A (zh) 一种水泥基渗透结晶型防水材料
CN202284334U (zh) 一种砼墙壁施工缝结构
CN203603173U (zh) 一种桩头节点防水处理装置
CN105330232A (zh) 一种新型双层免烧高强透水地砖
CN104003659A (zh) 掺杂玻璃碴的空心砖

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20131023