CN103353902A CN2012105638113A CN201210563811A CN103353902A CN 103353902 A CN103353902 A CN 103353902A CN 2012105638113 A CN2012105638113 A CN 2012105638113A CN 201210563811 A CN201210563811 A CN 201210563811A CN 103353902 A CN103353902 A CN 103353902A
Authority
CN
China
Prior art keywords
secondary device
secondary equipment
realistic model
construction method
power system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105638113A
Other languages
Chinese (zh)
Other versions
CN103353902B (en
Inventor
赵晓波
何心仲
毕会静
张红艳
白廷玉
纪璐
林昌年
徐正清
吴海宏
高峰
王国平
葛贤军
胡兴勇
黄帮局
曹柏林
张鹏程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Kedong Electric Power Control System Co Ltd
Training Center of State Grid Hebei Electric Power Co Ltd
Original Assignee
Beijing Kedong Electric Power Control System Co Ltd
Training Center of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Kedong Electric Power Control System Co Ltd, Training Center of State Grid Hebei Electric Power Co Ltd filed Critical Beijing Kedong Electric Power Control System Co Ltd
Priority to CN201210563811.3A priority Critical patent/CN103353902B/en
Publication of CN103353902A publication Critical patent/CN103353902A/en
Application granted granted Critical
Publication of CN103353902B publication Critical patent/CN103353902B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a construction method for a secondary equipment simulation model of an electric power system. The construction method comprises the following steps: (1) generating a training simulation system flexible bus; (2) drawing the appearance of the secondary equipment; (3) analyzing properties and functions of the secondary equipment; (4) analyzing input data and output data of the secondary equipment, ordering the input data of the secondary equipment from the training simulation system flexible bus, and defining the output data; (3) defining appearance logic node of the secondary equipment; (6) expanding the incidence relation between inside properties of the secondary equipment simulation model, expressing inside mechanism of model behavior, and realizing the defining of the properties and the functions; (7) storing the generated secondary equipment simulation model in a secondary equipment model base. The method can describe the physical property mechanism of the secondary equipment in detail, accurately simulate all appearance properties and action properties, and meets practical requirements of quick configuration and deployment.

Description

A kind of secondary equipment in power system realistic model construction method
Technical field
The present invention relates to a kind of method that makes up the secondary equipment in power system realistic model, belong to the Simulating technique in Electric Power System field.
Background technology
It is the basic tool of Electrical Power System Dynamic analysis and security control that electric system simulation calculates, and the electric system modeling is the basis of realizing simulation calculation.Current, along with the development of power system automation technology, the model of secondary equipment in power system is more and more, and function becomes increasingly complex, and integrated level is more and more higher, brings new technological challenge for the structure of realistic model.In existing Training Simulation System, secondary equipment in power system (equipment, loop) model has usually carried out the practicality of quite large degree and has simplified.There is the defective of emulation authenticity aspect based on the simulation calculation of above-mentioned simplified model, can not have adapted to that current regulation and control are integrated, the demand of the integrated Training Simulation System unified Modeling of O﹠M.
In existing training on electric power analogue system, modeling method commonly used can be divided into: the modeling of processor-oriented modeling, data-oriented modeling, Information, towards five kinds of the modeling of decision-making and OO modelings.Wherein, processor-oriented modeling method is process to be regarded as the essential part of system model, and data produce along with process.Data-oriented modeling method is to pay close attention to the input and output of model, and function is followed data.The modeling method of Information is that the logic data model from whole system begins, come all master data entity and mutual relationships thereof in the illustrative system by a global information demand view, progressively construct on this basis whole model, the information entity that the operation of information model register system is required.That the institutional analysis result of decision-making drawing up principle by system and mechanism, system is set up model towards the modeling method of decision-making.Object-oriented method is to utilize OO method, uses encapsulation, succession, the mechanism such as polymorphic to come the constructing virtual reality system.
It is the effective technology means that address the above problem that object-oriented (object-oriented) method is generally acknowledged.Because the objective system structure connects each other again with the system's existing mutual independence (encapsulation) of solving a problem, therefore can guarantee software systems constantly expansion and maintenance.Because electric system is the large scale system of a complexity, the required data volume of modeling is very huge, and structure is very complicated.Realistic model must change with the change of application function.The scale of realistic model, structure also will often change with power system development.Draft a model scheme take Object-oriented Technique as guidance and need repeatedly research and discovery.It is significant to the exploitation of software that Object-oriented Technique is introduced power system simulation software, but still have many particular problems to need research and discovery, such as the simulation modeling of secondary equipment in power system etc.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of secondary equipment in power system realistic model construction method.
For realizing above-mentioned goal of the invention, the present invention adopts following technical scheme:
A kind of secondary equipment in power system realistic model construction method comprises the steps:
(1) uses visual modeling tool, generate the Training Simulation System flexible bus;
(2) use visual modeling tool, the outward appearance of drawing secondary device;
(3) attribute and the function of analysis secondary device;
(4) analyze input data and the output data of secondary device, and from the Training Simulation System flexible bus, order the input data of secondary device, definition output data;
(5) use visual modeling tool, the outward appearance logic node of definition secondary device;
(6) according to the IEC61850 standard format, the incidence relation between the expansion secondary device realistic model built-in attribute, the internal mechanism of statement model behavior realizes the definition of attribute and function;
(7) according to the IEC61850 standard format, store the secondary device realistic model that generates in the secondary device model bank.
Wherein more preferably, in the described step (1), further draw the station AC and DC figure of electric system main wiring diagram and factory.
Wherein more preferably, described secondary device realistic model is made of logic node, and described logic node comprises attribute and the function of the secondary device state that embodies, parameter, definite value, interface and unit connection topological relation.
Wherein more preferably, in the described step (3), analyze attribute and the function of secondary device by described logic node.
Wherein more preferably, comprise equipment modeling instrument and power network modeling instrument in the described visual modeling tool.
Compared with prior art, the present invention has following technical characterstic:
1. the physical characteristics mechanism of secondary device be can accurately describe in detail, all appearance attributes and action attributes accurately simulated;
2. adopt the IEC61850 standard, can satisfy the practical requirement that rapid configuration is disposed.
Description of drawings
Fig. 1 is the logical organization synoptic diagram of secondary equipment in power system realistic model;
Fig. 2 is in visual modeling tool, and the synoptic diagram of logic node attribute, data is set;
Fig. 3 is the synoptic diagram of the extended model of IEC61850 standard;
Fig. 4 is the synoptic diagram of primary system flexible bus;
Fig. 5 is the synoptic diagram of DC power-supply system flexible bus.
Embodiment
Current, for the demand that satisfies the electric system unified Modeling and realize seamless communication, the 57th technical committee of International Electrotechnical Commission (IECTC57) successively issue for integrated very important two standard: the IEC61850 of power system information and IEC61970.Wherein, the communication protocol in all transformer stations is all used the IEC61850 standard.The IEC61850 standard is based on the transformer substation system common communication standard of universal network communication platform, by a series of standardization to secondary device, makes its output that forms a standard, realizes the seamless link of each secondary device in the transformer substation system.
In the present invention, the secondary device realistic model is made of logic node, meets the relevant regulations in the IEC61850 standard.As shown in Figure 1, this logic node is the basic unit module according to the secondary device functional definition, and logic node comprises corresponding attribute and function, and state, parameter, definite value, interface and the unit that can embody secondary device are connected topological relation etc.
The present invention combines the modeling method of object-oriented method and Information, in conjunction with the IEC61850 standard, sets up realistic model by visual means, makes the versatility of secondary device realistic model stronger.For this reason, adopted following technical step among the present invention:
(1) uses visual modeling tool, draw the station AC and DC figure of electric system main wiring diagram and factory, according to the characteristics generation Training Simulation System flexible bus of electric system.
The visual modeling tool here can be the powerWorld Simulator software Power World of U.S. University of Illinois exploitation etc.As shown in Figure 2, in this visual modeling tool, logic node attribute in the secondary device realistic model, data etc. can be set.In addition, can comprise equipment modeling instrument and power network modeling instrument etc. in the visual modeling tool, wherein the equipment modeling instrument can be used for producing the extended model of IEC61850 standard shown in Figure 3, and the power network modeling instrument can be used for producing primary system flexible bus shown in Figure 4.Further, this Training Simulation System flexible bus can also comprise DC power-supply system flexible bus shown in Figure 5 etc.
(2) use visual modeling tool, the outward appearance of drawing secondary device.
(3) analyze attribute and the function of secondary device by logic node.
(4) analyze input data and the output data of secondary device, and from the Training Simulation System flexible bus, order the input data of secondary device, definition output data.If necessary, the Training Simulation System flexible bus is expanded.
(5) use visual modeling tool, the outward appearance logic node of definition secondary device.
(6) according to the IEC61850 standard format, the incidence relation between the expansion secondary device realistic model built-in attribute, the internal mechanism of statement model behavior realizes the definition of attribute and function.
(7) according to the IEC61850 standard format, store the secondary device realistic model that generates in the secondary device model bank.
By collecting and put in order the various secondary device models in the electrical network, the secondary device model bank will progressively be expanded and be enriched, and finally forms complete secondary device model bank.The user can namely can finish secondary device in the emulation electrical network and the instantiation in loop fast by the parameter setting.
Above-mentioned visual, Componentized secondary device realistic model construction method is according to the IEC61850 standard, the visual modeling tool that adopts the artwork one with the inner member of secondary device abstract be logic node, and graphically make up according to the actual electrical air circuit and to build, thereby realize structure to the detailed realistic model of secondary device and loop.This secondary device realistic model not only can be described the internal physical functional attributes of secondary device, simulates exactly all appearance attributes and action attributes simultaneously.This visual modeling method will originally be built for patterned elements combination by the copying of inner run time version function realization is abstract, simple and clear, multiplexing convenience, can also carry out local the adjustment based on existing realistic model and namely can form new secondary device realistic model, need not again to develop, save construction cycle and cost, guaranteed the opening of Training Simulation System.
More than secondary equipment in power system realistic model construction method provided by the present invention is had been described in detail.To those skilled in the art, any apparent change of under the prerequisite that does not deviate from connotation of the present invention it being done all will consist of infringement of patent right of the present invention, will bear corresponding legal liabilities.

Claims (5)

1. a secondary equipment in power system realistic model construction method is characterized in that comprising the steps:
(1) generates the Training Simulation System flexible bus;
(2) outward appearance of drafting secondary device;
(3) attribute and the function of analysis secondary device;
(4) analyze input data and the output data of secondary device, and from described Training Simulation System flexible bus, order the input data of secondary device, definition output data;
(5) the outward appearance logic node of definition secondary device;
(6) incidence relation between the expansion secondary device realistic model built-in attribute, the internal mechanism of statement model behavior realizes the definition of attribute and function;
(7) the secondary device realistic model that generates in the storage of secondary device model bank.
2. secondary equipment in power system realistic model construction method as claimed in claim 1 is characterized in that:
In the described step (1), further draw the station AC and DC figure of electric system main wiring diagram and factory.
3. secondary equipment in power system realistic model construction method as claimed in claim 1 is characterized in that:
Described secondary device realistic model is made of logic node, and described logic node comprises attribute and the function of the secondary device state that embodies, parameter, definite value, interface and unit connection topological relation.
4. secondary equipment in power system realistic model construction method as claimed in claim 3 is characterized in that:
In the described step (3), analyze attribute and the function of secondary device by described logic node.
5. secondary equipment in power system realistic model construction method as claimed in claim 1 is characterized in that:
Comprise equipment modeling instrument and power network modeling instrument in the described visual modeling tool.
CN201210563811.3A 2011-12-21 2012-12-21 Construction method for secondary equipment simulation model of electric power system Expired - Fee Related CN103353902B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210563811.3A CN103353902B (en) 2011-12-21 2012-12-21 Construction method for secondary equipment simulation model of electric power system

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201110432137.0 2011-12-21
CN2011104321370 2011-12-21
CN201110432137 2011-12-21
CN201210563811.3A CN103353902B (en) 2011-12-21 2012-12-21 Construction method for secondary equipment simulation model of electric power system

Publications (2)

Publication Number Publication Date
CN103353902A true CN103353902A (en) 2013-10-16
CN103353902B CN103353902B (en) 2017-02-22

Family

ID=49310274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210563811.3A Expired - Fee Related CN103353902B (en) 2011-12-21 2012-12-21 Construction method for secondary equipment simulation model of electric power system

Country Status (1)

Country Link
CN (1) CN103353902B (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105160119A (en) * 2015-09-16 2015-12-16 中国电力科学研究院 Policy file based secondary electric power equipment simulation modeling method
CN105243196A (en) * 2015-09-18 2016-01-13 国网安徽省电力公司培训中心 Transformer substation secondary circuit simulation modeling method
CN105762763A (en) * 2014-12-15 2016-07-13 成都交大运达电气有限公司 Railway traction power supply system main transformer differential protection model based on IEC61850 standard
CN106789274A (en) * 2016-12-27 2017-05-31 上海科梁信息工程股份有限公司 Intelligent substation security test system and method
CN107971767A (en) * 2017-12-27 2018-05-01 上海捷谛电力科技有限公司 A kind of numerically-controlled machine tool auxiliary device intelligence control system based on Object-oriented Technique
CN108646587A (en) * 2018-04-18 2018-10-12 许继电气股份有限公司 A kind of EMTDC parallel simulation methods and system
CN109389326A (en) * 2018-11-05 2019-02-26 国网四川省电力公司 Objectification modeling method, equipment and system towards monitor event
CN110705078A (en) * 2019-09-25 2020-01-17 哈尔滨工程大学 Simulation model development system and analysis method of nuclear power device
CN110968546A (en) * 2018-09-30 2020-04-07 北京国双科技有限公司 Method for setting map node skipping probability and related equipment
CN112199806A (en) * 2020-10-09 2021-01-08 中国南方电网有限责任公司 Electric power secondary screen cabinet capability description system
CN114548001A (en) * 2022-02-27 2022-05-27 江苏中屹能源技术有限公司 Method for automatically generating primary wiring diagram based on intelligent power operation and maintenance system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894488A (en) * 2009-07-15 2010-11-24 上海市电力公司超高压输变电公司 Distributed three-dimensional simulation training system for regional power system transformer station
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制系统有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN102209108A (en) * 2011-05-16 2011-10-05 广东电网公司深圳供电局 Method and system for realizing seamless communication between master scheduling station and substation of power grid

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101894488A (en) * 2009-07-15 2010-11-24 上海市电力公司超高压输变电公司 Distributed three-dimensional simulation training system for regional power system transformer station
CN102081867A (en) * 2010-05-24 2011-06-01 北京科东电力控制系统有限责任公司 All-digital high-voltage direct current transmission training stimulation system
CN102209108A (en) * 2011-05-16 2011-10-05 广东电网公司深圳供电局 Method and system for realizing seamless communication between master scheduling station and substation of power grid

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
吴永超: ""基于IEC61850的继电保护通信系统仿真与设计"", 《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》 *
周鑫: ""变电站数字物理混合仿真培训系统的研究与应用"", 《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》 *
王睿: ""IEC 61850在继电保护故障信息系统中的应用研究"", 《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》 *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105762763A (en) * 2014-12-15 2016-07-13 成都交大运达电气有限公司 Railway traction power supply system main transformer differential protection model based on IEC61850 standard
CN105160119B (en) * 2015-09-16 2019-01-11 中国电力科学研究院 A kind of second power equipment emulation modelling method based on strategy file
CN105160119A (en) * 2015-09-16 2015-12-16 中国电力科学研究院 Policy file based secondary electric power equipment simulation modeling method
CN105243196A (en) * 2015-09-18 2016-01-13 国网安徽省电力公司培训中心 Transformer substation secondary circuit simulation modeling method
CN105243196B (en) * 2015-09-18 2018-07-24 国网安徽省电力公司培训中心 Substation secondary circuit emulation modelling method
CN106789274B (en) * 2016-12-27 2020-06-16 上海科梁信息工程股份有限公司 Intelligent substation safety testing system and method
CN106789274A (en) * 2016-12-27 2017-05-31 上海科梁信息工程股份有限公司 Intelligent substation security test system and method
CN107971767A (en) * 2017-12-27 2018-05-01 上海捷谛电力科技有限公司 A kind of numerically-controlled machine tool auxiliary device intelligence control system based on Object-oriented Technique
CN107971767B (en) * 2017-12-27 2023-08-29 圣辉(上海)能源科技有限公司 Intelligent control system of numerical control machine tool auxiliary device based on object-oriented technology
CN108646587A (en) * 2018-04-18 2018-10-12 许继电气股份有限公司 A kind of EMTDC parallel simulation methods and system
CN110968546A (en) * 2018-09-30 2020-04-07 北京国双科技有限公司 Method for setting map node skipping probability and related equipment
CN109389326A (en) * 2018-11-05 2019-02-26 国网四川省电力公司 Objectification modeling method, equipment and system towards monitor event
CN109389326B (en) * 2018-11-05 2021-05-25 国网四川省电力公司 Monitoring event-oriented object modeling method, device and system
CN110705078B (en) * 2019-09-25 2023-04-21 哈尔滨工程大学 Simulation model development system and analysis method of nuclear power plant
CN110705078A (en) * 2019-09-25 2020-01-17 哈尔滨工程大学 Simulation model development system and analysis method of nuclear power device
CN112199806A (en) * 2020-10-09 2021-01-08 中国南方电网有限责任公司 Electric power secondary screen cabinet capability description system
CN112199806B (en) * 2020-10-09 2024-06-25 中国南方电网有限责任公司 Power secondary screen cabinet capacity description system
CN114548001A (en) * 2022-02-27 2022-05-27 江苏中屹能源技术有限公司 Method for automatically generating primary wiring diagram based on intelligent power operation and maintenance system
CN114548001B (en) * 2022-02-27 2024-03-26 江苏中屹能源技术有限公司 Automatic generation primary wiring diagram method based on electric power intelligent operation and maintenance system

Also Published As

Publication number Publication date
CN103353902B (en) 2017-02-22

Similar Documents

Publication Publication Date Title
CN103353902A (en) Construction method for secondary equipment simulation model of electric power system
CN107103113B (en) The Automation Design method, apparatus and optimization method towards neural network processor
CN102054377B (en) Remote simulation training system for electrical tests of transformer
CN101989312B (en) Graphical intelligent transformer substation model design method based on computer-aided design (CAD)
CN102622463B (en) Drawing-model uniformity based method for automatic check of design drawings
CN106775746A (en) A kind of intelligent substation three-dimensional artificial training soft ware system and its platform building method
CN104008223B (en) Graphical expressing method for connection of virtual terminals of secondary system of intelligent substation
CN109191591A (en) Substation Training Simulator construction method based on augmented reality
CN106681726B (en) Python model conversion is the method for Modelica model
CN110502861B (en) Full-digital simulation system based on satellite information flow
CN101609615A (en) A kind of real-time semi-physical simulation system and collecting method thereof
CN104199664B (en) A kind of simulation code synchronization generation method based on annotation
CN106326450B (en) A kind of exchange method for realizing that SCD file is checked out based on data integration
CN109215432A (en) A kind of power plant's operation training system based on VR virtual technology
CN102968519A (en) Model of electronic current transformer with hollow coil in electrical system and modeling method thereof
CN112327745A (en) PLC program design method based on testable digital twin body
CN107657135A (en) A kind of generator of nuclear power station inner stator replacing options and system
Ebeid et al. Model-driven design of network aspects of distributed embedded systems
CN107038297A (en) The Step-varied back propagation integration method of global energy internet operation characteristic emulation
CN108920825A (en) A kind of SoC visual data manager based on IP kernel
CN103164545A (en) Visual editing method of virtual electronic components
CN101609614A (en) A kind of emulation platform of semi-matter simulating system reaches the method for goal systems being carried out online accent ginseng
CN106982140A (en) A kind of information flow emulation mode and system
CN206133209U (en) High -power hybrid simulation system based on RTDS
CN102800115A (en) Model-based animation producing system and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20171221