CN103352701B - Shield propelling constructing method of shield tunneling machine - Google Patents

Shield propelling constructing method of shield tunneling machine Download PDF

Info

Publication number
CN103352701B
CN103352701B CN201310285814.XA CN201310285814A CN103352701B CN 103352701 B CN103352701 B CN 103352701B CN 201310285814 A CN201310285814 A CN 201310285814A CN 103352701 B CN103352701 B CN 103352701B
Authority
CN
China
Prior art keywords
shield
shield machine
pushing device
hydraulic pushing
prefabricated pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310285814.XA
Other languages
Chinese (zh)
Other versions
CN103352701A (en
Inventor
谈海强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU RUICHENG MACHINERY CO Ltd
Original Assignee
JIANGSU RUICHENG MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU RUICHENG MACHINERY CO Ltd filed Critical JIANGSU RUICHENG MACHINERY CO Ltd
Priority to CN201310285814.XA priority Critical patent/CN103352701B/en
Publication of CN103352701A publication Critical patent/CN103352701A/en
Application granted granted Critical
Publication of CN103352701B publication Critical patent/CN103352701B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention relates to a shield propelling constructing method of a shield tunneling machine. The method includes a propelling mode adopted at the early stage of tunneling of the shield tunneling machine and a shield mode adopted at the later stage of the tunneling of the shield tunneling machine. On the basis that the shield propelling constructing method of the shield tunneling machine integrates the advantages of the shield constructing method, the propelling constructing method is integrated, overall constructing cost is greatly reduced, constructing efficiency is improved, constructing time is shortened, and field operation difficulty is reduced.

Description

A kind of shield machine push away shield construction
Technical field
The present invention relates to a kind of construction of tunnel, especially a kind of shield machine push away shield construction.
Background technology
On domestic market, general shield machine construction engineering method generally adopts shield construction, such shield method (Shield Method) is the Fully-mechanized construction method of one in shallow mining method, it is advanced in ground by Shield-type machinery, prevent toward caving in tunnel by shield structure shell and section of jurisdiction supporting surrounding country rock, carry out soil excavation at excavation face front topping machanism simultaneously, transport outside hole by unearthed machinery, by jack in rear pressurization jacking, and assembled precast concrete section of jurisdiction, form a kind of mechanized construction method of tunnel structure, although do environmental protection like this, efficiently, safety, but cost intensive.
Summary of the invention
The technical problem to be solved in the present invention is: propose a kind of a kind of construction shield method and propelling method being combined enforcement.
The technical solution adopted in the present invention is: a kind of shield machine push away shield construction, be included in Promoting Form that preliminary stage that shield machine carries out tunneling adopts and the shield configuration formula that the later stage that shield machine carries out tunneling adopts.
Specifically, the Promoting Form that driving preliminary stage of the present invention adopts comprises the following steps:
1) in the tunnel needing driving, put into shield machine, shield machine is started working, and promotes shield machine shield machine is pushed ahead by hydraulic pushing device;
2), after hydraulic pushing device completes primary propelling action, initial position got back to by catch bar;
3) place prefabricated pipe at the end of shield machine, and pushed ahead by hydraulic pushing device promotion prefabricated pipe, complete after this time advancing action, catch bar gets back to initial position again;
4) the last period prefabricated pipe end place another section of prefabricated pipe, hydraulic pushing device repeat completing steps 3) promotion;
5) the like until N section prefabricated pipe has been placed.
Because the thrust of hydraulic pushing device own is limited, therefore propelling method advance has extreme limit of travel, and the advance distance that driving preliminary stage of the present invention adopts is 750 ~ 1100 meters.
The shield configuration formula that driving later stage of the present invention adopts is similar to the shield method of prior art, comprises the following steps:
1), after N section prefabricated pipe has been placed, front end hydraulic pushing device being mounted to first paragraph prefabricated pipe is used for promoting shield machine and continues to tunnel forward;
2) after shield machine is promoted a segment distance by hydraulic pushing device, steel pipe sheet is transported to this segment distance from the inside of N section prefabricated pipe and carries out assembled by conveying arrangement, becomes first segment steel pipe;
3) hydraulic pushing device is moved on the assembled steel pipe sheet completed of first segment, repeats step 2) pushing action, conveying arrangement continues transport steel pipe sheet, and to carry out the steel pipe of M joint assembled until constructed.
Hydraulic pushing device of the present invention is conventional hydraulic jack; In the described propulsion phase, the reaction of bearing wall of hydraulic pushing device is tunnel wall.
The present invention adopts the combination of two kinds of construction methods, adopts propelling method to advance by carrying out rapidly at preliminary stage; And shield method is adopted again after being advanced to extreme limit of travel.
The invention has the beneficial effects as follows: this construction method is being integrated with on the advantage of shield construction, integrated propelling construction method, greatly reduce the overall overall cost of construction, improve efficiency of construction, reduce engineering time and field operation difficulty.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is the Construction State schematic diagram that preliminary stage of the present invention advances;
Fig. 2 is the Construction State schematic diagram of later stage shield structure of the present invention;
In figure: 1, counter force wall; 2, hydraulic jack; 3, prefabricated pipe; 4, another jack; 5, shield machine; 6, straddle truck.
Detailed description of the invention
The present invention is further detailed explanation with preferred embodiment by reference to the accompanying drawings now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present invention are described in a schematic way, and therefore it only shows the formation relevant with the present invention.
As shown in Figure 1, the preliminary stage tunneled is carried out at shield machine, adopt Promoting Form, the front action edge of shield machine 5 coordinates oil cylinder 2 to realize by prefabricated pipe 3, at shield machine rear, counter force wall 1 is set, hydraulic jack 2 piston rod stretches out pushes ahead shield machine, when after the stroke arriving hydraulic jack 2, hydraulic jack 2 piston rod is retracted, by straddle truck 6, prefabricated ring 3 is installed between shield machine 5 and hydraulic jack 2 and fills up shield machine forward travel distance, hydraulic jack 2 piston rod stretches out promotion shield going-forward again, produces onward impulse, and so forth.When shield machine employing propelling method advances 800 meters (according to the difference of geological conditions, advance distance can change), when rear hydraulic jack 2 power output can not meet shield machine 5 onward impulse, be then converted to shield structure pattern and continue driving;
As shown in Figure 2: after shield machine adopts propelling method to proceed to extreme limit of travel, adopt shield construction, hydraulic jack 4 in shield machine, first prefabricated pipe 3 is promoted shield machine as knee wall to advance.The inner steel-pipe assembly sheet 2 of shield machine simultaneously, hydraulic jack 4 afterwards, continues using steel pipe sheet 2 as knee wall to advance.Propelling adds shield structure one set of construction method and completes.
The just the specific embodiment of the present invention described in above manual, various illustrating is not construed as limiting flesh and blood of the present invention, person of an ordinary skill in the technical field after having read manual can to before described detailed description of the invention make an amendment or be out of shape, and do not deviate from essence of an invention and scope.

Claims (4)

1. shield machine push away a shield construction, it is characterized in that: be included in Promoting Form that preliminary stage that shield machine carries out tunneling adopts and the shield configuration formula that the later stage that shield machine carries out tunneling adopts; The Promoting Form that described driving preliminary stage adopts comprises the following steps:
1) in the tunnel needing driving, put into shield machine, shield machine is started working, and promotes shield machine shield machine is pushed ahead by hydraulic pushing device;
2), after hydraulic pushing device completes primary propelling action, initial position got back to by catch bar;
3) place prefabricated pipe at the end of shield machine, and pushed ahead by hydraulic pushing device promotion prefabricated pipe, complete after this time advancing action, catch bar gets back to initial position again;
4) the last period prefabricated pipe end place another section of prefabricated pipe, hydraulic pushing device repeat completing steps 3) promotion;
5) the like until N section prefabricated pipe has been placed;
The shield configuration formula that described driving later stage adopts comprises the following steps:
A), after N section prefabricated pipe has been placed, front end hydraulic pushing device being mounted to first paragraph prefabricated pipe is used for promoting shield machine and continues to tunnel forward;
B) after shield machine is promoted a segment distance by hydraulic pushing device, steel pipe sheet is transported to this segment distance from the inside of N section prefabricated pipe and carries out assembled by conveying arrangement, becomes first segment steel pipe;
C) hydraulic pushing device is moved on the assembled steel pipe sheet completed of first segment, repeats step b) pushing action, conveying arrangement continues transport steel pipe sheet, and to carry out the steel pipe of M joint assembled until constructed.
2. a kind of shield machine as claimed in claim 1 push away shield construction, it is characterized in that: the advance distance that described driving preliminary stage adopts is 750 ~ 1100 meters.
3. a kind of shield machine as claimed in claim 1 push away shield construction, it is characterized in that: described hydraulic pushing device is hydraulic jack.
4. a kind of shield machine as claimed in claim 1 push away shield construction, it is characterized in that: in described Promoting Form, the reaction of bearing wall of hydraulic pushing device is tunnel wall.
CN201310285814.XA 2013-07-08 2013-07-08 Shield propelling constructing method of shield tunneling machine Active CN103352701B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310285814.XA CN103352701B (en) 2013-07-08 2013-07-08 Shield propelling constructing method of shield tunneling machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310285814.XA CN103352701B (en) 2013-07-08 2013-07-08 Shield propelling constructing method of shield tunneling machine

Publications (2)

Publication Number Publication Date
CN103352701A CN103352701A (en) 2013-10-16
CN103352701B true CN103352701B (en) 2015-02-25

Family

ID=49309106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310285814.XA Active CN103352701B (en) 2013-07-08 2013-07-08 Shield propelling constructing method of shield tunneling machine

Country Status (1)

Country Link
CN (1) CN103352701B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104695970A (en) * 2014-08-04 2015-06-10 江苏锐成机械有限公司 Mud concentration type shield tunneling construction method for shield tunneling machine
CN106869165A (en) * 2017-02-20 2017-06-20 曾庆如 City integrated prefabricated piping lane open cut formula is from construction of prevention work method and self-propelled laydown machine
CN107313781B (en) * 2017-06-23 2023-07-14 山河智能装备股份有限公司 One-step molding tunneling machine and tunneling method for shallow stratum pipe gallery
CN107339504A (en) * 2017-07-12 2017-11-10 郑州市市政工程总公司 Interior spelling formula jacking pipe construction process
CN111173523B (en) * 2020-01-17 2021-06-22 上海力行工程技术发展有限公司 Method for constructing underground box culvert by using open type shield tunneling machine

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3471264B2 (en) * 1999-09-29 2003-12-02 大成建設株式会社 Tunnel construction method and shield machine used for it
CN101294495A (en) * 2008-06-25 2008-10-29 上海隧道工程股份有限公司 Tunnel shield propulsion and inside double-layer road synchronous construction method
CN102359379B (en) * 2011-09-21 2013-10-23 上海隧道工程股份有限公司 Tunnel construction method
CN102767377B (en) * 2012-08-13 2014-08-06 中铁一局集团有限公司 Loess strata subway tunnel earth pressure balance shield construction method

Also Published As

Publication number Publication date
CN103352701A (en) 2013-10-16

Similar Documents

Publication Publication Date Title
CN103352701B (en) Shield propelling constructing method of shield tunneling machine
CN104047623B (en) A kind of big across cavern excavation construction method
CN104033157B (en) For the packaged type counter-force equipment of launching shaft
CN106049532B (en) A kind of pipe gallery open-cut branch blocking means and its construction method
CN104018837B (en) A kind of interval filling gob-side entry retaining method processing planted agent's spoil
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
CN104912101B (en) The driving splicing structure and its construction method of a kind of pipe gallery
CN205578016U (en) Shield constructs quick -witted section of jurisdiction handling system
JP5316894B2 (en) Shield roof construction method
JP2007217911A (en) Construction method of underground cavity and tunnel construction method
CN102587928B (en) Complete equipment for construction of annular cutting arching pre-support tunnel
CN104389618A (en) Method for constructing multiple-arch tunnel hole body large room-free pipe shed support
CN102359379A (en) Annular shield machine and tunnel construction method
CN104196547A (en) Integrated supporting system and tunnel boring machine with same
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN204002832U (en) A kind of shield tunnel portal structure
CN111441786A (en) Be applied to entry driving machine in special-shaped section tunnel
CN103061778A (en) Tunnel arch foot circumferential high pressure jet strengthening method and construction equipment
CN108691553B (en) Rectangular-like pipe jacking machine for construction of connecting channel
CN106369224A (en) Pipe jacking machine tool pipe and application
KR101437443B1 (en) Pressure apparatus for boring tunnel
CN104832202A (en) Hydraulic telescopic movable lining trolley for one-time lining
CN102587923A (en) Center shaft type precutting trough equipment
CN202467847U (en) Center shaft type pre-grooving device
CN201588634U (en) Self-walking tunneller for tunnel pipeline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant