CN103352582A - 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法 - Google Patents

内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法 Download PDF

Info

Publication number
CN103352582A
CN103352582A CN2013102886046A CN201310288604A CN103352582A CN 103352582 A CN103352582 A CN 103352582A CN 2013102886046 A CN2013102886046 A CN 2013102886046A CN 201310288604 A CN201310288604 A CN 201310288604A CN 103352582 A CN103352582 A CN 103352582A
Authority
CN
China
Prior art keywords
prestressed reinforcement
wall
concrete hollow
anchor pole
hollow block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102886046A
Other languages
English (en)
Other versions
CN103352582B (zh
Inventor
董有
鞠树森
赵恩平
谢建明
万兆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaibei Jinhui Lvjian Technology Co.,Ltd.
Original Assignee
BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd filed Critical BEIJING AEIDO INTERNATIONAL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201310288604.6A priority Critical patent/CN103352582B/zh
Publication of CN103352582A publication Critical patent/CN103352582A/zh
Application granted granted Critical
Publication of CN103352582B publication Critical patent/CN103352582B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,属于抗震加固领域,该方法主要是通过在混凝土空心砌块砌体墙中置入预应力钢筋锚杆,并进行压力灌浆,再张拉钢筋进行锚固,形成预应力砂浆锚杆对混凝土空心砌块砌体结构进行抗震加固,其中预应力钢筋锚杆采用竖向均匀布置的形式,利用混凝土空心砌块的竖向通孔布置预应力钢筋锚杆,可以方便施工,省去了钻孔作业。该方法可以改善砌体结构材料的特性,提高砌体结构的抗裂、抗震性能及抗剪承载力,并且可以使既有建筑经过预应力加固及改造后满足后续安全使用要求、抗震要求、节能要求及环保要求。

Description

内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法
技术领域
本发明涉及一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,属于抗震加固领域。
背景技术
采用内部预应力钢筋锚杆进行抗震加固的技术是一种全新的抗震加固思路。传统的采用预应力技术在墙外部进行抗震加固方法对原结构的外观、结构以及施工工艺上都会产生较大影响。该技术是通过在混凝土空心小型砌块砌体墙中置入预应力钢筋锚杆并进行压力灌浆,再张拉钢筋进行锚固,形成预应力砂浆锚杆对混凝土空心小型砌块砌体结构进行抗震加固,为对砌体结构进行抗震加固的方法创造了广阔的应用条件,并展现了实际应用的前景。但是,目前我国还没有相应的标准及应用规范,并且对于合理的计算方法,预应力的张拉、锚固、最佳预应力度以及防止预应力松弛的方法等问题还需要进一步地研究、试验及工程实践,为推广和应用这一技术创造条件。
发明内容
本发明针对上述问题,提出了一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,即采用内部预应力钢筋锚杆对混凝土空心小型砌块砌体结构进行抗震加固的方法,主要是通过在混凝土空心砌块砌体墙中置入预应力钢筋锚杆,并进行压力灌浆,再张拉钢筋进行锚固,形成预应力砂浆锚杆对混凝土空心砌块砌体结构进行抗震加固,其中预应力钢筋锚杆采用竖向均匀布置的形式,利用混凝土空心小型砌块的竖向通孔布置预应力钢筋锚杆,可以方便施工,省去了钻孔作业。
为了实现上述目的,本发明采取了如下技术方案:
一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,包括墙体、预应力钢筋锚杆、基础;所述墙体为混凝土空心砌块砌体结构,所述基础为墙下条形基础,所述预应力钢筋锚杆竖向均匀插设于墙体中;所述预应力钢筋锚杆的上端采用带螺栓锚具锚固,预应力钢筋锚杆的下端锚固在基础中;预应力钢筋锚杆上套设有薄壁钢管或塑料管,薄壁钢管或塑料管与墙体的混凝土空心砌块之间灌注有砂浆,包括如下步骤:
步骤一:根据设计图纸对需采用砂浆锚杆加固的墙体进行放线并沿纵墙方向竖向均匀布置孔洞;
步骤二:在墙下基础外侧开挖明沟,沿孔洞的竖向投影方向下开“L”型洞口;
步骤三:将预应力钢筋锚杆涂油后套上薄壁钢管或塑料管,插入到上述孔洞中,将预应力钢筋锚杆布置在墙体内;
步骤四:调整预应力钢筋锚杆长度,使其下端深入上述“L”型洞口,其锚固长度不小于700mm,并用C30混凝土将上述洞口填实,使预应力钢筋锚杆的下端与基础锚固;
步骤五:采用气动推进注浆机进行压力注浆,将混凝土空心砌块与薄壁钢管或塑料管之间的缝隙用砂浆灌实;
步骤六:待砂浆强度达到设计强度后,用扭矩扳手拧紧预应力钢筋锚杆上端的螺栓来施加预应力张拉,并采用带螺栓锚具锚固。
其中,所述墙体中每隔5~6匹砌块设置水平钢筋网片。
所述水平钢筋网片采用φ6钢筋焊接而成。
所述预应力钢筋锚杆采用φ16~φ18预应力钢筋锚杆。
所述预应力钢筋锚杆的竖向布置间距为400mm~600mm。
所述“L”型洞口的横截面为矩形,其截面尺寸为650mm×450mm。
有益效果:能够有效地改善墙体抗裂、抗剪性能,抑制墙体开裂、抑制裂缝发展,提高砌体结构的抗震性能,特别是对既有砌体建筑抗震加固能有效地提高抗震承载力。
附图说明
图1为混凝土空心砌块砌体结构预应力钢筋锚杆抗震加固布置样图。
图2为图1的A-A剖面图。
图中,1墙体;2预应力钢筋锚杆;3基础;4薄壁钢管或塑料管;5水平钢筋网片;6锚具。
具体实施方式
如图1~图2所示,本发明的具体实施方式如下:
一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,包括墙体1、预应力钢筋锚杆2、基础3;墙体1为混凝土空心砌块砌体结构,基础3为墙下条形基础,预应力钢筋锚杆2竖向均匀插设于墙体1中,预应力钢筋锚杆2采用φ16~φ18预应力钢筋锚杆2,预应力钢筋锚杆2的竖向布置间距为400mm~600mm;预应力钢筋锚杆2的上端采用带螺栓锚具6锚固,预应力钢筋锚杆2的下端锚固在基础3中;预应力钢筋锚杆2上套设有薄壁钢管或塑料管4,薄壁钢管或塑料管4与墙体1的混凝土空心砌块之间灌注有砂浆,包括如下步骤:
步骤一:根据设计图纸对需采用砂浆锚杆加固的墙体1进行放线并沿纵墙方向竖向均匀布置孔洞;
步骤二:在墙下基础3外侧开挖明沟,沿孔洞的竖向投影方向下开“L”型洞口,“L”型洞口的横截面为矩形,其截面尺寸为650mm×450mm;
步骤三:将预应力钢筋锚杆2涂油后套上薄壁钢管或塑料管4,插入到上述孔洞中,将预应力钢筋锚杆2布置在墙体1内;
步骤四:调整预应力钢筋锚杆2长度,使其下端深入上述“L”型洞口,其锚固长度不小于700mm,并用C30混凝土将上述洞口填实,使预应力钢筋锚杆2的下端与基础3锚固;
步骤五:采用气动推进注浆机进行压力注浆,将混凝土空心砌块与薄壁钢管或塑料管4之间的缝隙用砂浆灌实;
步骤六:待砂浆强度达到设计强度后,用扭矩扳手拧紧预应力钢筋锚杆2上端的螺栓来施加预应力张拉,并采用带螺栓锚具6锚固。
其中,所述墙体1中每隔5~6匹砌块设置水平钢筋网片5,水平钢筋网片5采用φ6钢筋焊接而成。
以上是本发明的一典型实施例,本发明的实施不限于此。

Claims (6)

1.一种内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,包括墙体(1)、预应力钢筋锚杆(2)、基础(3);所述墙体(1)为混凝土空心砌块砌体结构,所述基础(3)为墙下条形基础,所述预应力钢筋锚杆(2)竖向均匀插设于墙体(1)中;所述预应力钢筋锚杆(2)的上端采用带螺栓锚具(6)锚固,预应力钢筋锚杆(2)的下端锚固在基础(3)中;预应力钢筋锚杆(2)上套设有薄壁钢管或塑料管(4),薄壁钢管或塑料管(4)与墙体(1)的混凝土空心砌块之间灌注有砂浆,
其特征在于:包括如下步骤:
步骤一:根据设计图纸对需采用砂浆锚杆加固的墙体(1)进行放线并沿纵墙方向竖向均匀布置孔洞;
步骤二:在墙下基础(3)外侧开挖明沟,沿孔洞的竖向投影方向下开“L”型洞口;
步骤三:将预应力钢筋锚杆(2)涂油后套上薄壁钢管或塑料管(4),插入到上述孔洞中,将预应力钢筋锚杆(2)布置在墙体(1)内;
步骤四:调整预应力钢筋锚杆(2)长度,使其下端深入上述“L”型洞口,其锚固长度不小于700mm,并用C30混凝土将上述洞口填实,使预应力钢筋锚杆(2)的下端与基础(3)锚固;
步骤五:采用气动推进注浆机进行压力注浆,将混凝土空心砌块与薄壁钢管或塑料管(4)之间的缝隙用砂浆灌实;
步骤六:待砂浆强度达到设计强度后,用扭矩扳手拧紧预应力钢筋锚杆(2)上端的螺栓来施加预应力张拉,并采用带螺栓锚具(6)锚固。
2.根据权利要求1所述的内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,其特征在于:所述墙体(1)中每隔5~6匹砌块设置水平钢筋网片(5)。
3.根据权利要求2所述的内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,其特征在于:所述水平钢筋网片(5)采用φ6钢筋焊接而成。
4.根据权利要求1所述的内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,其特征在于:所述预应力钢筋锚杆(2)采用φ16~φ18预应力钢筋锚杆(2)。
5.根据权利要求1所述的内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,其特征在于:所述预应力钢筋锚杆(2)的竖向布置间距为400mm~600mm。
6.根据权利要求1所述的内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法,其特征在于:所述“L”型洞口的横截面为矩形,其截面尺寸为650mm×450mm。
CN201310288604.6A 2013-07-09 2013-07-09 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法 Active CN103352582B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310288604.6A CN103352582B (zh) 2013-07-09 2013-07-09 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310288604.6A CN103352582B (zh) 2013-07-09 2013-07-09 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法

Publications (2)

Publication Number Publication Date
CN103352582A true CN103352582A (zh) 2013-10-16
CN103352582B CN103352582B (zh) 2015-10-14

Family

ID=49308990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310288604.6A Active CN103352582B (zh) 2013-07-09 2013-07-09 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法

Country Status (1)

Country Link
CN (1) CN103352582B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108277998A (zh) * 2018-04-04 2018-07-13 四川森宇建筑工程有限公司 一种混凝土加固墙体结构
CN108914779A (zh) * 2018-08-01 2018-11-30 武汉理工大学 预留灌浆孔螺栓锚头连接钢筋的锚固长度确定方法
JP2019019601A (ja) * 2017-07-20 2019-02-07 東日本旅客鉄道株式会社 組積造構造物の補強構造
CN109972852A (zh) * 2019-03-25 2019-07-05 北京筑福国际抗震技术有限责任公司 一种采用竖向通孔置入预应力锚杆压力灌浆加固空心砌块结构及其施工方法
CN111456287A (zh) * 2020-03-23 2020-07-28 湖南省第五工程有限公司 用于构建混凝土墙的加固装置、方法及混凝土墙
CN113338484A (zh) * 2021-05-18 2021-09-03 宝业湖北建工集团有限公司 一种建筑用墙
CN114033213A (zh) * 2021-12-15 2022-02-11 山西五建集团有限公司 瓮城变形墙体加固方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101558207A (zh) * 2006-08-01 2009-10-14 温布利创新有限公司 钢筋砌筑墙板结构
CN101818530A (zh) * 2010-04-07 2010-09-01 湖南大学 可再生砌体墙体系及其施工方法
JP2010281034A (ja) * 2009-06-02 2010-12-16 Takenaka Komuten Co Ltd 組積造壁の補強構造、及び組積造構造物
CN102051929A (zh) * 2009-11-10 2011-05-11 初明进 配置钢骨的砌块砌体墙及制造方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101558207A (zh) * 2006-08-01 2009-10-14 温布利创新有限公司 钢筋砌筑墙板结构
JP2010281034A (ja) * 2009-06-02 2010-12-16 Takenaka Komuten Co Ltd 組積造壁の補強構造、及び組積造構造物
CN102051929A (zh) * 2009-11-10 2011-05-11 初明进 配置钢骨的砌块砌体墙及制造方法
CN101818530A (zh) * 2010-04-07 2010-09-01 湖南大学 可再生砌体墙体系及其施工方法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019019601A (ja) * 2017-07-20 2019-02-07 東日本旅客鉄道株式会社 組積造構造物の補強構造
CN108277998A (zh) * 2018-04-04 2018-07-13 四川森宇建筑工程有限公司 一种混凝土加固墙体结构
CN108914779A (zh) * 2018-08-01 2018-11-30 武汉理工大学 预留灌浆孔螺栓锚头连接钢筋的锚固长度确定方法
CN108914779B (zh) * 2018-08-01 2019-10-25 武汉理工大学 预留灌浆孔螺栓锚头连接钢筋的锚固长度确定方法
CN109972852A (zh) * 2019-03-25 2019-07-05 北京筑福国际抗震技术有限责任公司 一种采用竖向通孔置入预应力锚杆压力灌浆加固空心砌块结构及其施工方法
CN111456287A (zh) * 2020-03-23 2020-07-28 湖南省第五工程有限公司 用于构建混凝土墙的加固装置、方法及混凝土墙
CN113338484A (zh) * 2021-05-18 2021-09-03 宝业湖北建工集团有限公司 一种建筑用墙
CN114033213A (zh) * 2021-12-15 2022-02-11 山西五建集团有限公司 瓮城变形墙体加固方法

Also Published As

Publication number Publication date
CN103352582B (zh) 2015-10-14

Similar Documents

Publication Publication Date Title
CN103352581B (zh) 采用内部预应力钢筋锚杆加固烧结粘土砖砌体结构的方法
CN103352582B (zh) 内部预应力钢筋锚杆加固混凝土空心砌块砌体结构的方法
CN106284655B (zh) 预制混凝土梁柱栓接连接节点及连接方法
CN102493602B (zh) 延阻钢筋局部屈曲延性混凝土柱及其制作方法
CN203394092U (zh) 一种采用内部预应力加固的混凝土空心砌块砌体结构
CN106930436B (zh) 一种内置预应力钢斜撑的钢筋混凝土剪力墙
CN103758362A (zh) 既有砌体建筑后增圈梁、构造柱及钢拉杆的抗震加固方法
Qi et al. Failure characteristics and control technology of surrounding rock in deep coal seam roadway with large dip angle under the influence of weak structural plane
CN110777823A (zh) 一种柔性网面层与刚性梁复合土钉墙支护体系
CN103498574B (zh) 砌筑墙体内后增芯柱抗震加固方法
CN109972852A (zh) 一种采用竖向通孔置入预应力锚杆压力灌浆加固空心砌块结构及其施工方法
CN105201525B (zh) 一种可修复的防治底鼓方法
CN215716274U (zh) 一种采用预应力锚杆压力灌浆加固空心砌块结构
CN203393865U (zh) 一种内部预应力烧结粘土砖砖砌体结构
CN104131535B (zh) 一种高聚物复合加筋土石坝抗震结构及其施工方法
CN112252169B (zh) 一种空腹式箱形-岩锚组合式轻型地锚桥台及其施工工艺
CN113175124A (zh) 一种采用竖向通孔置入竹竿灌浆加固空心砌块结构及施工方法
CN211849498U (zh) 一种柔性网面层与刚性梁复合土钉墙支护体系
CN211868181U (zh) 一种高速公路箱梁预制台座
CN204401627U (zh) 对拉式预应力管桩基坑支护结构
CN114525781A (zh) 预应力杆芯囊袋注浆组合抗浮构件及施工方法
CN209523212U (zh) 装配式独立基础
CN203603519U (zh) 砌筑墙体内后增芯柱抗震加固结构
CN215442538U (zh) 一种采用竖向通孔置入竹竿灌浆加固空心砌块结构
CN205776199U (zh) 新型抗腐蚀抗蠕变的锚杆结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Du Lihong

Inventor before: Dong You

Inventor before: Ju Shusen

Inventor before: Zhao Enping

Inventor before: Xie Jianming

Inventor before: Wan Zhao

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171110

Address after: 102600, room 2, building 2212, center 3, 2 Xinghua street, Daxing District, Beijing

Patentee after: BEIJING YONGBO TECHNOLOGY CO.,LTD.

Address before: 100043, Beijing, Shijingshan District, 166 Fu Shi Road, two floor, Chak Yang Building

Patentee before: BEIJING AEIDO ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180620

Address after: 235000 Huaibei City, Anhui, Renlou mine

Patentee after: HUAIBEI NENGTONG INDUSTRY AND TRADE Co.,Ltd.

Address before: 102600 room 2212, 2 tower, Pope center 3, 2 Xinghua street, Daxing District, Beijing.

Patentee before: BEIJING YONGBO TECHNOLOGY CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210823

Address after: 235025 southwest corner of the intersection of Yunhe road and Gushan Road, Lieshan Economic Development Zone, Huaibei City, Anhui Province

Patentee after: Huaibei Jinhui Lvjian Technology Co.,Ltd.

Address before: 235000 Huaibei City, Anhui, Renlou mine

Patentee before: HUAIBEI NENGTONG INDUSTRY AND TRADE Co.,Ltd.

PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Method of Strengthening Concrete Hollow Block Masonry Structure with Internal Prestressed Steel Anchors

Effective date of registration: 20221207

Granted publication date: 20151014

Pledgee: Huishang Bank Co.,Ltd. Huaibei Lieshan sub branch

Pledgor: Huaibei Jinhui Lvjian Technology Co.,Ltd.

Registration number: Y2022980025420