Assembled construction gateway Download PDFInfo
- Publication number
- CN103352570A CN103352570A CN2013103303586A CN201310330358A CN103352570A CN 103352570 A CN103352570 A CN 103352570A CN 2013103303586 A CN2013103303586 A CN 2013103303586A CN 201310330358 A CN201310330358 A CN 201310330358A CN 103352570 A CN103352570 A CN 103352570A
- Authority
- CN
- China
- Prior art keywords
- gateway
- bar
- construction
- bar column
- assembly type
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention relates to an exit gateway of a construction site, and particularly relates to an assembled construction gateway. The invention provides an assembled construction gateway to solve the problems that the traditional gateway is complicated to manufacture, cannot be repeatedly utilized, and the like. The assembled construction gateway comprises two gateway upright posts, operating derricks, and door heads, wherein the operating derricks are arranged inside the gateway upright posts; the door heads are connected to the top ends of the gateway upright posts; each gateway upright post is a vertical cuboid hollow upright post which is formed by a plurality of steel plates connected with a steel frame in a splicing manner; each door head is a horizontal cuboid hollow upright post which is formed by the plurality of steel plates connected to the steel frame in the splicing manner. The assembled construction gateway has the beneficial effects that the gateway upright posts and the door heads are prefabricated in blocks and produced in a standardizing manner; transportation and storage are facilitated; the targets of rapidly assembling the construction gateway on the spot and repeatedly utilizing after dismantling are achieved; large hoisting equipment and a construction scaffold are not needed in assembly and disassembly of the entire gateway; the engineering cost is saved; and the construction efficiency is improved.
Description
Technical field
The present invention relates to a kind of job site and import and export bar, be specifically related to a kind of assembly type construction bar.
Background technology
The construction bar is a sign of job site, is the Vomitory of on-the-spot people, machine, material, has both showed construction enterprises' image, also the display scene image.The tradition bar has brick, concrete structure or brick, concrete and steel work combination, and not only the construction period is grown but also has high input; Major part becomes building waste after removing, and causes the wasting of resources; And certain potential safety hazard is arranged in the work progress.
Summary of the invention
For solve traditional bar manufacturing complicated, the problem such as can't reuse, the invention provides a kind of assembly type construction bar.
Concrete technical scheme of the present invention is:
A kind of assembly type construction bar, comprise two bar columns, be arranged on the operation derrick in the described bar column and be connected to the door head on described bar column top, the vertical cuboid hollow cylinder that described bar column is spliced to form for the steel plate piece that is connected with steelframe by polylith, the horizontal cuboid hollow cylinder that described door head is spliced to form for the steel plate piece that is connected with steelframe by polylith.
The steel plate piece that the bar column of this programme and door head adopt respectively precast block consists of in the mode of unit spliced, has realized production plant, component standardization and lightweight; Because employing small plate structure, thereby load and unload, transport, store conveniently, on-the-spot spelling is convenient, speed is fast, effect is high, both saves the duration, reduces again cost; The operation derrick not only can be used for the Assembling of bar, and the scene does not need to set up in addition handling frame, thereby construction safety is easy, and after bar installed, the operation derrick in the bar column can be used for firm bar column again;
Further, described bar column is passed at a described door two ends, the top of described bar column is provided with the hoisting frame of the described door head of lifting, and described hoisting frame is provided with the detachable jack machinism of the described door head of lifting, and described door head can move up and down along described bar column.
By this further improvement project, so that flexibly detachable jack machinism is adopted in the lifting of door head, therefore do not need independent hanging device, make the packaging efficiency of bar higher, also saved construction cost simultaneously.
Further, described operation derrick is buckled by two welded steel pipe truss and steel pipe connecting rod employing dish and is spliced to form.
This further improvement project has realized the rapid-assembling of operation derrick, has further improved engineering efficient.
Further, the horizontal match line mutual dislocation between the steel plate piece on the adjacent two sides of described bar column.
This further improvement project has further improved the steadiness of bar column.
Further, described door head is connected and fixed by the tie-beam that is separately positioned on described bar column top and a described door two ends with the bar column.
Further, described jack machinism is bottle gouard moved by hands.
Further, consist of between the steel plate piece of described bar column with bolts.
This further improvement project has further realized Fast Installation and the dismounting of bar column.
Further, with bolts between the steel plate piece of the described door head of formation.
This further improvement project has further realized Fast Installation and the dismounting of door head.
To sum up, the beneficial effect that the present invention has is: bar column and door a precast block, standardized production, convenient transportation and storing, the purpose that has realized the on-the-spot rapid-assembling of construction bar, can reuse after removing; The peace of whole bar is torn open does not need large lifting equipment and construction scaffolding, has saved engineering cost, has improved efficiency of construction.
Description of drawings
Fig. 1 is overall structure schematic diagram before the assembling of the present invention;
Fig. 2 is confined state partial schematic diagram of the present invention;
Fig. 3 is the top view of bar column of the present invention;
Wherein: 1-bar column; 2-door head; The 3-lifting bracket; The 4-jack machinism; 5-operates derrick; The 6-tie-beam.
The specific embodiment
Below in conjunction with accompanying drawing the specific embodiment of the present invention is specifically addressed.
As shown in Figures 1 to 3, a kind of assembly type construction bar, comprise two bar columns 1, be arranged on the operation derrick 5 in the described bar column 1 and be connected to the door 2 on described bar column 1 top, the vertical cuboid hollow cylinder that described bar column 1 is spliced to form for the steel plate piece that is connected with steelframe by polylith, the horizontal cuboid hollow cylinder that described door 2 is spliced to form for the steel plate piece that is connected with steelframe by polylith.Described bar column 1 is passed at described door 2 two ends, the top of described bar column 1 is provided with the hoisting frame 3 of the described door of lifting 2, described hoisting frame 3 is provided with the detachable jack machinism 4 of the described door of lifting 2, and described door 2 can move up and down along described bar column 1.Described operation derrick 5 is buckled by two welded steel pipe truss and steel pipe connecting rod employing dish and is spliced to form.Horizontal match line mutual dislocation between the steel plate piece on the described bar column 1 adjacent two sides.Described door 2 and bar column 1 are connected and fixed by the tie-beam 6 that is separately positioned on described bar column 1 top and described 2 two ends.Described jack machinism 4 is bottle gouard moved by hands.Consist of between the steel plate piece of described bar column 1 with bolts.Consist of between the steel plate piece of described door 2 with bolts.
In the specific implementation, can carry out in accordance with the following steps:
At first be that upright post basic is set, carry out again the interior assembling that operates derrick of bar column after installing the column pedestal, then utilize the operation derrick to carry out an assembling of a column, carry out afterwards an assembly unit on ground, again hoisting frame and bottle gouard moved by hands are installed in bar column top, utilize the good door head of lifting bracket and bottle gouard moved by hands erection ﹠ lift to bar column top and be fixed, remove at last the installation that hoisting frame is finished the construction bar.
Claims (8)
1. assembly type construction bar, it is characterized in that, comprise two bar columns (1), be arranged on the operation derrick (5) in the described bar column (1) and be connected to the door (2) on described bar column (1) top, the vertical cuboid hollow cylinder that described bar column (1) is spliced to form for the steel plate piece that is connected with steelframe by polylith, the horizontal cuboid hollow cylinder that described door head (2) is spliced to form for the steel plate piece that is connected with steelframe by polylith.
2. assembly type according to claim 1 construction bar, it is characterized in that, described bar column (1) is passed at described door head (2) two ends, the top of described bar column (1) is provided with the hoisting frame (3) of the described door head of lifting (2), described hoisting frame (3) is provided with the detachable jack machinism (4) of the described door head of lifting (2), and described door head (2) can move up and down along described bar column (1).
3. assembly type construction bar according to claim 1 and 2 is characterized in that described operation derrick (5) is buckled by two welded steel pipe truss and steel pipe connecting rod employing dish and is spliced to form.
4. assembly type construction bar according to claim 3 is characterized in that the horizontal match line mutual dislocation between the steel plate piece on the adjacent two sides of described bar column (1).
5. assembly type construction bar according to claim 4 is characterized in that, described door head (2) is connected and fixed by the tie-beam (6) that is separately positioned on described bar column (1) top and described door head (2) two ends with bar column (1).
6. assembly type construction bar according to claim 5 is characterized in that described jack machinism (4) is bottle gouard moved by hands.
7. assembly type according to claim 6 construction bar is characterized in that, consists of between the steel plate piece of described bar column (1) with bolts.
8. assembly type according to claim 6 construction bar is characterized in that, consists of between the steel plate piece of described door (2) with bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310330358.6A CN103352570B (en) | 2013-08-01 | 2013-08-01 | Assembled construction gateway |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310330358.6A CN103352570B (en) | 2013-08-01 | 2013-08-01 | Assembled construction gateway |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103352570A true CN103352570A (en) | 2013-10-16 |
CN103352570B CN103352570B (en) | 2015-05-13 |
Family
ID=49308978
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310330358.6A Active CN103352570B (en) | 2013-08-01 | 2013-08-01 | Assembled construction gateway |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103352570B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104209724A (en) * | 2014-09-02 | 2014-12-17 | 中煤第五建设有限公司 | Combined steel frame for assembling headframe |
CN104631845A (en) * | 2015-01-09 | 2015-05-20 | 中国化学工程第三建设有限公司 | Integrated inverted construction device and method for steel structure between multilayer concrete bent frame columns |
CN108035436A (en) * | 2017-12-22 | 2018-05-15 | 武汉建工集团股份有限公司 | A kind of standard knot formula building site bar that can be recycled |
CN108517955A (en) * | 2018-03-21 | 2018-09-11 | 中国华冶科工集团有限公司 | Combined type bar and its installation method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3913098A1 (en) * | 1989-04-21 | 1990-10-25 | Siebau | Prefab. sheet-steel garage - has side- and rear-wall section with mating L- and channel-section edges |
JPH07331774A (en) * | 1994-06-06 | 1995-12-19 | Kyoei Kogyo Kk | Panel for partition |
JPH08232565A (en) * | 1995-02-24 | 1996-09-10 | Matsushita Electric Works Ltd | Arch gate |
CN202560079U (en) * | 2012-04-10 | 2012-11-28 | 陕西华达建筑工程有限公司 | Instrumentalizing work site gate |
CN203430045U (en) * | 2013-08-01 | 2014-02-12 | 湖南省第二工程有限公司 | Assembly construction gate tower |
-
2013
- 2013-08-01 CN CN201310330358.6A patent/CN103352570B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3913098A1 (en) * | 1989-04-21 | 1990-10-25 | Siebau | Prefab. sheet-steel garage - has side- and rear-wall section with mating L- and channel-section edges |
JPH07331774A (en) * | 1994-06-06 | 1995-12-19 | Kyoei Kogyo Kk | Panel for partition |
JPH08232565A (en) * | 1995-02-24 | 1996-09-10 | Matsushita Electric Works Ltd | Arch gate |
CN202560079U (en) * | 2012-04-10 | 2012-11-28 | 陕西华达建筑工程有限公司 | Instrumentalizing work site gate |
CN203430045U (en) * | 2013-08-01 | 2014-02-12 | 湖南省第二工程有限公司 | Assembly construction gate tower |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104209724A (en) * | 2014-09-02 | 2014-12-17 | 中煤第五建设有限公司 | Combined steel frame for assembling headframe |
CN104631845A (en) * | 2015-01-09 | 2015-05-20 | 中国化学工程第三建设有限公司 | Integrated inverted construction device and method for steel structure between multilayer concrete bent frame columns |
CN108035436A (en) * | 2017-12-22 | 2018-05-15 | 武汉建工集团股份有限公司 | A kind of standard knot formula building site bar that can be recycled |
CN108517955A (en) * | 2018-03-21 | 2018-09-11 | 中国华冶科工集团有限公司 | Combined type bar and its installation method |
Also Published As
Publication number | Publication date |
---|---|
CN103352570B (en) | 2015-05-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109184189B (en) | Construction method for conical shell silo top structure of large-diameter silo | |
WO2013185277A1 (en) | Constructing method for concrete cylinder of construction steel bar of high-rise steel structure | |
CN203684658U (en) | Early-dismantled template system of dropping prevention plate | |
CN103628680A (en) | Construction method for large-area steel structure hanging layer | |
CN103352570B (en) | Assembled construction gateway | |
CN211143305U (en) | Steel structure building | |
CN104372947A (en) | Integral mold plate feeding and retreating construction method for elevator shaft | |
CN211257811U (en) | Turnover screw rod for laminated slab cast-in-place slab band | |
CN203994174U (en) | The prefabricated internal mold of a kind of concrete core slab and assembling frame | |
CN103774838A (en) | Assembly type safe operation platform for elevator shaft construction and use method thereof | |
CN205257792U (en) | Bridge crane with triangular support girder | |
CN203430045U (en) | Assembly construction gate tower | |
CN202265836U (en) | Basic structure of communication tower | |
JP2010255374A (en) | Demolition method for skyscraper building | |
CN104164889A (en) | Demountable tower crane foundation | |
CN101457587B (en) | Template mutually lifting climbing apparatus and method | |
CN206769153U (en) | Assemble cast-in-place combined type superposed box mesh-beam floor system attachment structure | |
CN202208696U (en) | Construction platform used for dry quenching furnace | |
CN104372948A (en) | Elevator shaft formwork lifting frame | |
JP5985263B2 (en) | Structure demolition method | |
CN104453217A (en) | Elevator shaft whole formwork lifting construction method | |
CN211257769U (en) | Truss bridging based on attached lifting platform | |
CN104948004B (en) | A kind of site safety manages revolving enclosure wall | |
CN204098493U (en) | The dismantled and assembled input and output material movable platform of a kind of modular for building | |
CN210563531U (en) | Steel structure support for building protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |