CN103352469B - A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large - Google Patents

A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large Download PDF

Info

Publication number
CN103352469B
CN103352469B CN201310284586.4A CN201310284586A CN103352469B CN 103352469 B CN103352469 B CN 103352469B CN 201310284586 A CN201310284586 A CN 201310284586A CN 103352469 B CN103352469 B CN 103352469B
Authority
CN
China
Prior art keywords
vertical
slope
positioning bar
muscle
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310284586.4A
Other languages
Chinese (zh)
Other versions
CN103352469A (en
Inventor
李苏盐
杨建江
王余强
陈响
何宇航
王飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201310284586.4A priority Critical patent/CN103352469B/en
Priority to CN201510162741.4A priority patent/CN104746521B/en
Publication of CN103352469A publication Critical patent/CN103352469A/en
Application granted granted Critical
Publication of CN103352469B publication Critical patent/CN103352469B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines

Abstract

The invention discloses and a kind ofly to break the construction method of cross-section slope cushion layer and structure for super large, first utilize vertical positioning bar, vertical spacing muscle, vertical formwork, horizontal support muscle and horizontal shuttering that slope is divided into some machining areas, then carry out bed course and build.Technical scheme of the present invention breaches slope cushion layer and builds by ramp slope, ramp height and the restriction of building area, controls the construction quality of bed course, adds efficiency of construction, improve economic benefit.

Description

A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large
Technical field
The present invention relates to construction engineering technical field, more particularly, relate to and a kind ofly on super large breaks cross-section slope, carry out construction method that cement mortar bedding cushion builds and structure, belong to the pouring technique for the large-area retaining wall bed course of heavy grade.
Background technology
At present, in the basement construction of common buildings, special in the construction of deep foundation ditch, in order to ensure that the design of deep foundation pit degree of depth meets the demands, usually side slope is adopted multi level slope, but when the restriction of place red line and scene reality does not allow multi level slope, that slope retaining can be done is very steep very high, and the highest meeting reaches more than 10 meters.Because cement mortar is a kind of plastic material, mobility is comparatively large, when carrying out large slope cushion layer and building, cement mortar easily glides, particularly in the construction of comparatively steep higher slope, the thickness of bed course very easily produces the phenomenon of upper-thin-lower-thick, does not meet the construction quality requirement of waterproofing.Therefore, build principle based on what jump storehouse method, pass through technological innovation, propose a kind of easy and extremely easy-operating construction technology, solve by cement isogel material early flow large, difficult problem of evenly building on large slope, its construction quality is easy to control, good in economic efficiency.
Summary of the invention
Technical purpose of the present invention is intended to overcome the deficiencies in the prior art, there is provided a kind of to break the construction method of cross-section slope cushion layer and structure for super large, in the construction of high and steep big cross section slope waterproof bed course, it is unfavorable that the early flow controlling the cementitious material such as cement very well brings, and ensure that the construction quality of cement mortar bedding cushion.
Technical purpose of the present invention is achieved by following technical proposals:
A kind of construction method of cross-section slope cushion layer of breaking for super large, first on construction slope body 1, utilizing horizontal direction to draw draws every structure 6 every structure 5 and vertical direction, be divided into several build unit 4 by domatic for whole construction, wherein draw every structure 6 being evenly provided with vertical direction on Po Ding (or at the bottom of slope) direction, comprise vertical positioning bar 6-1, vertical spacing muscle 6-2, vertical formwork 6-3; Draw every structure 5 being provided with horizontal direction on construction slope body bevel direction, comprise horizontal shuttering 5-1, horizontal support muscle 5-2.
Carry out according to following step
Step (1) is according to the side slope situation of engineering reality, arrange vertical positioning bar, according to from slope, the chamfer length pushed up at the bottom of slope is uniformly distributed the vertical positioning bar of first row, then adopt the interval of each vertical positioning bar in same intervals and the vertical positioning bar of first row according to the length on (or top, slope) at the bottom of slope, body inclined-plane, slope arranges the vertical positioning bar of other all row.
When Specific construction, draw from side slope top along the vertical vertical direction in slope with tape measure bottom side slope, at interval, every 2000mm inserts a positioning bar, is knocked in the soil of slope body with hand hammer, lays out the vertical positioning bar of row; Then use tape measure stretching at slope bottom level, at interval, a positioning bar is inserted in the position of every 2200mm, and mark goes out the horizontal level of the positioning bar of other row, adopts the method same with the vertical positioning bar of first row, lays out other and arrange vertical positioning bar.Described vertical positioning bar selects diameter to be 6mm, and long is 200mm, and be placed in soil 100mm, material is HPB235.
Step (2), after vertical positioning bar has all been arranged, carry out layout vertical spacing muscle, one group of vertical spacing muscle is arranged respectively at 100-150mm place, the left and right sides of the vertical positioning bar often arranged, described vertical spacing muscle pushes up on the chamfer length direction at the bottom of slope on slope and is uniformly distributed, so, form two row vertical spacing muscle in the both sides of the vertical positioning bar of row, each row vertical spacing muscle is made up of on chamfer length direction is pushed up at the bottom of slope on slope some groups of vertical spacing muscle.
In Specific construction, vertical spacing muscle pushes up spacing 1000mm on the chamfer length direction at the bottom of slope on slope, to ensure the anti-side rigidity that vertical formwork is built.Described vertical spacing muscle selects diameter to be 6mm, and long is 400mm, is placed in soil 200mm, material is HPB235.
Step (3), after often row vertical spacing muscle has been arranged, carry out the placement of vertical formwork 6-3, namely the gap between vertical spacing muscle is utilized, vertical formwork card is inserted in vertical spacing muscle, fix and limit the left and right translation of vertical formwork, the distance namely between vertical formwork is the distance about vertical positioning bar between two groups of vertical spacing muscle.
In Specific construction, often the spacing organized between vertical spacing muscle is a bit larger tham template thickness, be decided to be 15mm, described vertical formwork adopts common red template, thick is 10mm, vertical formwork is placed between vertical spacing muscle, constitutes one group of vertical stupefied bar to make two pieces of vertical formworks at interval of 200-300mm.
Step (4), arranges horizontal support muscle 5-2, after vertical formwork installation, between the vertical stupefied bar that vertical formwork is formed, evenly arranges horizontal support muscle 5-2, and the chamfer length direction that slope is pushed up at the bottom of slope evenly arranges several rows horizontal support muscle.
In Specific construction, described horizontal support muscle selects diameter to be 12mm, and long is 400mm, is placed in soil 200mm, material is HPB235.Along short transverse (pushing up the chamfer length direction at the bottom of slope on slope), arrange six row horizontal support muscle, spacing is 1200mm; In the horizontal direction of often going, arrange a horizontal support muscle every 500mm, to guarantee the working load born in casting process.
Step (5), is laid in horizontal shuttering 5-1 on horizontal support muscle 5-2, and adopts tied silk to carry out colligation to fix, and ensures the stability of plank, and using horizontal shuttering as interim operation planar.In Specific construction, described horizontal shuttering adopts common red template, and thick is 10mm, and horizontal shuttering is laid on horizontal support muscle, and adopts tied silk to carry out colligation to fix.
Step (6), after the support of body inclined-plane, the slope pouring structure according to step (1)-(5) all completes, carry out bed course to build, first vertical stupefied bar is slowly built from right to left, ensure that side form pressure is less than the land power of vertical formwork, after material final set to be built, vertical formwork is removed.
Step (7), after vertical formwork is removed, the block placement at other positions of bed course will be carried out, advance left from the most top-right block of first row bed course and build one by one, six blocks in horizontal direction (slope is pushed up or direction at the bottom of slope) are selected to be the section of building, wipe one's face receive after light when every row has built the 6th block, carry out next row from right to left, the construction of arranging same casting direction with upper.
In the inventive solutions, the gradient of described construction slope body is selected on 40 degree, maximumly reaches 50 degree; Its height, according to engineering practice, maximumly reaches 10m.Now, break in slope, and section area is maximum reaches 1500 square metres.When Specific construction, constructor stands on horizontal shuttering, carries out troweling in time receive face to the bed course in vertical stupefied bar.When the bed course in all vertical stupefied bars is built all, as shown in Figure 5.Until after final setting time about 10 hours, carry out the dismounting of vertical formwork from right to left.Build order as shown in Figure 6, note manually wiping one's face in time receipts light after often having built a block, before next row is built, the block of the same position of a upper row has about built 10 hours, and cement final set makes the horizontal shuttering of this position remove.After removing horizontal shuttering, carry out the construction of next row bed course, note manually wiping one's face timely receipts light equally.Building that its method and upper one is arranged is consistent.
Described vertical positioning bar is evenly arranged on body inclined-plane, slope, and the interval, chamfer length direction of pushing up from slope at the bottom of slope is no more than 2000mm, interval 2200mm on slope Po Ding (or at the bottom of slope) direction.Described vertical positioning bar selects diameter to be 6mm, and long is 200mm, and be placed in soil 100mm, material is HPB235.
At 100-150mm place, the left and right sides of described vertical positioning bar difference vertical spacing muscle, described vertical spacing muscle is one group of vertical spacing muscle, described vertical spacing muscle pushes up on the chamfer length direction at the bottom of slope on slope and is uniformly distributed, such as vertical spacing muscle pushes up spacing 1000mm on the chamfer length direction at the bottom of slope on slope, to ensure the anti-side rigidity that vertical formwork is built.Described vertical spacing muscle selects diameter to be 6mm, and long is 400mm, and material is HPB235.
Vertical formwork is set described often group between vertical positioning bar, namely utilizes the gap between vertical spacing muscle, vertical formwork card is inserted in vertical spacing muscle, constitutes one group of vertical stupefied bar to make two pieces of vertical formworks.Described vertical formwork adopts common red template, and thick is 10mm, and often the spacing organized between vertical spacing muscle is a bit larger tham template thickness, is decided to be 15mm.
Horizontal support muscle is evenly set between the vertical stupefied bar that vertical formwork is formed, and several rows horizontal support muscle is evenly set on chamfer length direction is pushed up at the bottom of slope on slope.Described horizontal support muscle selects diameter to be 12mm, and long is 400mm, and material is HPB235.Along short transverse (pushing up the chamfer length direction at the bottom of slope on slope), arrange six row horizontal support muscle, spacing is 1200mm; In the horizontal direction of often going, arrange a horizontal support muscle every 500mm, to guarantee the working load born in casting process.
Horizontal shuttering 5-1 is arranged on horizontal support muscle 5-2, and adopts tied silk to carry out colligation to fix, ensure the stability of plank, and using horizontal shuttering as interim operation planar.Described horizontal shuttering adopts common red template, and thick is 10mm, and horizontal shuttering is laid on horizontal support muscle, and adopts tied silk to carry out colligation to fix.
Compared with prior art, technical scheme of the present invention breaches slope cushion layer and builds by ramp slope, ramp height and the restriction of building area, provide a kind of method can carrying out cushion construction on any slope, control the construction quality of bed course, add efficiency of construction, improve economic benefit.
Accompanying drawing explanation
Fig. 1 is the structural representation of slope body of constructing in the present invention, and wherein 1 is construction slope body, and 2 for pushing up on slope, and 3 is at the bottom of slope, and 4 for building unit, and 5 draw every structure for horizontal direction, and 6 draw every structure for vertical direction.
Fig. 2 constructs in the present invention slope body to be built the structural representation of unit, and wherein 5-1 is horizontal shuttering, and 5-2 is horizontal support muscle, and 6-1 is vertical positioning bar, and 6-2 is vertical spacing muscle, and 6-3 is vertical formwork.
Fig. 3 be in the present invention along perpendicular to line of slope to domatic view (1).
Fig. 4 be in the present invention along perpendicular to line of slope to domatic view (2).
Fig. 5 is bed course block placement sequential schematic (1) in the present invention.
Fig. 6 is bed course block placement sequential schematic (2) in the present invention.
Detailed description of the invention
Technical scheme of the present invention is further illustrated below in conjunction with the drawings and specific embodiments.
As shown in accompanying drawing 1-4, when utilizing technical scheme of the present invention to carry out building of construction slope body, for ensureing that building material does not produce the adverse effect glided by ramp slope and height, needing first on construction slope body 1, to utilize horizontal direction to draw draws every structure 6 every structure 5 and vertical direction, be divided into several build unit 4 by domatic for whole construction, wherein draw every structure 6 being evenly provided with vertical direction on Po Ding (or at the bottom of slope) direction, comprise vertical positioning bar 6-1, vertical spacing muscle 6-2, vertical formwork 6-3; Draw every structure 5 being provided with horizontal direction on construction slope body bevel direction, comprise horizontal shuttering 5-1, horizontal support muscle 5-2.
Described vertical positioning bar is evenly arranged on body inclined-plane, slope, and the interval, chamfer length direction of pushing up from slope at the bottom of slope is no more than 2000mm, interval 2200mm on slope Po Ding (or at the bottom of slope) direction.Described vertical positioning bar selects diameter to be 6mm, and long is 200mm, and be placed in soil 100mm, material is HPB235.
At 100-150mm place, the left and right sides of described vertical positioning bar difference vertical spacing muscle, described vertical spacing muscle is one group of vertical spacing muscle, described vertical spacing muscle pushes up on the chamfer length direction at the bottom of slope on slope and is uniformly distributed, such as vertical spacing muscle pushes up spacing 1000mm on the chamfer length direction at the bottom of slope on slope, to ensure the anti-side rigidity that vertical formwork is built.Described vertical spacing muscle selects diameter to be 6mm, and long is 400mm, and material is HPB235.
Vertical formwork is set described often group between vertical positioning bar, namely utilizes the gap between vertical spacing muscle, vertical formwork card is inserted in vertical spacing muscle, constitutes one group of vertical stupefied bar to make two pieces of vertical formworks.Described vertical formwork adopts common red template, and thick is 10mm, and often the spacing organized between vertical spacing muscle is a bit larger tham template thickness, is decided to be 15mm.
Horizontal support muscle is evenly set between the vertical stupefied bar that vertical formwork is formed, and several rows horizontal support muscle is evenly set on chamfer length direction is pushed up at the bottom of slope on slope.Described horizontal support muscle selects diameter to be 12mm, and long is 400mm, and material is HPB235.Along short transverse (pushing up the chamfer length direction at the bottom of slope on slope), arrange six row horizontal support muscle, spacing is 1200mm; In the horizontal direction of often going, arrange a horizontal support muscle every 500mm, to guarantee the working load born in casting process.
Horizontal shuttering 5-1 is arranged on horizontal support muscle 5-2, and adopts tied silk to carry out colligation to fix, ensure the stability of plank, and using horizontal shuttering as interim operation planar.Described horizontal shuttering adopts common red template, and thick is 10mm, and horizontal shuttering is laid on horizontal support muscle, and adopts tied silk to carry out colligation to fix.
The gradient of described construction slope body is selected on 40 degree, maximumly reaches 50 degree; Its height, according to engineering practice, maximumly reaches 10m.Now, break in slope, and section area is maximum reaches 1500 square metres.The break construction sequence of cross-section slope cushion layer construction method of super large of the present invention is carried out according to following step
Step (1) is according to the side slope situation of engineering reality, arrange vertical positioning bar, according to from slope, the chamfer length pushed up at the bottom of slope is uniformly distributed the vertical positioning bar of first row, then adopt the interval of each vertical positioning bar in same intervals and the vertical positioning bar of first row according to the length on (or top, slope) at the bottom of slope, body inclined-plane, slope arranges the vertical positioning bar of other all row.
When Specific construction, draw from side slope top along the vertical vertical direction in slope with tape measure bottom side slope, at interval, every 2000mm inserts a positioning bar, is knocked in the soil of slope body with hand hammer, lays out the vertical positioning bar of row; Then use tape measure stretching at slope bottom level, at interval, a positioning bar is inserted in the position of every 2200mm, and mark goes out the horizontal level of the positioning bar of other row, adopts the method same with the vertical positioning bar of first row, lays out other and arrange vertical positioning bar.Described vertical positioning bar selects diameter to be 6mm, and long is 200mm, and be placed in soil 100mm, material is HPB235.
Step (2), after vertical positioning bar has all been arranged, carry out layout vertical spacing muscle, one group of vertical spacing muscle is arranged respectively at the 100mm place, the left and right sides of the vertical positioning bar often arranged, described vertical spacing muscle pushes up on the chamfer length direction at the bottom of slope on slope and is uniformly distributed, so, form two row vertical spacing muscle in the both sides of the vertical positioning bar 6-1 of row, each row vertical spacing muscle is made up of on chamfer length direction is pushed up at the bottom of slope on slope some groups of vertical spacing muscle 6-2.
In Specific construction, vertical spacing muscle pushes up spacing 1000mm on the chamfer length direction at the bottom of slope on slope, to ensure the anti-side rigidity that vertical formwork is built.Described vertical spacing muscle selects diameter to be 6mm, and long is 400mm, is placed in soil 200mm, material is HPB235.
Step (3), after often row vertical spacing muscle has been arranged, carry out the placement of vertical formwork 6-3, namely the gap between vertical spacing muscle is utilized, vertical formwork card is inserted in vertical spacing muscle, fix and limit the left and right translation of vertical formwork, the distance namely between vertical formwork is the distance about vertical positioning bar between two groups of vertical spacing muscle.
In Specific construction, often the spacing organized between vertical spacing muscle is a bit larger tham template thickness, is decided to be 15mm, described vertical formwork adopts common red template, thick is 10mm, and vertical formwork is placed between vertical spacing muscle, constitutes one group of vertical stupefied bar to make two pieces of vertical formworks at interval of 200mm.
Step (4), arranges horizontal support muscle 5-2, after vertical formwork installation, between the vertical stupefied bar that vertical formwork is formed, evenly arranges horizontal support muscle 5-2, and the chamfer length direction that slope is pushed up at the bottom of slope evenly arranges several rows horizontal support muscle.
In Specific construction, described horizontal support muscle selects diameter to be 12mm, and long is 400mm, is placed in soil 200mm, material is HPB235.Along short transverse (pushing up the chamfer length direction at the bottom of slope on slope), arrange six row horizontal support muscle, spacing is 1200mm; In the horizontal direction of often going, arrange a horizontal support muscle every 500mm, to guarantee the working load born in casting process.
Step (5), is laid in horizontal shuttering 5-1 on horizontal support muscle 5-2, and adopts tied silk to carry out colligation to fix, and ensures the stability of plank, and using horizontal shuttering as interim operation planar.In Specific construction, described horizontal shuttering adopts common red template, and thick is 10mm, and horizontal shuttering is laid on horizontal support muscle, and adopts tied silk to carry out colligation to fix.
As depicted in figures 5 and 6, after the support of body inclined-plane, the slope pouring structure according to step (1)-(5) all completes, carry out bed course and build, first vertical stupefied bar is slowly built from right to left, ensure that side form pressure is less than the land power of vertical formwork.Constructor stands on horizontal shuttering, carries out troweling in time receive face to the bed course in vertical stupefied bar.When the bed course in all vertical stupefied bars is built all, as shown in Figure 5.Until after final setting time about 10 hours, carry out the dismounting of vertical formwork from right to left.
After vertical formwork is removed, will the block placement at other positions of bed course be carried out, wherein build order as shown in Figure 6.Advance left from the most top-right block of first row bed course and build one by one, after often having built a block, note manually wiping one's face in time receipts light.Select six blocks in horizontal direction (top, slope or slope at the bottom of direction) to be the section of building, wipe one's face receive after light when every row has built the 6th block, carry out next row from right to left, the construction of arranging same casting direction with upper.Before next row is built, the block of the same position of a upper row has about built 10 hours, and cement final set makes the horizontal shuttering of this position remove.After removing horizontal shuttering, carry out the construction of next row bed course, note manually wiping one's face timely receipts light equally.Building that its method and upper one is arranged is consistent.
Above to invention has been exemplary description; should be noted that; when not departing from core of the present invention, any simple distortion, amendment or other those skilled in the art can not spend the equivalent replacement of creative work all to fall into protection scope of the present invention.

Claims (7)

1. the construction method of a cross-section slope cushion layer of breaking for super large, it is characterized in that, first on the body of construction slope, utilizing horizontal direction to draw draws every structure every structure and vertical direction, be divided into several build unit by domatic for whole construction, wherein draw every structure being evenly provided with vertical direction on Po Ding direction, comprise vertical positioning bar, vertical spacing muscle, vertical formwork; Draw every structure being provided with horizontal direction on construction slope body bevel direction, comprise horizontal shuttering, horizontal support muscle, carry out according to following step:
Step (1) is according to the side slope situation of engineering reality, arrange vertical positioning bar, according to from slope, the chamfer length pushed up at the bottom of slope is uniformly distributed the vertical positioning bar of first row, then adopt the interval of each vertical positioning bar in same intervals and the vertical positioning bar of first row according to the length on top, at the bottom of slope or slope, body inclined-plane, slope arranges the vertical positioning bar of other all row;
Step (2), after vertical positioning bar has all been arranged, carry out layout vertical spacing muscle, one group of vertical spacing muscle is arranged respectively at 100-150mm place, the left and right sides of the vertical positioning bar often arranged, described vertical spacing muscle pushes up on the chamfer length direction at the bottom of slope on slope and is uniformly distributed, so, form two row vertical spacing muscle in the both sides of the vertical positioning bar of row, each row vertical spacing muscle is made up of on chamfer length direction is pushed up at the bottom of slope on slope some groups of vertical spacing muscle;
Step (3), after often row vertical spacing muscle has been arranged, carry out the placement of vertical formwork, namely the gap between vertical spacing muscle is utilized, vertical formwork card is inserted in vertical spacing muscle, fix and limit the left and right translation of vertical formwork, the distance namely between vertical formwork is the distance about vertical positioning bar between two groups of vertical spacing muscle;
Step (4), arranges horizontal support muscle, after vertical formwork installation, between the vertical stupefied bar that vertical formwork is formed, evenly arranges horizontal support muscle, and the chamfer length direction that slope is pushed up at the bottom of slope evenly arranges several rows horizontal support muscle;
Step (5), is arranged on horizontal support muscle by horizontal shuttering, ensure the stability of plank, and using horizontal shuttering as interim operation planar;
Step (6), after the support of body inclined-plane, the slope pouring structure according to step (1)-(5) all completes, carry out bed course to build, first vertical stupefied bar is slowly built from right to left, ensure that side form pressure is less than the land power of vertical formwork, after material final set to be built, vertical formwork is removed;
Step (7), after vertical formwork is removed, the block placement at other positions of bed course will be carried out, advance left from the most top-right block of first row bed course and build one by one, six blocks in horizontal direction are selected to be the section of building, wipe one's face receive after light when every row has built the 6th block, carry out next row from right to left, the construction of arranging same casting direction with upper.
2. the construction method of a kind of cross-section slope cushion layer of breaking for super large according to claim 1, it is characterized in that, in described step 1, when Specific construction, draw bottom side slope from side slope top along the vertical vertical direction in slope with tape measure, at interval, every 2000mm inserts a positioning bar, is knocked in the soil of slope body with hand hammer, lays out the vertical positioning bar of row; Then use tape measure stretching at slope bottom level, at interval, a positioning bar is inserted in the position of every 2200mm, and mark goes out the horizontal level of the positioning bar of other row, adopts the method same with the vertical positioning bar of first row, lays out other and arrange vertical positioning bar; Described vertical positioning bar selects diameter to be 6mm, and long is 200mm, and be placed in soil 100mm, material is HPB235.
3. the construction method of a kind of cross-section slope cushion layer of breaking for super large according to claim 1, it is characterized in that, in described step 2, in Specific construction, vertical spacing muscle pushes up spacing 1000mm on the chamfer length direction at the bottom of slope on slope, to ensure the anti-side rigidity that vertical formwork is built; Described vertical spacing muscle selects diameter to be 6mm, and long is 400mm, is placed in soil 200mm, material is HPB235.
4. the construction method of a kind of cross-section slope cushion layer of breaking for super large according to claim 1, it is characterized in that, in described step 3, in Specific construction, often the spacing organized between vertical spacing muscle is a bit larger tham template thickness, is decided to be 15mm, described vertical formwork adopts common red template, thick is 10mm, and vertical formwork is placed between vertical spacing muscle, constitutes one group of vertical stupefied bar to make two pieces of vertical formworks at interval of 200-300mm.
5. the construction method of a kind of cross-section slope cushion layer of breaking for super large according to claim 1, is characterized in that, in described step 4, in Specific construction, described horizontal support muscle selects diameter to be 12mm, and long is 400mm, be placed in soil 200mm, material is HPB235; Arrange six row horizontal support muscle along short transverse, spacing is 1200mm; In the horizontal direction of often going, arrange a horizontal support muscle every 500mm, to guarantee the working load born in casting process.
6. the construction method of a kind of cross-section slope cushion layer of breaking for super large according to claim 1, it is characterized in that, in described step 5, in Specific construction, described horizontal shuttering adopts common red template, thick is 10mm, and horizontal shuttering is laid on horizontal support muscle, and adopts tied silk to carry out colligation to fix.
7. the construction method as claimed in claim 1 application of breaking in cross-section slope cushion layer construction at super large, the gradient of described construction slope body is selected on 40 degree, maximumly reaches 50 degree; Its height, according to engineering practice, maximumly reaches 10m.
CN201310284586.4A 2013-07-08 2013-07-08 A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large Expired - Fee Related CN103352469B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201310284586.4A CN103352469B (en) 2013-07-08 2013-07-08 A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large
CN201510162741.4A CN104746521B (en) 2013-07-08 2013-07-08 The application of oversized cross-section slope cushion layer constructing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310284586.4A CN103352469B (en) 2013-07-08 2013-07-08 A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201510162741.4A Division CN104746521B (en) 2013-07-08 2013-07-08 The application of oversized cross-section slope cushion layer constructing structure

Publications (2)

Publication Number Publication Date
CN103352469A CN103352469A (en) 2013-10-16
CN103352469B true CN103352469B (en) 2015-08-19

Family

ID=49308877

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201510162741.4A Expired - Fee Related CN104746521B (en) 2013-07-08 2013-07-08 The application of oversized cross-section slope cushion layer constructing structure
CN201310284586.4A Expired - Fee Related CN103352469B (en) 2013-07-08 2013-07-08 A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201510162741.4A Expired - Fee Related CN104746521B (en) 2013-07-08 2013-07-08 The application of oversized cross-section slope cushion layer constructing structure

Country Status (1)

Country Link
CN (2) CN104746521B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103741699A (en) * 2013-12-24 2014-04-23 苏州欢颜电气有限公司 Support against soil landslide
CN107391831B (en) * 2017-07-14 2022-10-14 上海嘉实(集团)有限公司 Vertical layout method and system of building blocks, storage medium and terminal
CN108956226B (en) * 2018-06-27 2021-04-06 河海大学 Large-size cement soil test piece forming device and forming method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55132816A (en) * 1979-04-05 1980-10-16 Takaaki Shimauchi Slope protection work and method therefor
JP2006104667A (en) * 2004-09-30 2006-04-20 Yoshinori Ishizuka Structure and construction method of grating crib
CN201362854Y (en) * 2009-03-04 2009-12-16 王建军 Vertical and horizontal grid concrete casting ecological slope protection template
CN101649608A (en) * 2009-09-01 2010-02-17 同济大学 Ecological slope protection structure
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
KR101131242B1 (en) * 2011-10-18 2012-03-29 손재용 A drain apparatus for sloping side of linear structures
CN203346893U (en) * 2013-07-08 2013-12-18 天津大学 Construction structure used for slope cushion layer with extra-large cross section

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101031366B1 (en) * 2010-12-30 2011-04-29 김현래 Construction method of earth retaining structures
CN102900087B (en) * 2011-07-26 2014-12-17 王建军 Slope protection mold for cast-in-place ecological slope protection
CN102787608B (en) * 2012-08-17 2015-04-22 中国土木工程集团有限公司 Gravity type foundation pit supporting system under vacuum effect and construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55132816A (en) * 1979-04-05 1980-10-16 Takaaki Shimauchi Slope protection work and method therefor
JP2006104667A (en) * 2004-09-30 2006-04-20 Yoshinori Ishizuka Structure and construction method of grating crib
CN201362854Y (en) * 2009-03-04 2009-12-16 王建军 Vertical and horizontal grid concrete casting ecological slope protection template
CN101649608A (en) * 2009-09-01 2010-02-17 同济大学 Ecological slope protection structure
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
KR101131242B1 (en) * 2011-10-18 2012-03-29 손재용 A drain apparatus for sloping side of linear structures
CN203346893U (en) * 2013-07-08 2013-12-18 天津大学 Construction structure used for slope cushion layer with extra-large cross section

Also Published As

Publication number Publication date
CN103352469A (en) 2013-10-16
CN104746521A (en) 2015-07-01
CN104746521B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103321421B (en) The one-time formed construction method of a kind of concrete water pool wall
CN203080705U (en) Concrete post-cast strip supporting top
CN110777983A (en) Synchronous construction structure and method for concrete filled wall and cast-in-place structure
CN105178603A (en) EPS polyphenyl dismantling-exempt template concrete building cover plate construction technology method
CN204676609U (en) The reinforced waterproof construction of a kind of basement bottom plate rear pouring tape
CN103790182A (en) Hydraulic engineering vertical water stop structure and manufacturing and construction method thereof
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN103352469B (en) A kind ofly to break the construction method of cross-section slope cushion layer and structure for super large
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN202644976U (en) Slope roof double-side formwork support structure
CN109797969B (en) Construction method of post-cast strip tool type advanced formwork lifting system
CN103061509B (en) Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
CN113898102A (en) Ribbed concrete laminated slab
CN106760173B (en) Prefabricated plate at post-pouring zone of basement outer wall
CN202247938U (en) Wedge-shaped foundation bolt preformed hole core formwork device
CN203346893U (en) Construction structure used for slope cushion layer with extra-large cross section
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN107178391B (en) A kind of construction method and application of armored concrete fire dam
CN203625872U (en) Pile foundation construction platform
CN202882227U (en) Pre-embedded zigzag concrete horse-shaped stool
CN211499326U (en) Synchronous construction structures of concrete infilled wall and cast-in-place structure
CN108316308B (en) Method for dismantling large-section multi-channel temporary middle partition wall
CN204385755U (en) Foundation construction precast concrete form structure
CN206016054U (en) A kind of collar tie beam of aerated blocks or strip and preformed bricks

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20210708