Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention
It is not limited to this.
As it is shown in figure 1, be the technical reformation method flow process in one embodiment of power communication system of the present invention
Schematic diagram, including:
S11, obtain the various factors data of running status of electric power communication device;
The running status of electric power communication device is that equipment runs present situation and the integrated level of O&M level, runs shape
The poor electric power communication device of state there may be the hidden danger causing state to deteriorate, and should monitor its ruuning situation, must
Will time undergo technological transformation;
In the present embodiment, described various factors include risk data, spare unit data, stopping production data,
Historical data;
Described risk data is RA=fR(r1A, r2A..., r9A), wherein, RAWind for electric power communication device A
Danger data, r1For service life, r2For board redundancy, r3For power supply redundancy, r4For running environment,
r5For historical failure, r6For family's defect, r7For webmaster coefficient, r8For alternate routing, r9For portfolio, fRFor in advance
If function;The risk data of equipment can be by the function f that above-mentioned 9 factors are variableRDetermine;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;The spare unit situation of equipment
Can be divided into have spare unit, without two kinds of grades of spare unit, note spare unit situation integrates as S=[s1, s2];
Described stopping production data are electric power communication device stopping production data or are producing data;The stopping production situation of equipment can be divided
For stopping production, producing two kinds of grades, note stopping production situation integrates as M=[m1, m2];
Described historical data is HA=fH(h1A,h2A..., h5A), wherein HAFor going through of electric power communication device A
History data, h1For completion information quality, h2For check and acceptance quality, h3For regular inspection situation, h4Transport for equipment
Row data, h5For producer's service quality, fHFor preset function;The historical data of equipment can by above-mentioned 5 because of
Element is the function f of variableHDetermine.
In the present embodiment, the running status of described electric power communication device is CA=f (RA, SA,MA,HA), its
In, RAFor described risk data, SAFor described spare unit data, MAFor described stopping production data, HAGo through for described
History data, f is preset function, CAValue be 1,2 ..., N}, represent the most equal of equipment running status
Level;
Such as, the running status of electric power communication device A can be divided into normally, note, abnormal, serious four fortune
Row state, can be calculated as C by running status gradeA=1,2,3,4}, and respectively corresponding normal, note, different
Often, serious 4 grades;
Normal condition represents that equipment running status and maintenance levels are excellent, can be properly functioning;
Attention state represents that equipment running status and maintenance levels are good, there is cause state to deteriorate the most hidden
Suffer from, still can continue to run with, operating supervision should be strengthened;
Abnormality represents that equipment running status and maintenance levels are medium, there is cause state to deteriorate the most hidden
Suffer from, operation should be monitored, and arrange technology rectification in good time;
Severe conditions represents that equipment running status and maintenance levels are poor, there is the hidden trouble causing state to deteriorate,
Need to arrange technology to rectify and improve immediately.
S12, combine described influence factor data, obtain the multiple assembled scheme comprising different affecting factors data;
Obtain various described influence factor data, each influence factor data is undergone technological transformation, to electricity
The running status of power communication equipment has different impacts, and improvement expenses is the most different;Therefore difference be can be combined
Described influence factor data, obtain multiple combination scheme, such as only spare unit data undergone technological transformation
Scheme, or to other combinations of scheme that board redundancy, power supply redundancy in risk data undergo technological transformation etc.
Scheme.
S13, the influence factor data comprised in every kind of assembled scheme are updated to the influence factor after technological transformation
Data, obtain improved every kind of assembled scheme;
After obtaining assembled scheme, every kind of assembled scheme comprises the influence factor data of pending technological transformation,
These influence factor data are modified, is updated to the influence factor data after technological transformation, determines every kind
The improvement expenses of assembled scheme.
S14, according to the influence factor data comprised in improved every kind of assembled scheme, utilize the operation preset
State computation function determines the state grade of described electric power communication device after the transformation of influence factor data;
After technological transformation, the running status of electric power communication device is changed, improved every kind of assembled scheme bag
Containing the influence factor data after various renewals, the influence factor data separate in every kind of assembled scheme is preset
Running status calculates function, i.e. can determine that corresponding described electric power communication device after the transformation of influence factor data
State grade.
Such as:
Risk situation R to device AAIn factor riA(i=1,2 ..., 9) technological transformation needed for expense
cRiA(i=1,2 ..., 9), improved factor is riAnew(i=1,2 ..., 9);
To spare unit situation SAExpense needed for transformation is cSA, improved for SAnew;
It is M to stopping production situationAExpense needed for transformation is cMA, improved for MAnew;
To account of the history HAIn factor hiA(i=1,2 ..., 5) transformation needed for expense be chiA, improved it is
hiAnew(i=1,2 ..., 5).
S15, from described improved every kind of assembled scheme, choose the shape of improved described electric power communication device
State grade, more than or equal to the candidate scheme of the state grade preset, determines a kind of combination from described candidate scheme
Described electric power communication device is undergone technological transformation by scheme;
The state value making equipment require to reach after technological transformation is CR, excellent in new state grade the most obtained above
It is candidate scheme in the technical reform scheme corresponding to preset state grade;A side can be chosen from candidate scheme
Electric power communication device is undergone technological transformation by case, then the running status of the electric power communication device after technological transformation is just
Service requirement can be met.
In a preferred embodiment, it may be determined that the improvement expenses of every kind of assembled scheme, in candidate side every kind described
In case, by the risk data before transformation and the difference of improved risk data, obtain divided by described improvement expenses
To the judgment value of candidate scheme every kind described, described power communication is set by the candidate scheme choosing judgment value maximum
For undergoing technological transformation;
Such as:
Assembled scheme 1: after technological transformation, state is attention state, new value-at-risk is RA1, required expense is cA1
Assembled scheme 2: after technological transformation, state is normal condition, new value-at-risk is RA2, required expense is cA2;
If
Then the optimal technical scheme of device A is assembled scheme 1.
The present invention also provides for the technological transformation system of a kind of electric power communication device, as in figure 2 it is shown, include:
Acquisition module 21, for obtaining the various factors data of the running status of electric power communication device;
The running status of electric power communication device is that equipment runs present situation and the integrated level of O&M level, runs shape
The poor electric power communication device of state there may be the hidden danger causing state to deteriorate, and should monitor its ruuning situation, must
Will time undergo technological transformation;
In the present embodiment, described various factors include risk data, spare unit data, stopping production data,
Historical data;
Described risk data is RA=fR(r1A, r2A..., r9A), wherein, RAWind for electric power communication device A
Danger data, r1For service life, r2For board redundancy, r3For power supply redundancy, r4For running environment,
r5For historical failure, r6For family's defect, r7For webmaster coefficient, r8For alternate routing, r9For portfolio, fRFor in advance
If function;The risk data of equipment can be by the function f that above-mentioned 9 factors are variableRDetermine;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;The spare unit situation of equipment
Can be divided into have spare unit, without two kinds of grades of spare unit, note spare unit situation integrates as S=[s1,s2];
Described stopping production data are electric power communication device stopping production data or are producing data;The stopping production situation of equipment can be divided
For stopping production, producing two kinds of grades, note stopping production situation integrates as M=[m1,m2];
Described historical data is HA=fH(h1A,h2A,…,h5A), wherein HAFor going through of electric power communication device A
History data, h1For completion information quality, h2For check and acceptance quality, h3For regular inspection situation, h4Transport for equipment
Row data, h5For producer's service quality, fHFor preset function;The historical data of equipment can by above-mentioned 5 because of
Element is the function f of variableHDetermine.
In the present embodiment, the running status of described electric power communication device A is CA=f (RA,SA,MA,HA),
Wherein, RAFor described risk data, SAFor described spare unit data, MAFor described stopping production data, HAFor described
Historical data, f is preset function, CAValue be 1,2 ..., N}, represent the difference of equipment running status
Grade;
Such as, the running status of electric power communication device can be divided into normally, note, abnormal, serious four operations
State, can be calculated as C by running status gradeA=1,2,3,4}, and respectively corresponding normal, note, abnormal,
Serious 4 grades;
Normal condition represents that equipment running status and maintenance levels are excellent, can be properly functioning;
Attention state represents that equipment running status and maintenance levels are good, there is cause state to deteriorate the most hidden
Suffer from, still can continue to run with, operating supervision should be strengthened;
Abnormality represents that equipment running status and maintenance levels are medium, there is cause state to deteriorate the most hidden
Suffer from, operation should be monitored, and arrange technology rectification in good time;
Severe conditions represents that equipment running status and maintenance levels are poor, there is the hidden trouble causing state to deteriorate,
Need to arrange technology to rectify and improve immediately.
Composite module 22, is used for combining described influence factor data, obtains multiple comprising different affecting factors number
According to assembled scheme;
Obtain various described influence factor data, each influence factor data is undergone technological transformation, to electricity
The running status of power communication equipment has different impacts, and improvement expenses is the most different;Therefore difference be can be combined
Described influence factor data, obtain multiple combination scheme, such as only spare unit data undergone technological transformation
Scheme, or to other combinations of scheme that board redundancy, power supply redundancy in risk data undergo technological transformation etc.
Scheme.
More new module 23, for being updated to technological transformation by the influence factor data comprised in every kind of assembled scheme
After influence factor data, obtain improved every kind of assembled scheme;
After obtaining assembled scheme, every kind of assembled scheme comprises the influence factor data of pending technological transformation,
These influence factor data are modified, is updated to the influence factor data after technological transformation, determines every kind
The improvement expenses of assembled scheme.
Computing module 24, for according to the influence factor data comprised in improved every kind of assembled scheme, profit
Calculate function by default running status and determine the state of described electric power communication device after the transformation of influence factor data
Grade;
After technological transformation, the running status of electric power communication device is changed, improved every kind of assembled scheme bag
Containing the influence factor data after various renewals, the influence factor data separate in every kind of assembled scheme is preset
Running status calculates function, i.e. can determine that corresponding described electric power communication device after the transformation of influence factor data
State grade.
Such as:
Risk situation R to device AAIn factor riA(i=1,2 ..., 9) technological transformation needed for expense
cRiA(i=1,2 ..., 9), improved factor is riAnew(i=1,2 ..., 9);
To spare unit situation SAExpense needed for transformation is cSA, improved for SAnew;
It is M to stopping production situationAExpense needed for transformation is cMA, improved for MAnew;
To account of the history HAIn factor hiA(i=1,2 ..., 5) transformation needed for expense be chiA, improved it is
hiAnew(i=1,2 ..., 5).
Transformation module 25, for choosing improved described electric power from described improved every kind of assembled scheme
The state grade of communication equipment is more than or equal to the candidate scheme of the state grade preset, from described candidate scheme
Determine that described electric power communication device is undergone technological transformation by a kind of assembled scheme.
The state value making equipment require to reach after technological transformation is CR, excellent in new state grade the most obtained above
It is candidate scheme in the technical reform scheme corresponding to preset state grade;A side can be chosen from candidate scheme
Electric power communication device is undergone technological transformation by case, then the running status of the electric power communication device after technological transformation is just
Service requirement can be met.
In a preferred embodiment, described transformation module 25 can be additionally used in the transformation expense determining every kind of assembled scheme
With, in candidate scheme every kind described, by the difference of the risk data before transformation with improved risk data,
Obtain the judgment value of every kind of described candidate scheme divided by described improvement expenses, choose the candidate side that judgment value is maximum
Described electric power communication device is undergone technological transformation by case;
Such as:
Assembled scheme 1: after technological transformation, state is attention state, new value-at-risk is RA1, required expense is cA1
Assembled scheme 2: after technological transformation, state is normal condition, new value-at-risk is RA2, required expense is cA2;
If
Then the optimal technical scheme of device A is assembled scheme 1.
The technical reformation method of electric power communication device of the present invention and system, first obtain the shadow of electric power communication device
Ringing factor data, combination various factors data obtain multiple technologies modification scheme, respectively to every kind of technology
Modification scheme transform after the calculating of running status, according to the change of running status from being better than preset state etc.
The multiple combination scheme of level chooses one of which assembled scheme electric power communication device is undergone technological transformation;This
The various influence factor data to electric power communication device running status are analyzed in invention, from the peace of electric power communication device
Full property is set out and is determined the technology reforming scheme that reliability is the highest.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed,
But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for this area
Those of ordinary skill for, without departing from the inventive concept of the premise, it is also possible to make some deformation and
Improving, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended
Claim is as the criterion.