CN103345714B - The technical reformation method of a kind of electric power communication device and system - Google Patents

The technical reformation method of a kind of electric power communication device and system Download PDF

Info

Publication number
CN103345714B
CN103345714B CN201310268935.3A CN201310268935A CN103345714B CN 103345714 B CN103345714 B CN 103345714B CN 201310268935 A CN201310268935 A CN 201310268935A CN 103345714 B CN103345714 B CN 103345714B
Authority
CN
China
Prior art keywords
data
electric power
communication device
power communication
scheme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310268935.3A
Other languages
Chinese (zh)
Other versions
CN103345714A (en
Inventor
李�杰
梁炯光
萧琨
李卫军
黄达林
钟远强
林志东
张德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong University of Technology
Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology, Electric Power Dispatch Control Center of Guangdong Power Grid Co Ltd filed Critical Guangdong University of Technology
Priority to CN201310268935.3A priority Critical patent/CN103345714B/en
Publication of CN103345714A publication Critical patent/CN103345714A/en
Application granted granted Critical
Publication of CN103345714B publication Critical patent/CN103345714B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cable Transmission Systems, Equalization Of Radio And Reduction Of Echo (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The present invention provides the technical reformation method of a kind of electric power communication device, including: obtain the various factors data of the running status of electric power communication device;Combine described influence factor data and obtain assembled scheme;The influence factor data comprised in every kind of assembled scheme are updated to the influence factor data after technological transformation, obtain improved every kind of assembled scheme;According to the influence factor data comprised in improved every kind of assembled scheme, utilize the running status preset to calculate function and determine the state grade of electric power communication device after the transformation of influence factor data;From improved every kind of assembled scheme, choose the state grade candidate scheme more than or equal to the state grade preset of improved described electric power communication device, from candidate scheme, determine that electric power communication device is undergone technological transformation by a kind of assembled scheme.The present invention also provides for the technological transformation system of a kind of electric power communication device, can determine, from the security of electric power communication device, the technology reforming scheme that reliability is the highest rapidly.

Description

The technical reformation method of a kind of electric power communication device and system
Technical field
The present invention relates to electric power communication device technical field, particularly relate to the technology of a kind of electric power communication device Remodeling method, and the technological transformation system of a kind of electric power communication device.
Background technology
Along with the development of power industry, the process of power informatization is constantly accelerated, power network and Electricity Information Network Between interpenetrative trend more and more obvious.Generating in the high-stability requirement power network of power system, Transmission and disttrbution system has the highest automatization level, needs these systems at a mould efficient, effective Coordinated operation under formula, and the safe operation of power communication system is the most indispensable ring.Power communication Net is through safety management for many years, and situation of safety is steady, and safety index steadily improves.But along with communication network Scale extends rapidly, the corresponding increase of technical complexity, objectively needs management innovation, needs to set up with existing The modern management system adapted for electrical network and communication network thereof.At run duration, due to ageing equipment, ring The reasons such as border deterioration, hidden trouble of equipment make the running status of equipment component undesirable, are unfavorable for the safety of system Run.These equipment are undergone technological transformation be an up equipment state, safeguards system safety and steady run must Want measure.From the angle of O&M, technological transformation need to consider device security, economy and social influence Etc. the risk of aspect, under limited input, use scientific and reasonable technical reform scheme to carry out fortune pointedly Dimension work, thus promote optimizing resource allocation, improve efficiency, reduce cost.Therefore, technical reform scheme is excellent Change and have urgent reality need and practice significance.
At present, scheme mainly according to experience and the subjective understanding of practitioner, is examined by the selection of technical reform scheme Amount major part is to analyze qualitatively, lacks quantitative to the Expected Results of technical reform scheme and the relation of required investment Evaluate.Therefore, the quality of technical reform scheme is heavily dependent on the specialized capability of practitioner, has relatively Big randomness.
Summary of the invention
Based on this, the present invention provides technical reformation method and the system of a kind of electric power communication device, can be rapidly The technology reforming scheme that reliability is the highest is determined from the security of electric power communication device.
The technical reformation method of a kind of electric power communication device, comprises the steps:
Obtain the various factors data of the running status of electric power communication device;
Combine described influence factor data, obtain the multiple assembled scheme comprising different affecting factors data;
The influence factor data comprised in every kind of assembled scheme are updated to the influence factor data after technological transformation, Obtain improved every kind of assembled scheme;
According to the influence factor data comprised in improved every kind of assembled scheme, utilize the running status preset After calculating function determines the transformation of influence factor data, the state grade of described electric power communication device;
The state etc. of improved described electric power communication device is chosen from described improved every kind of assembled scheme Level, more than or equal to the candidate scheme of the state grade preset, determines a kind of assembled scheme from described candidate scheme Described electric power communication device is undergone technological transformation.
A kind of technological transformation system of electric power communication device, including:
Acquisition module, for obtaining the various factors data of the running status of electric power communication device;
Composite module, is used for combining described influence factor data, obtains multiple comprising different affecting factors data Assembled scheme;
More new module, after being updated to technological transformation by the influence factor data comprised in every kind of assembled scheme Influence factor data, obtain improved every kind of assembled scheme;
Computing module, for according to the influence factor data comprised in improved every kind of assembled scheme, utilizes After the running status calculating function preset determines the transformation of influence factor data, the state of described electric power communication device Grade;
Transformation module, leads to for choosing improved described electric power from described improved every kind of assembled scheme The state grade of letter equipment is more than or equal to the candidate scheme of the state grade preset, from described candidate scheme really Described electric power communication device is undergone technological transformation by fixed a kind of assembled scheme.
The technical reformation method of above-mentioned electric power communication device and system, first obtain the impact of electric power communication device Factor data, combination various factors data obtain multiple technologies modification scheme, change every kind of technology respectively The scheme of making transform after the calculating of running status, according to the change of running status from being better than preset state grade Multiple combination scheme in choose one of which assembled scheme electric power communication device undergone technological transformation;This The bright analysis various influence factor data to electric power communication device running status, from the safety of electric power communication device Property is set out and is determined the technology reforming scheme that reliability is the highest.
Accompanying drawing explanation
Fig. 1 is the technical reformation method schematic flow sheet in one embodiment of electric power communication device of the present invention.
Fig. 2 is the technological transformation system structural representation in one embodiment of electric power communication device of the present invention.
Detailed description of the invention
Below in conjunction with embodiment and accompanying drawing, the present invention is described in further detail, but embodiments of the present invention It is not limited to this.
As it is shown in figure 1, be the technical reformation method flow process in one embodiment of power communication system of the present invention Schematic diagram, including:
S11, obtain the various factors data of running status of electric power communication device;
The running status of electric power communication device is that equipment runs present situation and the integrated level of O&M level, runs shape The poor electric power communication device of state there may be the hidden danger causing state to deteriorate, and should monitor its ruuning situation, must Will time undergo technological transformation;
In the present embodiment, described various factors include risk data, spare unit data, stopping production data, Historical data;
Described risk data is RA=fR(r1A, r2A..., r9A), wherein, RAWind for electric power communication device A Danger data, r1For service life, r2For board redundancy, r3For power supply redundancy, r4For running environment, r5For historical failure, r6For family's defect, r7For webmaster coefficient, r8For alternate routing, r9For portfolio, fRFor in advance If function;The risk data of equipment can be by the function f that above-mentioned 9 factors are variableRDetermine;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;The spare unit situation of equipment Can be divided into have spare unit, without two kinds of grades of spare unit, note spare unit situation integrates as S=[s1, s2];
Described stopping production data are electric power communication device stopping production data or are producing data;The stopping production situation of equipment can be divided For stopping production, producing two kinds of grades, note stopping production situation integrates as M=[m1, m2];
Described historical data is HA=fH(h1A,h2A..., h5A), wherein HAFor going through of electric power communication device A History data, h1For completion information quality, h2For check and acceptance quality, h3For regular inspection situation, h4Transport for equipment Row data, h5For producer's service quality, fHFor preset function;The historical data of equipment can by above-mentioned 5 because of Element is the function f of variableHDetermine.
In the present embodiment, the running status of described electric power communication device is CA=f (RA, SA,MA,HA), its In, RAFor described risk data, SAFor described spare unit data, MAFor described stopping production data, HAGo through for described History data, f is preset function, CAValue be 1,2 ..., N}, represent the most equal of equipment running status Level;
Such as, the running status of electric power communication device A can be divided into normally, note, abnormal, serious four fortune Row state, can be calculated as C by running status gradeA=1,2,3,4}, and respectively corresponding normal, note, different Often, serious 4 grades;
Normal condition represents that equipment running status and maintenance levels are excellent, can be properly functioning;
Attention state represents that equipment running status and maintenance levels are good, there is cause state to deteriorate the most hidden Suffer from, still can continue to run with, operating supervision should be strengthened;
Abnormality represents that equipment running status and maintenance levels are medium, there is cause state to deteriorate the most hidden Suffer from, operation should be monitored, and arrange technology rectification in good time;
Severe conditions represents that equipment running status and maintenance levels are poor, there is the hidden trouble causing state to deteriorate, Need to arrange technology to rectify and improve immediately.
S12, combine described influence factor data, obtain the multiple assembled scheme comprising different affecting factors data;
Obtain various described influence factor data, each influence factor data is undergone technological transformation, to electricity The running status of power communication equipment has different impacts, and improvement expenses is the most different;Therefore difference be can be combined Described influence factor data, obtain multiple combination scheme, such as only spare unit data undergone technological transformation Scheme, or to other combinations of scheme that board redundancy, power supply redundancy in risk data undergo technological transformation etc. Scheme.
S13, the influence factor data comprised in every kind of assembled scheme are updated to the influence factor after technological transformation Data, obtain improved every kind of assembled scheme;
After obtaining assembled scheme, every kind of assembled scheme comprises the influence factor data of pending technological transformation, These influence factor data are modified, is updated to the influence factor data after technological transformation, determines every kind The improvement expenses of assembled scheme.
S14, according to the influence factor data comprised in improved every kind of assembled scheme, utilize the operation preset State computation function determines the state grade of described electric power communication device after the transformation of influence factor data;
After technological transformation, the running status of electric power communication device is changed, improved every kind of assembled scheme bag Containing the influence factor data after various renewals, the influence factor data separate in every kind of assembled scheme is preset Running status calculates function, i.e. can determine that corresponding described electric power communication device after the transformation of influence factor data State grade.
Such as:
Risk situation R to device AAIn factor riA(i=1,2 ..., 9) technological transformation needed for expense cRiA(i=1,2 ..., 9), improved factor is riAnew(i=1,2 ..., 9);
To spare unit situation SAExpense needed for transformation is cSA, improved for SAnew;
It is M to stopping production situationAExpense needed for transformation is cMA, improved for MAnew;
To account of the history HAIn factor hiA(i=1,2 ..., 5) transformation needed for expense be chiA, improved it is hiAnew(i=1,2 ..., 5).
S15, from described improved every kind of assembled scheme, choose the shape of improved described electric power communication device State grade, more than or equal to the candidate scheme of the state grade preset, determines a kind of combination from described candidate scheme Described electric power communication device is undergone technological transformation by scheme;
The state value making equipment require to reach after technological transformation is CR, excellent in new state grade the most obtained above It is candidate scheme in the technical reform scheme corresponding to preset state grade;A side can be chosen from candidate scheme Electric power communication device is undergone technological transformation by case, then the running status of the electric power communication device after technological transformation is just Service requirement can be met.
In a preferred embodiment, it may be determined that the improvement expenses of every kind of assembled scheme, in candidate side every kind described In case, by the risk data before transformation and the difference of improved risk data, obtain divided by described improvement expenses To the judgment value of candidate scheme every kind described, described power communication is set by the candidate scheme choosing judgment value maximum For undergoing technological transformation;
Such as:
Assembled scheme 1: after technological transformation, state is attention state, new value-at-risk is RA1, required expense is cA1
Assembled scheme 2: after technological transformation, state is normal condition, new value-at-risk is RA2, required expense is cA2
If R A - R A 1 c A 1 > R A - R A 2 c A 2
Then the optimal technical scheme of device A is assembled scheme 1.
The present invention also provides for the technological transformation system of a kind of electric power communication device, as in figure 2 it is shown, include:
Acquisition module 21, for obtaining the various factors data of the running status of electric power communication device;
The running status of electric power communication device is that equipment runs present situation and the integrated level of O&M level, runs shape The poor electric power communication device of state there may be the hidden danger causing state to deteriorate, and should monitor its ruuning situation, must Will time undergo technological transformation;
In the present embodiment, described various factors include risk data, spare unit data, stopping production data, Historical data;
Described risk data is RA=fR(r1A, r2A..., r9A), wherein, RAWind for electric power communication device A Danger data, r1For service life, r2For board redundancy, r3For power supply redundancy, r4For running environment, r5For historical failure, r6For family's defect, r7For webmaster coefficient, r8For alternate routing, r9For portfolio, fRFor in advance If function;The risk data of equipment can be by the function f that above-mentioned 9 factors are variableRDetermine;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;The spare unit situation of equipment Can be divided into have spare unit, without two kinds of grades of spare unit, note spare unit situation integrates as S=[s1,s2];
Described stopping production data are electric power communication device stopping production data or are producing data;The stopping production situation of equipment can be divided For stopping production, producing two kinds of grades, note stopping production situation integrates as M=[m1,m2];
Described historical data is HA=fH(h1A,h2A,…,h5A), wherein HAFor going through of electric power communication device A History data, h1For completion information quality, h2For check and acceptance quality, h3For regular inspection situation, h4Transport for equipment Row data, h5For producer's service quality, fHFor preset function;The historical data of equipment can by above-mentioned 5 because of Element is the function f of variableHDetermine.
In the present embodiment, the running status of described electric power communication device A is CA=f (RA,SA,MA,HA), Wherein, RAFor described risk data, SAFor described spare unit data, MAFor described stopping production data, HAFor described Historical data, f is preset function, CAValue be 1,2 ..., N}, represent the difference of equipment running status Grade;
Such as, the running status of electric power communication device can be divided into normally, note, abnormal, serious four operations State, can be calculated as C by running status gradeA=1,2,3,4}, and respectively corresponding normal, note, abnormal, Serious 4 grades;
Normal condition represents that equipment running status and maintenance levels are excellent, can be properly functioning;
Attention state represents that equipment running status and maintenance levels are good, there is cause state to deteriorate the most hidden Suffer from, still can continue to run with, operating supervision should be strengthened;
Abnormality represents that equipment running status and maintenance levels are medium, there is cause state to deteriorate the most hidden Suffer from, operation should be monitored, and arrange technology rectification in good time;
Severe conditions represents that equipment running status and maintenance levels are poor, there is the hidden trouble causing state to deteriorate, Need to arrange technology to rectify and improve immediately.
Composite module 22, is used for combining described influence factor data, obtains multiple comprising different affecting factors number According to assembled scheme;
Obtain various described influence factor data, each influence factor data is undergone technological transformation, to electricity The running status of power communication equipment has different impacts, and improvement expenses is the most different;Therefore difference be can be combined Described influence factor data, obtain multiple combination scheme, such as only spare unit data undergone technological transformation Scheme, or to other combinations of scheme that board redundancy, power supply redundancy in risk data undergo technological transformation etc. Scheme.
More new module 23, for being updated to technological transformation by the influence factor data comprised in every kind of assembled scheme After influence factor data, obtain improved every kind of assembled scheme;
After obtaining assembled scheme, every kind of assembled scheme comprises the influence factor data of pending technological transformation, These influence factor data are modified, is updated to the influence factor data after technological transformation, determines every kind The improvement expenses of assembled scheme.
Computing module 24, for according to the influence factor data comprised in improved every kind of assembled scheme, profit Calculate function by default running status and determine the state of described electric power communication device after the transformation of influence factor data Grade;
After technological transformation, the running status of electric power communication device is changed, improved every kind of assembled scheme bag Containing the influence factor data after various renewals, the influence factor data separate in every kind of assembled scheme is preset Running status calculates function, i.e. can determine that corresponding described electric power communication device after the transformation of influence factor data State grade.
Such as:
Risk situation R to device AAIn factor riA(i=1,2 ..., 9) technological transformation needed for expense cRiA(i=1,2 ..., 9), improved factor is riAnew(i=1,2 ..., 9);
To spare unit situation SAExpense needed for transformation is cSA, improved for SAnew;
It is M to stopping production situationAExpense needed for transformation is cMA, improved for MAnew;
To account of the history HAIn factor hiA(i=1,2 ..., 5) transformation needed for expense be chiA, improved it is hiAnew(i=1,2 ..., 5).
Transformation module 25, for choosing improved described electric power from described improved every kind of assembled scheme The state grade of communication equipment is more than or equal to the candidate scheme of the state grade preset, from described candidate scheme Determine that described electric power communication device is undergone technological transformation by a kind of assembled scheme.
The state value making equipment require to reach after technological transformation is CR, excellent in new state grade the most obtained above It is candidate scheme in the technical reform scheme corresponding to preset state grade;A side can be chosen from candidate scheme Electric power communication device is undergone technological transformation by case, then the running status of the electric power communication device after technological transformation is just Service requirement can be met.
In a preferred embodiment, described transformation module 25 can be additionally used in the transformation expense determining every kind of assembled scheme With, in candidate scheme every kind described, by the difference of the risk data before transformation with improved risk data, Obtain the judgment value of every kind of described candidate scheme divided by described improvement expenses, choose the candidate side that judgment value is maximum Described electric power communication device is undergone technological transformation by case;
Such as:
Assembled scheme 1: after technological transformation, state is attention state, new value-at-risk is RA1, required expense is cA1
Assembled scheme 2: after technological transformation, state is normal condition, new value-at-risk is RA2, required expense is cA2
If R A - R A 1 c A 1 > R A - R A 2 c A 2
Then the optimal technical scheme of device A is assembled scheme 1.
The technical reformation method of electric power communication device of the present invention and system, first obtain the shadow of electric power communication device Ringing factor data, combination various factors data obtain multiple technologies modification scheme, respectively to every kind of technology Modification scheme transform after the calculating of running status, according to the change of running status from being better than preset state etc. The multiple combination scheme of level chooses one of which assembled scheme electric power communication device is undergone technological transformation;This The various influence factor data to electric power communication device running status are analyzed in invention, from the peace of electric power communication device Full property is set out and is determined the technology reforming scheme that reliability is the highest.
Embodiment described above only have expressed the several embodiments of the present invention, and it describes more concrete and detailed, But therefore can not be interpreted as the restriction to the scope of the claims of the present invention.It should be pointed out that, for this area Those of ordinary skill for, without departing from the inventive concept of the premise, it is also possible to make some deformation and Improving, these broadly fall into protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be with appended Claim is as the criterion.

Claims (8)

1. the technical reformation method of an electric power communication device, it is characterised in that comprise the steps:
Obtain the various factors data of the running status of electric power communication device;
Combine described influence factor data, obtain the multiple assembled scheme comprising different affecting factors data;
The influence factor data comprised in every kind of assembled scheme are updated to the influence factor data after technological transformation, Obtain improved every kind of assembled scheme;
According to the influence factor data comprised in improved every kind of assembled scheme, utilize the running status preset After calculating function determines the transformation of influence factor data, the state grade of described electric power communication device;
The state etc. of improved described electric power communication device is chosen from described improved every kind of assembled scheme Level, more than or equal to the candidate scheme of the state grade preset, determines a kind of assembled scheme from described candidate scheme Described electric power communication device is undergone technological transformation.
The technical reformation method of electric power communication device the most according to claim 1, it is characterised in that
Described various factors includes risk data, spare unit data, stopping production data, historical data;
Described risk data is RA=fR(r1A,r2A,…,r9A), wherein, RAWind for electric power communication device A Danger data, r1AFor service life, r2AFor board redundancy, r3AFor power supply redundancy, r4AFor running environment, r5AFor historical failure, r6AFor family's defect, r7AFor webmaster coefficient, r8AFor alternate routing, r9AFor portfolio, fRFor preset function;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;
Described stopping production data are electric power communication device stopping production data or are producing data;
Described historical data is HA=fH(h1A,h2A,…,h5A), wherein HAFor going through of electric power communication device A History data, h1AFor completion information quality, h2AFor check and acceptance quality, h3AFor regular inspection situation, h4AFor setting Standby operational data, h5AFor producer's service quality, fHFor preset function.
The technical reformation method of electric power communication device the most according to claim 2, it is characterised in that
The running status of described electric power communication device is CA=f (RA,SA,MA,HA), wherein, RAFor described wind Danger data, SAFor described spare unit data, MAFor described stopping production data, HAFor described historical data, f is pre- If function, CAValue be 1,2 ..., N}.
The technical reformation method of electric power communication device the most according to claim 2, it is characterised in that institute State from described candidate scheme, determine that the step that described electric power communication device is undergone technological transformation by a kind of scheme is:
Determine the improvement expenses of every kind of assembled scheme, in candidate scheme every kind described, by the risk before transformation Data and the difference of improved risk data, obtain every kind of described candidate scheme divided by described improvement expenses Judgment value, described electric power communication device is undergone technological transformation by the candidate scheme choosing judgment value maximum.
5. the technological transformation system of an electric power communication device, it is characterised in that including:
Acquisition module, for obtaining the various factors data of the running status of electric power communication device;
Composite module, is used for combining described influence factor data, obtains multiple comprising different affecting factors data Assembled scheme;
More new module, after being updated to technological transformation by the influence factor data comprised in every kind of assembled scheme Influence factor data, obtain improved every kind of assembled scheme;
Computing module, for according to the influence factor data comprised in improved every kind of assembled scheme, utilizes After the running status calculating function preset determines the transformation of influence factor data, the state of described electric power communication device Grade;
Transformation module, leads to for choosing improved described electric power from described improved every kind of assembled scheme The state grade of letter equipment is more than or equal to the candidate scheme of the state grade preset, from described candidate scheme really Described electric power communication device is undergone technological transformation by fixed a kind of assembled scheme.
The technological transformation system of electric power communication device the most according to claim 5, it is characterised in that
Described various factors includes risk data, spare unit data, stopping production data, historical data;
Described risk data is RA=fR(r1A,r2A,…,r9A), wherein, RAWind for electric power communication device A Danger data, r1AFor service life, r2AFor board redundancy, r3AFor power supply redundancy, r4AFor running environment, r5AFor historical failure, r6AFor family's defect, r7AFor webmaster coefficient, r8AFor alternate routing, r9AFor portfolio, fRFor preset function;
Described spare unit data are that electric power communication device has spare unit data or without spare unit data;
Described stopping production data are electric power communication device stopping production data or are producing data;
Described historical data is HA=fH(h1A,h2A,…,h5A), wherein HAFor going through of electric power communication device A History data, h1AFor completion information quality, h2AFor check and acceptance quality, h3AFor regular inspection situation, h4AFor setting Standby operational data, h5AFor producer's service quality, fHFor preset function.
The technological transformation system of electric power communication device the most according to claim 6, it is characterised in that
The running status of described electric power communication device is CA=f (RA,SA,MA,HA), wherein, RAFor described wind Danger data, SAFor described spare unit data, MAFor described stopping production data, HAFor described historical data, f is pre- If function, CAValue be 1,2 ..., N}.
The technological transformation system of electric power communication device the most according to claim 6, it is characterised in that institute State transformation module and be additionally operable to determine the improvement expenses of every kind of assembled scheme, in candidate scheme every kind described, will Risk data before transformation and the difference of improved risk data, obtain every kind of institute divided by described improvement expenses Stating the judgment value of candidate scheme, the candidate scheme choosing judgment value maximum carries out skill to described electric power communication device Art is transformed.
CN201310268935.3A 2013-06-28 2013-06-28 The technical reformation method of a kind of electric power communication device and system Active CN103345714B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310268935.3A CN103345714B (en) 2013-06-28 2013-06-28 The technical reformation method of a kind of electric power communication device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310268935.3A CN103345714B (en) 2013-06-28 2013-06-28 The technical reformation method of a kind of electric power communication device and system

Publications (2)

Publication Number Publication Date
CN103345714A CN103345714A (en) 2013-10-09
CN103345714B true CN103345714B (en) 2016-08-17

Family

ID=49280507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310268935.3A Active CN103345714B (en) 2013-06-28 2013-06-28 The technical reformation method of a kind of electric power communication device and system

Country Status (1)

Country Link
CN (1) CN103345714B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN102081765A (en) * 2011-01-19 2011-06-01 西安交通大学 Systematic control method for repair based on condition of electricity transmission equipment
CN102509018A (en) * 2011-11-11 2012-06-20 山东电力研究院 System and method for evaluating importance of power system facilities

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050091916A (en) * 2004-03-11 2005-09-16 한국전력공사 Off line state evalution system and method for large scale power system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101859409A (en) * 2010-05-25 2010-10-13 广西电网公司电力科学研究院 Power transmission and transformation equipment state overhauling system based on risk evaluation
CN102081765A (en) * 2011-01-19 2011-06-01 西安交通大学 Systematic control method for repair based on condition of electricity transmission equipment
CN102509018A (en) * 2011-11-11 2012-06-20 山东电力研究院 System and method for evaluating importance of power system facilities

Also Published As

Publication number Publication date
CN103345714A (en) 2013-10-09

Similar Documents

Publication Publication Date Title
CN103646358B (en) Meter and the electrical network scheduled overhaul cycle determination method of power equipment time-varying fault rate
CN102081765A (en) Systematic control method for repair based on condition of electricity transmission equipment
CN102289731B (en) Method for maintaining state of power transmission equipment based on system risk
CN103971294B (en) One kind assesses information display system based on power transmission and transformation equipment state
CN104537487A (en) Assessment method of operating dynamic risk of electric transmission and transformation equipment
CN102663535A (en) Method and device for managing both technical performance and financial information of transformers
CN102354918A (en) Method and device for maintaining power transmission and transformation equipment
CN103400310A (en) Method for evaluating power distribution network electrical equipment state based on historical data trend prediction
CN104730458A (en) Method for monitoring state of generator excitation system
CN106203836A (en) A kind of appraisal procedure of oil refining enterprise equipment dependability performance management
CN103400224B (en) GIS device repair method and GIS device maintenance aid decision-making system
CN104917085A (en) Transformer maintenance decision method for optimizing reliability and economy
KR20140038265A (en) Fault management apparatus and fault management method of the same
CN102663542A (en) Fault mode subduction closure method based on logic decision
CN112633611A (en) Submarine cable state maintenance strategy optimization method and system based on big data analysis
CN104881754A (en) Currency type quantitative risk transformer life-cycle management auxiliary decision system
CN109359742B (en) Method for generating preventive maintenance period of subway subsystem
RU2687848C1 (en) Method and system of vibration monitoring of industrial safety of dynamic equipment of hazardous production facilities
KR20140068521A (en) System and method for equipment stability and engineering process effectiveness assessment
CN103345714B (en) The technical reformation method of a kind of electric power communication device and system
KR101165913B1 (en) A method for the condition assessment based on the risk assessment and the managing system for the hydro power generator
CN103325017B (en) A kind of technical reformation method of power communication system and system
CN115392383A (en) Early warning method and device for electricity utilization abnormity, electronic equipment and storage medium
CN104318328A (en) Maintenance decision optimization method for power grid device
KR20190043792A (en) Restoration system of breakdown in hydroelectric power generation equipment by an application

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510000 No. 75, Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province (office building only)

Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Patentee after: GUANGDONG University OF TECHNOLOGY

Address before: 510699 No. 75 Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province

Patentee before: Electric Power Dispatch Control Center of Guangdong Grid Co.

Patentee before: GUANGDONG University OF TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230907

Address after: 510000 No. 75, Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province (office building only)

Patentee after: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Address before: 510000 No. 75, Meihua Road, Yuexiu District, Guangzhou City, Guangdong Province (office building only)

Patentee before: ELECTRICAL POWER DISPATCHING & CONTROL CENTER OF GUANGDONG POWER GRID Co.,Ltd.

Patentee before: GUANGDONG University OF TECHNOLOGY