CN103345549A - Method for implementing electromagnetic looped network on-line monitoring based on longitudinal OSB technology - Google Patents

Method for implementing electromagnetic looped network on-line monitoring based on longitudinal OSB technology Download PDF

Info

Publication number
CN103345549A
CN103345549A CN2013102613195A CN201310261319A CN103345549A CN 103345549 A CN103345549 A CN 103345549A CN 2013102613195 A CN2013102613195 A CN 2013102613195A CN 201310261319 A CN201310261319 A CN 201310261319A CN 103345549 A CN103345549 A CN 103345549A
Authority
CN
China
Prior art keywords
looped network
semi
electromagnetic looped
summit
ring net
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102613195A
Other languages
Chinese (zh)
Other versions
CN103345549B (en
Inventor
蔡卓琦
党广宇
苏津
陈向晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guigang Power Supply Bureau of Guangxi Power Grid Co Ltd
Original Assignee
Guigang Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guigang Power Supply Bureau of Guangxi Power Grid Co Ltd filed Critical Guigang Power Supply Bureau of Guangxi Power Grid Co Ltd
Priority to CN201310261319.5A priority Critical patent/CN103345549B/en
Publication of CN103345549A publication Critical patent/CN103345549A/en
Application granted granted Critical
Publication of CN103345549B publication Critical patent/CN103345549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Small-Scale Networks (AREA)

Abstract

The invention discloses a method for implementing electromagnetic looped network on-line monitoring based on a longitudinal OSB technology. According to the method for implementing electromagnetic looped network on-line monitoring based on the longitudinal OSB technology, when devices spanned by an electromagnetic looped network exceed a modeling range of a dispatching control center, the electromagnetic looped network can still be identified. Firstly, semi-looped network is searched locally, when the semi-looped network is confirmed, a higher voltage class grid is searched at the two ends of the semi-looped network, the condition that the higher voltage class grid has a path which is communicated with the semi-looped network is confirmed, and therefore the existence of the complete electromagnetic looped network is judged. When the devices spanned by the electromagnetic looped network exceed the modeling range of the dispatching control center, data are interacted through longitudinal OSB interfaces. On one hand, a semi-looped network of a system needs to be sent upwards by a lower class dispatching system, after the upper class dispatching system obtains the semi-looped network, topological search is conducted from nodes of the head end and the tail end of the semi-looped network, and therefore whether the electromagnetic looped network exists or not is confirmed; on the other hand, a combination relation of boundary circuit end points needs to be sent downwards by the upper class dispatching system, boundary circuits are combined by the lower class dispatching system after the combination relation is obtained, and therefore all the electromagnetic looped networks of a management region in each class dispatching system can be identified by the upper class dispatching system and the lower class dispatching system.

Description

A kind of implementation method of the electromagnetic looped network in-service monitoring based on vertical OSB technology
Technical field
The present invention relates to Automation of Electric Systems scheduling field, be specifically related to a kind of implementation method of the electromagnetic looped network in-service monitoring based on vertical OSB technology.
Background technology
Electromagnetic looped network refers to the looped network of the transmission line of electricity formation of two or more different electric pressures.Because different electric pressure equipment contact by transformer, such looped network will inevitably be by the electromagnetic circuit of transformer, so be called " electromagnetic looped network ".
There is adverse influence in electromagnetic looped network to system, comprises following aspect:
1) is unfavorable for the systematic economy operation
2) voltage levels line disconnection, trend is transferred to low-voltage lines, is easy to cause the stability disruption accident, perhaps causes low-voltage lines out-of-limit, threatens security of system stable operation
3) existence of looped network can increase short-circuit current, can cause the out-of-limit problem of rupturing capacity under some situation
4) often need to increase safe stability control device, Bao Hu configuration simultaneously also needs to consider electromagnetic looped network, causes the complicated of protection, increases risk
According to the requirement of " power system safety and stability guide rule ", electric network composition should layering and zoning, should avoid and eliminate electromagnetic looped network.But in fact, in the early stage of development of a voltage levels electrical network, electromagnetic looped network can increase electric network transportation ability, and its existence is inevitable.Power network development need be than growth process simultaneously, and electromagnetic looped network can exist over a period to come.
For electromagnetic looped network, except departments such as Electric Power Network Planning, the method for operation need pay close attention to, dispatching control center also needed to strengthen monitoring.But present power network dispatching system is not outstanding especially for the supervision of electromagnetic looped network, only as the pretreated part of state estimation, lacks detailed displaying and monitoring interface.
China's power scheduling is the classification partition running, the modeling scope difference of the dispatching center of different stage.If the equipment that electromagnetic looped network is crossed over has surpassed the modeling scope of dispatching control center, then can't detect electromagnetic looped network.
Summary of the invention
The objective of the invention is to propose a kind of implementation method of the electromagnetic looped network in-service monitoring based on vertical OSB technology.Can realize that the scheduling of higher level and subordinate cooperatively interacts, interaction data, detect all electromagnetic looped networks in this area.
The technical scheme that the present invention solves the problems of the technologies described above is:
A kind of implementation method of the electromagnetic looped network in-service monitoring based on vertical OSB technology may further comprise the steps:
1. at first carry out the searching of semi-ring net in dispatching center at the corresponding levels; The search of semi-ring net is carried out respectively according to electric pressure, and for the semi-ring net of each electric pressure, its search step is as follows:
(1) this electric pressure electrical network is abstracted into figure, wherein, circuit is abstracted into the limit, the circuit end points is abstracted into the summit of figure, the merging of circuit end points is that following principle is followed on the shared summit of different circuit end points: directly connect between the circuit end points and namely pass through bus connection switch or disconnecting link cross-over connection, then share a summit; If the circuit end points is in same transformer station, and the circuit end points is connected with main transformer mesolow side, if corresponding main transformer voltage levels winding more all no resistances connect, then corresponding circuit end points shares the summit.
(2) the special summit among the affirmation figure.Special summit has following feature: contacting directly with the mesolow side winding of step-down transformer is that no resistance is connected.
(3) special summit is merged into a virtual vertex, forms a new figure, new figure is set analysis, connect branch if exist, then each connects the corresponding loop of branch, if this loop comprises virtual vertex, and the special summit that relates to is not same, judges that then this loop is the semi-ring net.
After confirming the semi-ring net, search a high electric pressure electrical network from semi-ring net two ends, confirm that high one-level electric pressure electrical network exists the path to be communicated with the semi-ring net and can be judged to be complete electromagnetic looped network.
By vertical OSB interactive interfacing data, send on the one hand the semi-ring net of native system on subordinate's dispatching system, higher level's scheduling is obtained the back and is carried out topology search by the first and last end node of semi-ring net and confirm whether electromagnetic looped network exists; The merging relation that needs higher level's dispatching down distributing boundary line terminal point on the other hand, subordinate's scheduling are obtained the back boundary line road are merged.
2. after confirming the semi-ring net, as long as search a high electric pressure electrical network from special summit, confirm that high one-level electric pressure electrical network exists the path to be communicated with the main transformer that special summit connects and can be judged to be complete electromagnetic looped network.
After above-mentioned steps is finished, can search out whole electromagnetic looped networks of this dispatching control center modeling scope, but and do not mean that and search the whole electromagnetic looped networks in this area, must cooperatively interact alternately by two-level scheduler system data up and down, interaction data just can finish; Can adopt classical graph-theoretical algorithm: breadth First or depth-first search algorithm.
3. vertical OSB technology is adopted in data interaction, and the OSB technology is to realize that electrical secondary system is integrated, comprises that horizontal specialty merges the core technology that connects with vertical information, and vertically OSB provides the unified interface standard, realizes that the two-level scheduler system data is mutual up and down.
Vertical OSB technology is adopted in data interaction, and concrete interactive media adopts the XML file, and mutual form is followed following rule:
For electromagnetic looped network the equipment of process, each equipment is formed delegation.The 1st classifies path sequence number as, and the 2nd classifies the cyclization implementor name as, the 3rd row place factory's name of station (circuit is not filled out place factory station name).Its concrete form is as follows:
Path sequence number cyclization implementor name place factory name of station
(1) cyclization of cyclization starting point implementor name plays point device place factory name of station
(2) path is through process equipment place, implementor name path factory name of station
………
N cyclization end device name cyclization end device place factory name of station
For three winding main transformers of electromagnetic looped network process, must clearly mark electromagnetic looped network the winding of process, marked with parenthesis.
4. when the two-stage electric network data is mutual up and down, send the semi-ring net of 110kV electric pressure on subordinate's dispatching system, the semi-ring net first and last end node that send on subordinate's dispatching system is obtained in higher level's scheduling then, confirms by topology search whether electromagnetic looped network exists again; The merging relation of higher level's dispatching down distributing boundary line terminal point, it is as follows to merge rule: if with electric pressure boundary line terminal point the topology contact is arranged outside the zone, then directly merge the summit; If there is the topology contact in the boundary line terminal point of different electric pressures outside the zone, then increase a virtual transformer, boundary line terminal point is placed the different windings of transformer respectively; Subordinate scheduling receive the higher level dispatch receive the merging relational file that the higher level dispatches after, be equivalent to increase a virtual transformer station, all border circuits all are to send from this virtual transformer station, the electromagnetic looped network analytic process of subordinate's scheduling afterwards is constant.
Description of drawings
Fig. 1 is typical electromagnetic looped network synoptic diagram of the present invention.Comprise main transformer, circuit, wherein the dotted line scope is the semi-ring net.
Fig. 2 is a kind of typical 220kV of the present invention transformer station circuit diagram, and wherein the black square represents to close the isolating switch figure of position.Among the figure, white expression isolating switch separately is used for the analysis circuit summit and shares.
Fig. 3 is a 110kV area power grid of the present invention figure.Among the figure, the black square represents to close the isolating switch of position, white expression isolating switch separately.
Fig. 4 is the figure that the present invention takes out.
Fig. 5 is the figure after the present invention merges.
Fig. 6 is OSB bus PUTFILE service message structural drawing of the present invention.
Embodiment
For ease of understanding the present invention, below in conjunction with accompanying drawing the present invention is further described.
The semi-ring net refers to the low cluster tool of electric pressure in the electromagnetic looped network.
A typical electromagnetic looped network as shown in Figure 1, the dotted line scope is the semi-ring net among the figure.
Two main transformers that the semi-ring net connects are followed following condition:
(1) main transformer moves, and is not standby, inspecting state, neither empty charged state;
(2) if two main transformers are at same factory station, then main transformer high-pressure side winding directly can not be no resistance connection (for example connecting by female connection), because the high-pressure side can't form line loop formation electromagnetic looped network in this case
The analysis of semi-ring net topology is that the component voltage grade is carried out respectively, and to one of them electric pressure, concrete steps are as follows:
This electric pressure electrical network is abstracted into figure as shown in Figure 4, and wherein, circuit is abstracted into the limit, and the circuit end points is abstracted into the summit of figure.Following principle is followed in the merging of circuit end points (being that different circuit end points share a summit):
Directly connect between the circuit end points (by bus connection switch or disconnecting link cross-over connection), then share a summit; If the circuit end points is in same transformer station, and the circuit end points is connected with main transformer mesolow side, if corresponding main transformer voltage levels winding more all no resistances connect, then corresponding circuit end points shares the summit.
A kind of typical 220kV transformer station circuit diagram as shown in Figure 2, L1 circuit end points and L2 circuit end points are contacted directly by the 110kV bus, so share a summit; Though L3 circuit end points is not contacted directly with L1 and L2 in the 110kV side, by No. 1 main transformer high-pressure side, contact with No. 2 main transformers by mother's connection in 220kV bus part, contact with L1 and L2 then, L3 circuit end points and L1 and L2 share the summit like this.
Confirm the special summit among the figure.Special summit has following feature: contact directly (no resistance is connected) with the mesolow side winding of step-down transformer.
Special summit is merged into a virtual vertex, forms a new figure.New figure is set analysis.Connect branch if exist, then each connects the corresponding loop of branch.If this loop comprises virtual vertex, and the special summit that relates to is not same, judges that then this loop is the semi-ring net.
A 110kV area power grid figure supposes every bus as shown in Figure 3 in different transformer stations, following surface analysis semi-ring net.
The first step is abstracted into figure, and then abstract result as shown in Figure 4.
In second step, confirm special summit.According to definition, M1, M5, M8 are special summit.
In the 3rd step, special summit is merged into virtual vertex, sets analysis then.Figure after the merging as shown in Figure 5.Among the figure, M1, M5, M8 form a virtual M0, and new figure is set analysis, can obtain a series of branches: L1, L5, L4, L8, L7, also have even branch a: L3.
Each connects the corresponding loop of branch, and then L5, L4, L3, L8 constitute a ring, and this ring is through virtual vertex.And the M5 that is associated with, M8 are not same special summits, are the semi-ring net so judge this ring.
After confirming the semi-ring net, as long as search a high electric pressure electrical network from special summit, confirm that high one-level electric pressure electrical network exists the path to be communicated with the main transformer that special summit connects and can be judged to be complete electromagnetic looped network.
Suppose that Fig. 3 is subordinate scheduling modeling scope, and fail in subordinate's scheduling modeling scope, to search complete electromagnetic looped network that then subordinate's scheduling is mail to the form of higher level's scheduling and is:
Path sequence number The cyclization implementor name Place factory name of station
1 Main transformer T3 So-and-so stands
2 Circuit L5
3 Circuit L4
4 Circuit L3
5 Circuit L8
6 Main transformer T2 So-and-so stands
PUTFILE interface in the mutual OSB of the employing bus is realized.The message structure that its WSDL describes as shown in Figure 6.
After higher level's scheduling is received file by the OSB interface, first and last end equipment is carried out the topology search of path, if form complete path, then path and semi-ring net are merged, namely dispatch side the higher level and realized complete electromagnetic looped network identification.
The above embodiment has only expressed one embodiment of the present invention, and it describes comparatively concrete and detailed, but can not therefore be interpreted as the restriction to claim of the present invention.Should be pointed out that for the person of ordinary skill of the art without departing from the inventive concept of the premise, can also make some distortion and improvement, these all belong to protection scope of the present invention.Therefore, the protection domain of patent of the present invention should be as the criterion with claims.

Claims (1)

1. the implementation method based on the electromagnetic looped network in-service monitoring of vertical OSB technology is characterized in that, may further comprise the steps:
1) at first carries out the searching of semi-ring net in dispatching center at the corresponding levels; The search of semi-ring net is carried out respectively according to electric pressure, and for the semi-ring net of each electric pressure, its search step is as follows:
(1) this electric pressure electrical network is abstracted into figure, wherein, circuit is abstracted into the limit, the circuit end points is abstracted into the summit of figure, the merging of circuit end points is that following principle is followed on the shared summit of different circuit end points: directly connect between the circuit end points and namely pass through bus connection switch or disconnecting link cross-over connection, then share a summit; If the circuit end points is in same transformer station, and the circuit end points is connected with main transformer mesolow side, if corresponding main transformer voltage levels winding more all no resistances connect, then corresponding circuit end points shares the summit;
(2) the special summit among the affirmation figure.Special summit has following feature: contacting directly with the mesolow side winding of step-down transformer is that no resistance is connected;
(3) special summit is merged into a virtual vertex, forms a new figure, new figure is set analysis, connect branch if exist, then each connects the corresponding loop of branch, if this loop comprises virtual vertex, and the special summit that relates to is not same, judges that then this loop is the semi-ring net;
After confirming the semi-ring net, search a high electric pressure electrical network from semi-ring net two ends, confirm that high one-level electric pressure electrical network exists the path to be communicated with the semi-ring net and can be judged to be complete electromagnetic looped network;
By vertical OSB interactive interfacing data, send on the one hand the semi-ring net of native system on subordinate's dispatching system, higher level's scheduling is obtained the back and is carried out topology search by the first and last end node of semi-ring net and confirm whether electromagnetic looped network exists; The merging relation that needs higher level's dispatching down distributing boundary line terminal point on the other hand, subordinate's scheduling are obtained the back boundary line road are merged;
2) confirm the semi-ring net after, as long as search a high electric pressure electrical network from special summit, confirm that high one-level electric pressure electrical network exists the path to be communicated with the main transformer that special summit connects and can be judged to be complete electromagnetic looped network;
After above-mentioned steps is finished, can search out whole electromagnetic looped networks of this dispatching control center modeling scope, but and do not mean that and search the whole electromagnetic looped networks in this area, must cooperatively interact alternately by two-level scheduler system data up and down, interaction data just can finish;
3) vertical OSB technology is adopted in data interaction, and the OSB technology is to realize that electrical secondary system is integrated, comprises that horizontal specialty merges the core technology that connects with vertical information, and vertically OSB provides the unified interface standard, realizes that the two-level scheduler system data is mutual up and down;
Vertical OSB technology is adopted in data interaction, and concrete interactive media adopts the XML file, and mutual form is followed following rule:
For electromagnetic looped network the equipment of process, each equipment is formed delegation.The 1st classifies path sequence number as, and the 2nd classifies the cyclization implementor name as, the 3rd row place factory's name of station (circuit is not filled out place factory station name), and its concrete form is as follows:
Path sequence number cyclization implementor name place factory name of station
(1) cyclization of cyclization starting point implementor name plays point device place factory name of station
(2) path is through process equipment place, implementor name path factory name of station
………
N cyclization end device name cyclization end device place factory name of station
For three winding main transformers of electromagnetic looped network process, must clearly mark electromagnetic looped network the winding of process, marked with parenthesis;
When 4) the two-stage electric network data is mutual up and down, send the semi-ring net of 110kV electric pressure on subordinate's dispatching system, the semi-ring net first and last end node that send on subordinate's dispatching system is obtained in higher level's scheduling then, confirms by topology search whether electromagnetic looped network exists again; The merging relation of higher level's dispatching down distributing boundary line terminal point, it is as follows to merge rule: if with electric pressure boundary line terminal point the topology contact is arranged outside the zone, then directly merge the summit; If there is the topology contact in the boundary line terminal point of different electric pressures outside the zone, then increase a virtual transformer, boundary line terminal point is placed the different windings of transformer respectively; Subordinate scheduling receive the higher level dispatch receive the merging relational file that the higher level dispatches after, be equivalent to increase a virtual transformer station, all border circuits all are to send from this virtual transformer station, the electromagnetic looped network analytic process of subordinate's scheduling afterwards is constant.
CN201310261319.5A 2013-06-27 2013-06-27 A kind of implementation method of the electromagnetic looped network in-service monitoring based on longitudinal OSB technology Active CN103345549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310261319.5A CN103345549B (en) 2013-06-27 2013-06-27 A kind of implementation method of the electromagnetic looped network in-service monitoring based on longitudinal OSB technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310261319.5A CN103345549B (en) 2013-06-27 2013-06-27 A kind of implementation method of the electromagnetic looped network in-service monitoring based on longitudinal OSB technology

Publications (2)

Publication Number Publication Date
CN103345549A true CN103345549A (en) 2013-10-09
CN103345549B CN103345549B (en) 2016-03-02

Family

ID=49280344

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310261319.5A Active CN103345549B (en) 2013-06-27 2013-06-27 A kind of implementation method of the electromagnetic looped network in-service monitoring based on longitudinal OSB technology

Country Status (1)

Country Link
CN (1) CN103345549B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105429139A (en) * 2015-12-15 2016-03-23 国家电网公司 Stability control method suitable for multi-level electromagnetic looped network of intertripping main transformer
CN110929403A (en) * 2019-11-22 2020-03-27 燕山大学 Micro-grid topology planning method based on loop

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1763782A (en) * 2005-09-30 2006-04-26 清华大学 Power system external network equivalent model automatic forming method
US20090063122A1 (en) * 2006-07-19 2009-03-05 Edsa Micro Corporation Real-time stability indexing for intelligent energy monitoring and management of electrical power network system
CN102195354A (en) * 2011-05-16 2011-09-21 中国电力科学研究院 Large-grid wide-area asynchronous coordination control method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1763782A (en) * 2005-09-30 2006-04-26 清华大学 Power system external network equivalent model automatic forming method
US20090063122A1 (en) * 2006-07-19 2009-03-05 Edsa Micro Corporation Real-time stability indexing for intelligent energy monitoring and management of electrical power network system
CN102195354A (en) * 2011-05-16 2011-09-21 中国电力科学研究院 Large-grid wide-area asynchronous coordination control method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105429139A (en) * 2015-12-15 2016-03-23 国家电网公司 Stability control method suitable for multi-level electromagnetic looped network of intertripping main transformer
CN105429139B (en) * 2015-12-15 2017-12-15 国家电网公司 A kind of connection suitable for multistage electromagnetic looped network cuts the stable control method of main transformer
CN110929403A (en) * 2019-11-22 2020-03-27 燕山大学 Micro-grid topology planning method based on loop
CN110929403B (en) * 2019-11-22 2022-10-28 燕山大学 Micro-grid topology planning method based on loop

Also Published As

Publication number Publication date
CN103345549B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
Santacana et al. Getting smart
CN109494715B (en) Dynamic identification system and method for low-voltage distribution station area electric network topology
CN102904645B (en) Distribution Network Communication networking structure based on EPON demixing technology
CN101431254B (en) Intelligent apparatus GOOSE virtual terminal collocation method for digitized transforming plant
CN107730093A (en) A kind of System and method in power grid accident telegram in reply path
CN103855713A (en) Power distribution net rack wiring structure
CN102570602A (en) Fault comprehensive processing platform and method of distribution network
CN103020713A (en) Intelligent substation fault diagnosis method combining topology and relay protection logic
CN102495850A (en) Method for splicing multi-stage multi-region interconnected power grid relay protection model
CN107846015B (en) Intelligent power distribution network load transfer optimal path selection method based on peer-to-peer communication
CN106026088B (en) Distribution network automated strategy based on the transfer of load layering and zoning
CN103903192B (en) A kind of method for building up in power distribution network powering mode storehouse
CN105678651A (en) Power grid big data quality standardization-based power grid information management system and method
CN112910091A (en) Method for identifying topology of low-voltage distribution station area
CN103730894B (en) EMS image checking mehtod and device
CN105974267A (en) IEC 61850-based low current ground fault positioning system and method
CN103427484B (en) A kind of centralized area power grid prepared auto restart control method
CN104701991B (en) The repair method of relay protection device of intelligent substation
CN202712975U (en) Distribution automation system
CN112907051B (en) Intelligent maintenance plan generation method based on allocation cooperation
CN104361531B (en) The recognition methods of the excessive risk faulty equipment of electric substation automation system and system
CN102497017A (en) Power grid failure information comprehensive collection platform and collection method
CN110120664A (en) A kind of reliable urban power distribution network grid structure of intelligence
CN104332993B (en) A kind of intelligent distribution type feeder automation load transfer method
CN201937332U (en) Intelligent-substation communication-network framework based on distributed passive optical-network technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant