CN103335520A - 一种集中控制的快速降温固化炉装置 - Google Patents

一种集中控制的快速降温固化炉装置 Download PDF

Info

Publication number
CN103335520A
CN103335520A CN2013102643650A CN201310264365A CN103335520A CN 103335520 A CN103335520 A CN 103335520A CN 2013102643650 A CN2013102643650 A CN 2013102643650A CN 201310264365 A CN201310264365 A CN 201310264365A CN 103335520 A CN103335520 A CN 103335520A
Authority
CN
China
Prior art keywords
cooling
curing
control device
thermocirculator
electrically connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102643650A
Other languages
English (en)
Other versions
CN103335520B (zh
Inventor
栾铸德
曹克涛
张广聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HADA ELECTRIC CO Ltd
Original Assignee
SHANDONG HADA ELECTRIC CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HADA ELECTRIC CO Ltd filed Critical SHANDONG HADA ELECTRIC CO Ltd
Priority to CN201310264365.0A priority Critical patent/CN103335520B/zh
Publication of CN103335520A publication Critical patent/CN103335520A/zh
Application granted granted Critical
Publication of CN103335520B publication Critical patent/CN103335520B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及固化炉装置,尤其涉及一种集中控制的快速降温固化炉装置,包括控制装置和固化炉,所述控制装置连接一台或一台以上固化炉,所述固化炉包括固化室、装载台、快速降温装置和热循环装置,所述装载台安装在所述固化室内,所述快速降温装置和所述热循环装置安装在所述固化室外部,并与所述固化室相连通,所述控制装置与快速降温装置和热循环装置电气连接。本发明的有益效果是:本发明是一种全新的具有强制风冷系统、可集中控制、状态查询功能的集中控制的快速降温固化炉装置,可实时远程集中操控。并且在升温固化结束后,可根据材料特性及工艺要求强制降温,节约了固化时间,同时该设备结构简单、成本低廉、使用方便。

Description

一种集中控制的快速降温固化炉装置
技术领域
本发明涉及固化炉装置,尤其设计一种集中控制的快速降温固化炉装置。
背景技术
固化炉是电力电子行业中零部件加热、树脂固化、产品烘干生产工艺中用于加热、固化的容器。树脂固化炉是对树脂进行固化、固溶处理,将温度按照一定升温曲线升高,并保持恒定,使树脂材料固化,增强材料应力的一种设备。
现有的技术中,该设备包括固化室、加热装置、风机、设备装载台等部件。其中装载台位于固化室内部,将待固化品放置到装载台上,通过风机将加热装置的热量传递到固化室内部,使环氧树脂固化。而目前,该设备冷却只能依靠自然冷却,冷却时间较长。并且每台固化炉须单独操控、设定。
发明内容
本发明是为了克服现有的固化设备冷却时间长、多台设备操控繁琐、不能远程查看运行状态等缺点,提供了一种全新的具有强制风冷系统、可集中控制、状态查询功能的一种集中控制的快速降温固化炉装置。
本发明解决上述技术问题的技术方案如下:一种集中控制的快速降温固化炉装置,包括控制装置和固化炉,所述控制装置连接一台或一台以上固化炉,所述固化炉包括固化室、装载台、快速降温装置和热循环装置,所述装载台安装在所述固化室内,所述快速降温装置和所述热循环装置安装在所述固化室外部,并与所述固化室相连通,所述控制装置与快速降温装置和热循环装置电气连接,所述控制装置控制所述快速降温装置降温,所述控制装置控制所述的热循环装置加热。
在上述技术方案的基础上,本发明还可以做如下改进。
进一步,所述热循环装置包括热循环管道、热循环风机和加热器,所述热循环风机和所述加热器安装在所述热循环管道内,所述固化室上设有热风循环入口和热风循环出口,所述热循环管道的两端分别连接热风循环入口和热风循环出口,所述热循环风机与控制装置电气连接,所述控制装置控制热循环风机的开启、关闭,所述加热器与所述控制装置电气连接,所述控制装置控制所述加热器加热。
进一步,所述快速降温装置包括第一降温管道、第二降温管道、冷却风机和风阀执行器,所述冷却风机安装在第一降温管道的一端,所述第一降温管道未安装冷却风机的一端连接风阀执行器,所述固化室上设有强制冷风入口,所述第二降温管道的两端分别连接风阀执行器和强制冷风入口,所述冷却风机与控制装置电气连接,所述风阀执行器与控制装置电气连接。
进一步,所述固化室内安装有温度传感器,所述温度传感器与控制装置电气连接。
本发明的有益效果是:本发明是一种全新的具有强制风冷系统、可集中控制、状态查询功能的集中控制的快速降温固化炉装置,可实时远程集中操控,查询运行状态。并且在升温固化结束后,可根据材料特性及工艺要求强制降温,提高固化物的固化性能,节约了固化整体时间,同时该设备还具有结构简单、成本低廉、使用方便等特点。
附图说明
图1为本发明的结构示意图;
图2为本发明固化炉与快速降温装置、热循环装置连接的示意图。
附图中,各标号所代表的部件列表如下:
1、控制装置,2、固化炉,3、装载台,4、热循环装置,5、快速降温装置,6、温度传感器,7、固化室,8、热循环管道,9、热循环风机,10、加热器,11、热风循环入口,12、热风循环出口,13、第二降温管道,14、第一降温管道,15、冷却风机,16、风阀执行器,17、强制冷风入口。
具体实施方式
以下结合附图对本发明的原理和特征进行描述,所举实例只用于解释本发明,并非用于限定本发明的范围。
如图1、图2所示,本发明所述一种集中控制的快速降温固化炉装置,包括控制装置1和固化炉2,所述控制装置1连接一台或一台以上固化炉2,所述固化炉2包括固化室7、装载台3、快速降温装置5和热循环装置4,所述装载台3安装在所述固化室7内,所述快速降温装置5和所述热循环装置4安装在所述固化室7上,所述控制装置1与快速降温装置5和热循环装置4电气连接。
所述热循环装置4包括热循环管道8、热循环风机9和加热器10,所述热循环风机9和所述加热器10安装在所述热循环管道8内,所述固化室7上设有热风循环入口11和热风循环出口12,所述热循环管道8的两端分别连接热风循环入口11和热风循环出口12,所述热循环风机9与控制装置1电气连接,所述加热器10与控制装置1电气连接。
所述快速降温装置5包括第一降温管道14、第二降温管道14、冷却风机15和风阀执行器16,所述冷却风机15安装在第一降温管道14的一端,所述第一降温管道14未安装冷却风机15的一端连接风阀执行器16,所述固化室7上设有强制冷风入口17,所述第二降温管道13的两端分别连接风阀执行器16和强制冷风入口17,所述冷却风机15与控制装置1电气连接,所述风阀执行器16与控制装置1电气连接,所述固化室7内安装有温度传感器6,所述温度传感器6与控制装置1电气连接。
本发明所述的一种集中控制的快速降温固化炉装置,控制装置1可以连接多台固化炉2,实现了控制器1对固化炉2的集中控制,控制装置1还可以根据各个固化炉2的固化情况来分别控制。控制装置1连接固化室7内的快速降温装置5,可根据固化需要对固化室7内强制制冷。现有的固化炉无强制制冷,随着固化室内温度和环境温度的温差减小,降温越来越慢,不利于固化物的化学性能,前置制冷装置对固化物的化学性能更好。
通过控制装置1设定加热曲线及降温曲线,接通电源,加热器10开始加热,热循环风机9启动,将加热器10产生的热量传递至固化室7,温度传感器6实时采集固化室7内温度并将信息提供给控制装置1,控制装置1监控实时温度,当达到设定值时热循环装置4停止工作,并在温度降低时继续加热以保持固化室7内温度,直至到达设定时间。加热过程结束后,热循环装置4停止工作,快速降温装置5开启,风阀执行器16转动,带动风门挡板旋转至设定角度,冷却风机15开始工作,将外界冷风通过风阀执行器16吹入固化室7,控制装置1根据温度传感器6采集的温度实时调整风阀执行器16风门角度,直至整个固化过程结束。
以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (4)

1.一种集中控制的快速降温固化炉装置,其特征在于,包括控制装置和固化炉,所述控制装置连接一台或一台以上固化炉,所述固化炉包括固化室、装载台、快速降温装置和热循环装置,所述装载台安装在所述固化室内,所述快速降温装置和所述热循环装置安装在所述固化室外部,并与所述固化室相连通,所述控制装置与快速降温装置和热循环装置电气连接,所述控制装置控制所述快速降温装置降温,所述控制装置控制所述热循环装置加热。
2.根据权利要求1所述一种集中控制的快速降温固化炉装置,其特征在于,所述热循环装置包括热循环管道、热循环风机和加热器,所述热循环风机和所述加热器安装在所述热循环管道内,所述固化室上设有热风循环入口和热风循环出口,所述热循环管道的两端分别连接热风循环入口和热风循环出口,所述热循环风机与所述控制装置电气连接,所述控制装置控制热循环风机的开启、关闭,所述加热器与所述控制装置电气连接,所述控制装置控制所述加热器加热。
3.根据权利要求1所述一种集中控制的快速降温固化炉装置,其特征在于,所述快速降温装置包括第一降温管道、第二降温管道、冷却风机和风阀执行器,所述冷却风机安装在第一降温管道的一端,所述第一降温管道未安装冷却风机的一端连接风阀执行器,所述固化室上设有强制冷风入口,所述第二降温管道的两端分别连接风阀执行器和强制冷风入口,所述冷却风机与控制装置电气连接,所述风阀执行器与控制装置电气连接。
4.根据权利要求1至3任一所述一种集中控制的快速降温固化炉装置,其特征在于,所述固化室内安装有温度传感器,所述温度传感器与控制装置电气连接。
CN201310264365.0A 2013-06-26 2013-06-26 一种集中控制的快速降温固化炉装置 Active CN103335520B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310264365.0A CN103335520B (zh) 2013-06-26 2013-06-26 一种集中控制的快速降温固化炉装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310264365.0A CN103335520B (zh) 2013-06-26 2013-06-26 一种集中控制的快速降温固化炉装置

Publications (2)

Publication Number Publication Date
CN103335520A true CN103335520A (zh) 2013-10-02
CN103335520B CN103335520B (zh) 2015-05-20

Family

ID=49243729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310264365.0A Active CN103335520B (zh) 2013-06-26 2013-06-26 一种集中控制的快速降温固化炉装置

Country Status (1)

Country Link
CN (1) CN103335520B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104972585A (zh) * 2015-08-04 2015-10-14 江苏东宝光学有限公司 一种高温固化炉
CN111981848A (zh) * 2020-08-13 2020-11-24 江苏丰锐磨料磨具有限公司 一种集中控制的快速降温固化炉装置
CN113741322A (zh) * 2021-08-09 2021-12-03 昆山万盛电子有限公司 一种电子产品固化炉用智能控制系统

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003314963A (ja) * 2002-04-23 2003-11-06 Koyo Thermo System Kk 熱風循環式オーブン
CN201224161Y (zh) * 2008-05-22 2009-04-22 自贡大业高压容器有限责任公司 连续式树脂固化炉的供热装置
CN201506007U (zh) * 2009-09-15 2010-06-16 上海康耐特光学股份有限公司 一种树脂镜片固化炉
CN201644354U (zh) * 2010-03-25 2010-11-24 广州汇侨电子有限公司 一种连续式电子元件固化装置
CN102241095A (zh) * 2010-05-12 2011-11-16 哈尔滨乐普实业发展中心 一种固化炉智能控温方法及装置
CN102350793A (zh) * 2011-08-31 2012-02-15 中国科学院广州电子技术研究所 一种光固化快速成型设备树脂加热干燥系统
CN202700770U (zh) * 2012-05-10 2013-01-30 佛山津西金兰冷轧板有限公司 一种新型固化装置
CN203421951U (zh) * 2013-06-26 2014-02-05 山东哈大电气有限公司 一种集中控制的快速降温固化炉装置

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003314963A (ja) * 2002-04-23 2003-11-06 Koyo Thermo System Kk 熱風循環式オーブン
CN201224161Y (zh) * 2008-05-22 2009-04-22 自贡大业高压容器有限责任公司 连续式树脂固化炉的供热装置
CN201506007U (zh) * 2009-09-15 2010-06-16 上海康耐特光学股份有限公司 一种树脂镜片固化炉
CN201644354U (zh) * 2010-03-25 2010-11-24 广州汇侨电子有限公司 一种连续式电子元件固化装置
CN102241095A (zh) * 2010-05-12 2011-11-16 哈尔滨乐普实业发展中心 一种固化炉智能控温方法及装置
CN102350793A (zh) * 2011-08-31 2012-02-15 中国科学院广州电子技术研究所 一种光固化快速成型设备树脂加热干燥系统
CN202700770U (zh) * 2012-05-10 2013-01-30 佛山津西金兰冷轧板有限公司 一种新型固化装置
CN203421951U (zh) * 2013-06-26 2014-02-05 山东哈大电气有限公司 一种集中控制的快速降温固化炉装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104972585A (zh) * 2015-08-04 2015-10-14 江苏东宝光学有限公司 一种高温固化炉
CN111981848A (zh) * 2020-08-13 2020-11-24 江苏丰锐磨料磨具有限公司 一种集中控制的快速降温固化炉装置
CN113741322A (zh) * 2021-08-09 2021-12-03 昆山万盛电子有限公司 一种电子产品固化炉用智能控制系统

Also Published As

Publication number Publication date
CN103335520B (zh) 2015-05-20

Similar Documents

Publication Publication Date Title
CN204329531U (zh) 烘烤设备
CN203982907U (zh) 一种生产漆包线的烘炉
CN202895572U (zh) 一种注塑机料筒余热回收利用装置
CN103335520A (zh) 一种集中控制的快速降温固化炉装置
CN102371620B (zh) 环保节能远红外线自动温控混凝土养护系统
CN202823407U (zh) 能自动控制温度的试验箱装置
CN102345970A (zh) 脱硝催化剂干燥装置
CN108687299A (zh) 锻造炉
CN203421951U (zh) 一种集中控制的快速降温固化炉装置
CN205537063U (zh) 一种高密封电热鼓风干燥箱
CN209128506U (zh) 一种用于凸轮轴加工的热处理设备
CN206817754U (zh) 一种自动控温的热风机
CN202281463U (zh) 脱硝催化剂干燥装置
CN103861784A (zh) 一种硅胶固化箱
CN205448156U (zh) 自动调节恒温室
CN203672069U (zh) 烘箱
CN103471345B (zh) 一种用高温热泵与辐射烘干工业物料的方法
CN205510430U (zh) 一种永磁体恒温加热装置
CN203621400U (zh) 一种适合于大尺寸砂型烘干的微波烘干设备
CN208787458U (zh) 一种锻造炉
CN201246944Y (zh) 用于对蓄电池盖密封胶进行快速固化的烘干炉
CN202993766U (zh) 一种烘干机
CN103471346B (zh) 一种用高温热泵烘干工业物料的方法
CN203236084U (zh) 一种气热钎焊设备
CN206377993U (zh) 一种退热用箱式电阻炉

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Centralized-control rapidly-cooling curing furnace device

Effective date of registration: 20190924

Granted publication date: 20150520

Pledgee: Rizhao bank Limited by Share Ltd. Yantai branch

Pledgor: SHANDONG HADA ELECTRIC Co.,Ltd.

Registration number: Y2019370010020

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221104

Granted publication date: 20150520

Pledgee: Rizhao bank Limited by Share Ltd. Yantai branch

Pledgor: SHANDONG HADA ELECTRIC Co.,Ltd.

Registration number: Y2019370010020

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A centralized controlled fast cooling curing furnace device

Effective date of registration: 20221118

Granted publication date: 20150520

Pledgee: Rizhao bank Limited by Share Ltd. Yantai branch

Pledgor: SHANDONG HADA ELECTRIC Co.,Ltd.

Registration number: Y2022980022473

PE01 Entry into force of the registration of the contract for pledge of patent right