CN103334358B - Prefabricated hollow steel bar concrete flag and pavement construction method - Google Patents
Prefabricated hollow steel bar concrete flag and pavement construction method Download PDFInfo
- Publication number
- CN103334358B CN103334358B CN201310258778.8A CN201310258778A CN103334358B CN 103334358 B CN103334358 B CN 103334358B CN 201310258778 A CN201310258778 A CN 201310258778A CN 103334358 B CN103334358 B CN 103334358B
- Authority
- CN
- China
- Prior art keywords
- steel bar
- hollow steel
- prefabricated
- prefabricated hollow
- flag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
A kind of prefabricated hollow steel bar concrete flag and pavement construction method, described prefabricated hollow steel bar concrete flag, be made up of precast concrete body, the main muscle of the plate be wrapped in plate body and the fiber tube that is embedded in precast concrete bodies top, described precast concrete body is length is 3m, width is 1m, thickness is the cuboid calibrated bolck of 0.3m, and long to for evenly offering and through hole along it, the main muscle of described plate is distributed in top and the bottom of precast concrete body.Have structural strength high, be convenient to transport, reusable, the advantages such as high construction efficiency, can be widely used in road rehabilitation and temporary construction road construction.
Description
Technical field
The present invention relates to a kind of prefabricated bridge-type road slab and pavement construction method.
Background technology
At present, the road structural system of road traffic is mainly cast-in-situ concrete pavement system, because ordinary Portland cement setting and harden is slow, the strength developing time is long, generally needs fencing lawn to reach more than 80% of design strength to concrete strength in 14 days, can open to traffic, delay the duration.In addition, after the process of being delivered for use, usually can run into because improper use or service time longer needs repair existing road surface, repair process is complicated, and the reparation duration is longer, especially for important road, can affect greatly public's traffic.In addition, in road construction and building operations, often need to lay some interim builder's roads, these temporary roads need to remove after using function completes, if adopt cast-in-situ concrete pavement system, waste a large amount of manpower and materials, and produce a large amount of building waste, environment is worked the mischief.
Given this, the present invention is emphatically to find the prefabricated road surface of a kind of standardization, can realize rapid construction and reparation, improves road construction efficiency.
Summary of the invention
The object of this invention is to provide a kind of prefabricated hollow steel bar concrete flag and pavement construction method, solve existing cast-in-situ concrete road slab, long construction period, repair difficulty, use terminates rear dismounting inconvenience, easily produces the technical problem of a large amount of building waste.
For achieving the above object, the present invention adopts following technical scheme:
A kind of prefabricated hollow steel bar concrete flag, be made up of precast concrete body, the main muscle of the plate be wrapped in plate body and the fiber tube that is embedded in precast concrete bodies top, described precast concrete body is length is 3m, width is 1m, thickness is the cuboid calibrated bolck of 0.3m, long to for evenly offering and through hole along it, the main muscle of described plate is distributed in top and the bottom of precast concrete body.
Described fiber tube is at least four, is distributed in precast concrete bodies top near corner positions.
Described fiber tube is made up of internal thread sleeve pipe, external screw thread rod iron, rectangle anchor slab and bar dowel, described external screw thread rod iron is vertically welded in rectangle anchor slab center, described internal thread sleeve pipe and external screw thread rod iron are threaded, described bar dowel is symmetrically welded at external screw thread rod iron both sides near rectangle anchor slab marginal position, and rectangle anchor slab edge is all exposed at its two ends.
Described internal thread sleeve outer is 4cm, and internal diameter is 2cm, is highly 8cm; The diameter of described external screw thread rod iron is 2cm, is highly 8cm; The length of described rectangle anchor slab is 15cm, and width is 10cm, and thickness is 1cm; The diameter of described bar dowel is 1cm.
The bottom of described precast concrete body is embedded with suspension ring.
Prefabricated hollow steel bar concrete flag described in employing carries out pavement construction method, and step is as follows:
Step one, prefabricated inverted T shape strip foundation;
Step 2, prefabricated assembled precast hollow reinforced concrete pavement plate; Prefabrication process is: the main muscle of colligation plate, and presets fiber tube at its soffit, and is welded to connect by the main muscle of plate at described fiber tube top and top, then builds precast concrete body and carries out maintenance, and surface programming suspension ring thereon;
Step 3, after the sheet metal forming of prefabricated hollow steel bar rigid pavement, suspension ring are caught on by crane gear, prefabricated hollow steel bar concrete flag is sling, the demoulding, then suspension ring are cut off, and prefabricated hollow steel bar concrete flag upset is made facing up with fiber tube;
Step 4, removes roadbase, and is flattened by road by machinery;
Step 5, is transported to job site by prefabricated inverted T shape strip foundation and prefabricated hollow steel bar concrete flag;
Step 6, at inverted T shape strip foundation end face fiber tube pre-buried position dress suspension ring, winches to installation site by inverted T shape strip foundation, lays down suspension ring;
Step 7, at the step place pad L-type rubber pad of prefabricated inverted T shape strip foundation;
Step 8, adopts the mode identical with lifting inverted T shape strip foundation that prefabricated hollow steel bar concrete flag is winched to installation site, and is erected at T-shaped strip foundation step place, and holds out against with the edge of a wing of T-shaped strip foundation and web.
The prefabricated hollow steel bar concrete flag of the present invention, lays with traditional road and compared with method for maintaining, has structural strength high, and be convenient to transport, reusable, the advantages such as high construction efficiency, are in particular in the following aspects:
1) convenient transportation.Although structure is built by steel concrete, the volume of each block is little, and is standardized structural element, transports more convenient.
2) Fast Installation, easy construction.Structure upper is provided with built-in fitting, make the installing of prefabricated hollow steel bar concrete flag pavement system hoisting ring and removal very convenient, and then make the lifting of this prefabricated hollow steel bar concrete flag pavement system very convenient.When constructing, first reinforced concrete strip foundation being lifted into smooth road surface, darker for steel concrete beam slab is lifted in strip foundation, after having spliced, without any need for being connected between block with block and between block with basis, can use.
3) the required plant equipment of construction is few, and material usage is economized, and low its of energy consumption can be reused, and greatly reduces construction costs and other expenditure.Because dress prefabricated reinforced concrete strip foundation and the dark beam slab of prefabricated reinforced concrete are prefabricated in the factory, at the construction field (site), only need by grading, this prefabricated hollow steel bar concrete flag pavement system is laid in lifting, to temporary road, be finished rear recyclable, use in order to next time, save material usage further.
4) pavement construction is few to ambient influnence.Traditional pavement construction needs more construction machinery, produces larger noise when construction machinery runs.Meanwhile, in traditional pavement engineering construction, waste material of buildings is more, comprises water conservancy, timber, packaging material, discarded mould etc.These refuses are buried under the ground, and can cause the pollution of underground water.The present invention is prefabricated at workshop, and refuse is less and can focus on, and does not almost affect job site environment.
5) namely spread i.e. use, open to traffic early.Once laying construction is complete, just can open to traffic immediately after removal suspension ring.Even can be open to traffic on construction limit, limit, be conducive to conveniently marching into the arena of construction machinery and Construction traffic, accelerating construction progress.The time that is open to traffic after construction of cement concrete road surface is greater than 16 days, and the time that is open to traffic after asphalt concrete pavement construction is greater than 3 days, and namely prefabricated hollow steel bar concrete flag pavement system of the present invention can spread i.e. use, and even limit paving is just used.
6) dismounting freely.Prefabricated hollow steel bar concrete flag pavement system is reusable, and can lay in advance, the scene that is transported to when needed is laid.In structure, built-in fitting is housed, installs, removal suspension ring are very convenient, structure hoisting fashionable dress upper lift ring and Liftable.
7) technique is simple, and cost is lower, and prefabricated hollow steel bar concrete flag pavement system adopts ordinary reinforced concrete as preparing material, and the cost of material is low, and structure is unified standard size, Mold Making and build all very convenient.Applied widely.Prefabricated hollow steel bar concrete flag pavement system is applicable to the various roadbeds with certain bearing capacity, can not only be used in the laying of construction with interim matter transportation road, can also be used for rushing to repair the road be damaged in earthquake.
8) by being lined with L-type rubber pad on prefabricated reinforced concrete road slab and prefabricated inverted T shape strip foundation contact surface, submitting the vibration damping and vibration isolation effect of bridge to, improving the application life of bridge.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention will be further described in detail.Fig. 1 is the plan view of prefabricated hollow steel bar concrete flag.
Fig. 2 is the A-A sectional view one of Fig. 1.
Fig. 3 is the A-A sectional view two of Fig. 1.
Fig. 4 is the B-B sectional view of Fig. 1.
Fig. 5 is fiber tube detail drawing.
Fig. 6 is Fig. 5 top view.
Reference numeral: 1-precast concrete body, 1.1-through hole, the main muscle of 2-plate, 3-suspension ring, 4-fiber tube, 4.1-internal thread sleeve pipe, 4.2-external screw thread rod iron, 4.3-rectangle anchor slab, 4.4-bar dowel.
Detailed description of the invention
Embodiment is see shown in Fig. 1 to 4, a kind of prefabricated hollow steel bar concrete flag, be made up of precast concrete body 1, the main muscle 2 of the plate be wrapped in plate body and the fiber tube 4 that is embedded in precast concrete body 1 top, described precast concrete body 1 for length be 3m, width is 1m, thickness is the cuboid calibrated bolck of 0.3m, and long to for evenly offering and through hole 1.1 along it, the main muscle 2 of described plate is distributed in top and the bottom of precast concrete body 1.
Described fiber tube 4 is at least four, is distributed in precast concrete body 1 top near corner positions.
Described fiber tube 4 is made up of internal thread sleeve pipe 4.1, external screw thread rod iron 4.2, rectangle anchor slab 4.3 and bar dowel 4.4, described external screw thread rod iron 4.2 is vertically welded in rectangle anchor slab 4.3 center, described internal thread sleeve pipe 4.1 and external screw thread rod iron 4.2 are threaded, described bar dowel 4.4 is symmetrically welded at external screw thread rod iron 4.2 both sides near rectangle anchor slab 4.3 marginal position, and rectangle anchor slab 4.3 edge is all exposed at its two ends.Described internal thread sleeve pipe 4.1 external diameter is 4cm, and internal diameter is 2cm, is highly 8cm; The diameter of described external screw thread rod iron 4.2 is 2cm, is highly 8cm; The length of described rectangle anchor slab 4.3 is 15cm, and width is 10cm, and thickness is 1cm; The diameter of described bar dowel 4.4 is 1cm, see Fig. 5 and Fig. 6.
The bottom of described precast concrete body 1 is embedded with suspension ring 3, and described suspension ring 3 are welded to connect with the main muscle 2 of plate of bottom.Described suspension ring 3 are formed by reinforcing bar bending or are finished product suspension ring.
Prefabricated hollow steel bar concrete flag described in employing carries out pavement construction method, and step is as follows:
Step one, prefabricated inverted T shape strip foundation;
Step 2, prefabricated assembled precast hollow reinforced concrete pavement plate; Prefabrication process is: the main muscle 2 of colligation plate, and presets fiber tube 4 at its soffit, and is welded to connect by the main muscle 2 of plate at described fiber tube 4 top and top, then builds precast concrete body 1 and carries out maintenance, and surface programming suspension ring 3 thereon;
Step 3, after the sheet metal forming of prefabricated hollow steel bar rigid pavement, suspension ring are caught on by crane gear, prefabricated hollow steel bar concrete flag is sling, the demoulding, then suspension ring are cut off, and prefabricated hollow steel bar concrete flag upset is made facing up with fiber tube 4;
Step 4, removes roadbase, and is flattened by road by machinery;
Step 5, is transported to job site by prefabricated inverted T shape strip foundation and prefabricated hollow steel bar concrete flag;
Step 6, at inverted T shape strip foundation end face fiber tube pre-buried position dress suspension ring, winches to installation site by inverted T shape strip foundation, lays down suspension ring;
Step 7, at the step place pad L-type rubber pad of prefabricated inverted T shape strip foundation;
Step 8, adopt the mode identical with lifting inverted T shape strip foundation that prefabricated hollow steel bar concrete flag is winched to installation site, and be erected at T-shaped strip foundation step place, and and the edge of a wing of T-shaped strip foundation and web holds out against between road slab and banket in both sides.And banket and jolt ramming to the gap place that connects between plate with plate, the traveling for vehicle provides the environment of an opposed flattened.Also earth filling tamping is wanted, to improve the lateral stability of road slab in plate body both sides, road surface.
The length of described prefabricated inverted T shape strip foundation is 4m, and flange width is 1m, and edge of a wing thickness is 0.3m, web width 0.5m, web height 0.35m, is also standard component.
Claims (5)
1. a prefabricated hollow steel bar concrete flag, it is characterized in that: be made up of precast concrete body (1), the main muscle (2) of the plate be wrapped in plate body and the fiber tube (4) that is embedded in precast concrete body (1) top, described precast concrete body (1) for length be 3m, width is 1m, thickness is the cuboid calibrated bolck of 0.3m, long to for evenly offering and through hole (1.1) along it, the main muscle of described plate (2) is distributed in top and the bottom of precast concrete body (1); Described fiber tube (4) is made up of internal thread sleeve pipe (4.1), external screw thread rod iron (4.2), rectangle anchor slab (4.3) and bar dowel (4.4), described external screw thread rod iron (4.2) is vertically welded in rectangle anchor slab (4.3) center, described internal thread sleeve pipe (4.1) and external screw thread rod iron (4.2) are threaded, described bar dowel (4.4) is symmetrically welded at external screw thread rod iron (4.2) both sides near rectangle anchor slab (4.3) marginal position, and rectangle anchor slab (4.3) edge is all exposed at its two ends.
2. prefabricated hollow steel bar concrete flag according to claim 1, is characterized in that: described fiber tube (4) is at least four, is distributed in precast concrete body (1) top near corner positions.
3. prefabricated hollow steel bar concrete flag according to claim 1, is characterized in that: described internal thread sleeve pipe (4.1) external diameter is 4cm, and internal diameter is 2cm, is highly 8cm; The diameter of described external screw thread rod iron (4.2) is 2cm, is highly 8cm; The length of described rectangle anchor slab (4.3) is 15cm, and width is 10cm, and thickness is 1cm; The diameter of described bar dowel (4.4) is 1cm.
4. prefabricated hollow steel bar concrete flag according to claim 1, is characterized in that: the bottom of described precast concrete body (1) is embedded with suspension ring (3).
5. adopt the prefabricated hollow steel bar concrete flag described in Claims 1-4 any one to carry out pavement construction method, it is characterized in that: step is as follows:
Step one, prefabricated inverted T shape strip foundation;
Step 2, prefabricated assembled precast hollow reinforced concrete pavement plate; Prefabrication process is: the main muscle of colligation plate (2), and preset fiber tube (4) at its soffit, and the main muscle of plate (2) at described fiber tube (4) top and top is welded to connect, then build precast concrete body (1) and carry out maintenance, and surface programming suspension ring (3) thereon;
Step 3, after the sheet metal forming of prefabricated hollow steel bar rigid pavement, suspension ring are caught on by crane gear, prefabricated hollow steel bar concrete flag is sling, the demoulding, then suspension ring are cut off, and prefabricated hollow steel bar concrete flag upset is made facing up with fiber tube (4);
Step 4, removes roadbase, and is flattened by road by machinery;
Step 5, is transported to job site by prefabricated inverted T shape strip foundation and prefabricated hollow steel bar concrete flag;
Step 6, at inverted T shape strip foundation end face fiber tube pre-buried position dress suspension ring, winches to installation site by inverted T shape strip foundation, lays down suspension ring;
Step 7, at the step place pad L-type rubber pad of prefabricated inverted T shape strip foundation;
Step 8, adopts the mode identical with lifting inverted T shape strip foundation that prefabricated hollow steel bar concrete flag is winched to installation site, and is erected at T-shaped strip foundation step place, and holds out against with the edge of a wing of T-shaped strip foundation and web.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310258778.8A CN103334358B (en) | 2013-06-26 | 2013-06-26 | Prefabricated hollow steel bar concrete flag and pavement construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310258778.8A CN103334358B (en) | 2013-06-26 | 2013-06-26 | Prefabricated hollow steel bar concrete flag and pavement construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103334358A CN103334358A (en) | 2013-10-02 |
CN103334358B true CN103334358B (en) | 2015-10-28 |
Family
ID=49242555
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310258778.8A Expired - Fee Related CN103334358B (en) | 2013-06-26 | 2013-06-26 | Prefabricated hollow steel bar concrete flag and pavement construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103334358B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107130519B (en) * | 2017-05-23 | 2019-03-05 | 中国一冶集团有限公司 | The production and handling method of concrete prefabricated plate |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1098155A (en) * | 1994-05-20 | 1995-02-01 | 姚行厚 | Hollow road surface structure on the elastic foundation |
CN1145431A (en) * | 1996-03-12 | 1997-03-19 | 西南工学院 | Novel road and construction method thereof |
GB2342375A (en) * | 1998-10-06 | 2000-04-12 | L H Woodhouse & Co Ltd | A roadway, hardstand, floor or fence. |
WO2007018903A2 (en) * | 2005-07-28 | 2007-02-15 | Friedrich Thommes | Seismic, pressure and heat resistant wall |
KR20080107008A (en) * | 2007-06-05 | 2008-12-10 | (주)이코시스 | Production method and structure for recycled plastic block releasing thermal expansion pressure |
CN201176551Y (en) * | 2008-01-28 | 2009-01-07 | 邢建欣 | Precast slab for roads |
CN101570949A (en) * | 2009-05-04 | 2009-11-04 | 李嘉树 | Method for fast paving urban road surfaces and special reinforced concrete block |
CN203373630U (en) * | 2013-06-26 | 2014-01-01 | 中国建筑股份有限公司 | Prefabricated hollow reinforced concrete pavement slab |
-
2013
- 2013-06-26 CN CN201310258778.8A patent/CN103334358B/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1098155A (en) * | 1994-05-20 | 1995-02-01 | 姚行厚 | Hollow road surface structure on the elastic foundation |
CN1145431A (en) * | 1996-03-12 | 1997-03-19 | 西南工学院 | Novel road and construction method thereof |
GB2342375A (en) * | 1998-10-06 | 2000-04-12 | L H Woodhouse & Co Ltd | A roadway, hardstand, floor or fence. |
WO2007018903A2 (en) * | 2005-07-28 | 2007-02-15 | Friedrich Thommes | Seismic, pressure and heat resistant wall |
KR20080107008A (en) * | 2007-06-05 | 2008-12-10 | (주)이코시스 | Production method and structure for recycled plastic block releasing thermal expansion pressure |
CN201176551Y (en) * | 2008-01-28 | 2009-01-07 | 邢建欣 | Precast slab for roads |
CN101570949A (en) * | 2009-05-04 | 2009-11-04 | 李嘉树 | Method for fast paving urban road surfaces and special reinforced concrete block |
CN203373630U (en) * | 2013-06-26 | 2014-01-01 | 中国建筑股份有限公司 | Prefabricated hollow reinforced concrete pavement slab |
Also Published As
Publication number | Publication date |
---|---|
CN103334358A (en) | 2013-10-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334359B (en) | Prefabricated reinforced concrete pavement plate and pavement construction method | |
CN103334356B (en) | The dark beam slab pavement system of bridge-type prefabricated reinforced concrete and construction method thereof | |
CN103334361B (en) | Prefabricated hollow steel bar concrete wear resistant road surface plate and pavement construction method | |
CN103866670B (en) | Fabricated vehicle bearing pavement and construction method thereof | |
CN103352471B (en) | Container prefabricated house assembling type steel reinforced concrete single-double-column foundation and construction method thereof | |
CN103343503B (en) | Bridge-type prefabricated reinforced concrete trough slab wear resistant road surface structural system and construction method | |
CN104863035A (en) | Simple assembled temporary construction steel plate pavement system and construction method of simple assembled temporary construction steel plate pavement system | |
CN103334360B (en) | The dark beam slab wear-resistant pavement system of bridge-type prefabricated reinforced concrete and construction method thereof | |
CN103343547B (en) | Container type prefabricated house assembling steel reinforced concrete four patten and construction method | |
CN103850162B (en) | Bridge-type combining structure pavement system and construction method thereof | |
CN203768757U (en) | Novel assembled vehicle bearing pavement | |
CN203373630U (en) | Prefabricated hollow reinforced concrete pavement slab | |
CN103334362B (en) | Prefabricated steel concrete wear resistant road surface plate and pavement construction method | |
CN203373635U (en) | Prefabricated hollow reinforced concrete wearproof pavement slab | |
CN203373631U (en) | Prefabricated reinforced concrete pavement slab | |
CN107151958B (en) | Permanent rural highway cement road surface of easy maintenance | |
CN203373624U (en) | Bridge prefabricated reinforced concrete hidden beam slab wearproof pavement system | |
CN109811613B (en) | Temporary ground facility and integrated construction method thereof | |
CN103334358B (en) | Prefabricated hollow steel bar concrete flag and pavement construction method | |
CN209854577U (en) | Assembled thin-wall box-shaped channel | |
CN203429528U (en) | Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system | |
CN203768754U (en) | Double-layer superimposed pavement | |
CN204715148U (en) | A kind of Simple mounting temporary construction steel plate pavement system | |
CN203373629U (en) | Prefabricated reinforced concrete wearproof pavement slab | |
CN203768753U (en) | Bridge type steel plate pavement system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151028 Termination date: 20190626 |