Pole drill and erection truck
Technical field
The present invention relates to technical field of engineering machinery, be specifically related to a kind of pole drill and erection truck.
Background technology
At present, electric power becomes basically universal in the application of China, and some problems have also been produced thereupon, digging pit and setting work of the facilities of setting up on both sides of the road as the used electric pole of electric power transfer, road such as street lamp post, generally all need a large amount of manpowers to operate, or need large-scale lifting appliance to assist, so just caused the waste of a large amount of human and material resources, in work progress, also had potential safety hazard simultaneously.In the perfect day by day epoch of mechanization, not having favorable mechanical equipment to help us to finish the work is a greatly loss, therefore we more should be applied to mechanization in the production practices process, and our country's a kind of security performances of urgent need plant equipment high and that can effectively economize on resources is helped us and finished various construction operations.
Summary of the invention
The objective of the invention is provides a kind of pole drill and erection truck in order to overcome above-mentioned technical disadvantages.
The technical scheme that technical solution problem of the present invention adopts is: a kind of pole drill and erection truck, comprise headstock and car body, the front end of described car body and headstock junction are provided with the operation seat, the opposite of described operation seat is provided with action bars and operating light, fixedly there is the cycle platform in described car body front end centre position, described cycle platform is connected the outer suspension rod of control by hanging on device with the fluctuating device, described outer suspension rod inside is plugged with interior suspension rod, interior suspension rod is provided with twist bit support sector, and described twist bit support sector is provided with twist bit device and hook gear; Described vehicle body side is provided with the start fuel tank, and car body is provided with leg around the bottom, and top one side of car body is provided with containing box.
Described twist bit device is connected in the twist bit support sector by peg, described peg is provided with switch hook and two switch hook brake barses, described peg lower end is connected with reductor and oil pressure motor, the lowermost end of described twist bit device is provided with the twist bit head, the rear end of described twist bit head is connected with borded pile, and described borded pile is provided with clue hook and borded pile slip-off preventing brake bars.
Described outer suspension rod is provided with the twist bit incorporating section, native twist bit is installed on the described twist bit incorporating section takes in brake and take in clue.
The beneficial effect that the present invention has is:
Pole drill and erection truck has adopted the material of advanced technologies and high-quality in manufacturing and designing, reliable in quality, and vertical rod is effective, taken into full account the matching with the twist bit device, have simple to operate, security performance height, convenient transportation, save manpower, time, economize on resources again and improved benefit, be applicable to hillside fields, sand ground, hard soil, working area is little, need not destroy greenbelt, be the ideal machine equipment of the boring of electric pole and light pole and telecommunication cable cement pole, setting.
Description of drawings
Accompanying drawing 1 is front view of the present invention.
Accompanying drawing 2 is vertical view of the present invention.
Accompanying drawing 3 is the structural representation of twist bit device of the present invention.
Accompanying drawing 4 is the structural representation of action bars of the present invention.
The specific embodiment
Do following detailed description below in conjunction with accompanying drawing 1, accompanying drawing 2, accompanying drawing 3,4 couples of the present invention of accompanying drawing.
As shown in the figure, the present invention includes headstock 1 and car body 13, the front end of described car body 13 and headstock 1 junction are provided with operation seat 2, the opposite of described operation seat 2 is provided with action bars 3 and operating light 4, fixedly there is cycle platform 14 in described car body 13 front end centre positions, described cycle platform 14 is connected the outer suspension rod 7 of control by hanging on device 5 with fluctuating device 6, described outer suspension rod 7 inside are plugged with interior suspension rod 9, interior suspension rod 9 is provided with twist bit support sector 8, and described twist bit support sector 8 is provided with twist bit device 15 and hook gear 12; Described car body 13 sides are provided with start fuel tank 10, are provided with leg 11 around car body 13 bottoms, and top one side of car body 13 is provided with containing box 16.
Described twist bit device 15 is connected in the twist bit support sector 8 by peg 20, described peg 20 is provided with switch hook 19 and two switch hook brake barses 18, described peg 20 lower ends are connected with reductor 21 and oil pressure motor 29, the lowermost end of described twist bit device 15 is provided with twist bit head 25, the rear end of described twist bit head 25 is connected with borded pile 24, and described borded pile 24 is provided with clue hook 23 and borded pile slip-off preventing brake bars 22; Described outer suspension rod 7 is provided with twist bit incorporating section 26, native twist bit is installed on the described twist bit incorporating section 26 takes in brake 27 and take in clue 28.
Pole drill and erection truck should be parked on the firm level ground in use, and the operator is sitting in control operation bar 3 on the operation seat 2, and four legs 11 steadily are placed on the level ground, discharges hook gear 12 simultaneously.If leg 11 when circling round, has the danger of tumbling uneven; Leg 11 is if operate on softer ground, places below four legs 11 with solid plate thing pad, in order to avoid be absorbed in.Operator's control operation bar 3, control cycle platform 14, hang on device 5 and fluctuating device 6 makes outer suspension rod 7 rise to certain altitude, suspension rod 9 was to Len req in control operation this moment bar 3 discharged, at this moment, taking in brake 27 control by the native twist bit on the twist bit incorporating section 26 set on the outer suspension rod 7 takes in clue 28 twist bit device 15 is slowly fallen.After twist bit device 15 is fallen, regulate action bars 3, take in clue 28, take in clue 28 and just leave clue hook 23 automatically.Control operation bar 3 moves to the position of excavation to twist bit device 15, and twist bit head 25 is touched ground, and suspension rod Cheng Fuzhuan with accelerator pedal 30, adjusts revolution and excavates.In mining process, if the duration of runs, long start fuel tank 10 interior start oil can obviously rise, should notice that the temperature of start oil is above 80 degree.After borded pile 24 reached the necessary degree of depth, control operation bar 3 shut down and twist bit device 15 is drawn.Regulate action bars 3 and make twist bit device 15 move to the position of next excavation, repeat above-mentioned dredge operation and get final product, bored the empty back disposable four line bars of placing.After the end to be excavated, to take in clue 28 is hooked on the clue hook 23, regulating native twist bit takes in brake 27 control and takes in clue 28 twist bit device 15 is slowly risen with taking in clue 28, take in clue 28 income twist bit incorporating sections 26, to take in brake bars then and fix, wait to hear " clickly " sound namely stop.Regulate action bars 3 with in the outer suspension rod 7 of interior suspension rod 9 retractions, the control operation bar 3 again, control cycle platform 14, hang on device 5 and fluctuating device 6 makes outer suspension rod put initial position 7 times, after the aforesaid operations end, hook gear 12 is hung up, avoid when walking, vibrating.
The present invention has adopted the material of advanced technologies and high-quality in manufacturing and designing, reliable in quality, vertical rod is effective, taken into full account the matching with the twist bit device, have simple to operate, the security performance height, convenient transportation, namely save manpower and time, economize on resources again and improved benefit, be applicable to hillside fields, sand ground, hard soil, working area is little, need not destroy greenbelt, be the desirable drilling machine that large tracts of land afforestation, road both sides and orchard tree planting, electric pole and light pole and telecommunication cable cement pole are erect.