CN103321403B - Dissipate at interlayer external wall construction seam and spell formwork erection method and structure - Google Patents
Dissipate at interlayer external wall construction seam and spell formwork erection method and structure Download PDFInfo
- Publication number
- CN103321403B CN103321403B CN201310228890.7A CN201310228890A CN103321403B CN 103321403 B CN103321403 B CN 103321403B CN 201310228890 A CN201310228890 A CN 201310228890A CN 103321403 B CN103321403 B CN 103321403B
- Authority
- CN
- China
- Prior art keywords
- fixed form
- wall
- concrete
- template
- poured
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The invention discloses to dissipate at a kind of interlayer external wall construction seam and spell formwork erection method, comprise the following steps (1) and install an inner side template and the absolute altitude outboard template less than concrete floor top elevation at concrete exterior wall body of wall sidepiece to be poured;(2) fixed form is placed along outboard template horizontal full-length suitable for reading;(3) by a built-in fitting through concrete exterior wall body of wall to be poured and fixed form;(4) carry out the concreting of exterior wall and floor, after having poured, remove inner side template and outboard template;(5) based on fixed form, repeat the above steps, carry out installing of upper former and pouring of concrete;(6) after upper strata concreting completes, remove the fixed form of lower floor and excise the built-in fitting stretching out exterior wall;(7) repeat above-mentioned two step, complete the construction of whole outer wall body.Dissipate at interlayer external wall construction seam of the present invention and spell formwork erection method and ensure that the seamless combination of body of wall, it is to avoid spillage and faulting of slab ends phenomenon.
Description
Technical field
The present invention, about a kind of formwork erection method and structure, refers in particular to a kind of interlayer external wall construction seam
Place dissipates spells formwork erection method and structure.
Background technology
Xoncrete structure is mainly itemized greatly by reinforcing bar, template, concrete three and is constituted, wherein, and form fixer
Journey is the most complicated, and the subdivisional work that the amount of labour used is maximum, it has become affects construction quality, engineering
The key factor of progress.Although now widely popularize sizing masterplate, all-steel big shuttering etc., various its
Its new type formwork is also constantly occurring, but, dissipate and spell template with its low cost, convenient transportation, assembly
Flexibly etc. feature is still in occupation of major part market.But, along with construction quality requires more and more higher,
The shortcomings such as its piece, spillage, faulting of slab ends, deformation are more obvious, not only affect structural safety and
Presentation quality, also can increase the biggest later stage processing cost, affect carrying out of various work.Especially
Detailed treatment at interlayer external wall construction seam, spillage that piece the most sternly causes and faulting of slab ends are the most always
It it is the difficult problem of puzzlement people.Spillage and faulting of slab ends phenomenon once occur, deals with and bother very much, take a lot of work
Laborious more expensive, process not in time and affect image.
Therefore, each unit actively takes different measures to carry out pre-control, such as: have people at outer wall template
Bottom pad one elongated flitch, the method can reduce spillage, but faulting of slab ends phenomenon usually occurs;Someone is outside
Sponge strip set up by wall, and the method is higher to the completeest concrete wall outer edge flatness requirements, otherwise without
Method jam-packed, still there will be the phenomenon such as spillage and faulting of slab ends;Someone Os Draconis each time bottom wall form
Place adds a timber wedge, makes the adjacent body of wall of template, the method, and wood losses amount is big, and can pair cross-section size
Produce impact;Similar method is a lot, differ and with, but all cannot ensure template and the completeest concrete walls
Body is in close contact, thus tackles the problem at its root.
Summary of the invention
Because the problems referred to above, the invention provides to dissipate at a kind of interlayer external wall construction seam and spell formwork erection
Method, comprises the following steps:
(1) inner side template is installed and an absolute altitude is low at concrete exterior wall body of wall sidepiece to be poured
Outboard template in concrete floor top elevation;
(2) fixed form, described fixed form are placed along described outboard template horizontal full-length suitable for reading
Extend upward described concrete floor top board;
(3) built-in fitting is passed described in concrete exterior wall body of wall to be poured and described fixing mould
Plate;
(4) carry out the concreting of exterior wall and floor, after having poured, remove described interior side form
Plate and outboard template;
(5) repeat step (1) to (4), carry out installing of upper former and watering of concrete
Building, wherein, the outboard template of upper former installs based on described fixed form;
(6) after upper strata concreting completes, outside the fixed form of dismounting lower floor excision are stretched out
The built-in fitting of wall;
(7) repeat step (5) and (6), complete the construction of whole outer wall body.
Further improvement is that of the method, after step (2), also includes step (21):
In the outside of described inner side template, outboard template and fixed form, by through calculating the size determined
And spacing configures secondary joist, main joist and carries out reinforcing check.
Further improvement is that of the method, described built-in fitting is a pre embedded bolt, described pre embedded bolt
One end wear into concrete exterior wall body of wall to be poured, the other end of described pre embedded bolt stretches out to be poured
The concrete exterior wall body of wall built, and further pass through described fixed form.
Further improvement is that of the method, described pre embedded bolt wears into concrete exterior wall to be poured
One end of body of wall is welded with a vertical reinforcing bar.
In order to coordinate the enforcement of said method, present invention also offers and dissipate at a kind of interlayer external wall construction seam
Spell formwork structure, including propping up inner side template and the outside being located at the concrete exterior wall body of wall sidepiece built to be poured
Template, the absolute altitude of described outboard template is less than the absolute altitude of concrete floor top board by a preset value, along institute
State outboard template horizontal full-length suitable for reading and be placed with the width fixed form more than described preset value, and institute
State fixed form and be anchored on the concrete exterior wall body of wall after having poured by a built-in fitting.
Further improvement is that of this structure, described built-in fitting is a pre embedded bolt, described pre embedded bolt
One end wear into concrete exterior wall body of wall to be poured, the other end of described pre embedded bolt stretches out to be poured
The concrete exterior wall body of wall built.
Further improvement is that of this structure, described pre embedded bolt wears into concrete exterior wall to be poured
One end of body of wall is welded with a vertical reinforcing bar.
Use to dissipate at the interlayer external wall construction seam of the present invention and spell formwork erection method, poured concrete
After, do not remove fixed form and pre embedded bolt, only remove the template of remainder, erecting of pre embedded bolt
Straight reinforcing bar can form a mutual grasp with concrete, it is ensured that template firm.On installing
During layer outboard template, carrying out joining mould bottom it based on fixed form, above-mentioned same sample prescription is pressed at its top
Method configures, then by through calculating, the size determined and spacing configure secondary joist, main joist is gone forward side by side
Row reinforcing, check etc..After upper strata concreting completes, then remove bottom the outboard template of upper strata
Fixed form, and excision simultaneously stretches out the pre embedded bolt of exterior wall, so repeats construction, complete whole outside
The construction of wall.
Due to the fact that and have employed technique scheme, have the advantages that
1, owing to, during pouring levels concrete, fixed form remains the most motionless,
Ensure that the seamless combination of itself and concrete wall, it is to avoid spillage and faulting of slab ends phenomenon occur.
2, owing to having installed fixed form, make exterior wall other parts template has installed the base depended on
Plinth, it is simple to operation.
3, exceed the absolute altitude of floor top board due to fixed form, facilitate outboard template glacing flatness and
The inspection of sectional dimension and check.
4, after form removable, levels seam is tight, and mortar is full, and organoleptic quality is good, can be direct
Carry out decoration of exterior wall construction.
Accompanying drawing explanation
Fig. 1 is the flow chart dissipating at the interlayer external wall construction seam of the present invention and spelling formwork erection method.
Fig. 2 is the joining of fixed form dissipating at the interlayer external wall construction seam of the present invention and spelling formwork erection structure
Put schematic diagram.
Fig. 3 is the joining of pre embedded bolt dissipating at the interlayer external wall construction seam of the present invention and spelling formwork erection structure
Put schematic diagram.
Fig. 4 is the knot dissipating the pre embedded bolt spelling formwork erection structure at the interlayer external wall construction seam of the present invention
Composition.
Fig. 5 is to dissipate spelling formwork erection method lower-layer concrete at the interlayer external wall construction seam of the present invention to pour
The configuration schematic diagram of upper former after completing.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing
And embodiment, the present invention is further elaborated.Should be appreciated that described herein specifically
Embodiment only in order to explain the present invention, is not intended to limit the present invention.
Coordinate referring to shown in Fig. 2, dissipate at the interlayer external wall construction seam of the present invention and spell formwork structure, including
Prop up inner side template 10 and outboard template 20, the institute being located at concrete exterior wall body of wall 80 sidepiece built to be poured
The absolute altitude stating outboard template 20 is less than the absolute altitude of concrete floor 90 top board 901, edge by a preset value
Described outboard template 20 horizontal full-length suitable for reading is placed with the width fixed form more than described preset value
30, and described fixed form 30 is anchored on the concrete exterior wall wall after having poured by a built-in fitting
Body.Again by through calculating the size and spacing determined, configure secondary joist, main joist 50 and screw rod
60 and carry out reinforce check.
Coordinating referring to shown in Fig. 3, Fig. 4, described built-in fitting is a pre embedded bolt 40, described pre-buried spiral shell
One end of bar 40 wears into concrete exterior wall body of wall 80 to be poured, and is welded with a vertical reinforcing bar
401, the other end of described pre embedded bolt 40 stretches out concrete exterior wall body of wall 80 to be poured, and goes forward side by side one
Step is through described fixed form 30.
In a preferred embodiment of the present invention, the absolute altitude of described outboard template 20 is less than concrete building
The absolute altitude 200mm of plate 90 top board 901.The width of described fixed form 30 is 400mm, is allowed to
Fill up the 200mm of outboard template 20 opposite concrete floor 90 top board 901 deficiency, and also than mixed
Solidifying Tulou plate 90 top board 901 exceeds 200, it is ensured that the seamless combination of levels concrete wall.Institute
State the position that pre embedded bolt 40 is arranged below the absolute altitude 100mm of concrete floor 90 top board 901,
Insert from inside to outside, after adjustment level, firm with tied silk colligation.
Shown in Fig. 1, dissipate at the interlayer external wall construction seam of the present invention and spell formwork erection method, including
Following steps:
S1 installs inner side template 10 and a mark at the sidepiece of concrete exterior wall body of wall 80 to be poured
Height is in the outboard template 20 of top board 901 absolute altitude of concrete floor 90;
S2 places a fixed form 30, described fixing mould along described outboard template 20 horizontal full-length suitable for reading
Plate 30 extends upward the top board 901 of described concrete floor 90;
S3 one built-in fitting (for pre embedded bolt 40 shown in figure) is passed described in concrete to be poured
Outer wall body 80 and described fixed form 30;
S4 carries out the concreting of exterior wall and floor, shown in Fig. 5, has poured concrete seven 0
After, do not remove fixed form 30 and pre embedded bolt 40, only remove inner side template 10 and outboard template
20, the vertical reinforcing bar 41 of pre embedded bolt 40 can form a mutual grasp with concrete seven 0,
Ensure the firm of template;
S5 repeats step S1 to S4, carries out installing of upper former and pouring of concrete, wherein,
When installing upper strata outboard template, carry out bottom it joining mould based on fixed form 30, its top
Configure by step S1 to S4 same method, then join by size and the spacing determined through calculating
Put secondary joist, main joist 50 carrying out reinforce, check etc..
S6 is after upper strata concreting completes, outside the fixed form 30 of dismounting lower floor excision are stretched out
The pre embedded bolt 40 of wall;
S7 repeats step S5 and S6, completes the construction of whole outer wall body.
The above is only presently preferred embodiments of the present invention, not the present invention is done any in form
Restriction, although the present invention is disclosed above with preferred embodiment, but is not limited to the present invention,
Any those skilled in the art, in the range of without departing from technical solution of the present invention, when can profit
Make a little change with the technology contents of the disclosure above or be modified to the Equivalent embodiments of equivalent variations, but
Every content without departing from technical solution of the present invention, the technical spirit of the foundation present invention is to above example
Any simple modification, equivalent variations and the modification made, all still falls within the scope of technical solution of the present invention
In.
Claims (1)
1. dissipate at an interlayer external wall construction seam and spell formwork erection method, it is characterised in that include following step
Rapid:
(1) inner side template is installed and an absolute altitude is low at concrete exterior wall body of wall sidepiece to be poured
Outboard template in concrete floor top elevation;
(2) fixed form, described fixed form are placed along described outboard template horizontal full-length suitable for reading
Extend upward described concrete floor top board, in the outside of described inner side template, described outboard template
Outside and the outside of described fixed form, by through calculating the size that determines and spacing configuration time dragon
Bone, main joist also carry out reinforcing check;
(3) pre embedded bolt is passed described in concrete exterior wall body of wall to be poured and described fixing
Template, described pre embedded bolt is positioned at the bottom of elevation location and the described fixed form of described concrete floor top board
Between the elevation location in portion, one end of described pre embedded bolt wears into concrete exterior wall body of wall to be poured,
The other end of described pre embedded bolt stretches out concrete exterior wall body of wall to be poured, and further passs through described
Fixed form, one end that described pre embedded bolt wears into concrete exterior wall body of wall to be poured is welded with one
Vertically reinforcing bar;
(4) carry out the concreting of exterior wall and floor, after having poured, remove described interior side form
Plate, outboard template, secondary joist, main joist and Screw arbor with nut at both-ends;
(5) repeat step (1) to (4), carry out installing of upper former and watering of concrete
Building, wherein, the outboard template of upper former installs based on described fixed form, and upper
The layer outside of inner side template of template, the outside of outboard template and the outside of fixed form, by passing through
Calculate the size determined and the secondary joist of spacing configuration upper former and main joist, and, described pre-
Bury screw rod and stretch out the part of described exterior wall by mountain type fastener to described fixed form, upper former
Secondary joist and main joist fasten;
(6) after upper strata concreting completes, outside the fixed form of dismounting lower floor excision are stretched out
The pre embedded bolt of wall;
(7) repeat step (5) and (6), complete the construction of whole outer wall body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310228890.7A CN103321403B (en) | 2013-06-08 | 2013-06-08 | Dissipate at interlayer external wall construction seam and spell formwork erection method and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310228890.7A CN103321403B (en) | 2013-06-08 | 2013-06-08 | Dissipate at interlayer external wall construction seam and spell formwork erection method and structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103321403A CN103321403A (en) | 2013-09-25 |
CN103321403B true CN103321403B (en) | 2016-08-17 |
Family
ID=49190425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310228890.7A Active CN103321403B (en) | 2013-06-08 | 2013-06-08 | Dissipate at interlayer external wall construction seam and spell formwork erection method and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103321403B (en) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105113784B (en) * | 2015-09-20 | 2024-09-24 | 刘其标 | Main steel mould structure for bare concrete inner and outer walls |
CN106088580A (en) * | 2016-06-08 | 2016-11-09 | 中国十七冶集团有限公司 | A kind of skin external corner |
CN106245827A (en) * | 2016-08-30 | 2016-12-21 | 中建八局第四建设有限公司 | A kind of shear wall construction method |
CN106760522A (en) * | 2016-11-30 | 2017-05-31 | 中国冶集团有限公司 | A kind of concrete structure seam crossing prevents swollen mould mortar leakage prevention fixing device and method |
CN109518697A (en) * | 2018-12-12 | 2019-03-26 | 中铁局集团厦门建设工程有限公司 | The construction method of form concrete between a kind of subway station fender post |
CN109577648A (en) * | 2018-12-12 | 2019-04-05 | 中建四局第六建筑工程有限公司 | A kind of connection structure of outer wall template bottom |
CN110761322B (en) * | 2019-09-23 | 2021-08-13 | 中国一冶集团有限公司 | Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof |
CN112112424A (en) * | 2020-10-14 | 2020-12-22 | 中国核工业二四建设有限公司 | Construction method of stainless steel water tank cladding forming die |
CN116657910A (en) * | 2023-06-16 | 2023-08-29 | 中国建筑第四工程局有限公司 | Formwork-free construction method for flat space structure top plate |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5664367B2 (en) * | 2011-03-15 | 2015-02-04 | 株式会社Ihi | Mounting hardware fixing method |
CN202644980U (en) * | 2012-06-01 | 2013-01-02 | 中建三局建设工程股份有限公司 | Joint reinforcing system for structural edge member formwork |
CN102926537B (en) * | 2012-11-28 | 2015-01-07 | 深圳市鹏城建筑集团有限公司 | Device for fixing root of external wall formwork |
CN203347223U (en) * | 2013-06-08 | 2013-12-18 | 中国建筑第八工程局有限公司 | Separate-assembly formwork structure at interlayer outer wall construction joint |
-
2013
- 2013-06-08 CN CN201310228890.7A patent/CN103321403B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103321403A (en) | 2013-09-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103321403B (en) | Dissipate at interlayer external wall construction seam and spell formwork erection method and structure | |
CN104453014B (en) | The method of attachment of 3D printing filled wall and constructional column and attachment structure | |
CN106245678B (en) | Outer wall of basement single side formwork construction method based on steel pipe truss | |
CN102493341A (en) | Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway | |
CN105040970A (en) | High formwork system of comprehensive gymnasium and construction method thereof | |
CN103132537A (en) | Steel latticed column homocentric-square-shaped concrete bearing platform combination type tower crane base structure and construction method | |
CN107310025A (en) | The fabricated device and method for prefabricating of a kind of Prefabricated bar boots | |
CN108894488A (en) | A kind of construction method of Novel section steel keel steel and wood composite template | |
CN106836463A (en) | The constructing device and construction method of cushion cap and ground girder construction | |
CN105332506A (en) | Formwork support system for parallel multi-section stair and method for constructing same | |
CN207405730U (en) | A kind of discharge structure of basement | |
CN107476567A (en) | It is a kind of to control the pitched roof gradient and the construction method and track-type facilities of thickness | |
CN106223960A (en) | High ferro major long tunnel inverted arch moves integrally mould bases construction | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN205894670U (en) | Template structure for concrete joint construction between floors | |
CN103074871A (en) | Arc-shaped slope concrete sliding and lifting template | |
CN207405882U (en) | A kind of steel bar positioning frame | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
CN204126082U (en) | A kind of integral cast-in-situ light weight concrete construction partition wall | |
CN207436503U (en) | Efficient construction of precast floorslab hangs membrane module | |
CN203347223U (en) | Separate-assembly formwork structure at interlayer outer wall construction joint | |
CN103912127A (en) | Construction control method of floor formwork or floor slab and special calibration ruler | |
CN206722225U (en) | A kind of accurate spacing and strip thickness control device of concreting floor bar skeleton | |
CN205206315U (en) | Run -in runs formwork support system of stair more | |
CN205975995U (en) | Cast -in -place concrete floor indent steel tube frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |