CN103321234A - 建于高边坡或地质复杂区域上的承重结构及其施工方法 - Google Patents

建于高边坡或地质复杂区域上的承重结构及其施工方法 Download PDF

Info

Publication number
CN103321234A
CN103321234A CN2013102844310A CN201310284431A CN103321234A CN 103321234 A CN103321234 A CN 103321234A CN 2013102844310 A CN2013102844310 A CN 2013102844310A CN 201310284431 A CN201310284431 A CN 201310284431A CN 103321234 A CN103321234 A CN 103321234A
Authority
CN
China
Prior art keywords
load
matrix
petrographic province
carrying members
province
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102844310A
Other languages
English (en)
Other versions
CN103321234B (zh
Inventor
张公平
周钟
唐忠敏
曾勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Original Assignee
Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group filed Critical Chengdu Hydroelectric Investigation and Design Institute of China Hydropower Engineering Consulting Group
Priority to CN201310284431.0A priority Critical patent/CN103321234B/zh
Publication of CN103321234A publication Critical patent/CN103321234A/zh
Application granted granted Critical
Publication of CN103321234B publication Critical patent/CN103321234B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种建于高边坡或地质复杂区域上的承重结构,以及用于建造所述承重结构的施工方法,属于土建设计施工技术领域。提供一种结构稳定、承载能力强的建于边坡或地质复杂区域上的承重结构和用于建造所述承重结构的施工方法。该承重结构包括承重结构本体、承重基础和内部设置有加固件的岩区基体,所述承重基础的上部与所述的承重结构本体连接,下部与所述的岩区基体连接。在建造所述承重结构时,先开挖出建基面,然后在所述建基面临空侧原始地形线边坡面上,向建基面以下的岩层内植入加固件并钻设灌浆孔,并通过所述灌浆孔进行固结灌浆和插入锚杆束形成岩区基体,最后再在所述岩区基体上依次浇筑承重基础和承重结构本体砼形成承重结构。

Description

建于高边坡或地质复杂区域上的承重结构及其施工方法
技术领域
本发明涉及一种承重结构,尤其是涉及一种建于高边坡或地质复杂区域上的承重结构,属于土建设计施工技术领域。本发明还涉及一种用于建造所述承重结构的施工方法。
背景技术
随着我国西部地区基础设施建设的不断推进,在深山峡谷地区大量的公路、桥梁及其他承重建筑物得以修建。由于西部山区大多地形高陡、地质条件复杂,大量的桥墩、承重墩、承重柱等必须修建在高陡边坡区域,有的甚至必须修建在地质条件复杂的部位如软岩部位、断层部位等。如何确保这些承重结构在满足基础地基承载力要求的同时,又满足边坡受荷载作用后的稳定要求,这是当前西部地区工程建设所面临的重要技术问题。
发明内容
本发明所要解决的技术问题是:提供一种结构稳定、承载能力强的建于边坡或地质复杂区域上的承重结构。本发明还提供了一种用于建造所述承重结构的施工方法。
为解决上述技术问题所采用的技术方案是:建于高边坡或地质复杂区域上的承重结构,包括承重结构本体、承重基础和内部设置有加固件的岩区基体,所述承重基础的上部与所述的承重结构本体连接,下部与所述的岩区基体连接。
进一步的是,所述岩区基体为地质复杂地区或高边坡区域内的经钻孔灌浆固结形成的灌浆固结体。
进一步的是,设置在所述岩区基体内的加固件之一为竖直的设置在所述岩区基体内的锚杆束,所述锚杆束具有一个伸出端,所述伸出端伸入所述的承重基础中。
进一步的是,设置在所述岩区基体内的加固件之一为倾斜的设置在所述岩区基体内的系统锚杆。
上述方案的优选方式是,在设置有所述系统锚杆的所述岩区基体外侧的边坡上还设置有钢筋砼面板,所述系统锚杆具有一个伸出段,所述伸出段伸入所述的钢筋砼面板内。
进一步的是,设置在所述岩区基体内的加固件之一为倾斜的设置在所述岩区基体内的预应力锚索。
上述方案的优选方式是,在设置有所述预应力锚索的所述岩区基体外侧的边坡上还设置有钢筋砼面板,所述预应力锚索具有一段伸出节,所述伸出节伸入所述的钢筋砼面板内。
用于建造所述承重结构的施工方法,包括以下步骤,
1)基础开挖,根据图纸要求,在地质复杂或高边坡地区内的选定区域开挖形成所述承重基础的建基面;
2)岩区基体施工,在开挖结束后形成的所述建基面临空侧原始地形线边坡面上,向所述建基面以下的岩层内植入加固件构成含有所述加固件的岩区基体;
3)岩区基体的固结,在岩区基体施工完成后,根据建基面开挖时获得的地质情况,在所述建基面上向岩区基体内钻设灌浆孔,并通过所述灌浆孔向所述岩区基体内进行固结灌浆施工,形成灌浆固结体结构的岩区基体,与此同时向所述灌浆孔中插入锚杆束形成群桩基础,完成岩区基体的固结;
4)承重基础以及承重结构的施工,在所述岩区基体上以建基面为基面,由下往上分别进行承重基础和承重结构砼的浇筑施工,这样便完成了一件所述承重结构的施工。
进一步的是,步骤1)中对所述地质复杂或高边坡地区内的选定区域的开挖采用的是人工开挖或小药量爆破式开挖。
进一步的是,步骤2)中植入所述岩层内的加固件分别为系统锚杆和/或预应力锚索,并且在分别植入所述系统锚杆和/或预应力锚索后,随之在所述建基面临空侧原始地形线边坡面上浇筑钢筋砼面板。
本发明的有益效果是:通过先在地质复杂或高边坡地区内的选定区域开挖出建基面,然后在所述建基面临空侧原始地形线边坡面上,向建基面以下的岩层内植入加固件构成含有所述加固件的岩区基体后,再在所述岩区基体上根据建基面开挖时获得的地质情况,钻设灌浆孔,并通过所述灌浆孔向所述岩区基体内进行固结灌浆和插入锚杆束,形成具有群桩基础的灌浆固结体结构的岩区基体,最后在所述具有群桩基础的灌浆固结体结构的岩区基体上依次浇筑承重基础和承重结构本体砼,形成所述的承重结构。这样,由于在所述的岩区基体内设置有能有效提高所述岩区基体稳定性和承载能力的加固件,从而使在以所述岩区地基体为基础建造成的所述承重结构也具有很强的稳定性和承载能力。
附图说明
图1为本发明建于高边坡或地质复杂区域上的承重结构的结构示意图。
图中标记为:承重结构本体1、承重基础2、加固件3、岩区基体4、锚杆束5、伸出端6、系统锚杆7、钢筋砼面板8、伸出段9、预应力锚索10、伸出节11、建基面12、原始地形线边坡面13、灌浆孔14。
具体实施方式
如图1所示是本发明提供的一种结构稳定、承载能力强的建于边坡或地质复杂区域上的承重结构,以及用于建造该承重结构的施工方法。所述的承重结构包括承重结构本体1、承重基础2和内部设置有加固件3的岩区基体4,所述承重基础2的上部与所述的承重结构本体1连接,下部与所述的岩区基体4连接;所述岩区基体4为复杂地质地区或高边坡区域内的经钻孔灌浆固结形成的灌浆固结体;设置在所述岩区基体4内的加固件3之一为竖直的设置在所述岩区基体4内的锚杆束5,所述锚杆束5具有一个伸出端6,所述伸出端6伸入所述的承重基础2中。所述的施工方法包括以下步骤,
1)基础开挖,根据图纸要求,在复杂地质或高边坡地区内的选定区域采用人工开挖或小药量爆破式开挖形成所述承重基础2的建基面12;
2)岩区基体施工,在开挖结束后形成的所述建基面12临空侧原始地形线边坡面13上,向所述建基面12以下的岩层内植入加固件3构成含有所述加固件3的岩区基体4;
3)岩区基体4的固结,在岩区基体4施工完成后,根据建基面12开挖时获得的地质情况,在所述建基面12上向岩区基体4内钻设灌浆孔14,并通过所述灌浆孔14向所述岩区基体4内进行固结灌浆施工,形成灌浆固结体结构的岩区基体4,与此同时向所述灌浆孔14中插入锚杆束5形成群桩基础,完成岩区基体4的固结;
4)承重基础2以及承重结构本体1的施工,在所述岩区基体4上以建基面12为基面,由下往上分别进行承重基础2和承重结构本体1砼的浇筑施工,这样便完成了一件所述承重结构的施工。
通过先在地质复杂或高边坡地区内的选定区域开挖出建基面12,然后在所述建基面12临空侧原始地形线边坡面13上,向建基面12以下的岩层内植入加固件3构成含有所述加固件3的岩区基体4后,再在所述岩区基体4上根据建基面12开挖时获得的地质情况,钻设灌浆孔14,并通过所述灌浆孔14向所述岩区基体4内进行固结灌浆和插入锚杆束5,形成具有群桩基础的灌浆固结体结构的岩区基体4,最后在所述具有群桩基础的灌浆固结体结构的岩区基体4上依次浇筑承重基础2和承重结构本体5砼,形成所述的承重结构。这样,由于在所述的岩区基体4内设置有能有效提高所述岩区基体4稳定性和承载能力的加固件3,从而使在以所述岩区地基体4为基础建造成的所述承重结构也具有很强的稳定性和承载能力。
上述施方式中,设置在所述岩区基体4内的加固件3之一可以是倾斜的设置在所述岩区基体4内的系统锚杆7,也可以是倾斜的设置在所述岩区基体4内的预应力锚索10,还可以是倾斜的设置在所述岩区基体4内的所述系统锚杆7和预应力锚索10的混合结构。同时,为了使所述的岩区基体4在恶劣气候条件下不会出原始边坡的垮塌和/或滑坡,在设置完成所述系统锚杆7和/或预应力锚索10后,随之在所述岩区基体4外侧原始地形线边坡面13上还浇筑钢筋砼面板8,使所述系统锚杆7的伸出段9和/或预应力锚索10的伸出节11,分别插入所述的钢筋砼面板8中,这样,即使是在十分恶劣的气候条件下,所述的原始地形线边坡面13也由于有钢筋砼面板8的保护而不会出垮塌和/或滑坡的现象。进一步的保证了所述承重结构的稳定性。

Claims (10)

1.建于高边坡或复杂地质区域上的承重结构,其特征在于:包括承重结构本体(1)、承重基础(2)和内部设置有加固件(3)的岩区基体(4),所述承重基础(2)的上部与所述的承重结构本体(1)连接,下部与所述的岩区基体(4)连接。
2.根据权利要求1所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:所述岩区基体(4)为复杂地质地区或高边坡区域内的经钻孔灌浆固结形成的灌浆固结体。
3.根据权利要求1或2所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:设置在所述岩区基体(4)内的加固件(3)之一为竖直的设置在所述岩区基体(4)内的锚杆束(5),所述锚杆束(5)具有一个伸出端(6),所述伸出端(6)伸入所述的承重基础(2)中。
4.根据权利要求1所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:设置在所述岩区基体(4)内的加固件(3)之一为倾斜的设置在所述岩区基体(4)内的系统锚杆(7)。
5.根据权利要求4所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:在设置有所述系统锚杆(7)的所述岩区基体(4)外侧的边坡上还设置有钢筋砼面板(8),所述系统锚杆(7)具有一个伸出段(9),所述伸出段(9)伸入所述的钢筋砼面板(8)内。
6.根据权利要求1所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:设置在所述岩区基体(4)内的加固件(3)之一为倾斜的设置在所述岩区基体(4)内的预应力锚索(10)。
7.根据权利要求6所述的建于高边坡或复杂地质区域上的承重结构,其特征在于:在设置有所述预应力锚索(10)的所述岩区基体(4)外侧的边坡上还设置有钢筋砼面板(8),所述预应力锚索(10)具有一段伸出节(11),所述伸出节(11)伸入所述的钢筋砼面板(8)内。
8.用于建造权利要求3所述承重结构的施工方法,其特征在于:包括以下步骤,
1)基础开挖,根据图纸要求,在复杂地质或高边坡地区内的选定区域开挖形成所述承重基础(2)的建基面(12);
2)岩区基体施工,在开挖结束后形成的所述建基面(12)临空侧原始地形线边坡面(13)上,向所述建基面(12)以下的岩层内植入加固件(3)构成含有所述加固件(3)的岩区基体(4);
3)岩区基体(4)的固结,在岩区基体(4)施工完成后,根据建基面(12)开挖时获得的地质情况,在所述建基面(12)上向岩区基体(4)内钻设灌浆孔(14),并通过所述灌浆孔(14)向所述岩区基体(4)内进行固结灌浆施工,形成灌浆固结体结构的岩区基体(4),与此同时向所述灌浆孔(14)中插入锚杆束(5)形成群桩基础,完成岩区基体(4)的固结;
4)承重基础(2)以及承重结构本体(1)的施工,在所述岩区基体(4)上以建基面(12)为基面,由下往上分别进行承重基础(2)和承重结构本体(1)砼的浇筑施工,这样便完成了一件所述承重结构的施工。
9.根据权利要求8所述的施工方法,其特征在于:步骤1)中对所述复杂地质或高边坡地区内的选定区域的开挖采用的是人工开挖或小药量爆破式开挖。
10.根据权利要求8所述的施工方法,其特征在于:步骤2)中植入所述岩层内的加固件(3)分别为系统锚杆(7)和/或预应力锚索(10),并且在分别植入所述系统锚杆(7)和/或预应力锚索(10)后,随之在所述建基面(12)临空侧原始地形线边坡面(13)上浇筑钢筋砼面板(8)。
CN201310284431.0A 2013-07-08 2013-07-08 建于高边坡或地质复杂区域上的承重结构的施工方法 Active CN103321234B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310284431.0A CN103321234B (zh) 2013-07-08 2013-07-08 建于高边坡或地质复杂区域上的承重结构的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310284431.0A CN103321234B (zh) 2013-07-08 2013-07-08 建于高边坡或地质复杂区域上的承重结构的施工方法

Publications (2)

Publication Number Publication Date
CN103321234A true CN103321234A (zh) 2013-09-25
CN103321234B CN103321234B (zh) 2015-06-03

Family

ID=49190257

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310284431.0A Active CN103321234B (zh) 2013-07-08 2013-07-08 建于高边坡或地质复杂区域上的承重结构的施工方法

Country Status (1)

Country Link
CN (1) CN103321234B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005416A (zh) * 2014-04-29 2014-08-27 中建四局第六建筑工程有限公司 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法
CN104532835A (zh) * 2014-12-17 2015-04-22 青岛理工大学 锚杆束复合抗拔加固设计强度的测定方法
CN104532868A (zh) * 2014-12-11 2015-04-22 西南交通大学 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN108360585A (zh) * 2018-04-02 2018-08-03 山东建筑大学 临近边坡高层建筑基础的托换加固方法及建筑物复合基础
CN111535161A (zh) * 2020-05-22 2020-08-14 中铁二院工程集团有限责任公司 一种斜坡地形桥墩变形修复结构及修复方法
CN114457834A (zh) * 2022-03-23 2022-05-10 浙江交工集团股份有限公司 一种斜坡地形下桥墩大直径圆形基础体系及其施工方法
CN115305977A (zh) * 2022-07-01 2022-11-08 中冀建勘集团有限公司 一种附崖建筑的地基基础加固方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005016196A (ja) * 2003-06-27 2005-01-20 Yasuhiko Okochi 橋台背面盛土工法
KR100587376B1 (ko) * 2006-02-24 2006-06-14 벽산엔지니어링주식회사 도로 교량의 비탈면 교각 보강 구조
CN201148620Y (zh) * 2008-01-11 2008-11-12 肖世国 小型桩组合抗滑结构
CN201962558U (zh) * 2011-03-21 2011-09-07 中铁二院工程集团有限责任公司 山区高陡边坡路基构造
CN102979103A (zh) * 2012-12-13 2013-03-20 中国水电顾问集团成都勘测设计研究院 一种大型卸荷松弛岩质边坡的台阶式开挖施工方法
CN203475443U (zh) * 2013-07-08 2014-03-12 中国水电顾问集团成都勘测设计研究院有限公司 建于高边坡或地质复杂区域上的承重结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005016196A (ja) * 2003-06-27 2005-01-20 Yasuhiko Okochi 橋台背面盛土工法
KR100587376B1 (ko) * 2006-02-24 2006-06-14 벽산엔지니어링주식회사 도로 교량의 비탈면 교각 보강 구조
CN201148620Y (zh) * 2008-01-11 2008-11-12 肖世国 小型桩组合抗滑结构
CN201962558U (zh) * 2011-03-21 2011-09-07 中铁二院工程集团有限责任公司 山区高陡边坡路基构造
CN102979103A (zh) * 2012-12-13 2013-03-20 中国水电顾问集团成都勘测设计研究院 一种大型卸荷松弛岩质边坡的台阶式开挖施工方法
CN203475443U (zh) * 2013-07-08 2014-03-12 中国水电顾问集团成都勘测设计研究院有限公司 建于高边坡或地质复杂区域上的承重结构

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104005416A (zh) * 2014-04-29 2014-08-27 中建四局第六建筑工程有限公司 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法
CN104005416B (zh) * 2014-04-29 2017-06-30 中建四局第六建筑工程有限公司 一种用于高陡边坡素填土反压条件下大直径孔桩塌孔的处理方法
CN104532868A (zh) * 2014-12-11 2015-04-22 西南交通大学 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN104532868B (zh) * 2014-12-11 2016-01-06 西南交通大学 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN104532835A (zh) * 2014-12-17 2015-04-22 青岛理工大学 锚杆束复合抗拔加固设计强度的测定方法
CN104532835B (zh) * 2014-12-17 2016-01-20 青岛理工大学 锚杆束复合抗拔加固设计强度的测定方法
CN108360585A (zh) * 2018-04-02 2018-08-03 山东建筑大学 临近边坡高层建筑基础的托换加固方法及建筑物复合基础
CN111535161A (zh) * 2020-05-22 2020-08-14 中铁二院工程集团有限责任公司 一种斜坡地形桥墩变形修复结构及修复方法
CN111535161B (zh) * 2020-05-22 2022-04-12 中铁二院工程集团有限责任公司 一种斜坡地形桥墩变形修复结构及修复方法
CN114457834A (zh) * 2022-03-23 2022-05-10 浙江交工集团股份有限公司 一种斜坡地形下桥墩大直径圆形基础体系及其施工方法
CN115305977A (zh) * 2022-07-01 2022-11-08 中冀建勘集团有限公司 一种附崖建筑的地基基础加固方法
CN115305977B (zh) * 2022-07-01 2024-06-11 中冀建勘集团有限公司 一种附崖建筑的地基基础加固方法

Also Published As

Publication number Publication date
CN103321234B (zh) 2015-06-03

Similar Documents

Publication Publication Date Title
CN103321234B (zh) 建于高边坡或地质复杂区域上的承重结构的施工方法
CN102758642B (zh) 上软下硬地层大跨隧道叠合承载拱结构及其施工方法
CN110318770A (zh) 一种公路隧道半明半暗进洞施工方法
CN104532868B (zh) 高陡变形斜坡区桥梁锚拉式高承台群桩基础修建方法
CN102758632A (zh) 岩质地层双初支分层法修建大型地下结构的方法
CN101349064A (zh) 软弱岩石地质条件下水电站调压室竖井的施工方法
CN209924998U (zh) 一种浅覆土盾构隧道下穿道路加固保护结构
CN103485363A (zh) 立体连续框架式钢筋混凝土结构挡土墙
CN107905251A (zh) 一种模块预应力装配式挡土墙及其装配方法
CN202323970U (zh) 边坡联合加固系统
CN109930609A (zh) 一种用于上软下硬地层的排桩复合支护结构及其施工方法
CN103590408A (zh) 一种双排桩梁竖锚新型支护体系及其施工方法
CN100513705C (zh) 用于边坡加固的地下梁-桩框架结构
CN103215889A (zh) 一种用于较差地质条件的拱桥基础及其施工方法
CN109973122A (zh) 一种围岩松动或软岩大变形的隧道加固控制方法
CN109056810A (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法
CN101368388B (zh) 锚管构架支护方法
CN206418509U (zh) 一种高陡边坡的桩锚支护结构
CN104863613A (zh) 岩质地层暗挖地下结构高边墙锚拉初支结构及施工方法
CN205576990U (zh) 一种过河段穿桥桩隧道注浆支护结构
CN109681212B (zh) 小断面黄土隧道的开挖施工方法
CN208815566U (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造
CN203475443U (zh) 建于高边坡或地质复杂区域上的承重结构
CN211900659U (zh) 浅埋大跨度地下洞室开挖支护布置结构
CN212250067U (zh) 一种穿越大型全充填溶洞的隧道衬砌结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China

Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072

Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant