CN103321148A - Bridge guardrail base split bolt hole plugging structure and process - Google Patents
Bridge guardrail base split bolt hole plugging structure and process Download PDFInfo
- Publication number
- CN103321148A CN103321148A CN2013103071767A CN201310307176A CN103321148A CN 103321148 A CN103321148 A CN 103321148A CN 2013103071767 A CN2013103071767 A CN 2013103071767A CN 201310307176 A CN201310307176 A CN 201310307176A CN 103321148 A CN103321148 A CN 103321148A
- Authority
- CN
- China
- Prior art keywords
- hole
- rod
- split bolt
- bridge guardrail
- millimeters
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Abstract
The invention discloses a bridge guardrail base split bolt hole plugging structure which is used for solving the problems of water seepage and water leakage of split bolt hole plugging. The bridge guardrail base split bolt hole plugging structure comprises a guardrail base, wherein a hole is formed in the guardrail base, and is remained by a split bolt in the pouring process. The bridge guardrail base split bolt hole plugging structure is characterized in that a nylon plastic rod which is in excessively tight fit with the hole is embedded in the hole, an adhering agent is coated between the nylon plastic rod and the hole to form a watertight full-sealing structure. The invention also discloses a construction process of the bridge guardrail base split bolt hole plugging structure. The plugged hole does not seep and leak, and thus the problems of water seepage and water leakage of the bridge guardrail base to the split bolt hole are well solved.
Description
Technical field
This scheme is mainly used in the cast-in-place guardrail of bridge water cement concrete field, specifically a kind of structure and plugging technology that carries out shutoff for the split bolt hole in the Bridge guardrail pedestal.
Background technology
All be provided with the cast-in-place anticollision barrier of cement concrete in the bridge both sides, such as Fig. 1, in building forming process, need to use template to finalize the design, template in the general civil engineering need to use split bolt 11 that the template 12 of both sides is tightened up, play the effect of fixed form, then inside casting cement concrete.Behind the coagulation forming, again split bolt is extracted out, will be formed a hole in the position of interspersed split bolt, can be with reference to the Template Location scheme among the CN201962608U.At present, for the processing mode of split bolt hole be, use mortar with the simple shutoff of hole, this shutoff mode is suitable at general building, but has potential safety hazard for bridge and guardrail, is mainly reflected in:
In the winter time, the infiltration on road surface can progressively be accumulated in the hole, then progressively effluxes, and freeze to form the ice scraper-trough conveyer in the process that effluxes, and has caused security threat to pedestrian and the vehicle of dealing under the bridge.
Simultaneously, because the water that oozes out in the hole can form washmarking on the surface of bridge, affect the attractive in appearance of city, need to carry out thoroughly shutoff, had no at present effective shutoff scheme.
Summary of the invention
In order to solve the deficiencies in the prior art, the invention provides a kind of Bridge guardrail pedestal split bolt holes blocking structure and plugging technology, one of its purpose is carried out complete shutoff to the split bolt hole, and another purpose is to satisfy long-term non-maintaining military service.
The technical solution adopted for the present invention to solve the technical problems is: Bridge guardrail pedestal split bolt holes blocking structure, comprise Guard fence base, in described Guard fence base, be reserved with hole, this hole split bolt in casting process stays, it is characterized in that, in described hole, embed one and cross friction tight nylon plastic(s) rod, and between described nylon plastic(s) rod and hole, scribble cementing agent, form a watertight complete hermetically-sealed construction.
Described cementing agent is the neutral silicone weather-resistant glue.
Described nylon plastic(s) rod comprises straight rod section and cone rod section, and cone rod section wherein can conveniently be inserted hole, and straight rod section is crossed tight fit with hole formation.
Described nylon rod length is 150 millimeters, and is boring the rod section near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.
Bridge guardrail pedestal split bolt holes blocking technique, according to the following steps operation in tandem:
Step 1 is made nylon rod, and described nylon rod has following architectural feature: described nylon rod comprises the straight rod section of outer end and inner cone rod section, and the described straight rod section of outer end matches with the size of hole;
Step 2 is cleaned out hole with hairbrush, air gun;
Step 4 uses hammer rapidly nylon rod to be wedged in the hole, until the nylon rod outer face is concordant with the pedestal external surface.
After step 4, also comprise a step of the hole mouth of wedging nylon rod being smeared the neutral silicone weather-resistant glue.
Detailed, described nylon rod length is 150 millimeters, and is boring the rod section near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.
The invention has the beneficial effects as follows: the nylon plastic(s) rod has that good toughness, tear resistance are strong, oil resistant, antidetonation, stretching, bending strength are good, and have characteristics such as water imbibition is little, good stability of the dimension, the needs of the outdoor adverse circumstances of viaduct can be satisfied fully, hundred-percent shutoff can be realized.Hole after the shutoff no longer seeps water, leaks, and has well solved Bridge guardrail pedestal split bolt hole seepy question.
Description of drawings
Fig. 1 is Guard fence base cast in situs moulding figure;
Fig. 2 is the Guard fence base structural representation;
Fig. 3 is the stereogram of nylon plastic(s) rod.
Among the figure: 11 split bolts, 12 templates, 2 nylon plastic(s)s rod, 21 straight rod sections, 22 cone rod sections, 3 holes, 4 Guard fence bases.
The specific embodiment
As shown in Figure 2 to Figure 3,
The Bridge guardrail pedestal split bolt hole plugging technology that leaks was carried out the fishing expedition work in early stage before beginning to construct, mainly comprise and be familiar with design document, and carry out highway condition investigation at the scene comprehensively.Clear and definite Guard fence base split bolt hole location, quantity are also carried out detailed observed and recorded.
Then track of sealing utilizes crane gear the constructor to be delivered to guardrail outside pedestal split bolt hole location, then according to the following steps operation in tandem as construction area below bridge floor:
Step 1, make nylon plastic(s) rod 2, described nylon rod has following architectural feature: nylon rod comprises the straight rod section 21 of outer end and inner cone rod section 22, the straight rod section of outer end matches with the size of hole 3, nylon rod length is 150 millimeters, and is boring the rod section near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.
Step 2 is cleaned out hole 3 with hairbrush, air gun, thoroughly removes the foreign material in the hole clean.
Step 4 uses the hammer instrument rapidly nylon rod to be wedged in the hole, until the nylon rod outer face is concordant with the pedestal external surface, the neutral silicone weather-resistant glue can form effective shutoff after solidifying.
Step 5 is smeared the neutral silicone weather-resistant glue to the hole mouth of wedging nylon rod 2.
Require Guard fence base maintenance to carry out quality inspection and evaluation according to job specfication after construction is finished, and in time the test evaluation situation is fed back to quality examination section, the problem of appearance is in time solved.
Final a kind of urban viaduct Guard fence base hole plugging structure that leaks that forms, comprise Guard fence base 4, in Guard fence base, be reserved with hole 3, in hole, embed one and cross friction tight nylon rod 2, nylon rod length is 150 millimeters, and is boring rod section 22 near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.Scribble the neutral silicone weather-resistant glue between nylon rod and the hole.Form a kind of totally enclosed structure.
Nylon rod itself has mechanical strength, rigidity, hardness, toughness is high, ageing-resistant performance good, mechanical damping capacity is good, good sliding, excellent abrasion resistance, machining property is good, abrasion resistance is good, the feature of good stability of the dimension.In machine, filling operation, all have good characteristic, and can satisfy sealing performance and later stage weatherability requirement.
Embodiment recited above is described preferred embodiment of the present invention; be not that scope of the present invention is limited; design under the prerequisite of spirit not breaking away from the present invention; the relevant technical staff in the field all should expand as in the determined protection domain of claims of the present invention various distortion of the present invention and improvement.
Claims (7)
1. Bridge guardrail pedestal split bolt holes blocking structure, comprise Guard fence base, in described Guard fence base, be reserved with hole, it is characterized in that, in described hole, embed one and cross friction tight nylon plastic(s) rod, and between described nylon plastic(s) rod and hole, scribble cementing agent.
2. Bridge guardrail pedestal split bolt holes blocking structure according to claim 1 is characterized in that, described cementing agent is the neutral silicone weather-resistant glue.
3. Bridge guardrail pedestal split bolt holes blocking structure according to claim 1 and 2 is characterized in that, described nylon rod comprises straight rod section and cone rod section.
4. Bridge guardrail pedestal split bolt holes blocking structure according to claim 3 is characterized in that, described nylon rod length is 150 millimeters, and is boring the rod section near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.
5. Bridge guardrail pedestal split bolt holes blocking technique, according to the following steps operation in tandem:
Step 1 is made nylon rod, and described nylon rod has following architectural feature: described nylon rod comprises the straight rod section of outer end and inner cone rod section, and the described straight rod section of outer end matches with the size of hole,
Step 2 will be cleaned out in the hole with hairbrush, air gun,
Step 3, injection neutral silicone weather-resistant glue in the hole after the cleaning, and smear the neutral silicone weather-resistant glue at the corresponding surface of nylon rod;
Step 4 uses the hammer instrument rapidly nylon rod to be wedged in the hole, until the nylon rod outer face is concordant with the pedestal external surface.
6. Bridge guardrail pedestal split bolt holes blocking technique according to claim 5 is characterized in that, also comprises a step of the hole mouth of wedging nylon rod being smeared the neutral silicone weather-resistant glue after step 4.
7. Bridge guardrail pedestal split bolt holes blocking technique according to claim 5 is characterized in that, described nylon rod length is 150 millimeters, and is boring the rod section near making 15 millimeters to 18 millimeters gradual changes of diameter in 50 millimeters scopes of inner face.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310307176.7A CN103321148B (en) | 2013-07-19 | 2013-07-19 | Bridge guardrail base split bolt holes blocking structure and plugging technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310307176.7A CN103321148B (en) | 2013-07-19 | 2013-07-19 | Bridge guardrail base split bolt holes blocking structure and plugging technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103321148A true CN103321148A (en) | 2013-09-25 |
CN103321148B CN103321148B (en) | 2015-08-19 |
Family
ID=49190172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310307176.7A Active CN103321148B (en) | 2013-07-19 | 2013-07-19 | Bridge guardrail base split bolt holes blocking structure and plugging technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103321148B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867306A (en) * | 2017-05-10 | 2018-11-23 | 镇江长城重工科技有限公司 | A kind of S-shaped steel structure bridge |
CN109013166A (en) * | 2018-09-05 | 2018-12-18 | 中国航发动力股份有限公司 | A kind of fabrication hole sealant coated tool and sealant coating method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004176400A (en) * | 2002-11-27 | 2004-06-24 | Sho Bond Constr Co Ltd | Width expansion member for road and its installation method |
CN1769611A (en) * | 2004-11-02 | 2006-05-10 | 邱则有 | Cast in situ reinforcing steel bar concrete hollow board |
CN101016756A (en) * | 2006-02-06 | 2007-08-15 | 朱新伟 | Cast-in-situ concrete structure non-hole construction method |
CN201074404Y (en) * | 2007-07-16 | 2008-06-18 | 莱西市建筑总公司 | Plugging tool |
JP2008266910A (en) * | 2007-04-17 | 2008-11-06 | Kajima Corp | Projection structure of anchorage or deviator of tendon, and construction method therefor |
CN203361017U (en) * | 2013-07-19 | 2013-12-25 | 济南金曰公路工程有限公司 | Bridge guardrail base split bolt hole plugging structure |
-
2013
- 2013-07-19 CN CN201310307176.7A patent/CN103321148B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004176400A (en) * | 2002-11-27 | 2004-06-24 | Sho Bond Constr Co Ltd | Width expansion member for road and its installation method |
CN1769611A (en) * | 2004-11-02 | 2006-05-10 | 邱则有 | Cast in situ reinforcing steel bar concrete hollow board |
CN101016756A (en) * | 2006-02-06 | 2007-08-15 | 朱新伟 | Cast-in-situ concrete structure non-hole construction method |
JP2008266910A (en) * | 2007-04-17 | 2008-11-06 | Kajima Corp | Projection structure of anchorage or deviator of tendon, and construction method therefor |
CN201074404Y (en) * | 2007-07-16 | 2008-06-18 | 莱西市建筑总公司 | Plugging tool |
CN203361017U (en) * | 2013-07-19 | 2013-12-25 | 济南金曰公路工程有限公司 | Bridge guardrail base split bolt hole plugging structure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108867306A (en) * | 2017-05-10 | 2018-11-23 | 镇江长城重工科技有限公司 | A kind of S-shaped steel structure bridge |
CN109013166A (en) * | 2018-09-05 | 2018-12-18 | 中国航发动力股份有限公司 | A kind of fabrication hole sealant coated tool and sealant coating method |
Also Published As
Publication number | Publication date |
---|---|
CN103321148B (en) | 2015-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103422868B (en) | The structure of a kind of Super-void Water Pressure that dissipates, reinforcing shield tunnel soil body and method | |
CN104594199B (en) | A kind of Reinforced Concrete Bridge longitudinally connected construction method of framing longitudinal joint | |
CN202187415U (en) | Sidewalk drainage structure | |
CN103321148A (en) | Bridge guardrail base split bolt hole plugging structure and process | |
CN104846849A (en) | Method for preventing basement bottom plate post-cast strip from leaking | |
CN203361017U (en) | Bridge guardrail base split bolt hole plugging structure | |
CN105463986A (en) | Construction method of bridge expansion joint | |
CN106592378A (en) | T-shaped collector pipe | |
CN207143920U (en) | Water-stopping system between novel pile under a kind of complicated circumstance of flowing water | |
CN110593894B (en) | Novel shield tunnel concrete pipe piece miniature reinforcing pile | |
CN109138116A (en) | Concrete expires packet drainage pipeline tubine construction method | |
CN107587434A (en) | Culvert of reinforced concrete percolating water prevention and disposition method | |
CN202500153U (en) | Integral ribbed plastic inspection well | |
DE102013109594A1 (en) | Tubing with a cast protective layer and method for producing such a tubbing | |
DD254750A5 (en) | METHOD FOR RECONSTRUCTING IMMEDIATE RIVER CHANNELS, IN PARTICULAR PROFILED CANNULARS | |
CN104963294B (en) | A kind of railway Thin-wall Hollow Pier circulation drip irrigation curing system | |
CN107165198A (en) | Underground project waterproof systematical working construction method and waterproof material used | |
CN204370319U (en) | Road and bridge crack bracing means | |
CN107542170A (en) | A kind of cast in situ ferroconcrete wall or beam construction joint surface construction method | |
CN204530357U (en) | Cliff side slope plank road | |
CN204326072U (en) | A kind of anti-float anchor rod node | |
CN208423702U (en) | The cable penetration cannula structure of slip casting sealing | |
CN208455457U (en) | A kind of assembled bridge pier that drainpipe is embedded | |
CN207003605U (en) | Reinforced buried concrete pumping equipment | |
CN105804008A (en) | Anti-scour, heat-insulation and anti-seepage structure for box culvert and inverted siphon |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |