CN103318769B - Shipyard gantry crane with upper dolly provided with lifting device - Google Patents

Shipyard gantry crane with upper dolly provided with lifting device Download PDF

Info

Publication number
CN103318769B
CN103318769B CN201210245934.2A CN201210245934A CN103318769B CN 103318769 B CN103318769 B CN 103318769B CN 201210245934 A CN201210245934 A CN 201210245934A CN 103318769 B CN103318769 B CN 103318769B
Authority
CN
China
Prior art keywords
dolly
upper dolly
shipyard
gauntry crane
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210245934.2A
Other languages
Chinese (zh)
Other versions
CN103318769A (en
Inventor
赵永新
严冬华
吕炳炳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhenghua Heavy Industries Co Ltd
Original Assignee
Shanghai Zhenghua Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhenghua Heavy Industries Co Ltd filed Critical Shanghai Zhenghua Heavy Industries Co Ltd
Priority to CN201210245934.2A priority Critical patent/CN103318769B/en
Publication of CN103318769A publication Critical patent/CN103318769A/en
Application granted granted Critical
Publication of CN103318769B publication Critical patent/CN103318769B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a shipyard gantry crane with an upper dolly which is provided with a lifting device. The gantry crane comprises a main beam, a lower dolly and the upper dolly which are arranged on the main beam. The lower and upper dollies are provided with main suspension hooks respectively, and the fixed lifting device is arranged on the upper side of the upper dolly. The gantry crane is capable of lifting goods higher at a low cost.

Description

Upper dolly is fixed the shipyard gauntry crane hung
Technical field
The present invention relates to shipyard gauntry crane, particularly relate to a kind of upper dolly and be fixed the shipyard gauntry crane hung.
Background technology
The mankind facilitate the development of ship building industry to the continuous utilization of marine resources and exploitation, and shipyard gauntry crane is a kind of visual plant in ship building industry.The structure normally form going up dolly and coordinate subordinate's dolly of traditional shipyard gauntry crane, lifting altitude is generally equal to or less than the height of girder lower surface.
The application such as current offshore platform increases day by day for the requirement of lifting altitude, and improves lifting altitude will significantly increase the cost of shipyard gauntry crane by increasing main depth of beam.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of upper dolly and is fixed the shipyard gauntry crane hung, and can improve lifting altitude with lower cost.
For solving the problems of the technologies described above, the invention provides a kind of upper dolly and being fixed the shipyard gauntry crane hung, comprising:
Girder;
Be arranged on the lower dolly on described girder and upper dolly, described lower dolly and below of getting on or off the bus are respectively arranged with main suspension hook;
Be provided with above described upper dolly and fixedly hang.
Alternatively, described fixing bull ladle is drawn together:
The arm extended laterally above the trolley frame of described upper dolly, described side direction refers to the direction perpendicular to described girder bearing of trend;
Be arranged on the side suspension hook of described arm end.
Alternatively, the trolley frame of described upper dolly is also provided with the side lifting mechanism driving described side suspension hook.
Alternatively, also running gear for trolley is installed below the trolley frame of described upper dolly.
Alternatively, the quantity of the main suspension hook below described upper dolly is 2, and the quantity of the main suspension hook below described lower dolly is 1.
Alternatively, the two ends of described girder are separately installed with rigid leg and flexible leg.
Compared with prior art, the present invention has the following advantages:
The shipyard gauntry crane of the embodiment of the present invention installs additional and fixedly hangs above upper dolly, is moved by the cooperation of dolly and cart, freely can lift and require higher segmentation to lifting altitude, compared with increasing the mode of girder terrain clearance, less on the impact of cost.
Further, in the shipyard gauntry crane of the embodiment of the present invention, below upper dolly, be provided with 2 main suspension hooks, below lower dolly, be provided with 1 main suspension hook, 3 suspension hooks stand up with the use of realizing the function lifted, and install additional above upper dolly fixedly hang the realization not affecting and stand up and lift function.
Accompanying drawing explanation
Fig. 1 is the front elevation of the shipyard gauntry crane of the embodiment of the present invention;
Fig. 2 is the lateral plan of the shipyard gauntry crane of the embodiment of the present invention;
Fig. 3 is the front elevation of the upper dolly of the shipyard gauntry crane of the embodiment of the present invention;
Fig. 4 is the birds-eye view of the upper dolly of the shipyard gauntry crane of the embodiment of the present invention;
Fig. 5 is the lateral plan of the upper dolly of the shipyard gauntry crane of the embodiment of the present invention;
Fig. 6 is the canoe of the main hoisting mechanism of the upper dolly of the embodiment of the present invention;
Fig. 7 is the canoe of the side lifting mechanism of the upper dolly of the embodiment of the present invention.
Detailed description of the invention
Below in conjunction with specific embodiments and the drawings, the invention will be further described, but should not limit the scope of the invention with this.
With reference to figure 1 and Fig. 2, the shipyard gauntry crane of the present embodiment comprises: girder 1, rigid leg 2, flexible leg 3, upper dolly 5, lower dolly 6, maintenance crane 7, cart walking mechanism 8.
Wherein, rigid leg 2 and flexible leg 3 are arranged on the two ends of girder 1 respectively.Such as, flexible leg 3 can be hinged by flexible hinge 4 and girder 1.
Lower dolly 5 and upper dolly 6 are arranged on girder 1, and lower dolly 5 and upper dolly 6 can be walked independently of each other on girder 1.Main suspension hook (not indicating in figure) is respectively arranged with below lower dolly 5 and upper dolly 6, in the present embodiment, the main suspension hook quantity arranged below lower dolly 5 is 1, the main suspension hook quantity arranged below upper dolly 6 is 2, and 3 main suspension hooks that lower dolly 5 and upper dolly 6 are installed can lift function with the use of realizing standing up.
In addition, the top of girder 1 is provided with maintenance crane 7, and the bottom of whole shipyard gauntry crane is provided with cart walking mechanism 8.By cart walking mechanism 8, shipyard gauntry crane along being laid on ground track travel, can realize the movement of shipyard gauntry crane.
With reference to figure 3 to Fig. 5, the upper dolly of the present embodiment comprises trolley frame 51, main hoisting mechanism 52, main suspension hook 54, running gear for trolley 56, also adds and fixedly hang above this outside upper dolly.
Furthermore, this fixing bull ladle draws together the arm 57 extended laterally above the trolley frame 51 of upper dolly and the side suspension hook 55 being arranged on arm 57 end.It should be noted that, " side direction " herein refers to the direction perpendicular to girder bearing of trend.
Particularly, arm 57 can stretch out from any side girder both sides.Because the arm 57 fixedly hung extends laterally, in order to avoid affecting the balance of gauntry crane during lifting, clump weight can be added on upper dolly and/or girder.
Trolley frame 51 is provided with main hoisting mechanism 52 and side lifting mechanism 53, wherein main hoisting mechanism 52 is for the main suspension hook 54 of drive installation below trolley frame 51, and side lifting mechanism 53 is for driving the main suspension hook 54 fixedly hung.When reality uses, be fixed on by parts to be lifted on side suspension hook 55, side lifting mechanism 53 drive side suspension hook 55 hoists, thus is sling by these parts.
In addition, installation carriage traveling gear 56 is gone back in the below of trolley frame 51, walks along girder for driving described upper dolly.
Fig. 6 and Fig. 7 respectively illustrates the canoe of main hoisting mechanism in dolly and side lifting mechanism, and wherein main hoisting mechanism adopts the canoe having row's rope, and side lifting mechanism adopts the canoe without row's rope.
The shipyard gauntry crane of the present embodiment in use, can be moved by the cooperation of dolly and traveling gear of getting a lift, employing is fixedly hung the parts treating lifting and is lifted, and because fixedly hanging of the present embodiment is arranged on above upper dolly, thus its lifting altitude can higher than girder lower surface.And fixedly hang and be arranged on above dolly, standing up that three main suspension hooks that also can't affect on dolly and lower dolly can realize lifts function.
In addition, improve compared with lifting altitude with traditional by the mode raising girder terrain clearance, the impact of technical scheme on cost of the present embodiment is less, is conducive to the complete machine manufacturing cost reducing shipyard gauntry crane, has significant economic benefit.
Although the present invention with preferred embodiment openly as above; but it is not for limiting the present invention; any those skilled in the art without departing from the spirit and scope of the present invention; can make possible variation and amendment, the scope that therefore protection scope of the present invention should define with the claims in the present invention is as the criterion.

Claims (6)

1. upper dolly is fixed the shipyard gauntry crane hung, and comprising:
Girder;
Be arranged on the lower dolly on described girder and upper dolly, described lower dolly and below of getting on or off the bus are respectively arranged with main suspension hook, and described lower dolly and upper dolly can be walked independently of each other on described girder;
It is characterized in that, be provided with above described upper dolly and fixedly hang.
2. upper dolly according to claim 1 is fixed the shipyard gauntry crane hung, and it is characterized in that, described fixing bull ladle is drawn together:
The arm extended laterally above the trolley frame of described upper dolly, described side direction refers to the direction perpendicular to described girder bearing of trend;
Be arranged on the side suspension hook of described arm end.
3. upper dolly according to claim 2 is fixed the shipyard gauntry crane hung, and it is characterized in that, the trolley frame of described upper dolly is also provided with the side lifting mechanism driving described side suspension hook.
4. upper dolly according to claim 2 is fixed the shipyard gauntry crane hung, and it is characterized in that, is also provided with running gear for trolley below the trolley frame of described upper dolly.
5. upper dolly according to claim 1 is fixed the shipyard gauntry crane hung, and it is characterized in that, the quantity of the main suspension hook below described upper dolly is 2, and the quantity of the main suspension hook below described lower dolly is 1.
6. upper dolly according to claim 1 is fixed the shipyard gauntry crane hung, and it is characterized in that, the two ends of described girder are separately installed with rigid leg and flexible leg.
CN201210245934.2A 2012-07-16 2012-07-16 Shipyard gantry crane with upper dolly provided with lifting device Active CN103318769B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210245934.2A CN103318769B (en) 2012-07-16 2012-07-16 Shipyard gantry crane with upper dolly provided with lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210245934.2A CN103318769B (en) 2012-07-16 2012-07-16 Shipyard gantry crane with upper dolly provided with lifting device

Publications (2)

Publication Number Publication Date
CN103318769A CN103318769A (en) 2013-09-25
CN103318769B true CN103318769B (en) 2015-02-11

Family

ID=49187873

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210245934.2A Active CN103318769B (en) 2012-07-16 2012-07-16 Shipyard gantry crane with upper dolly provided with lifting device

Country Status (1)

Country Link
CN (1) CN103318769B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108249286B (en) * 2018-01-08 2023-11-17 上海振华重工(集团)股份有限公司 Method for lifting gantry crane girder by lifting lugs and gantry crane girder
CN112194002A (en) * 2020-10-14 2021-01-08 上海外高桥造船有限公司 Gantry crane track device and setting method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101088906A (en) * 2007-07-12 2007-12-19 同济大学 Process of installing multiple-tower combination of gantry
CN201040684Y (en) * 2007-05-14 2008-03-26 大连华锐股份有限公司 Composite bearing for mobile machinery door type structure leg
CN201087076Y (en) * 2007-09-19 2008-07-16 上海海事大学 Gantry crane
CN100543235C (en) * 2007-10-16 2009-09-23 中铁大桥局集团第四工程有限公司 The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN201376848Y (en) * 2009-03-20 2010-01-06 史胜海 Large-scale double-tower automatic-elevation hoisting equipment
CN102530739A (en) * 2012-02-22 2012-07-04 象王重工股份有限公司 Anti-collision tower type portal crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201040684Y (en) * 2007-05-14 2008-03-26 大连华锐股份有限公司 Composite bearing for mobile machinery door type structure leg
CN101088906A (en) * 2007-07-12 2007-12-19 同济大学 Process of installing multiple-tower combination of gantry
CN201087076Y (en) * 2007-09-19 2008-07-16 上海海事大学 Gantry crane
CN100543235C (en) * 2007-10-16 2009-09-23 中铁大桥局集团第四工程有限公司 The method and system of erecting steel trusses by stay cable auxiliary complete cantilever
CN201376848Y (en) * 2009-03-20 2010-01-06 史胜海 Large-scale double-tower automatic-elevation hoisting equipment
CN102530739A (en) * 2012-02-22 2012-07-04 象王重工股份有限公司 Anti-collision tower type portal crane

Also Published As

Publication number Publication date
CN103318769A (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN103663142B (en) Tailing mechanism and translation tailing hoisting method
CN201990928U (en) Pontoon pier steel approach bridge lifting device
CN103318769B (en) Shipyard gantry crane with upper dolly provided with lifting device
CN204098952U (en) A kind of coal mine roadway centre mounted type container handling equipment
CN103058069B (en) Horizontal arm tower-type crane
CN201634333U (en) Super-altitude gantry crane
CN205973518U (en) Track portal jib crane
CN202465099U (en) Single-girder partial hanging gantry crane
CN204416951U (en) A kind of low clearance twin beam overhead bridge crane
CN202449763U (en) Simple pneumatic crane
CN206219113U (en) One kind lifting chassis
CN202465109U (en) Motor-driven double-beam grab bucket gantry crane
CN206109992U (en) Bridge bottom surface construction platform
CN204251218U (en) Hoisting crane antiswing device
CN204173776U (en) Frame-type low clearance armored rope electric hoist dolly
CN203545404U (en) Shaftway configuration deice of elevator without machine room
CN202717479U (en) Ultra high-speed elevator weight compensation device
CN202201644U (en) Installation equipment for insulator supporting column of serial compensation platform
CN202429891U (en) Crane hook device
CN106702911B (en) A kind of secondary traversing construction method for hanging of cable-carried arch bridge rib-lifting section
CN104591002A (en) Low-clearance double-beam bridge type crane
CN202492296U (en) Spinning electromagnetic suspension beam bridge crane
CN204297984U (en) Syllogic arm crane
CN208980206U (en) A kind of deck type with c-type overhead traveling crane is multi-tower continuous across cable crane
CN208869202U (en) A kind of deck type with T-type overhead traveling crane is multi-tower continuous across cable crane

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant