CN103310061A - 煤田地震勘探绘图系统 - Google Patents

煤田地震勘探绘图系统 Download PDF

Info

Publication number
CN103310061A
CN103310061A CN2013102434443A CN201310243444A CN103310061A CN 103310061 A CN103310061 A CN 103310061A CN 2013102434443 A CN2013102434443 A CN 2013102434443A CN 201310243444 A CN201310243444 A CN 201310243444A CN 103310061 A CN103310061 A CN 103310061A
Authority
CN
China
Prior art keywords
module
seismic
mapping
database server
exploration
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102434443A
Other languages
English (en)
Other versions
CN103310061B (zh
Inventor
刘兆国
龚远武
徐爽
武磊彬
郝邵敏
赵智勇
曾龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Geophysical Prospecting And Surveying Team Anhui Provincial Bureau Of Coal Geology
Original Assignee
Geophysical Prospecting And Surveying Team Anhui Provincial Bureau Of Coal Geology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Geophysical Prospecting And Surveying Team Anhui Provincial Bureau Of Coal Geology filed Critical Geophysical Prospecting And Surveying Team Anhui Provincial Bureau Of Coal Geology
Priority to CN201310243444.3A priority Critical patent/CN103310061B/zh
Publication of CN103310061A publication Critical patent/CN103310061A/zh
Application granted granted Critical
Publication of CN103310061B publication Critical patent/CN103310061B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了煤田地震勘探绘图系统,包括依次连接的数据处理单元、测井曲线采样模块、图形预处理单元、地震报告成图单元,以及与前述四部分均连接的数据库服务器、系统接口模块、显示输出模块,其中数据处理单元包括主处理模块和与主处理模块连接的二维地震观测系统数据处理模块、三维地震观测系统数据处理模块、三维地震设计图预处理成图模块、人机交互模块;图形预处理单元包括成图预处理模块和与之连接的二维描图模块、三维描图模块;地震报告成图单元包括二维地震报告成图模块、三维地震报告成图模块。本发明实现了地震勘探从设计到报告全过程绘图工作自动化;大大缩短了地震报告绘图工期;大大减少了人工工作量,降低了生产成本。

Description

煤田地震勘探绘图系统
技术领域
本发明涉及一种勘探绘图系统,尤其涉及一种煤田地震勘探绘图系统。
背景技术
目前,煤田地震勘探成图方法主要是在通用绘图软件的成图系统上,利用绘图软件的一些基本命令,按照地震勘探原理、成图方法、技术规范,进行手工成图。此种方式要求专业技术人员必须掌握地震勘探原理,并能熟练操作绘图软件等一系列工具。现有的操作方式存在成图效率低、勘探绘图精度差、人员工作量大等诸多问题。
发明内容
本发明目的是克服现有技术存在的上述缺点,提供一种精度高、自动绘图的煤田地震勘探绘图系统。
为实现上述目的,本发明所采用的技术方案是:煤田地震勘探绘图系统,包括依次连接的数据处理单元、测井曲线采样模块、图形预处理单元、地震报告成图单元,以及与前述四部分均连接的数据库服务器、系统接口模块、显示输出模块,其中数据处理单元包括主处理模块和与主处理模块连接的二维地震观测系统数据处理模块、三维地震观测系统数据处理模块、三维地震设计图预处理成图模块、人机交互模块;图形预处理单元包括成图预处理模块和与之连接的二维描图模块、三维描图模块;地震报告成图单元包括二维地震报告成图模块、三维地震报告成图模块。
进一步的,煤田地震勘探绘图系统具体工作步骤如下:
一、数据库服务器通过系统接口模块接收地震勘探观测系统传递的勘探参数并保存;
二、数据处理单元从数据库服务器中读取勘探参数,绘制地震勘探观测系统图并通过显示输出模块显示,此时工作人员可以通过人机交互模块进行人机联作,分析地震勘探观测系统参数的可行性,如果以上参数不适宜在某区进行施工,重复选取勘探参数,再次进行地震勘探观测系统图的绘制和人机交互分析,直到各项参数符合技术经济要求;利用最终确定的勘探参数绘制供野外生产的设计施工图,统计相关的施工参数及技术经济指标,输出上述各项指标至数据库服务器保存,供野外生产使用;
三、测井曲线采样模块从数据库服务器中调取勘探煤田的各种模拟测井曲线,按照设置的采样率、采样长度自动采样,采样数据保存至数据库服务器,并通过系统接口模块将采样数据输出至地震数据解释系统,对地震数据进行层位标定、对比解释;
四、图形预处理单元通过系统接口模块接收地震资料解释系统传入的等高线图、剖面图、断层迹、陷落柱边界的数据,按照设定的扫描半径、精度自动描图,将描图数据输出至数据库服务器保存并通过显示输出模块显示;
五、地震报告成图单元从数据库服务器读取步骤四中图形预处理单元存储的数据和煤田勘探的钻孔数据,标注等高线值,生成地震地质剖面;自动绘制钻孔、准确标注钻孔参数、目的层参数;根据勘探边界自动生成底图、标注经纬度、大地坐标,最终绘制各种地震报告成果图,并通过显示输出模块显示和数据库服务器保存。
本发明的有益效果在于:通过本系统能够实现煤田地震勘探从地质任务分析设计到最终地震地质报告的全过程绘图工作的自动化,对提高地震勘探绘图质量具有重要意义;大大缩短了地震报告绘图工期,为保证地震勘探报告按时、按质提交提供了技术保障;大大减少了人工工作量,在当前全国各行各业提倡的加强技术创新,减员增效,降低生产成本,增强企业核心竞争力方面也具有重要的实际意义。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1 是本发明实施例中自动绘制的二维观测系统图;
图2 是本发明实施例中自动绘制的三维地震勘探设计图;
图3 是本发明实施例中自动标注的等高线值图;
图4 是本发明实施例中自动扫描生成的等高线图。
具体实施方式
煤田地震勘探绘图系统,包括依次连接的数据处理单元、测井曲线采样模块、图形预处理单元、地震报告成图单元,以及与前述四部分均连接的数据库服务器、系统接口模块、显示输出模块,其中数据处理单元包括主处理模块和与主处理模块连接的二维地震观测系统数据处理模块、三维地震观测系统数据处理模块、三维地震设计图预处理成图模块、人机交互模块;图形预处理单元包括成图预处理模块和与之连接的二维描图模块、三维描图模块;地震报告成图单元包括二维地震报告成图模块、三维地震报告成图模块。
进一步的,煤田地震勘探绘图系统具体工作步骤如下:
一、数据库服务器通过系统接口模块接收地震勘探观测系统传递的勘探参数并保存;
二、数据处理单元从数据库服务器中读取勘探参数,绘制地震勘探观测系统图并通过显示输出模块显示,此时工作人员可以通过人机交互模块进行人机联作,分析地震勘探观测系统参数的可行性,如果以上参数不适宜在某区进行施工,重复选取勘探参数,再次进行地震勘探观测系统图的绘制和人机交互分析,直到各项参数符合技术经济要求;利用最终确定的勘探参数绘制供野外生产的设计施工图,如图1、2所示;统计相关的施工参数及技术经济指标,输出上述各项指标至数据库服务器保存,供野外生产使用;
三、测井曲线采样模块从数据库服务器中调取勘探煤田的各种模拟测井曲线,按照设置的采样率、采样长度自动采样,采样数据保存至数据库服务器,并通过系统接口模块将采样数据输出至地震数据解释系统,对地震数据进行层位标定、对比解释;
四、图形预处理单元通过系统接口模块接收地震资料解释系统传入的等高线图、剖面图、断层迹、陷落柱边界的数据,按照设定的扫描半径、精度自动描图,将描图数据输出至数据库服务器保存并通过显示输出模块显示,如图3所示;
五、地震报告成图单元从数据库服务器读取步骤四中图形预处理单元存储的数据和煤田勘探的钻孔数据,标注等高线值,生成地震地质剖面;自动绘制钻孔、准确标注钻孔参数、目的层参数;根据勘探边界自动生成底图、标注经纬度、大地坐标,最终绘制各种地震报告成果图,并通过显示输出模块显示和数据库服务器保存,如图4所示。
三维地震设计图预处理成图模块包括设计图绘制、分束物理点及总物理点统计、检波点、炮点桩号标注、检波点、炮点标志插入、一次覆盖、满覆盖边界绘制、相对坐标系建立、坐标轴标注及绘制;
测井曲线采样模块主要是对现有的模拟测井曲线进行数字化采样;
二维描图模块、三维描图模块主要执行包括二维、三维勘探平面图等高线、断层边界的自动描图;二维地震报告成图模块、三维地震报告成图模块主要执行包括二维、三维勘探构造平面图等高线值自动标注、地质钻孔平面自动绘制、报告底图自动绘制、平剖面自动对比。
本发明系统在我队的地震勘探绘图应用中,极大地方便了广大技术人员。在以前的绘图过程中,许多图件的绘制需要数天,并且难免会出现人为错误,使用本系统只需要数秒至数十秒,由于绝大部分是自动完成,出现错误的几率大大降低,同时节省人工工作量达99%以上。
以上所述,仅为本发明的具体实施方式,包括但不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本发明的保护之中。

Claims (2)

1.煤田地震勘探绘图系统,其特征在于:包括依次连接的数据处理单元、测井曲线采样模块、图形预处理单元、地震报告成图单元,以及与前述四部分均连接的数据库服务器、系统接口模块、显示输出模块,其中数据处理单元包括主处理模块和与主处理模块连接的二维地震观测系统数据处理模块、三维地震观测系统数据处理模块、三维地震设计图预处理成图模块、人机交互模块;图形预处理单元包括成图预处理模块和与之连接的二维描图模块、三维描图模块;地震报告成图单元包括二维地震报告成图模块、三维地震报告成图模块。
2.根据权利要求1所述的煤田地震勘探绘图系统,其特征在于:具体工作步骤如下:
一、数据库服务器通过系统接口模块接收地震勘探观测系统传递的勘探参数并保存;
二、数据处理单元从数据库服务器中读取勘探参数,绘制地震勘探观测系统图并通过显示输出模块显示,此时工作人员可以通过人机交互模块进行人机联作,分析地震勘探观测系统参数的可行性,如果以上参数不适宜在某区进行施工,重复选取勘探参数,再次进行地震勘探观测系统图的绘制和人机交互分析,直到各项参数符合技术经济要求;利用最终确定的勘探参数绘制供野外生产的设计施工图,统计相关的施工参数及技术经济指标,输出上述各项指标至数据库服务器保存,供野外生产使用;
三、测井曲线采样模块从数据库服务器中调取勘探煤田的各种模拟测井曲线,按照设置的采样率、采样长度自动采样,采样数据保存至数据库服务器,并通过系统接口模块将采样数据输出至地震数据解释系统,对地震数据进行层位标定、对比解释;
四、图形预处理单元通过系统接口模块接收地震资料解释系统传入的等高线图、剖面图、断层迹、陷落柱边界的数据,按照设定的扫描半径、精度自动描图,将描图数据输出至数据库服务器保存并通过显示输出模块显示;
五、地震报告成图单元从数据库服务器读取步骤四中图形预处理单元存储的数据和煤田勘探的钻孔数据,标注等高线值,生成地震地质剖面;自动绘制钻孔、准确标注钻孔参数、目的层参数;根据勘探边界自动生成底图、标注经纬度、大地坐标,最终绘制各种地震报告成果图,并通过显示输出模块显示和数据库服务器保存。
CN201310243444.3A 2013-06-19 2013-06-19 煤田地震勘探绘图系统 Expired - Fee Related CN103310061B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310243444.3A CN103310061B (zh) 2013-06-19 2013-06-19 煤田地震勘探绘图系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310243444.3A CN103310061B (zh) 2013-06-19 2013-06-19 煤田地震勘探绘图系统

Publications (2)

Publication Number Publication Date
CN103310061A true CN103310061A (zh) 2013-09-18
CN103310061B CN103310061B (zh) 2015-10-28

Family

ID=49135273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310243444.3A Expired - Fee Related CN103310061B (zh) 2013-06-19 2013-06-19 煤田地震勘探绘图系统

Country Status (1)

Country Link
CN (1) CN103310061B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317427A (zh) * 2014-06-05 2016-02-10 中国石油化工股份有限公司 描述老断层顶面构造图的表示方法
CN106227857A (zh) * 2016-07-28 2016-12-14 中国石油天然气集团公司 数据推送和加载方法和装置
CN111965705A (zh) * 2020-07-21 2020-11-20 中国石油天然气集团有限公司 地震单炮记录地质层位的标定方法、装置、设备及介质
CN114240073A (zh) * 2021-11-25 2022-03-25 湖北省地震局(中国地震局地震研究所) 微动勘探施工方法、系统、计算机设备及存储介质

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101021565A (zh) * 2006-05-11 2007-08-22 侯树麒 地震勘探数据采集系统
CN101051394A (zh) * 2007-04-11 2007-10-10 中国科学院地质与地球物理研究所 一种基于地球物理场数据的地质体三维可视化系统

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101021565A (zh) * 2006-05-11 2007-08-22 侯树麒 地震勘探数据采集系统
CN101051394A (zh) * 2007-04-11 2007-10-10 中国科学院地质与地球物理研究所 一种基于地球物理场数据的地质体三维可视化系统

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
张琳等: "LandMark系统在煤田地震勘探解释成图中的应用", 《中州煤炭》, no. 12, 25 December 2010 (2010-12-25), pages 45 - 47 *
武磊彬等: "复杂地表地区三维地震勘探应用与效果", 《煤炭科学技术》, vol. 37, no. 11, 25 November 2009 (2009-11-25), pages 113 - 116 *
解团结: "山区煤田地震勘探技术及应用研究", 《中国优秀硕士学位论文全文数据库 基础科学辑》, vol. 2010, no. 07, 15 July 2010 (2010-07-15) *
郭龙芳等: "AutoCAD软件在地震地质图件中的应用", 《西部探矿工程》, no. 8, 15 August 2008 (2008-08-15), pages 88 - 90 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105317427A (zh) * 2014-06-05 2016-02-10 中国石油化工股份有限公司 描述老断层顶面构造图的表示方法
CN106227857A (zh) * 2016-07-28 2016-12-14 中国石油天然气集团公司 数据推送和加载方法和装置
CN106227857B (zh) * 2016-07-28 2019-07-09 中国石油天然气集团公司 数据推送和加载方法和装置
CN111965705A (zh) * 2020-07-21 2020-11-20 中国石油天然气集团有限公司 地震单炮记录地质层位的标定方法、装置、设备及介质
CN111965705B (zh) * 2020-07-21 2023-04-25 中国石油天然气集团有限公司 地震单炮记录地质层位的标定方法、装置、设备及介质
CN114240073A (zh) * 2021-11-25 2022-03-25 湖北省地震局(中国地震局地震研究所) 微动勘探施工方法、系统、计算机设备及存储介质

Also Published As

Publication number Publication date
CN103310061B (zh) 2015-10-28

Similar Documents

Publication Publication Date Title
CN106779417A (zh) 工程勘察信息数字化采集、管理及综合应用方法
CN103810333B (zh) 一种工程地质信息化工作系统
CN103345540B (zh) 一种在数字地球软件平台上模拟和显示地质钻孔信息的方法
CN109143361B (zh) 一种基于层序地层学的碳酸盐岩地层古地质图的编制方法
CN111339691A (zh) 一种基于voxler软件的智慧岩土工程参数三维分析与评价系统及方法
CN110287511B (zh) 基于bim技术的桩基选型及施工质量控制方法
CN103310061B (zh) 煤田地震勘探绘图系统
CN105184865A (zh) 基于地质三维建模流程的地质图件编绘方法
CN110263456A (zh) 一种基于ifc标准的隧道动态反馈分析系统
CN103632397A (zh) 分块分单元三维地质调查方法
CN107153725A (zh) 一种关于陆相层序地层格架构建的成图系列及技术方法
CN103969682A (zh) 一种钻测井资料深度匹配方法及系统
CN109212589A (zh) 一种基于gpu/cpu协同并行的地震采集观测系统设计方法
US20200183044A1 (en) Computing System Assessment of Geological Similarity of Wells Employing Well-Log Data
CN109685896A (zh) 一种支持岩土工程bim的管线工程勘察数据交付方法及系统
CN105069162A (zh) 一种勘探平洞编录的信息化数据采集系统和方法
CN103714203A (zh) 基于cad模板绑定技术的钻孔柱状图自动成图方法
CN107479095A (zh) 三维地震资料交汇区构造图拼接方法
CN111243088A (zh) 工程地质勘察中的真三维航空遥感地质解译方法及系统
CN113627657A (zh) 一种使用机器学习模型的砂岩型铀成矿有利区预测方法
CN103529473A (zh) 一种地震反演过程中差异压实的补偿方法
CN106504319B (zh) 井间储层三维对比图的生成方法及装置
CN105279305B (zh) 一种地面三维激光扫描技术测站选取方法
CN114742526A (zh) 基于标准化设计流程的勘察全流程信息化方法和系统
CN111966732A (zh) 全智能化地质填图方法、装置、设备及可读存储介质

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Zhaoguo

Inventor after: Gong Yuanwu

Inventor after: Xu Shi

Inventor after: Wu Leibin

Inventor after: Hao Zhaomin

Inventor after: Zhao Zhiyong

Inventor after: Zeng Long

Inventor before: Liu Zhaoguo

Inventor before: Gong Yuanwu

Inventor before: Xu Shuang

Inventor before: Wu Leibin

Inventor before: Hao Shaomin

Inventor before: Zhao Zhiyong

Inventor before: Zeng Long

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU ZHAOGUO GONG YUANWU XU SHUANG WU LEIBIN HAO SHAOMIN ZHAO ZHIYONG CENG LONG TO: LIU ZHAOGUO GONG YUANWU XU SHI WU LEIBIN HAO ZHAOMIN ZHAO ZHIYONG CENG LONG

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151028

Termination date: 20200619