CN103308302A - 液压支架平衡机构试验方法 - Google Patents

液压支架平衡机构试验方法 Download PDF

Info

Publication number
CN103308302A
CN103308302A CN2013102682373A CN201310268237A CN103308302A CN 103308302 A CN103308302 A CN 103308302A CN 2013102682373 A CN2013102682373 A CN 2013102682373A CN 201310268237 A CN201310268237 A CN 201310268237A CN 103308302 A CN103308302 A CN 103308302A
Authority
CN
China
Prior art keywords
hydraulic support
column
front rod
rod
link point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102682373A
Other languages
English (en)
Other versions
CN103308302B (zh
Inventor
刘顺斌
包冬生
李晓丽
康远宁
段志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN201310268237.3A priority Critical patent/CN103308302B/zh
Publication of CN103308302A publication Critical patent/CN103308302A/zh
Application granted granted Critical
Publication of CN103308302B publication Critical patent/CN103308302B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明公开了一种液压支架平衡机构试验方法,液压支架包括顶梁、掩护梁、立柱、底座、平衡千斤顶、前连杆、后连杆。首先保持液压支架一侧的前连杆和后连杆不动,将另一侧的前连杆拆下,并将该侧的后连杆的上端拆下后与前连杆上铰接点连接,使掩护梁与前连杆和后连杆之间锁住;然后,通过立柱的动作使液压支架升降,从而对整个平衡机构进行试验。简单、实用、实验效果好。

Description

液压支架平衡机构试验方法
技术领域
本发明涉及一种液压支架平衡机构的试验技术,尤其涉及一种液压支架平衡机构试验方法。
背景技术
目前,国内发布的《GB_25974.1-2010_煤矿用液压支架_第1部分:通用技术条件》中对煤矿用液压支架上的检测没有对平衡机构的实验项目。国外虽然有这方面的检测项目,但实验装置和方法复杂、效果不理想。
发明内容
本发明的目的是提供一种简单、实用、效果好的液压支架平衡机构试验方法。
本发明的目的是通过以下技术方案实现的:
本发明的液压支架平衡机构试验方法,所述液压支架包括顶梁、掩护梁、立柱、底座,所述顶梁与掩护梁之间连接有平衡千斤顶,所述掩护梁上设有前连杆上铰接点和后连杆上铰接点,所述底座上设有前连杆下铰接点和后连杆下铰接点,所述前连杆上铰接点与前连杆下铰接点之间连接有前连杆,所述后连杆上铰接点与后连杆下铰接点之间铰接有后连杆,包括步骤:
首先,保持所述液压支架一侧的前连杆和后连杆不动,将另一侧的前连杆拆下,并将该侧的后连杆的上端拆下后与所述前连杆上铰接点连接,或将另一侧的后连杆拆下,并将该侧的前连杆的下端拆下后与所述后连杆下铰接点连接,使所述掩护梁与前连杆和后连杆之间锁住;
然后,通过所述立柱的动作使液压支架升降,从而对整个平衡机构进行试验。
由上述本发明提供的技术方案可以看出,本发明实施例提供的液压支架平衡机构试验方法,由于通过保持液压支架一侧的前连杆和后连杆不动,将另一侧的前连杆拆下,并将该侧的后连杆的上端拆下后与前连杆上铰接点连接,使掩护梁与前连杆和后连杆之间锁住,并通过立柱的动作使液压支架升降,从而对整个平衡机构进行试验,简单、实用、实验效果好。
附图说明
图1为本发明实施例提供的液压支架平衡机构试验方法中液压支架一侧连杆正常连接的结构示意图;
图2为本发明实施例提供的液压支架平衡机构试验方法中液压支架另一侧去掉前连杆、后连杆连接到前连杆处的结构示意图;
图3为本发明实施例提供的液压支架平衡机构试验方法中平衡千斤顶的液压管路示意图。
图中:
1、顶梁,2、掩护梁,3、立柱,4、底座,5、前连杆,6、后连杆,7、平衡千斤顶,8、平衡双向锁,9、活塞杆腔安全阀,10、活塞腔安全阀。
具体实施方式
下面将对本发明实施例作进一步地详细描述。
本发明的液压支架平衡机构试验方法,其较佳的具体实施方式如图1、图2所示:
所述液压支架包括顶梁、掩护梁、立柱、底座,所述顶梁与掩护梁之间连接有平衡千斤顶,所述掩护梁上设有前连杆上铰接点和后连杆上铰接点,所述底座上设有前连杆下铰接点和后连杆下铰接点,所述前连杆上铰接点与前连杆下铰接点之间连接有前连杆,所述后连杆上铰接点与后连杆下铰接点之间铰接有后连杆,包括步骤:
首先,保持所述液压支架一侧的前连杆和后连杆不动,将另一侧的前连杆拆下,并将该侧的后连杆的上端拆下后与所述前连杆上铰接点连接,或将另一侧的后连杆拆下,并将该侧的前连杆的下端拆下后与所述后连杆下铰接点连接,使所述掩护梁与前连杆和后连杆之间锁住;
然后,通过所述立柱的动作使液压支架升降,从而对整个平衡机构进行试验。
对整个平衡机构进行试验的步骤包括:
先升立柱使所述顶梁上仰,所述平衡千斤顶的活塞杆受拉、活塞杆腔受压至活塞杆腔安全阀卸载;
再降立柱使所述顶梁低头,所述平衡千斤顶的活塞杆受压、活塞腔受压至活塞腔安全阀卸载;
上述过程循环多次。
升立柱过程中,使所述平衡千斤顶的活塞杆被拉出至少30mm;
降立柱过程中,使所述平衡千斤顶的活塞杆被压回至少30mm;
上述过程共循环4000次以上。
实验过程中利用时间控制平衡千斤顶的伸缩量,先反复几次,根据伸出30mm的平均时间设定供液的时间。
在升立柱的同时,给所述平衡千斤顶的活塞腔补液;
在降立柱的同时,给所述平衡千斤顶的活塞杆腔补液。
本发明利用液压支架四连杆机构的特性,使掩护梁和前、后连杆机构有效的限位,通过立柱的动作使支架升降,从而对整个平衡机构进行试验。本试验可以较好的验证平衡机构的强度,减少井下事故。
具体实施例的实验方法是:
支架后部通过连杆固定后,先升立柱使顶梁上仰,平衡千斤顶的活塞杆受拉、活塞杆腔受压至活塞杆腔安全阀卸载并被拉出至少30mm,再降立柱使顶梁低头,平衡千斤顶的活塞腔受压至活塞腔安全阀卸载并被压回至少30mm。立柱升降一次为一个循环,共循环4000次。
根据试验台管路系统局限性,试验台无位移传感器,可以利用时间控制平衡千斤顶的伸缩量,先反复几次,根据伸出30mm的平均时间设定供液的时间。
如图3所示,在升立柱和降立柱时,分别给平衡千斤顶的活塞腔和活塞杆腔补液:在升立柱的同时,平衡千斤顶的活塞杆腔增压,活塞杆腔安全阀泄液,系统给活塞腔补液,平衡千斤顶伸出,反之,降立柱时,系统给平衡千斤顶的活塞杆腔补液,平衡千斤顶的活塞腔增压,活塞腔安全阀开启,平衡千斤顶收缩。
本发明通过结构限位,支架的升降会压缩平衡千斤顶的活塞杆腔和活塞腔,使活塞杆腔和活塞腔的安全阀开启,同时,系统不断给活塞杆腔和活塞腔补液,试验过程简单、效果好。
本发明填补了本领域关于平衡机构试验的空白,有效验证了平衡机构的强度以及平衡千斤顶的密封等,提高了产品质量。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求书的保护范围为准。

Claims (5)

1.一种液压支架平衡机构试验方法,所述液压支架包括顶梁、掩护梁、立柱、底座,所述顶梁与掩护梁之间连接有平衡千斤顶,所述掩护梁上设有前连杆上铰接点和后连杆上铰接点,所述底座上设有前连杆下铰接点和后连杆下铰接点,所述前连杆上铰接点与前连杆下铰接点之间连接有前连杆,所述后连杆上铰接点与后连杆下铰接点之间铰接有后连杆,其特征在于,包括步骤:
首先,保持所述液压支架一侧的前连杆和后连杆不动,将另一侧的前连杆拆下,并将该侧的后连杆的上端拆下后与所述前连杆上铰接点连接,使所述掩护梁与前连杆和后连杆之间锁住;
然后,通过所述立柱的动作使液压支架升降,从而对整个平衡机构进行试验。
2.根据权利要求1所述的液压支架平衡机构试验方法,其特征在于,对整个平衡机构进行试验的步骤包括:
先升立柱使所述顶梁上仰,所述平衡千斤顶的活塞杆受拉、活塞杆腔受压至活塞杆腔安全阀卸载;
再降立柱使所述顶梁低头,所述平衡千斤顶的活塞杆受压、活塞腔受压至活塞腔安全阀卸载;
上述过程循环多次。
3.根据权利要求2所述的液压支架平衡机构试验方法,其特征在于,升立柱过程中,使所述平衡千斤顶的活塞杆被拉出至少30mm;
降立柱过程中,使所述平衡千斤顶的活塞杆被压回至少30mm;
上述过程共循环4000次以上。
4.根据权利要求3所述的液压支架平衡机构试验方法,其特征在于,实验过程中利用时间控制平衡千斤顶的伸缩量,先反复几次,根据伸出30mm的平均时间设定供液的时间。
5.根据权利要求2至4任一项所述的液压支架平衡机构试验方法,其特征在于,在升立柱的同时,给所述平衡千斤顶的活塞腔补液;
在降立柱的同时,给所述平衡千斤顶的活塞杆腔补液。
CN201310268237.3A 2013-06-28 2013-06-28 液压支架平衡机构试验方法 Expired - Fee Related CN103308302B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310268237.3A CN103308302B (zh) 2013-06-28 2013-06-28 液压支架平衡机构试验方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310268237.3A CN103308302B (zh) 2013-06-28 2013-06-28 液压支架平衡机构试验方法

Publications (2)

Publication Number Publication Date
CN103308302A true CN103308302A (zh) 2013-09-18
CN103308302B CN103308302B (zh) 2015-11-25

Family

ID=49133767

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310268237.3A Expired - Fee Related CN103308302B (zh) 2013-06-28 2013-06-28 液压支架平衡机构试验方法

Country Status (1)

Country Link
CN (1) CN103308302B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500120A (zh) * 2014-12-15 2015-04-08 中煤北京煤矿机械有限责任公司 两柱掩护式液压支架四连杆机构固定结构
CN104502079A (zh) * 2014-12-15 2015-04-08 中煤北京煤矿机械有限责任公司 立柱动态试验装置
CN104533491A (zh) * 2014-12-26 2015-04-22 中煤北京煤矿机械有限责任公司 液压支架平衡机构试验装置及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87213791U (zh) * 1987-10-04 1988-07-27 煤炭工业部煤炭科学研究院北京开采研究所 新型四连杆液压支架
CN2627215Y (zh) * 2003-08-31 2004-07-21 靖远煤业有限责任公司 单摆杆液压支架
AU2005227376A1 (en) * 2004-12-10 2006-06-29 Yanzhou Coal Mining Company Limited Hydraulic support for fully mechanized mining and caving face end
AU2005242116A1 (en) * 2004-12-10 2006-06-29 Yanzhou Coal Mining Company Limited Electro-hydraulically controlled roof coal caving method and hydraulic support therefor
CN101078351A (zh) * 2007-06-30 2007-11-28 枣庄矿业(集团)有限责任公司第一机械厂 电液控制薄煤层掩护式液压支架

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87213791U (zh) * 1987-10-04 1988-07-27 煤炭工业部煤炭科学研究院北京开采研究所 新型四连杆液压支架
CN2627215Y (zh) * 2003-08-31 2004-07-21 靖远煤业有限责任公司 单摆杆液压支架
AU2005227376A1 (en) * 2004-12-10 2006-06-29 Yanzhou Coal Mining Company Limited Hydraulic support for fully mechanized mining and caving face end
AU2005242116A1 (en) * 2004-12-10 2006-06-29 Yanzhou Coal Mining Company Limited Electro-hydraulically controlled roof coal caving method and hydraulic support therefor
CN101078351A (zh) * 2007-06-30 2007-11-28 枣庄矿业(集团)有限责任公司第一机械厂 电液控制薄煤层掩护式液压支架

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
煤炭科学研究总院开采设计研究分院 等: "《中华人民共和国国家标准》", 10 January 2011, article "煤矿用液压支架第1部分:通用技术条件" *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104500120A (zh) * 2014-12-15 2015-04-08 中煤北京煤矿机械有限责任公司 两柱掩护式液压支架四连杆机构固定结构
CN104502079A (zh) * 2014-12-15 2015-04-08 中煤北京煤矿机械有限责任公司 立柱动态试验装置
CN104533491A (zh) * 2014-12-26 2015-04-22 中煤北京煤矿机械有限责任公司 液压支架平衡机构试验装置及方法

Also Published As

Publication number Publication date
CN103308302B (zh) 2015-11-25

Similar Documents

Publication Publication Date Title
CN104034549B (zh) 一种飞机机翼大变形试验加载装置
CN103308302A (zh) 液压支架平衡机构试验方法
CN104110527B (zh) 输油管道支撑装置
CN202108528U (zh) 液压支架操纵阀操纵手柄防护闭锁装置
CN204457832U (zh) 液压支架平衡机构试验装置
CN207348807U (zh) 自调平式移运拖撬
CN203347815U (zh) 液压支架平衡机构试验装置
CN204984448U (zh) 一种矿用液压支撑装置
CN201771528U (zh) 煤矿综采工作面防飞矸护帮装置
CN102877876B (zh) 推移机构动态循环液压系统及其实现动态循环加载的方法
CN203347821U (zh) 液压支架平衡机构限位装置
CN204183943U (zh) 带有安全顶杆装置的液压成型机
CN207679988U (zh) 一种便于安装维修的移动篮球架
CN104533491A (zh) 液压支架平衡机构试验装置及方法
CN203347820U (zh) 液压支架平衡机构试验液压系统
CN204330369U (zh) 液压支架推移机构双倍加载装置
CN204269356U (zh) 立柱动态试验装置
CN208184756U (zh) 液压支架用大工作阻力双伸缩立柱
CN204718798U (zh) 一种地弹簧弹簧寿命模拟快速检测装置
CN202730818U (zh) 一种安装于挖掘装载机上的架棚机构
CN102213102B (zh) 一种大倾角工作面倒架扶架方法
CN204371391U (zh) 两柱掩护式液压支架四连杆机构固定结构
CN106013029B (zh) 一种插销升降平台的升降方法及插销升降平台
CN202768045U (zh) 推移机构动态循环液压系统
CN202628146U (zh) 高档普采推溜装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20160628

CF01 Termination of patent right due to non-payment of annual fee