CN103306686A - Tunnel structure and method for preventing volcanic eruption - Google Patents

Tunnel structure and method for preventing volcanic eruption Download PDF

Info

Publication number
CN103306686A
CN103306686A CN2013102329841A CN201310232984A CN103306686A CN 103306686 A CN103306686 A CN 103306686A CN 2013102329841 A CN2013102329841 A CN 2013102329841A CN 201310232984 A CN201310232984 A CN 201310232984A CN 103306686 A CN103306686 A CN 103306686A
Authority
CN
China
Prior art keywords
tunnel
lava
volcano
chamber
eruption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102329841A
Other languages
Chinese (zh)
Inventor
陈钢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013102329841A priority Critical patent/CN103306686A/en
Publication of CN103306686A publication Critical patent/CN103306686A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a tunnel structure and a method for preventing volcanic eruption. The tunnel structure is characterized in that one end of a tunnel is connected with a lava chamber inside a volcano, and the other end of the tunnel is far away from the lava chamber and is connected with the outside of the ground, so that lava in the lava chamber is guided or accommodated, and pressure above a volcanic vent is reduced; and the length of the tunnel is 20-40 times of a passageway for vertical eruption of the volcano, the cross sectional area of the tunnel is 50-150 square meters, the depth of the tunnel is 5-10 kilometers underground, and the tunnel is a horizontal tunnel, or gradually extends upwards after the tunnel leaves the lava chamber, or gradually extends downwards and then extends upwards.

Description

A kind of tunnel structure and method that prevents volcanic eruption
Technical field
The present invention relates to the prevention area of natural calamity, particularly a kind of tunnel structure and method that prevents volcanic eruption.
 
Background technology
" super-volcano " (supervolcano) word comes from the filmograph of BBC, this sheet analysis and prediction process and the consequence of following Huangshi volcano eruption.In February, 2008 " Elements " magazine super-volcano special edition, summarized the academic research with the relevant each side of super-volcano outburst, comprise that super-volcano is historical, the outburst form, the lava chamber is analyzed, the volcanic crater size, intensity and the duration of eruption, omen before the outburst, outburst dynamic process, and the impact and the consequence that produce.The E.A. Parfitt that delivers recently and the works of L. Wilson " Fundamentals of Physical Volcanology. " describe physical mechanism and the analogy method of volcano eruption in detail.
47 super-volcanos of nearly total in the world.The research of super-volcano can be traced back to the research that van Bemmelen did the Toba lake in 1949 the earliest." super outburst " (supereruption) word is generally defined as volcano explosion index VEI and reaches more than 8 grades, and the lava discharge amount reaches the volcano eruption of (being equivalent to the pozzolan area coverage reaches more than 1000 square kilometres) more than 450 cubic kilometers.Pozzuolanic deposit mainly is comprised of pyroclastic flow (pyroclastic) material, and their density is far below the density of lava, then than the latter large 3 times of volumes.Maximum super-volcano eruption can produce nearly 4500 cubic kilometers lava." super-volcano " is defined as and produces at least the once volcano of super outburst.The material that the such super-volcano in similar Huangshi volcano sprays can be Duoed 10,000 times than the Sheng Hailun volcano of outburst in 1980.The appearance of super-volcano is a huge sunk area of ground surface, and area can reach 100 square kilometres.
Please refer to Fig. 1, the root of volcano eruption is that the lava in the underground lava chamber is rushed to ground along the pipeline (vertically erupting passage) of a rising, breaks through the resistance on earth's surface and produces the process of blast.In this process, the gases at high pressure of lava inside are released owing to pressure reduces suddenly near the earth's surface time, produce huge blast.The flowability of lava material is poorer, and the gas in the lava just is difficult to overflow so, and therefore final blast is also just stronger.The lava chamber of super-volcano is made of two kinds of lava usually, and the bottom part mainly is basalt (basaltic) magma, and they are main drives of blast.The upper strata of lava chamber mainly is the very high rhyolite of viscosity (ryholitic) magma, and they are main components of explosive.Volcano eruption or since surface pressure reduce, perhaps since the pressure increase at the end, ground cause.
The super-volcano outburst will bring large-scale destruction.Life in several thousand square kilometres of scopes of explosion center will be killed up to the pyroclastic flow of 400 degree to 800 degree by temperature.Pozzuolanic area coverage can reach the whole continent (continent).The flight of aircraft will be had a strong impact on.Surpass 10 centimetres to 15 centimetres the pozzolan roof, house that will crush at thickness.The pozzolan of one centimetre of thickness will work the mischief to the growth of crops.The pollution at water source will make power station and nuclear power station close.Sulfur gas in the volcanics will become the sulfuric acid particle with the fluid layer transfer, and stops the several years, thereby makes Global Temperature decline 10 degree, and convalescence may reach 10 years.Tropical rain forest can be destroyed by the amount of precipitation of microthermal climate and minimizing.Winter will be worldwide caused large-scale famine in this volcano, and the foundation structure of human social activity will shut down in the time in several years at some months.Therefore, must provide a kind of method that prevents or postpone volcanic eruption.
Owing to causing owing to the indoor lava accumulation of lava is excessive during volcano eruption, so, as long as can from the lava chamber, discharge lava, alleviate the pressure of top, lava chamber, so just might prevent volcano eruption.
Stratford proposed a patent " Magma evacuation systems for the prevention of explosions from supervolcanoes, United States patent 20030145592 " that prevents volcano eruption.His main thought is to beat a bite well to lead to the slag chamber from the top of slag chamber, thereby slag is discharged by this well head.We think that the feasibility of this class proposal is poor: if the diameter of vertical shaft is meticulous, lava can be given this well very soon and stop up so, if too wide, might cause so the volcano blast.
 
Summary of the invention
The present invention is directed to the prior art above shortcomings, a kind of tunnel structure that prevents volcanic eruption is provided, by being guided out the indoor lava of lava to ground or being stored in tunnel internal, thereby reduce the indoor pressure of lava, effectively prolong and prevent volcanic eruption.
The present invention is achieved through the following technical solutions:
A kind of tunnel structure that prevents volcanic eruption comprises a tunnel, and an end in tunnel connects the lava chamber of inside, a volcano, and the other end is away from the lava chamber and connect the outside, earth's surface, to guide or to hold the indoor lava of lava, to alleviate the pressure of top, volcanic crater;
Wherein, the length in tunnel is 20-40 times that passage is vertically erupted in the volcano, and cross-sectional area is 50-150 square metre, and the degree of depth is the tunnel of underground 5-10 kilometer, and the tunnel is horizontal tunnel, or makes progress gradually after leaving the lava chamber, or the shape that then makes progress downwards gradually.
Better, the tunnel comprises some arborizationses, in order to guiding or hold lava.
Better, the tunnel be evenly distributed on the lava chamber around.
The present invention also provides a kind of method that prevents volcanic eruption, by being guided out the indoor lava of lava to ground or being stored in tunnel internal, thereby reduces the indoor pressure of lava, effectively prolongs and prevents volcanic eruption.
A kind of method that prevents volcanic eruption comprises: excavate the tunnel of the lava chamber of inside, some connections one volcano, the other end is away from the lava chamber and connect the outside, earth's surface, in order to guide or to hold the indoor lava of lava, to alleviate the pressure of top, volcanic crater;
Wherein, the length in tunnel is 20-40 times that passage is vertically erupted in the volcano, and cross-sectional area 50-150 square metre, the degree of depth is the tunnel of underground 5-10 kilometer, and the tunnel is horizontal tunnel, or the shape that then makes progress downwards gradually after leaving the lava chamber.
Better, the tunnel comprises some arborizationses, in order to guiding or hold lava.
Better, the tunnel be evenly distributed on the lava chamber around.
 
Description of drawings
Shown in Figure 1 is the structure chart of lava chamber;
Shown in Figure 2 is the structural representation of one embodiment of the invention;
Shown in Figure 3 is the structural representation of another embodiment of the present invention.
 
The specific embodiment
Below with reference to accompanying drawing of the present invention; technical scheme in the embodiment of the invention is carried out clear, complete description and discussion; obviously; as described herein only is a part of example of the present invention; it is not whole examples; based on the embodiment among the present invention, the every other embodiment that those of ordinary skills obtain under the prerequisite of not making creative work belongs to protection scope of the present invention.
For the ease of the understanding to the embodiment of the invention, be further explained explanation below in conjunction with accompanying drawing as an example of specific embodiment example, and each embodiment does not consist of the restriction to the embodiment of the invention.
To discharge underground lava on the one hand, can not cause again on the other hand the volcano blast, in order to solve this a pair of contradiction, the method that the present invention proposes is in the tunnel of the basic horizontal trend of the lava chamber periphery long distance of mine working (such as 100 kilometers), and lava is discharged in the middle of the underground lava tunnel.Because what lava was walked is subterranean tunnel, therefore just can not cause the volcano blast of top, lava chamber, on the other hand, through flowing of long distance, the volcano magma slow consumption falls its energy, when they flow to the other end in tunnel, to lose its destructiveness, become controllable lava and flow.
The tunnel section area is at 50-150 square metre, general section is about 10*10=100 square metre, and the tunnel degree of depth is at underground 5-10 kilometer, and to lead to the lava chamber near the mode of level, or after leaving the lava chamber, make progress gradually, or the shape that then makes progress downwards gradually.This Cross section Design can reach 18 meters wide, 11 meters high (Bayliss Cave) according to occurring in nature by the mobile natural tunnel that produces of slag.The degree of depth in tunnel also is according to the present dark subterranean tunnel of Most: South Africa mine tunnel (Western Deep), its degree of depth reach underground 3.4 kilometers, and the plan degree of depth will reach underground 5 kilometers.
Aspect tunnel-shaped and length, propose several design schemes here, and analyze their pros and cons:
The first string.Build a length in 100 kilometers to 200 kilometers tunnel, the degree of depth is at underground about 6 kilometers, and shape as shown in Figure 2.This degree of depth can arrive the top of lava chamber, can draw lava.Length is 20 to 40 times that passage is vertically erupted in the volcano, so whole tunnel is full of after the lava, gross weight also will reach the lava weight in the vertical channel, under this pressure, is unlikely to cause the explosivity eruption of lava.The advantage of long tunnel is safety, and shortcoming is that the lava flowing velocity is slower, and the possibility of blocking channel is arranged.
Second scheme.Shorten length of tunnel to the 40-50 kilometer, can accelerate flowing velocity, but the danger meeting of explosive eruption increases relatively.
The 3rd scheme.Build 100 to 150 kilometers long tunnels.The tunnel leaves the afterwards gradually descending then rising of lava chamber.Such character pair lava rises and causes larger pressure, reduces the danger of blast.See Fig. 3.Can hold the lava of 10-15 cubic kilometer within this tunnel.
In fact not necessarily to discharge the earth's surface to lava, be emitted on the time that lava in the tunnel also can delay volcano eruption greatly.The lava total amount of lava chamber, U.S. Yellowstone is 10,000 5 thousand cubic kilometers.If therefrom extract 15 cubic kilometers lava out, be equivalent to reduce 0.1% lava amount, perhaps be equivalent to 1% actual eruption amount.The Huangshi volcano need to spend the eruption amount that 60-70 just accumulated 1300 cubic kilometers in 10000 years, therefore needs the lava of 15 cubic kilometers of cost accumulation in about 7000.So, discharge 15 cubic kilometers lava, just can be volcano eruption time retardation several thousand.For winning time enough, the mankind develop more tunnel discharge lava.
Lower surface analysis once lava fills up the required time of whole tunnel.Lava 90% in Huangshi slag chamber is that rhyolite 10% is basalt, and the former often is in solid-state, and the latter often is in the fluid attitude, and both often are in admixture.
On land, the basalt lava in the flowing velocity on the gentle slope at hundreds of rice per hour to per hour between one kilometer, on steeper slope, flowing velocity can reach per hour 30-60 kilometer.So, fill up time of taking in 150 kilometers long tunnels greatly about one day by one month between.
If the lava main component in the tunnel is basalt, the analysis of mobility status is with more complicated so.On ground, basalt lava flowing velocity is several meters of every days.If basalt lava flowing velocity is 10 meters of every days in the tunnel, lava will expend 41 years and fill up 150 kilometers long tunnels so.On the other hand, underground basalt lava contains a high proportion of Compressed Gas interior, therefore has very high explosivity.In natural volcanic eruption, the basalt lava is in uphill process, and the gas that is compressed in the magma constantly overflows in uphill process, causes the lava material to expand and explodes, and stone and pozzolan are taken to the high-altitude at a terrific speed.Therefore, we constrain in explosive within the tunnel by the long tunnel of design, slowly release the gaseous matter in the lava.
By computer simulation and experiment will be to lava pressure on the spot, the tunnel wall resistance obtains further to understand, and can the flow situation make preliminary estimation.Expection may there will be two kinds of situations, and a kind of is to fill up most of tunnel under the lava pushed at high pressure to stop to flow afterwards, and another kind of possibility is that lava can flow out the tunnel face, and forming in the tunnel face does not have destructive small-sized eruption.
Consider that long distance tunnel itself also possesses the function of underground lava locker room, the present invention also comprises the net of subterranean tunnel on a large scale that excavation is made of a plurality of arborizationses, as large-scale lava discharging and storage system, around the slag chamber, evenly discharge lava.If the excavation in tunnel is the bottom of the deep enough slag of energy chamber at last, the so easier strong lava of flowability of directly drawing.
The above; only for the better specific embodiment of the present invention, but protection scope of the present invention do not limit to therewith, anyly is familiar with those skilled in the art in the technical scope that the present invention discloses; the variation that can expect easily or replacement all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should be as the criterion with the protection domain of claim.

Claims (6)

1. a tunnel structure that prevents volcanic eruption is characterized in that, comprises a tunnel, one end in described tunnel connects the lava chamber of inside, a volcano, the other end is away from described lava chamber and connect the outside, earth's surface, to guide or to hold the indoor lava of described lava, to alleviate the pressure of top, volcanic crater;
Wherein, the length in described tunnel is 20-40 times that passage is vertically erupted in described volcano, and cross-sectional area is between 50-150 square metre, the degree of depth is the tunnel of underground 5-10 kilometer, described tunnel is horizontal tunnel, or makes progress gradually after leaving described lava chamber, or the shape that then makes progress downwards gradually.
2. a kind of method that prevents volcanic eruption according to claim 1 is characterized in that, described tunnel comprises some arborizationses, in order to guiding or hold lava.
3. the described a kind of method that prevents volcanic eruption of any one in 2 according to claim 1 is characterized in that, described tunnel be evenly distributed on described lava chamber around.
4. method that prevents volcanic eruption, it is characterized in that, comprising: excavate the tunnel of the lava chamber of inside, some connections one volcano, the other end is away from described lava chamber and connect the outside, earth's surface, in order to guide or to hold the indoor lava of described lava, to alleviate the pressure of top, volcanic crater;
Wherein, the length in described tunnel is 20-40 times that passage is vertically erupted in described volcano, and cross-sectional area is about 50-150 square metre, the degree of depth is the tunnel of underground 5-10 kilometer, described tunnel is horizontal tunnel, or makes progress gradually after leaving described lava chamber, or the shape that then makes progress downwards gradually.
5. a kind of method that prevents volcanic eruption according to claim 4 is characterized in that, described tunnel can be single line, also can comprise some arborizationses, in order to guiding or hold lava.
6. the described a kind of method that prevents volcanic eruption of any one in 5 according to claim 4 is characterized in that, described tunnel be evenly distributed on described lava chamber around.
CN2013102329841A 2013-06-13 2013-06-13 Tunnel structure and method for preventing volcanic eruption Pending CN103306686A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102329841A CN103306686A (en) 2013-06-13 2013-06-13 Tunnel structure and method for preventing volcanic eruption

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102329841A CN103306686A (en) 2013-06-13 2013-06-13 Tunnel structure and method for preventing volcanic eruption

Publications (1)

Publication Number Publication Date
CN103306686A true CN103306686A (en) 2013-09-18

Family

ID=49132361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102329841A Pending CN103306686A (en) 2013-06-13 2013-06-13 Tunnel structure and method for preventing volcanic eruption

Country Status (1)

Country Link
CN (1) CN103306686A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107130977A (en) * 2017-06-27 2017-09-05 长江勘测规划设计研究有限责任公司 Super-span dome hollow be oriented in underground nuclear reactor cavern excavates structure and excavation method
WO2018034583A1 (en) * 2016-08-15 2018-02-22 Игорь Борис МАШИНСКИ Method for preventing eruption of a dangerous caldera

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2231092C2 (en) * 2001-07-24 2004-06-20 Плугин Александр Илларионович Method of prevention of volcano eruption
JP2009020659A (en) * 2007-07-11 2009-01-29 Shimizu Corp Volcano disaster prevention map system
CN102733372A (en) * 2012-07-06 2012-10-17 朴德春 Prevention method for re-explosion of volcanoes in volcanic fields
CN102767171A (en) * 2011-05-03 2012-11-07 张科元 Method for preventing destructive violent earthquakes and volcano eruptions
CA2791827A1 (en) * 2012-10-04 2013-01-12 Weimin Wu Volcano eruption prevention process

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2231092C2 (en) * 2001-07-24 2004-06-20 Плугин Александр Илларионович Method of prevention of volcano eruption
JP2009020659A (en) * 2007-07-11 2009-01-29 Shimizu Corp Volcano disaster prevention map system
CN102767171A (en) * 2011-05-03 2012-11-07 张科元 Method for preventing destructive violent earthquakes and volcano eruptions
CN102733372A (en) * 2012-07-06 2012-10-17 朴德春 Prevention method for re-explosion of volcanoes in volcanic fields
CA2791827A1 (en) * 2012-10-04 2013-01-12 Weimin Wu Volcano eruption prevention process

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
创思: "拯救美国 一个阻止超级火山爆发的设想", 《HTTP://WWW.TAOGUBA.COM.CN/ARTICLE/425518/1 淘股吧》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018034583A1 (en) * 2016-08-15 2018-02-22 Игорь Борис МАШИНСКИ Method for preventing eruption of a dangerous caldera
CN107130977A (en) * 2017-06-27 2017-09-05 长江勘测规划设计研究有限责任公司 Super-span dome hollow be oriented in underground nuclear reactor cavern excavates structure and excavation method
CN107130977B (en) * 2017-06-27 2023-10-10 长江勘测规划设计研究有限责任公司 Hollow guide excavation structure and excavation method for ultra-large span dome of underground nuclear reactor cavity

Similar Documents

Publication Publication Date Title
CN108286920B (en) Implementation method for tunnel blasting and excavation
CN101813002B (en) Coal seam pre-splitting method based on gas extraction
CN104712358A (en) Coal seam group with high gas content pressure relief and co-mining method based on gob-side entry retaining of working face of first mining total rock pressure relief
CN105507938A (en) Construction method of hydraulic flushing and presplit blasting combined permeability-increasing extraction system in drill holes
CN103306250A (en) In-tunnel diversion type cascade hydropower station and construction method thereof
CN104213932A (en) Outburst coal bed hydraulic phase change cracking cross-cut coal uncovering method
CN204718510U (en) A kind of novel joint-cutting quick-burning charge monoblock type photoface exploision device
CN100557375C (en) Lateral direction loosening blasting
CN106437497A (en) Method for constructing hot dry rock artificial geothermal reservoir through water pressure blasting fracturing
CN104107609A (en) Combined dust settling method for large-area excavation and explosion in water conservancy and hydropower project
CN102678166B (en) Method for increasing gas extraction rate by permeability increasing of single thick coal seam
CN102748064A (en) Large-mining-height fully-mechanized caving face gas control method
CN102777185A (en) Inclined well shaft construction technology
CN102788539A (en) Side slope outlining blasting method for greening
CN103306686A (en) Tunnel structure and method for preventing volcanic eruption
CN102094671A (en) Three-dimensional gas extraction method for coal seams with low-permeability and low possibility of gas extraction
CN205445634U (en) Be used for constructing built -in toward peripheral stratum slip casting reinforcing apparatus from shield
CN104948191A (en) Method for preventing and treating rock burst by using filling mode
CN102182426A (en) Method for pumping coal bed gas from long-distance pressure-relieved coal bed
CN107191218B (en) Suspended slag water seal blasting permeability increasing and gas extraction method
CN206430888U (en) A kind of lower thrust load caused landslide physical model experiment system of storehouse water effect
CN105507872A (en) Hydraulic flushing and presplit blasting combined permeability-increasing extraction system in crossing holes
CN202157306U (en) Anti-breaking and anti-leakage water-power plant dam built in gorges
CN103557029A (en) Method for transition from non-pillar sublevel caving method to upward horizontal cut-and-fill method
CN206431941U (en) A kind of reservoir landslide physical model experiment system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130918