CN103303600B - 海上风力发电机桩基基础的绑扎装置 - Google Patents
海上风力发电机桩基基础的绑扎装置 Download PDFInfo
- Publication number
- CN103303600B CN103303600B CN201310284320.XA CN201310284320A CN103303600B CN 103303600 B CN103303600 B CN 103303600B CN 201310284320 A CN201310284320 A CN 201310284320A CN 103303600 B CN103303600 B CN 103303600B
- Authority
- CN
- China
- Prior art keywords
- pile foundation
- rood beam
- moving slider
- bolt
- support member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310284320.XA CN103303600B (zh) | 2013-07-08 | 2013-07-08 | 海上风力发电机桩基基础的绑扎装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310284320.XA CN103303600B (zh) | 2013-07-08 | 2013-07-08 | 海上风力发电机桩基基础的绑扎装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103303600A CN103303600A (zh) | 2013-09-18 |
CN103303600B true CN103303600B (zh) | 2015-04-29 |
Family
ID=49129397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310284320.XA Active CN103303600B (zh) | 2013-07-08 | 2013-07-08 | 海上风力发电机桩基基础的绑扎装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103303600B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104859801A (zh) * | 2015-04-21 | 2015-08-26 | 武船重型工程股份有限公司 | 一种捆扎装置 |
CN106762341B (zh) * | 2016-12-13 | 2018-07-24 | 哈尔滨工程大学 | 一种井字型海洋能发电装置通用托架 |
CN109449521B (zh) * | 2018-10-25 | 2021-08-27 | 天津普兰能源科技有限公司 | 一种回收激光焊模组中单体电池的方法 |
CN117163498B (zh) * | 2023-11-02 | 2023-12-26 | 上海建工(江苏)钢结构有限公司 | 田字型海上风电塔筒运输船用托架及其施工工艺 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2500473A1 (de) * | 2011-03-16 | 2012-09-19 | HOCHTIEF Solutions AG | Verfahren zur Herstellung einer Gründung für eine Offshore-Anlage |
CN103088801A (zh) * | 2011-11-03 | 2013-05-08 | 赖志勤 | 海上风力发电机及桩基一次整体安装平台 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE1019832A4 (nl) * | 2011-02-22 | 2013-01-08 | Geosea N V | Inrichting voor het vervaardigen van een fundering voor een zich op hoogte bevindende massa, bijbehorende werkwijze en samenstel van de inrichting en een opvijzelbaar platform. |
NO333643B1 (no) * | 2011-09-23 | 2013-07-29 | Norwind Installer As | Opptakbar pre-paelingsramme for offshore vindturbinfundamenter |
-
2013
- 2013-07-08 CN CN201310284320.XA patent/CN103303600B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2500473A1 (de) * | 2011-03-16 | 2012-09-19 | HOCHTIEF Solutions AG | Verfahren zur Herstellung einer Gründung für eine Offshore-Anlage |
CN103088801A (zh) * | 2011-11-03 | 2013-05-08 | 赖志勤 | 海上风力发电机及桩基一次整体安装平台 |
Also Published As
Publication number | Publication date |
---|---|
CN103303600A (zh) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103303600B (zh) | 海上风力发电机桩基基础的绑扎装置 | |
EP3574149B1 (en) | A method and tool for installation of an offshore wind turbine | |
US9144863B2 (en) | System and method for handling wind turbine tower sections | |
JP6041581B2 (ja) | 洋上風力発電の風車設備の設置専用船及び風車設備の設置方法 | |
KR101864145B1 (ko) | 해양구조물 설치선박 | |
KR20120047740A (ko) | 갑판승강식작업대선 및 이를 이용한 해상풍력발전시설의 시공방법 | |
WO2010138622A2 (en) | Pivoting installation system and method for an offshore wind | |
KR101642623B1 (ko) | 양상 풍차 설치용 선박 및 양상 풍차 설치 방법 | |
CN102030291A (zh) | 海上风机运输、安装平台 | |
KR101722595B1 (ko) | 플레어 타워의 분할 탑재 방법 | |
CN103693170A (zh) | 一种漂浮式海上风电组装平台及用该平台组装海上风机的方法 | |
CN103807114A (zh) | 海上风力发电机组水平组装整体翻转竖立安装系统及方法 | |
KR20140050186A (ko) | 해상 풍력 발전장치 및 이의 급속 설치방법 | |
CN103807115A (zh) | 海上风力发电机组水平组装整体翻转竖立装置及施工方法 | |
KR101724593B1 (ko) | 전용 바지선을 이용한 풍력발전기의 해상 구축 방법 | |
CN103171911A (zh) | 装船机安装工艺 | |
JP2021076043A (ja) | 洋上風車の据付方法 | |
CN103807116A (zh) | 海上风力发电机组拉索千斤顶提升安装装置及施工方法 | |
CN216950679U (zh) | 一种海上起重船浮态安装风机部件的施工装置 | |
KR20130117815A (ko) | 양식용으로 사용되는 정사각형 및 원형의 케이지 래프트를 조립 및 이송하기 위한 방법 및 강성 수중 구조체를 지지하기 위한 폴리에틸렌 부동 시스템 | |
KR20130120164A (ko) | 해상 풍력발전기 설치선 | |
KR101280521B1 (ko) | 플레어 타워를 구비하는 해양구조물 및 플레어 타워의 탑재방법 | |
CN106976808A (zh) | 超大型离岸风机水下基座的运输安装方法及运输安装设备 | |
CN203822557U (zh) | 海上风力发电机组拉索千斤顶提升安装装置 | |
CN114198261A (zh) | 一种起重船浮态安装风机机舱的导向装置及操作方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
EE01 | Entry into force of recordation of patent licensing contract |
Application publication date: 20130918 Assignee: JIANGSU HANTONG SHIP HEAVY INDUSTRY CO., LTD. Assignor: Han Tong (Shanghai) new energy ship design & Research Co., Ltd. Contract record no.: 2015320010079 Denomination of invention: Colligation device of pile foundation of offshore wind turbine Granted publication date: 20150429 License type: Exclusive License Record date: 20150529 |
|
LICC | Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20151020 Address after: 226361 Tongzhou District City, Jiangsu Province, the town of Thean Hou Temple,, five Patentee after: JIANGSU HANTONG SHIP HEAVY INDUSTRY CO., LTD. Address before: 201203, 88, 509, 510 Darwin Road, Zhangjiang hi tech park, Shanghai, Pudong New Area, 2 Patentee before: Han Tong (Shanghai) new energy ship design & Research Co., Ltd. |