CN103291327A - 一种用于控制沿空留巷底鼓的钢桩方法 - Google Patents

一种用于控制沿空留巷底鼓的钢桩方法 Download PDF

Info

Publication number
CN103291327A
CN103291327A CN2013101848899A CN201310184889A CN103291327A CN 103291327 A CN103291327 A CN 103291327A CN 2013101848899 A CN2013101848899 A CN 2013101848899A CN 201310184889 A CN201310184889 A CN 201310184889A CN 103291327 A CN103291327 A CN 103291327A
Authority
CN
China
Prior art keywords
side entry
entry retaining
piling bar
gob side
pucking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101848899A
Other languages
English (en)
Other versions
CN103291327B (zh
Inventor
徐营
魏昌盛
柏建彪
姬国英
于永政
王襄禹
陈勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201310184889.9A priority Critical patent/CN103291327B/zh
Publication of CN103291327A publication Critical patent/CN103291327A/zh
Application granted granted Critical
Publication of CN103291327B publication Critical patent/CN103291327B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明属于矿山领域,涉及一种控制沿空留巷底鼓的方法。针对沿空留巷底鼓的控制难题,距正在回采采煤工作面后方15~25m的沿空留巷两底角处,施工两个平行的底板钻孔,把两根废旧钢轨分别安装在两个钻孔内作为底板钢桩,再用浮矸充实钢桩和钻孔壁之间的空隙,用木楔楔紧钢桩外露部分与两帮之间的空隙;随采煤工作面推进,按照排距向前逐排施工,直至完成整条沿空留巷的施工。本发明不仅考虑了钢桩较强的抗弯和抗剪能力,而且考虑了钢桩控制底板岩体变形的力学机理,使得控制沿空留巷底鼓的效果更好。其施工方法简单、操作方便;材料为废旧钢轨,成本低。

Description

一种用于控制沿空留巷底鼓的钢桩方法
技术领域
本发明涉及一种控制矿山巷道底鼓的方法,尤其是一种适用于沿空留巷底鼓的控制方法。
背景技术
在采矿业绿色开采、科学开采的发展方向下,沿空留巷技术在国内外许多矿井得到广泛的应用,不断体现出该技术在成巷速度、煤炭采出率和瓦斯治理等方面的优越性。但是,工程现场表明,沿空留巷技术还不完善,在应用中仍存在着诸多难题,其中底鼓问题尤为严重,有的巷道最大底鼓量近1000mm,最大底鼓速度达95mm/d。卧底后,底鼓仍继续发展。在深井开采中,沿空留巷底鼓问题更加突出,最大底鼓量可占到巷道高度的50%,导致巷道必须进行二次翻修,失去了沿空留巷的实际意义,这严重制约着沿空留巷技术的发展和应用。
传统的巷道底鼓控制技术为加固法和卸压法,加固法是控制矿井巷道底鼓最常用的一种方法,主要有底板注浆、底板锚杆、封闭式支架、混凝土反底拱等,其控制机理为提高加固区内底板岩层的抗变形能力。卸压法主要有底板切缝、两帮切缝、钻孔、松动爆破、卸压煤柱等,其控制机理是使底板岩层处于应力降低区。这些方法对处于较差应力环境下的沿空留巷底板,虽然可以起到一定的控制作用,但其控制能力有限,并且施工程序复杂,成本高,在沿空留巷工程现场一般不使用。而工程现场常用的卧底方法,既不经济又不能从根本上解决沿空留巷底鼓控制难题。
发明内容
技术问题:本发明的目的是提供一种施工方法简单、成本低、效果好的控制沿空留巷底鼓的钢桩方法。
技术方案:一种用于控制沿空留巷底鼓的钢桩方法,步骤如下:
(1)对正在实施沿空留巷技术的巷道,清理距正在回采采煤工作面后方15~25m处施工现场的障碍物;
(2)在沿空留巷底板上,分别距两底角200~300mm处,确定两个平行桩位,钻机放置在将要打钻的桩位点;
(3)启动钻机,打好直径为90~100mm,长度为1500~3500mm,纵向夹角α为10°~20°的两个钻孔;
(4)把两根型号为11kg/m、15kg/m或18kg/m、长度为1800~3800mm的废旧钢轨,分别安装在两个钻孔内作为底板钢桩,安装时钢轨轨底面平行于巷道轴向,轨底面的外法线指向巷道外侧,外露长度为300mm;
(5)用粒径为2~10mm的浮矸充实钢桩和钻孔壁之间的空隙;
(6)用优质木料的木楔楔紧钢桩外露部分与两帮之间的空隙;
(7)随采煤工作面推进,重复上述步骤,按照800~2000mm的排距向前逐排施工,直至完成整条沿空留巷的施工。
有益效果:
(1)底板钢桩较强的抗弯能力可有效抵抗沿空留巷底板岩体的变形;底板钢桩较强的抗剪能力可阻止沿空留巷底板塑性区岩体的滑动;底板钢桩间岩体存在起拱效应,可充分调动桩间及邻近岩体的承载能力,达到共同抵抗沿空留巷底板变形的作用;底板钢桩起到类似帷幕作用,减小应力场对沿空留巷底板岩体的作用效应。通过以作用,该发明可很好控制沿空留巷底鼓;
(2)底板钢桩为废旧钢轨,成本低;
(3)该发明施工简单、操作方便,只需要在沿空留巷底板上安设两排钢桩,比普通底板锚杆或锚索的支护工艺还简单,不需要专门的人员和设备。
附图说明
图1是本发明的用于控制沿空留巷底鼓的钢桩方法示意图。
图中:1-巷道,2-两帮,3-底板,4-底角,5-钻孔,6-钢桩,7-浮矸,8-木楔。
具体实施方式
某矿为缓解采掘接替紧张的局面,在采煤工作面回采过程中,采用沿空留巷技术将本工作面的运输巷道保留下来,作为下一工作面的回风巷道使用。实施过沿空留巷技术巷道的围岩变形监测结果表明:在下一工作面回采前巷道底鼓量最大达1000mm,采用卧底法和加固法也未能解决这一难题。为保证沿空留巷技术的实施和矿井的安全高效生产,对正在实施沿空留巷技术的巷道,实施了控制沿空留巷底鼓的钢桩方法,下面结合附图对本发明的实施例作进一步的描述:
1)对正在实施沿空留巷技术的巷道1,清理距正在回采采煤工作面后方15m处施工现场的障碍物;
2)在沿空留巷底板3上,分别距两底角4的200mm处,确定两个平行桩位,钻机放置在将要打钻的桩位点;
3)启动钻机,打好直径为90mm,长度为1500mm,纵向夹角α为10°的两个钻孔5;
4)把两根型号为11kg/m、长度为1800mm的废旧钢轨,分别安装在两个钻孔内作为底板钢桩6,安装时钢轨轨底面平行于巷道1轴向,轨底面的外法线指向巷道1外侧,外露长度为300mm;
5)用粒径为2mm的浮矸7充实钢桩6和钻孔壁之间的空隙;
6)用优质木料的木楔8楔紧钢桩外露部分与两帮2之间的空隙;
7)随采煤工作面推进,重复上述步骤,按照800mm的排距向前逐排施工,直至完成整条沿空留巷的施工。
以上所述仅为本发明示意性的具体实施方式,并非用以限定本发明的范围。任何本领域的技术人员,在不脱离本发明的构思和原则的前提下所作的等同变化与修改,均应属于本发明保护的范围。

Claims (7)

1.一种用于控制沿空留巷底鼓的钢桩方法,其特征在于其实施步骤包括:
1)对正在实施沿空留巷技术的巷道(1),清理距正在回采采煤工作面后方15~25m处施工现场的障碍物;
2)在沿空留巷(1)的底板(3)上,分别距两底角(4)200~300mm处,确定两个平行桩位,钻机放置在将要打钻的桩位点;
3)启动钻机,按设计角度和长度打好两个钻孔(5);
4)把两根废旧钢轨分别安装在两个钻孔(5)内作为底板钢桩(6),钢桩(6)外露长度为200~400mm;
5)用浮矸(7)充实钢桩(6)和钻孔(5)壁之间的空隙;
6)用木楔(8)楔紧钢桩(6)外露部分与两帮(2)之间的空隙;
7)随采煤工作面推进,重复上述步骤,按照排距向前逐排施工,直至完成整条沿空留巷的施工。
2.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在于:所述钻孔(5)的直径为90~100mm,长度为1500~3500mm,纵向夹角α为10°~20°。
3.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在于:所述钢桩(6)为11kg/m、15kg/m或18kg/m型号的废旧钢轨,长度为1800~3800mm。
4.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在于:所述钢桩(6)安装时,钢轨轨底面平行于巷道(1)轴向,轨底面的外法线指向巷道(1)外侧。
5.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在:所述钢桩(6)的排距为800~2000mm。
6.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在于:所述浮矸(7)的粒径控制在2~10mm。
7.根据权利要求1所述的一种用于控制沿空留巷底鼓的钢桩方法,其特征在:所述木楔(8)的木料为优质木。
CN201310184889.9A 2013-05-07 2013-05-07 一种用于控制沿空留巷底鼓的钢桩方法 Active CN103291327B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310184889.9A CN103291327B (zh) 2013-05-07 2013-05-07 一种用于控制沿空留巷底鼓的钢桩方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310184889.9A CN103291327B (zh) 2013-05-07 2013-05-07 一种用于控制沿空留巷底鼓的钢桩方法

Publications (2)

Publication Number Publication Date
CN103291327A true CN103291327A (zh) 2013-09-11
CN103291327B CN103291327B (zh) 2019-05-03

Family

ID=49092789

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310184889.9A Active CN103291327B (zh) 2013-05-07 2013-05-07 一种用于控制沿空留巷底鼓的钢桩方法

Country Status (1)

Country Link
CN (1) CN103291327B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907170A (zh) * 2017-04-29 2017-06-30 陕西省建筑职工大学 一种巷道底板支护结构及施工方法
CN108756930A (zh) * 2018-05-31 2018-11-06 天地科技股份有限公司 一种利用联排桩基治理巷道底鼓和底板冲击地压的方法
CN108979666A (zh) * 2018-07-11 2018-12-11 河北工程大学 一种钢管混凝土桩控制巷道底鼓的方法
CN110529142A (zh) * 2019-07-30 2019-12-03 太原理工大学 基于智能化液压囊的深部巷道底鼓控制装置和方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4699547A (en) * 1985-03-15 1987-10-13 Seegmiller Ben L Mine truss structures and method
CN1865660A (zh) * 2006-06-16 2006-11-22 中国矿业大学 一种底板围岩弱化区域的构筑方法
CN101886545A (zh) * 2010-07-05 2010-11-17 北京科技大学 一种微型碎石管注桩治理软岩巷道底鼓的方法
CN101975074A (zh) * 2010-10-16 2011-02-16 山东科技大学 软岩巷道锚拉钢管混凝土抗底臌装置及其施工方法
CN102797478A (zh) * 2012-08-27 2012-11-28 中国矿业大学 分布式抗剪阻滑钢筋混凝土桩防治软岩巷道底鼓方法
CN102797480A (zh) * 2012-08-27 2012-11-28 中国矿业大学 非连续承压格栅砼墙控制高应力软岩巷道底鼓变形方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4699547A (en) * 1985-03-15 1987-10-13 Seegmiller Ben L Mine truss structures and method
CN1865660A (zh) * 2006-06-16 2006-11-22 中国矿业大学 一种底板围岩弱化区域的构筑方法
CN101886545A (zh) * 2010-07-05 2010-11-17 北京科技大学 一种微型碎石管注桩治理软岩巷道底鼓的方法
CN101975074A (zh) * 2010-10-16 2011-02-16 山东科技大学 软岩巷道锚拉钢管混凝土抗底臌装置及其施工方法
CN102797478A (zh) * 2012-08-27 2012-11-28 中国矿业大学 分布式抗剪阻滑钢筋混凝土桩防治软岩巷道底鼓方法
CN102797480A (zh) * 2012-08-27 2012-11-28 中国矿业大学 非连续承压格栅砼墙控制高应力软岩巷道底鼓变形方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
孟超等: "马头门底鼓机理及防治技术研究", 《金属矿山》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907170A (zh) * 2017-04-29 2017-06-30 陕西省建筑职工大学 一种巷道底板支护结构及施工方法
CN106907170B (zh) * 2017-04-29 2023-03-03 陕西省建筑职工大学 一种巷道底板支护结构及施工方法
CN108756930A (zh) * 2018-05-31 2018-11-06 天地科技股份有限公司 一种利用联排桩基治理巷道底鼓和底板冲击地压的方法
CN108979666A (zh) * 2018-07-11 2018-12-11 河北工程大学 一种钢管混凝土桩控制巷道底鼓的方法
CN108979666B (zh) * 2018-07-11 2024-04-02 河北工程大学 一种钢管混凝土桩控制巷道底鼓的方法
CN110529142A (zh) * 2019-07-30 2019-12-03 太原理工大学 基于智能化液压囊的深部巷道底鼓控制装置和方法

Also Published As

Publication number Publication date
CN103291327B (zh) 2019-05-03

Similar Documents

Publication Publication Date Title
CN108625856B (zh) 一种地下矿山相邻两个采场一条出矿巷的采矿方法
CN102230382B (zh) 一种底板渐进掩护增压式注浆加固技术
CN107060760A (zh) 一种煤矿回撤巷道预裂爆破放顶卸压的方法
CN100577986C (zh) 三软地质条件下采空区留巷围岩支护方法
CN103821558B (zh) 煤矿采空区充填采矿及沿空留巷充填工艺
CN101839140B (zh) 一种巷道底板注浆加固方法
CN105317459A (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
CN104763434B (zh) 一种无煤柱双巷掘进方法
CN104234749B (zh) 一种综采工作面大断面回撤通道围岩控制方法
WO2011103620A1 (en) A method of reducing subsidence or windblast impacts from longwall mining
CN101509395A (zh) 一种控制放顶护巷方法
CN101126316A (zh) 一种长壁综采回收房式开采煤柱的方法
CN101608552A (zh) 煤层底板含水层加固并在加固过程中保护隔水层的方法
CN101509383A (zh) 巷道底脚锚注加固抗底臌的方法及施工工艺
CN101915108A (zh) 一种控制动压巷道底鼓的方法
CN107893658A (zh) 强地压环境下极厚大矿体阶段空场嗣后充填采矿方法
CN108979638B (zh) 采煤巷道楔形再生墙与单腿棚梁复合沿空留巷方法
CN103291327A (zh) 一种用于控制沿空留巷底鼓的钢桩方法
CN105781597A (zh) 深井软岩沿空留巷巷内锚注加固方法
CN103195443A (zh) 深部开采优化支护参数预防巷道滞后突水的方法
CN110630271A (zh) 用于富水砂层盾构穿越钢管土钉区的施工方法
CN111535844A (zh) 用于坚硬顶板的沿空留巷无煤柱开采装备系统及方法
RU2472936C1 (ru) Способ управления труднообрушающейся кровлей при входе механизированного комплекса в демонтажную камеру
CN102155248B (zh) 一种煤柱下方巷道支护方法
CN102493819B (zh) 一种控制煤层巷道围岩稳定性的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant