CN102155248B - 一种煤柱下方巷道支护方法 - Google Patents

一种煤柱下方巷道支护方法 Download PDF

Info

Publication number
CN102155248B
CN102155248B CN201110057985A CN201110057985A CN102155248B CN 102155248 B CN102155248 B CN 102155248B CN 201110057985 A CN201110057985 A CN 201110057985A CN 201110057985 A CN201110057985 A CN 201110057985A CN 102155248 B CN102155248 B CN 102155248B
Authority
CN
China
Prior art keywords
laneway
steel band
top board
hydraulic expansion
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201110057985A
Other languages
English (en)
Other versions
CN102155248A (zh
Inventor
柏建彪
王襄禹
徐营
冯伟
王元明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201110057985A priority Critical patent/CN102155248B/zh
Publication of CN102155248A publication Critical patent/CN102155248A/zh
Application granted granted Critical
Publication of CN102155248B publication Critical patent/CN102155248B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种煤柱下方巷道支护方法,首先对巷道顶板及两帮支设临时支护,并铺设金属网及钢带,使钢带压住金属网,用单体液压支柱将钢带顶住;然后用与螺纹钢锚杆直径相匹配的钻头配合钻机通过顶板钢带的孔口向顶板钻孔,依次将螺纹钢锚杆装入各个钻孔内,通过螺母使其达到预紧力;再用与水力膨胀锚杆直径相匹配的钻头配合钻机从巷帮钢带的孔口向巷帮打眼钻孔,依次将水力膨胀锚杆装入巷帮各个钻孔内,向水力膨胀锚杆内注入高压水使其膨胀。在以上工序进行的同时,按照规定的间排距向顶板及两帮增打锚索。重复进行,直至完成煤柱下方巷道的支护。该方法采用的水力膨胀锚杆能够实现全长锚固,再用锚索加强支护后,能够有效控制煤柱下方巷道围岩变形。

Description

一种煤柱下方巷道支护方法
技术领域
本发明涉及一种煤柱下方巷道支护方法,尤其适用极近距离煤层群开始时,位于煤柱下方巷道的支护,也可应用于高应力破碎围岩巷道的支护。
背景技术
对于煤层群开采,当煤层层间距离较大时,上部煤层开采后对下部煤层的开采影响程度很小。但是,随着煤层间距离减小,上下煤层间开采的相互影响会逐渐增大,特别是当煤层间距很近时(小于1.5m),下部煤层开采前顶板的完整程度已受上部煤层开采损伤影响,且上部煤层开采后残留的区段煤柱在底板形成的集中压力,导致下部煤层开采区域的顶板结构和应力环境发生变化。从而使下部煤层开采时,回采巷道的矿山压力显现十分明显,巷道围岩移近量大,巷道支护困难。目前对于这种情况通常采用高强度螺纹钢锚杆支护,如果不能有效控制围岩变形,采取加大支护密度,或者采取先让后支,但效果均不明显。尤其是两帮的支护,由于煤柱集中载荷向下传递,形成高应力环境,使得两帮围岩破碎范围加大,采用树脂锚固锚杆容易失效。
发明内容
技术问题:本发明的目的是克服已有技术中的不足,提供一种方法简单、能有效控制围岩变形、支护效果好的煤柱下方巷道支护方法。
技术方案:本发明的煤柱下方巷道支护方法,包括以下步骤:
a.首先将煤柱下方掘出的巷道顶板及两帮的危石处理掉,支设临时支护;
b.对掘出的巷道顶板及两帮铺设金属网,用布有孔径与螺纹钢锚杆直径相匹配的顶板钢带托住顶板金属网,然后用单体液压支柱将顶板钢带顶住,使其贴紧顶板;
c.用与螺纹钢锚杆直径相匹配的钻头配合钻机依次从该排顶板钢带的孔口向顶板打眼钻孔,孔深与螺纹钢锚杆长度相匹配; 
d.依次将螺纹钢锚杆装入顶板各个钻孔内,并通过螺纹钢锚杆尾部的螺母使其达到预紧力;
e.用布有孔径与水力膨胀锚杆直径相匹配的巷帮钢带压住铺设在巷帮的金属网,用单体液压支柱将巷帮钢带顶住,使其贴紧巷帮;
f.用与水力膨胀锚杆直径相匹配的钻头配合钻机从巷帮钢带的孔口向巷帮打眼钻孔,孔深与水力膨胀锚杆长度相匹配,依次将水力膨胀锚杆装入巷帮各个钻孔内,并通过水力膨胀锚杆尾部的托盘使钢带贴紧巷帮;
g.通过注液连接器逐个向水力膨胀锚杆内注入压力为20~22MPa的高压水,每个水力膨胀锚杆的注液时间不少于2min;
h.在以上工序进行的同时,在顶板及两帮锚杆之间间隔增打锚索;
i.重复上述步骤b、c、d、e、f、g、h,直至完成煤柱下方巷道的支护。
有益效果:本发明采用钢带组合高强度螺纹钢锚杆支护顶板,锚索增强支护顶板;钢带组合水力膨胀锚杆支护两帮,锚索增强支护两帮,尤其适用极近距离煤层群开采时,位于煤柱下方巷道的支护。钢带护表面积大,护表作用强,抗弯性能好,适用于围岩不稳定的巷道。水力膨胀锚杆能够立即承载,锚固性能随围岩性质变化不大,能够真正实现全长锚固,锚固力随围岩对其挤压力的增大而增大,且随着杆体收缩能够产生一定的预紧力。解决了单独采用高强螺纹钢锚杆不能有效控制煤柱下方极近距离巷道围岩变形的难题。与现有的支护技术相比,首先是水力膨胀锚杆能够立即承载,真正实现全长锚固,锚固性能随围岩性质变化不大,且锚固力随围岩对其挤压力的增大而增大,适用于松散破碎围岩巷道的支护;2和螺纹钢锚杆相比,使用过程不产生化学污染,且在注入高压水的过程中能大大降低粉尘污染,改善劳动环境;3能够与顶板支护形成整体承载结构,有效控制围岩变形,支护效果好,在本技术领域内具有广泛的实用性。
具体实施方式
本发明的煤柱下方巷道支护方法,首先将煤柱下方掘出的巷道顶板及两帮的危石处理掉,支设临时支护;对掘出的巷道顶板及两帮铺设菱形金属网,用布有孔径为22mmm、孔间距为750mm的W形状的顶板钢带托住顶板金属网,按照作业规程中要求的排距定位顶板钢带的位置,然后用单体液压支柱将顶板钢带顶住,使其贴紧顶板;用直径28mm的钻头配合钻机依次从该排顶板钢带的孔口向顶板打眼钻孔,孔深2150mm;依次将直径20mm长2200mm的螺纹钢锚杆装入顶板各个钻孔内,并通过螺纹钢锚杆尾部的螺母使其预紧扭矩不低于250N·m;用孔径为40mm×60mm、孔间距为750mm的W形状的巷帮钢带压住铺设在巷帮的金属网,按照作业规程中要求的排距定位巷帮钢带的位置,用单体液压支柱将巷帮钢带顶住,使其贴紧巷帮;用与水力膨胀锚杆直径相匹配的钻头配合钻机从巷帮钢带的孔口向巷帮打眼钻孔,孔深与水力膨胀锚杆长度相匹配,例如用直径38mm钻头配合钻机依次从该排钢带的孔口向巷帮打眼钻孔,孔深2500mm,依次将直径30mm长2500mm的水力膨胀锚杆装入巷帮各个钻孔内,并通过水力膨胀锚杆尾部的托盘使钢带贴紧巷帮;并通过注液连接器逐个向水力膨胀锚杆内注入压力为20~22MPa的高压水,每个水力膨胀锚杆的注液时间不少于2min;在以上工序进行的同时,按照作业规程中规定的间排距向顶板及两帮增打直径17.8mm长6300mm的锚索;安装一排顶板和两帮锚杆、锚索之后,重复上述过程,进行下一排顶板和两帮锚杆、锚索的安装,周而复始,直至完成煤柱下方巷道的支护。

Claims (1)

1.一种煤柱下方巷道支护方法,其特征在于包括以下步骤:
a.首先将煤柱下方掘出的巷道顶板及两帮的危石处理掉,支设临时支护;
b.对掘出的巷道顶板及两帮铺设金属网,用布有孔径与螺纹钢锚杆直径相匹配的顶板钢带托住顶板金属网,然后用单体液压支柱将顶板钢带顶住,使其贴紧顶板;
c.用与螺纹钢锚杆直径相匹配的钻头配合钻机依次从该排顶板钢带的孔口向顶板打眼钻孔,孔深与螺纹钢锚杆长度相匹配; 
d.依次将螺纹钢锚杆装入顶板各个钻孔内,并通过螺纹钢锚杆尾部的螺母使其达到预紧力;
e.用布有孔径与水力膨胀锚杆直径相匹配的钢带压住铺设在巷帮的金属网,用单体液压支柱将巷帮钢带顶住,使其贴紧巷帮;
f.用与水力膨胀锚杆直径相匹配的钻头配合钻机从巷帮钢带的孔口向巷帮打眼钻孔,孔深与水力膨胀锚杆长度相匹配,依次将水力膨胀锚杆装入巷帮各个钻孔内,并通过水力膨胀锚杆尾部的托盘使钢带贴紧巷帮;
g.通过注液连接器逐个向水力膨胀锚杆内注入压力为20~22MPa的高压水,每个水力膨胀锚杆的注液时间不少于2min;
h.在以上工序进行的同时,在顶板及两帮中的锚杆之间间隔增打锚索;
i.重复上述步骤b、c、d、e、f、g、h,直至完成煤柱下方巷道的支护。
CN201110057985A 2011-03-11 2011-03-11 一种煤柱下方巷道支护方法 Expired - Fee Related CN102155248B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110057985A CN102155248B (zh) 2011-03-11 2011-03-11 一种煤柱下方巷道支护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110057985A CN102155248B (zh) 2011-03-11 2011-03-11 一种煤柱下方巷道支护方法

Publications (2)

Publication Number Publication Date
CN102155248A CN102155248A (zh) 2011-08-17
CN102155248B true CN102155248B (zh) 2012-10-24

Family

ID=44436892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110057985A Expired - Fee Related CN102155248B (zh) 2011-03-11 2011-03-11 一种煤柱下方巷道支护方法

Country Status (1)

Country Link
CN (1) CN102155248B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425438A (zh) * 2011-11-21 2012-04-25 大同煤矿集团有限责任公司 极近距离煤层群多采空区下巷道的支护方法
CN102418527B (zh) * 2011-12-28 2014-08-13 北京科技大学 一种缓倾斜极薄沉积型地下铁矿床开采方法
CN102865092B (zh) * 2012-09-22 2015-05-06 山西晋城无烟煤矿业集团有限责任公司 回采工作面u+u型巷道通风系统
CN103470289A (zh) * 2013-09-25 2013-12-25 大同煤矿集团有限责任公司 极近距离煤层开采支护方法
CN106761867A (zh) * 2016-12-23 2017-05-31 四川广旺能源发展(集团)有限责任公司 急倾斜回采巷道围岩稳定支护设施及支护工艺

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2367771Y (zh) * 1999-04-15 2000-03-08 周正濂 楔式二翼管状锚杆
CN1966937A (zh) * 2006-11-24 2007-05-23 天地科技股份有限公司 深部巷道强力锚杆一次支护方法
CN201170106Y (zh) * 2008-03-28 2008-12-24 尚海峰 巷道锚杆支护系统
CN201187308Y (zh) * 2008-05-06 2009-01-28 中国科学院武汉岩土力学研究所 大倾角厚煤层留小煤柱沿空掘巷支架
CN201232558Y (zh) * 2008-06-24 2009-05-06 义马煤业(集团)有限责任公司 综采切眼全断面锚网支护
CN101457651A (zh) * 2008-11-19 2009-06-17 淮南矿业(集团)有限责任公司 煤气共采y型通风系统中沿空留巷的充填垛超前支护方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6682268B2 (en) * 2000-09-01 2004-01-27 Earl Products, Inc. Method and apparatus for secondary roof support in an underground mine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2367771Y (zh) * 1999-04-15 2000-03-08 周正濂 楔式二翼管状锚杆
CN1966937A (zh) * 2006-11-24 2007-05-23 天地科技股份有限公司 深部巷道强力锚杆一次支护方法
CN201170106Y (zh) * 2008-03-28 2008-12-24 尚海峰 巷道锚杆支护系统
CN201187308Y (zh) * 2008-05-06 2009-01-28 中国科学院武汉岩土力学研究所 大倾角厚煤层留小煤柱沿空掘巷支架
CN201232558Y (zh) * 2008-06-24 2009-05-06 义马煤业(集团)有限责任公司 综采切眼全断面锚网支护
CN101457651A (zh) * 2008-11-19 2009-06-17 淮南矿业(集团)有限责任公司 煤气共采y型通风系统中沿空留巷的充填垛超前支护方法

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
刘建国.水胀式锚杆在隧道施工中的应用.《现代隧道技术》.2003,第40卷(第2期),
复合再生顶板条件下锚杆支护技术研究;夏云峰;《能源技术与管理》;20051231(第6期);11-12 *
夏云峰.复合再生顶板条件下锚杆支护技术研究.《能源技术与管理》.2005,(第6期),
新汶矿区煤巷锚杆支护技术应用与发展;李海燕;《煤矿开采》;19990630(第2期);6-9 *
李海燕.新汶矿区煤巷锚杆支护技术应用与发展.《煤矿开采》.1999,(第2期),
水胀式锚杆在隧道施工中的应用;刘建国;《现代隧道技术》;20030430;第40卷(第2期);62-64 *

Also Published As

Publication number Publication date
CN102155248A (zh) 2011-08-17

Similar Documents

Publication Publication Date Title
CN105178981B (zh) 破碎软岩巷道全断面封闭式深浅耦合让压锚注支护方法
CN102493821B (zh) 一种高应力巷道煤岩体的支护方法
CN104389628B (zh) 滑坡地段隧道加固装置及加固施工方法
CN205117366U (zh) 一种大断面松软破碎煤巷双承压拱支护装置
CN108087008B (zh) 一种三软煤层沿空巷道支护方法
CN102900449B (zh) 一种煤矿井下采空区顶板的支护方法
CN103244122B (zh) 沿空掘巷煤柱稳定性三位一体耦合支护控制方法
CN102900446B (zh) 碎裂介质向下套管成孔及锚注分步加固方法
CN108930543A (zh) 一种大断面沿空掘巷耦合支护结构及施工方法
CN106321119A (zh) 一种控制采动巷道围岩变形的双层锚网索支护结构及其方法
CN102182482A (zh) 防冲复合抗压支护系统
CN101915108A (zh) 一种控制动压巷道底鼓的方法
CN102155248B (zh) 一种煤柱下方巷道支护方法
CN103899329A (zh) 一种大变形破碎围岩巷道的治理方法
CN103758529A (zh) 一种煤矿沿空留巷巷旁支护方法
CN106194203A (zh) 一种煤矿软岩支护方法
CN102839984A (zh) 井下超大断面支护结构
CN102155249A (zh) 一种采空区下方巷道顶板支护方法
CN102135005A (zh) 一种煤柱与采空区过渡段下方巷道顶板支护方法
CN114087001A (zh) 一种内外联合加固裂隙化围岩的型钢预应力注浆锚索及使用方法
CN210948737U (zh) 薄煤层倾斜小断面半煤岩巷的高效快速掘进巷道支护设施
CN101737078B (zh) 一种防止沿空留巷充填墙体滑移结构及方法
CN102425428A (zh) 巷道迎头极破碎顶板控制方法
CN207620820U (zh) 一种破碎围岩及软岩巷道u型钢套棚支护结构
CN108979686A (zh) 一种煤矿井下采空区顶板的支护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121024

CF01 Termination of patent right due to non-payment of annual fee