CN103287997A - Double-layer winding hoisting mechanism - Google Patents

Double-layer winding hoisting mechanism Download PDF

Info

Publication number
CN103287997A
CN103287997A CN2013102453478A CN201310245347A CN103287997A CN 103287997 A CN103287997 A CN 103287997A CN 2013102453478 A CN2013102453478 A CN 2013102453478A CN 201310245347 A CN201310245347 A CN 201310245347A CN 103287997 A CN103287997 A CN 103287997A
Authority
CN
China
Prior art keywords
group
fixed pulley
steel rope
running block
around
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102453478A
Other languages
Chinese (zh)
Other versions
CN103287997B (en
Inventor
马卫军
张蜀平
周燕
王伟良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Huaxin Mechanical & Electrical Engineering Co Ltd
Original Assignee
Hangzhou Huaxin Mechanical & Electrical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Huaxin Mechanical & Electrical Engineering Co Ltd filed Critical Hangzhou Huaxin Mechanical & Electrical Engineering Co Ltd
Priority to CN201310245347.8A priority Critical patent/CN103287997B/en
Publication of CN103287997A publication Critical patent/CN103287997A/en
Application granted granted Critical
Publication of CN103287997B publication Critical patent/CN103287997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ropes Or Cables (AREA)

Abstract

The invention discloses mechanical equipment, and particularly relates to a novel double-layer winding hoisting mechanism. The double-layer winding hoisting mechanism comprises an end beam I, steel wire rope end fixing devices, a duplex winding drum, a fixed pulley beam, fixed pulley blocks, an end beam II, a speed reducer, movable pulleys, a lifting hook pulley block and movable pulley blocks, wherein one ends of steel wire ropes of the same set are connected with the winding drum, then the steel wire ropes are wound across the movable pulley blocks and the fixed pulley blocks in sequence and are wound on a steel wire rope of the duplex winding drum, and the other ends of the steel wire ropes are jointly fixed on the steel wire rope end fixing devices. The double-layer winding hoisting mechanism has the advantage that the steel wire ropes do not interfere with each other in the process of cross winding. By means of the modified double-layer winding hoisting mechanism, a trolley span can be reduced, the width of the entire machine and the left and right extreme dimension of a lifting hook can be reduced by 30%, and the construction cost of a workshop is reduced. The double-layer winding hoisting mechanism can be widely used for occasions provided with the equipment, such as a power station and a factory.

Description

A kind of twin-laminate roll around lifting mechanism
Technical field
The present invention relates to a kind of bridge crane hoisting mechanism, relate in particular to the lifting mechanism of great type crane facility, belong to the crane facility technical field.
Technical background
Along with the long-term needs of clean energy resource, domestic water power has obtained development faster, and large quantities of huge units appear in the continuous lifting of the design of hydraulic generator unit and manufacturing capacity.In the large hydropower station project, the excavation work capacity of unit factory building is big especially, thereby reduces the factory building volume, not only can reduce civil engineering excavation work capacity, shortens the completion time of project, reduces construction cost, can reduce the influence to geologic framework again.Like this, for the crane in bridge type of the ultrahigh pump lift in being arranged in factory building, its height and width are the smaller the better.
The lifting mechanism of general conventional bridge hoisting crane adopt single laminate roll around or common multilaminate coiled.Single laminate roll around lifting mechanism, only at the reel one deck of reeling, this structure design drum diameter is big for same steel rope, the retarder width between centers is big, lifting mechanism Gao Erkuan simultaneously causes complete machine height, width big, it is also big to conduct oneself with dignity, and overall performance is low.
Another kind of common multilaminate coiled lifting mechanism, same steel rope continues the coiling second layer or more multi-layered again after reel is rolled up ground floor.Though this structure design reel length can reduce greatly, steel rope is arranged chaotic easily, wearing and tearing.Some uses rope-arranging mechanism, but effect is also undesirable.
Summary of the invention
The present invention has overcome above-mentioned the deficiencies in the prior art, and its purpose is to provide a kind of lifting mechanism of novel double-layer coiling.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of twin-laminate roll around lifting mechanism, it comprises end carriage I, the cable wire end anchor fitting, double crosslinking drum, the fixed pulley beam, the fixed pulley group, fixed pulley, end carriage II, retarder, movable pulley, the lifting hook pulley group, running block is characterized in that:
The fixed pulley group comprises first group of fixed pulley group, second group of fixed pulley group; Running block comprises first group of running block, second group of running block; Lower floor's cable wire end of same group of steel rope is fixed on the end of double crosslinking drum by the cable wire end anchor fitting, walk around first group of running block, first group of fixed pulley group successively, after oppositely, walk around first group of running block, first group of fixed pulley group again, again around becoming the upper strata steel rope above lower floor's steel rope of double crosslinking drum, the fag end of upper strata steel rope fixes by the fixing cable wire end anchor fitting of lower floor's steel rope;
Lower floor's cable wire end of another group steel rope is fixed on the end of double crosslinking drum by the cable wire end anchor fitting, walk around second group of running block, second group of fixed pulley group successively, after oppositely, walk around second group of running block, second group of fixed pulley group again, again around becoming the upper strata steel rope above lower floor's steel rope of double crosslinking drum, the fag end of upper strata steel rope fixes by the fixing cable wire end anchor fitting of lower floor's steel rope;
In the technical program, hoisting drum is the double crosslinking drum structure, and two fag ends of same group of steel rope are fixed on the double crosslinking drum end simultaneously, and steel rope divides two-layer coiling simultaneously up and down.Along with steel rope lays out double crosslinking drum, progressively move to the double crosslinking drum end steel rope rope-out end; Otherwise, along with steel rope around going into reel, the steel rope rope-out end is progressively mobile to the double crosslinking drum middle part;
The fixed pulley beam is arranged in the centre of lifting motor and double crosslinking drum, and its two ends are supported on respectively on end carriage I and the end carriage II, the two groups of fixed pulley groups that are arranged in parallel in the middle part of the fixed pulley beam, and fixed pulley is parallel to reel.In the technical program, adopt no trolley frame curb girder carrying speed governing crane carriage structure, the angle of steel rope and double crosslinking drum is controlled all the time in more among a small circle, and adopt many multiplying powers, the pulley center of suspension hook running block is parallel to the pulley center of fixed pulley group, and upper strata steel rope and lower floor's steel rope are in fixed pulley and the staggered winding of movable pulley.。
As preferably, above-mentioned a kind of twin-laminate roll around lifting mechanism in fixed pulley and movable pulley be parallel to double crosslinking drum, first group of fixed pulley group and second group of fixed pulley group are arranged in parallel in the fixed pulley beam, and first group of running block and second group of running block are arranged in parallel in the lifting hook pulley group; Steel rope is divided into two groups, is wound on the both sides of double crosslinking drum respectively.
As preferably, above-mentioned a kind of twin-laminate roll around lifting mechanism in two groups of steel ropes walk around all pulleys in homonymy fixed pulley group and the running block respectively, and the upper strata steel rope of every group of steel rope and lower floor's steel rope intersect walks around fixed pulley or movable pulley, formed the wiring system of intersecting, by the layout of two groups of fixed pulley groups, make steel rope mutually noninterfere when cross winding.
As preferably, above-mentioned a kind of twin-laminate roll around lifting mechanism in the angle of plug helix line of centers of steel rope line of centers and double crosslinking drum control all the time in 3.5 ° of scopes.
Beneficial effect:
(1) the double-layer wire rope is reeled simultaneously, and job-hopping, disorder cable phenomenon can not appear in the steel rope marshalling, and steel rope abrasion is little, prolongs steel rope service life.
(2) because the double crosslinking drum contraction in length, thereby trolley span reduces, and then the complete machine width is corresponding reduces, and suspension hook left and right sides limit size dwindles about 30%, and the corresponding reduction of factory building length for the underground excavation factory building, can be saved a large amount of civil engineerings investments.
(3) adopting twin-laminate roll around the lifting mechanism technology, can optimize the complete machine performance and reduce project total cost, particularly for this clean energy resource of Hydropower Development, is a kind of environmentally friendly novel product.
Description of drawings
The plan sketch of Fig. 1 structure of the present invention
The side schematic view of Fig. 2 structure of the present invention
The front schematic view of Fig. 3 structure of the present invention
The double-layer wire rope coiling scheme drawing of Fig. 4 structure of the present invention
1-end carriage I, 2-cable wire end anchor fitting, 3-double crosslinking drum, 4-fixed pulley beam, first group of fixed pulley group of 5-, second group of fixed pulley group of 6-, 7-fixed pulley, 8-end carriage II, the 9-retarder, 10-movable pulley, 11-lifting hook pulley group, first group of running block of 12-, second group of running block 14-of 13-upper strata steel rope 15-lower floor steel rope
The specific embodiment
Below in conjunction with accompanying drawing, enforcement of the present invention is specified.
Embodiment 1
Be example with four times of pulley block ratios, as shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of twin-laminate roll around lifting mechanism, it comprises end carriage I1, cable wire end anchor fitting 2, double crosslinking drum 3, fixed pulley beam 4, fixed pulley group, fixed pulley 7, end carriage II8, retarder 9, movable pulley 10, lifting hook pulley group 11, running block, wherein the fixed pulley group comprises first group of fixed pulley group 5, second group of fixed pulley group 6; Running block comprises first group of running block 12, second group of running block 13; Lower floor's steel rope 15 fag ends of same group of steel rope are fixed on the end of double crosslinking drum 3 by cable wire end anchor fitting 2, walk around first group of running block 12, first group of fixed pulley group 5 successively, after oppositely, walk around first group of running block 12, first group of fixed pulley group 5 again, again around becoming upper strata steel rope 14 above lower floor's steel rope 15 of double crosslinking drum 3, the fag end of upper strata steel rope 14 fixes by the fixing cable wire end anchor fitting 2 of lower floor's steel rope 15; Lower floor's steel rope 15 fag ends of another group steel rope are fixed on the end of double crosslinking drum 3 by cable wire end anchor fitting 2, walk around second group of running block 13, second group of fixed pulley group 6 successively, after oppositely, walk around second group of running block 13, second group of fixed pulley group 6 again, again around becoming upper strata steel rope 14 above lower floor's steel rope of double crosslinking drum 3, the fag end of upper strata steel rope 14 fixes by the fixing cable wire end anchor fitting 2 of lower floor's steel rope 15; Fixed pulley beam 4 is arranged in the centre of lifting motor and double crosslinking drum 3, and its two ends are supported on respectively on end carriage I1 and the end carriage II8, the fixed pulley beam 4 middle parts two groups of fixed pulley groups that are arranged in parallel, and fixed pulley is parallel to reel.Fixed pulley 7 and movable pulley 10 are parallel to 3, the first groups of fixed pulley groups 5 of double crosslinking drum and second group of fixed pulley group 6 is arranged in parallel in the fixed pulley beam 4, and first group of running block 12 and second group of running block 13 are arranged in parallel in the lifting hook pulley group 11; Steel rope is divided into two groups, is wound on the both sides of double crosslinking drum 3 respectively.Two groups of steel ropes are walked around all pulleys in homonymy fixed pulley group and the running block respectively, and the upper strata steel rope 14 of every group of steel rope and lower floor's steel rope 15 intersect walks around fixed pulley 7 or movable pulley 10, formed the wiring system of intersecting, by the layout of two groups of fixed pulley groups, make steel rope mutually noninterfere when cross winding.Two-layer steel rope was wound on the double crosslinking drum simultaneously about same group of steel rope was divided into, and had avoided the too big appearance job-hopping of steel rope angle and disorder cable, had reduced the wearing and tearing between the steel rope simultaneously.
Embodiment 2
The structure identical according to embodiment 1 controlled at 3.0 ° all the time at the angle of the plug helix line of centers of steel rope line of centers and double crosslinking drum 3, reduces design difficulty greatly.
In the present invention, lower floor's steel rope 15 fag ends are fixed on the end of double crosslinking drum 3 by cable wire end anchor fitting 2, other end fag end in lifting hook pulley group 11 near behind first movable pulley 10 of double crosslinking drum 3 sides, in last fixed pulley beam 4 in the same side fixed pulley group 5 near first fixed pulleys 7 of double crosslinking drum 3 sides; Then, cable wire end from fixed pulley 7 come out the back around hook assembly pulley 11 the 3rd movable pulley 10.Then, steel rope is the 3rd fixed pulley 7 in the fixed pulley group of the same side in last fixed pulley beam 4 oppositely, and steel rope is from fixed pulley 7 back the 4th movable pulley 10 around hook assembly pulley 11 that come out; Second movable pulley 10 in second fixed pulley 7 and the lifting hook pulley group in last fixed pulley group more successively, then steel rope becomes upper strata steel rope 14 around last double crosslinking drum 3, and the fag end of the fag end of upper strata steel rope 14 and lower floor's steel rope 15 is fixed on the end of double crosslinking drum 3 with same cable wire end anchor fitting 2 the most at last.Two-layer steel rope was wound on the double crosslinking drum simultaneously about same group of steel rope was divided into, and had avoided steel rope angle Mrs job-hopping and disorder cable to occur, had reduced the wearing and tearing between the steel rope simultaneously.

Claims (4)

  1. A twin-laminate roll around lifting mechanism, it comprises end carriage I(1), cable wire end anchor fitting (2), double crosslinking drum (3), fixed pulley beam (4), fixed pulley group, fixed pulley (7), end carriage II(8), retarder (9), movable pulley (10), lifting hook pulley group (11), running block is characterized in that:
    The fixed pulley group comprises first group of fixed pulley group (5), second group of fixed pulley group (6); Running block comprises first group of running block (12), second group of running block (13); Lower floor's cable wire end of same group of steel rope is fixed on the end of double crosslinking drum (3) by cable wire end anchor fitting (2), walk around first group of running block (12), first group of fixed pulley group (5) successively, after oppositely, walk around first group of running block (12), first group of fixed pulley group (5) again, again around becoming upper strata steel rope (14) above lower floor's steel rope (15) of double crosslinking drum (3), the fag end of upper strata steel rope (14) fixes by the fixing cable wire end anchor fitting (2) of lower floor's steel rope (15);
    Lower floor's steel rope (15) fag end of another group steel rope is fixed on the end of double crosslinking drum (3) by cable wire end anchor fitting (2), walk around second group of running block (13), second group of fixed pulley group (6) successively, after oppositely, walk around second group of running block (13), second group of fixed pulley group (6) again, again around becoming upper strata steel rope (14) above lower floor's steel rope (15) of double crosslinking drum (3), the fag end of upper strata steel rope (14) fixes by the fixing cable wire end anchor fitting (2) of lower floor's steel rope (15);
    Fixed pulley beam (4) is arranged in the centre of lifting motor and double crosslinking drum (3), and its two ends are supported on end carriage I(1 respectively) and end carriage II(8) on, the two groups of fixed pulley groups that are arranged in parallel in the middle part of the fixed pulley beam (4), fixed pulley is parallel to reel.
  2. A kind of twin-laminate roll according to claim 1 around lifting mechanism, it is characterized in that: fixed pulley (7) and movable pulley (10) are parallel to double crosslinking drum (3), first group of fixed pulley group (5) and second group of fixed pulley group (6) are arranged in parallel in the fixed pulley beam (4), and first group of running block (12) and second group of running block (13) are arranged in parallel in the lifting hook pulley group (11); Steel rope is divided into two groups, is wound on the both sides of double crosslinking drum (3) respectively.
  3. A kind of twin-laminate roll according to claim 1 around lifting mechanism, it is characterized in that: two groups of steel ropes are walked around all pulleys in homonymy fixed pulley group and the running block respectively, and the upper strata steel rope (14) of every group of steel rope and lower floor's steel rope (15) intersect walks around fixed pulley (7) or movable pulley (10), formed the wiring system of intersecting, by the layout of two groups of fixed pulley groups, make steel rope mutually noninterfere when cross winding.
  4. A kind of twin-laminate roll according to claim 1 around lifting mechanism, it is characterized in that: the angle of the plug helix line of centers of steel rope line of centers and double crosslinking drum (3) is controlled all the time in 3.5 ° of scopes.
CN201310245347.8A 2013-06-18 2013-06-18 Double-layer winding hoisting mechanism Active CN103287997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310245347.8A CN103287997B (en) 2013-06-18 2013-06-18 Double-layer winding hoisting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310245347.8A CN103287997B (en) 2013-06-18 2013-06-18 Double-layer winding hoisting mechanism

Publications (2)

Publication Number Publication Date
CN103287997A true CN103287997A (en) 2013-09-11
CN103287997B CN103287997B (en) 2015-06-24

Family

ID=49089622

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310245347.8A Active CN103287997B (en) 2013-06-18 2013-06-18 Double-layer winding hoisting mechanism

Country Status (1)

Country Link
CN (1) CN103287997B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106335849A (en) * 2015-07-10 2017-01-18 昝士录 Regular winding and unwinding mechanical arm for winding drum composite steel wire ropes of winding machine
CN106604786A (en) * 2014-10-06 2017-04-26 宇部兴产机械株式会社 Extrusion press
CN108313885A (en) * 2018-04-17 2018-07-24 郑州科润机电工程有限公司 A kind of unconventional reel system for big multiplying power bridge machine
CN108657977A (en) * 2018-07-03 2018-10-16 信华智能装备(江苏)有限公司 A kind of double-steel wire rope electric block
CN112505863A (en) * 2020-12-07 2021-03-16 宁波市樱铭电子科技有限公司 Optical fiber butt joint equipment and optical fiber butt joint system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000352189A (en) * 1999-06-09 2000-12-19 Nihon Bisoh Co Ltd Elevator for working cage
DE10135034C1 (en) * 2001-07-18 2002-10-31 Demag Cranes & Components Gmbh Lifting gear with a cable arrangement for the suspension of slinging means, in particular for a traveling crane with a crab
CN101913539A (en) * 2010-09-10 2010-12-15 天津起重设备有限公司 Crane hoisting drum device
CN201729618U (en) * 2010-06-04 2011-02-02 无锡国电华新起重运输设备有限公司 Fixed pulley beam assembly of bridge machine
CN202415043U (en) * 2011-12-30 2012-09-05 大连华锐重工集团股份有限公司 Double-winding-drum hoisting mechanism
CN202671090U (en) * 2012-04-12 2013-01-16 杭州华新机电工程有限公司 Rope-breaking and rope-winding prevention device of bridge-type crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000352189A (en) * 1999-06-09 2000-12-19 Nihon Bisoh Co Ltd Elevator for working cage
DE10135034C1 (en) * 2001-07-18 2002-10-31 Demag Cranes & Components Gmbh Lifting gear with a cable arrangement for the suspension of slinging means, in particular for a traveling crane with a crab
CN201729618U (en) * 2010-06-04 2011-02-02 无锡国电华新起重运输设备有限公司 Fixed pulley beam assembly of bridge machine
CN101913539A (en) * 2010-09-10 2010-12-15 天津起重设备有限公司 Crane hoisting drum device
CN202415043U (en) * 2011-12-30 2012-09-05 大连华锐重工集团股份有限公司 Double-winding-drum hoisting mechanism
CN202671090U (en) * 2012-04-12 2013-01-16 杭州华新机电工程有限公司 Rope-breaking and rope-winding prevention device of bridge-type crane

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106604786A (en) * 2014-10-06 2017-04-26 宇部兴产机械株式会社 Extrusion press
CN106335849A (en) * 2015-07-10 2017-01-18 昝士录 Regular winding and unwinding mechanical arm for winding drum composite steel wire ropes of winding machine
CN108313885A (en) * 2018-04-17 2018-07-24 郑州科润机电工程有限公司 A kind of unconventional reel system for big multiplying power bridge machine
CN108657977A (en) * 2018-07-03 2018-10-16 信华智能装备(江苏)有限公司 A kind of double-steel wire rope electric block
CN112505863A (en) * 2020-12-07 2021-03-16 宁波市樱铭电子科技有限公司 Optical fiber butt joint equipment and optical fiber butt joint system
CN112505863B (en) * 2020-12-07 2023-10-10 宁波市樱铭电子科技有限公司 Optical fiber butt joint equipment and optical fiber butt joint system

Also Published As

Publication number Publication date
CN103287997B (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN103287997A (en) Double-layer winding hoisting mechanism
CN204030456U (en) A kind of cable unreeling rack
CN103174317B (en) Lifting drive system of parking appliance and lifting cross sliding type parking appliance
CN206789988U (en) A kind of quick laying apparatu of horizontal cable
CN109487912A (en) A kind of construction method of super-span truss-string-structure
CN103835237A (en) Anti-slip cable saddle structure for suspension bridges
CN109159860A (en) A kind of trailer system of cable laying ship
CN204980896U (en) Monkey with anti -swing puts function
CN204096953U (en) The energy-efficient tower crane of equiarm
CN103730866A (en) Cable laying device
CN206606958U (en) Window-cleaning machine steel wire rope wiring system
CN103072513A (en) Multifunctional construction vehicle for high-tension line construction
CN102903424B (en) One kind is sparsely stranded type expanded diameter conductor
CN102587292B (en) System and method for cradle cantilever construction
CN109665431B (en) Underground horizontal driving arrangement type ultra-deep traction system and using method
CN202586243U (en) Cable pay-off machine
CN108792977A (en) Rope guide for winding drum double-layer winding steel wire rope and using method
CN209035139U (en) Unlubricated reinforcing bar draw-off gear
CN202247492U (en) Steel wire rope for traction pumping unit
CN208666964U (en) Rope guider for winding drum double-layer winding steel wire rope
CN203728459U (en) Traction device
CN210286532U (en) Hydraulic dragging lifting type double-beam steel wire rope crane
CN102358598A (en) Special lift truck for steel wire rope
CN202245927U (en) Special lifting truck adopting steel wire ropes
CN106013821A (en) Sliding shoe for sliding steel net frame

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Double-layer winding hoisting mechanism

Effective date of registration: 20200325

Granted publication date: 20150624

Pledgee: Shanghai Pudong Development Bank Co., Ltd. Hangzhou Wenhui sub branch

Pledgor: HANGZHOU HUAXIN MECHANICAL & ELECTRICAL ENGINEERING Co.,Ltd.

Registration number: Y2020330000117

PE01 Entry into force of the registration of the contract for pledge of patent right