CN103280738B - Aerial earth wire lowering or hoisting gear - Google Patents

Aerial earth wire lowering or hoisting gear Download PDF

Info

Publication number
CN103280738B
CN103280738B CN201310219346.6A CN201310219346A CN103280738B CN 103280738 B CN103280738 B CN 103280738B CN 201310219346 A CN201310219346 A CN 201310219346A CN 103280738 B CN103280738 B CN 103280738B
Authority
CN
China
Prior art keywords
screw
support arm
earth wire
hook
aerial earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219346.6A
Other languages
Chinese (zh)
Other versions
CN103280738A (en
Inventor
林健
闫继成
赵志远
陆潇
董伟
李英燕
王武装
袁力
李艳超
李彦国
彭海燕
于丽楠
杜建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Langfang Power Supply Co of State Grid Jibei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201310219346.6A priority Critical patent/CN103280738B/en
Publication of CN103280738A publication Critical patent/CN103280738A/en
Application granted granted Critical
Publication of CN103280738B publication Critical patent/CN103280738B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)
  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The present invention relates to a kind of aerial earth wire lowering or hoisting gear, including: screw, the hook being connected with one end of described screw mandrel through the screw mandrel that described screw is threaded with described screw that support arm is rotationally connected with described support arm and fix the handle being connected with described screw mandrel, wherein, described support arm includes that the installation portion for being arranged on steel tower by aerial earth wire lowering or hoisting gear, described handle and described hook are positioned at the both sides of described screw.The aerial earth wire lowering or hoisting gear that the present invention provides can not only smoothly promote aerial earth wire, and it is little, easy to use to take up room.

Description

Aerial earth wire lowering or hoisting gear
Technical field
The present invention relates to power equipment lowering or hoisting gear, particularly relate to a kind of aerial earth wire lowering or hoisting gear.
Background technology
Aerial earth wire is also called lightning conducter, introduces the earth for the electric current produced by thunder and lightning, in case The electric current that only thunder and lightning produces destroys transmission facility.In using for a long time, owing to being used for clamping Aerial earth wire is also suspended in the wire clamp in high-altitude and can gradually relax, so not adopting by aerial earth wire In the case of the good locking measure of wire clamp, aerial earth wire can misplace with wire clamp.When built on stilts When line misplaces with wire clamp, the supporting point of aerial earth wire can change, and aerial earth wire also can be with line Folder phase mutual friction.If things go on like this, the more fragile internal structure that can make aerial earth wire is damaged Wound, even can make aerial earth wire disconnect.Accordingly, it would be desirable to aerial earth wire is overhauled.
According to the regulation of " overhead transmission line operating standard " (DL/T741-2010), carrying out The wire clamp of aerial earth wire it is switched on, to check that abrasion, disconnected stock, broken stock, electric discharge are burnt during maintenance Faults such as wound and carry out fault restoration.In existing inspection operation, a kind of mode of operation is Operator substitute wire clamp with shoulder and support aerial earth wire to unclamp wire clamp and adjusting wire clamp Position, this mode of operation can make operating personnel's shoulder injuries, and safety coefficient is low.Another kind of Mode of operation be utilize chain block substitute wire clamp to lift aerial earth wire in case open wire clamp and Repairing aerial earth wire, the instrument that this mode of operation uses takes up room greatly, and operating process is complicated, The operator needed are many.Also having a kind of mode of operation is not exclusively to unclamp wire clamp to use spanner Beaing wire clamp makes wire clamp enter tram, and this mode of operation easily damages aerial earth wire, wink Between impulsive force steel tower also can be made to produce rock thus affect operation safety.As can be seen here, above-mentioned side The safety of method can not get ensureing, overhaul efficiency is low.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of can being arranged on for installing electric wiring The easy device for lifting aerial earth wire on steel tower.
In order to solve above-mentioned technical problem, the invention provides a kind of aerial earth wire lowering or hoisting gear, Including:
Screw that support arm is rotationally connected with described support arm, through described screw and described silk The hook that is connected with one end of described screw mandrel of screw mandrel that box thread connects and with described screw mandrel The fixing handle connected, wherein, described support arm includes for being pacified by aerial earth wire lowering or hoisting gear The installation portion being contained on steel tower, described handle and described hook are positioned at the both sides of described screw.
Preferably, described installation portion is to offer towards the side of described hook at described support arm Slit.
Preferably, described screw is arranged on the middle part of described support arm, described installation portion be about At least one pair of screw that described screw is symmetrically arranged.
Preferably, described hook is connected with described screw mandrel by the connector of hollow, described connection Part is fixing with described screw mandrel to be connected, and described connector offers installing hole, described hook and institute State one end that connector is connected be provided with in stretching into and be limited in described installing hole and make institute Stating hook can lock part in relative rotation with described connector.
Preferably, described installing hole is circular, and described lock part is that diameter is more than described installation The spheroid of the diameter in hole.
In order to solve above-mentioned technical problem, present invention also offers another kind of aerial earth wire lifting dress Put, including support arm and the screw-threaded shaft elevator structure that is symmetrically arranged at the two ends of described support arm,
Wherein said support arm includes the peace for being arranged on steel tower by aerial earth wire lowering or hoisting gear Dress portion;
Described screw-threaded shaft elevator structure includes: the screw being rotationally connected with described support arm;Through institute State the screw mandrel that screw is threadeded with described screw;The hook being connected with one end of described screw mandrel; Fix the handle being connected, wherein said handle and described hook with described screw mandrel and be positioned at described screw Both sides.
Preferably, described installation portion is towards the middle part of the side of described hook at described support arm The slit offered.
Preferably, described installation portion is that the middle part about described support arm is symmetrically arranged at least Pair of screws.
Preferably, described hook is connected with described screw mandrel by the connector of hollow, described connection Part is fixing with described screw mandrel to be connected, and described connector offers installing hole, described hook and institute State one end that connector is connected be provided with in stretching into and be limited in described installing hole and make institute Stating hook can lock part in relative rotation with described connector.
Preferably, described installing hole is circular, and described lock part is that diameter is more than described installation The spheroid of the diameter in hole.
The aerial earth wire lowering or hoisting gear that the present invention provides can not only smoothly promote aerial earth wire, And it is little, easy to use to take up room.
Accompanying drawing explanation
Fig. 1 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention one;
Fig. 2 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention two;
Fig. 3 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention three;
Fig. 4 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention four.
Detailed description of the invention
With specific embodiment, the present invention is described in further detail below in conjunction with the accompanying drawings, but does not makees For limitation of the invention.
Fig. 1 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention one.Such as Fig. 1 Shown in, aerial earth wire lowering or hoisting gear 1 includes: the silk that support arm 2 is rotationally connected with support arm 2 Female 4, be connected through the screw mandrel 5 that screw 4 is threaded with screw 4 with one end of screw mandrel 5 Hook 6 and the handle 7 that be connected fixing with screw mandrel 5, wherein, support arm 2 includes for inciting somebody to action Aerial earth wire lowering or hoisting gear 1 is arranged on the installation portion 8 in steel tower (not shown), handle 7 With the both sides that hook 6 is positioned at screw 4.Screw 4 is provided with female thread (not shown), silk Bar 5 is provided with the external screw thread (not shown) that the female thread with screw 4 matches.According to excellent Selecting scheme, screw 4 is connected on support arm 2 realize by symmetrically arranged pair of rotary axes 3 Screw 4 is rotationally connected with support arm 2.
In the present embodiment, installation portion 8 is to offer towards the side of hook 6 at support arm 2 Slit.In use, aerial earth wire lowering or hoisting gear 1 can be arranged on steel tower, make steel tower The flat outer rim of crossbeam stretches into slit, adjusts the screw 4 that can rotate relative to support arm 2 Angle, and aerial earth wire is ridden over hook 6 on;Then handle 7 is used to drive screw mandrel 5 The axis of wire winding rod 5 rotates in one direction, threadeds meeting between screw 4 with screw mandrel 5 Wire winding rod 5 is made to move along a straight line along its axis such that it is able to lifting aerial earth wire, along contrary Direction turning handle 7 then can make aerial earth wire decline.The device that the present embodiment provides can be by very It is easily mounted on steel tower, after hooking aerial earth wire, just can lift frame by turning handle Vacant lot line, operates simpler, and by can relative to support arm rotate screw permissible Adjust the orientation of hook more easily.
With continued reference to Fig. 1, hook 6 is connected with screw mandrel 5 by the connector 9 of hollow, connector 9 fixing with screw mandrel 5 are connected, and connector 9 offers installing hole 10, hook 6 and connector 9 The one end being connected is provided with in stretching into and be limited in installing hole 10 and makes hook 6 and be connected Part 9 can lock part 11 in relative rotation.According to preferred version, installing hole 10 is circular, Lock part 11 is more than the spheroid of the diameter of installing hole 10 for diameter.Handle 7 can drive screw mandrel 5 Rotating together with connector 9, spherical lock part 11 does not turns together with screw mandrel 5 and connector 9 Dynamic, but make hook 6 move axially along with screw mandrel 5 such that it is able to reduce lock part 11 And the frictional force between connector 9.
Fig. 2 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention two.Such as Fig. 2 Shown in, screw 4 is arranged on the middle part of support arm 2, and installation portion 8 is about screw 4 symmetrically At least one pair of screw arranged.Aerial earth wire lowering or hoisting gear 1 can be fixed on steel tower by screw. During promoting aerial earth wire, so can ensure that the uniform stressed of support arm 2.In described Portion is preferably this to the midpoint of the shortest route between screw.Other structures are identical with embodiment one.
Fig. 3 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention three.Built on stilts ground Line lowering or hoisting gear 1 includes the leading screw liter that support arm 2 and the two ends at support arm 2 are symmetrically arranged Descending mechanism,
Wherein, support arm 2 includes the peace for being arranged on steel tower by aerial earth wire lowering or hoisting gear Dress portion 8;Screw-threaded shaft elevator structure includes: the screw 4 being rotationally connected with support arm 2;Through screw 4 screw mandrels 5 threadeded with screw 4;The hook 6 being connected with one end of screw mandrel 5;With screw mandrel The 5 vertical and fixing handles 7 connected, wherein handle 7 and hook 6 are positioned at the both sides of screw 4. According to preferred scheme, screw 4 is connected to support arm 2 by symmetrically arranged pair of rotary axes 3, Installation portion 8 is the slit offered towards the middle part of side of hook 6 at support arm 2.It addition, The present embodiment is again provided with the connector 9 similar with embodiment one and the lock part 11 of hook 6, Wherein the middle part of support arm is preferably the midpoint of the shortest route between symmetrical screw-threaded shaft elevator structure.
The mode of operation of the aerial earth wire lowering or hoisting gear 1 of the present embodiment and the operation side of embodiment one Formula is similar to.Additionally, the present embodiment uses two screw-threaded shaft elevator structures to lift aerial earth wire, this Sample can make support arm uniform force, and the lifting making aerial earth wire is more steady, also has simultaneously Advantage simple to operate, easy to use.
Fig. 4 is the structural representation of the aerial earth wire lowering or hoisting gear of the embodiment of the present invention four.Such as Fig. 4 Shown in, installation portion 8 is at least one pair of screw that the middle part about support arm 2 is symmetrically arranged. Can arrange on support arm 2 and be suitable for the through hole that this screw passes, one end of screw is to vertically should The direction bending of screw, screw through described through hole and is provided with nut at the other end, this Screw is applicable to the situation that the outer rim of steel tower crossbeam is narrower.Other structures are identical with embodiment three.
In sum, the aerial earth wire lowering or hoisting gear that the present invention provides can be conveniently mounted to ferrum On tower, it is possible to smoothly promote aerial earth wire, take up room little simultaneously.
Above example is only the exemplary embodiment of the present invention, is not used in the restriction present invention, this The protection domain of invention is defined by the claims.Those skilled in the art can be the present invention's In essence and protection domain, the present invention is made various amendment or equivalent, this amendment or Equivalent also should be regarded as being within the scope of the present invention.

Claims (6)

1. an aerial earth wire lowering or hoisting gear, it is characterised in that including:
Screw that support arm is rotationally connected with described support arm, through described screw and described silk The hook that is connected with one end of described screw mandrel of screw mandrel that box thread connects and with described screw mandrel The fixing handle connected, wherein, described support arm includes for being pacified by aerial earth wire lowering or hoisting gear The installation portion being contained on steel tower, described handle and described hook are positioned at the both sides of described screw;
Described hook is connected with described screw mandrel by the connector of hollow, and described connector is with described Screw mandrel is fixing to be connected, and described connector offers installing hole, described hook and described connector The one end being connected be provided with in stretching into and be limited in described installing hole and make described hook with Described connector can lock part in relative rotation;
Described installing hole is circular, and described lock part is the diameter that diameter is more than described installing hole Spheroid.
Aerial earth wire lowering or hoisting gear the most according to claim 1, it is characterised in that described Installation portion is the slit offered towards the side of described hook at described support arm.
Aerial earth wire lowering or hoisting gear the most according to claim 1, it is characterised in that described Screw is arranged on the middle part of described support arm, and described installation portion is for set symmetrically about described screw At least one pair of screw put.
4. an aerial earth wire lowering or hoisting gear, it is characterised in that include support arm and at described The screw-threaded shaft elevator structure that the two ends of brace are symmetrically arranged,
Wherein said support arm includes the peace for being arranged on steel tower by aerial earth wire lowering or hoisting gear Dress portion;
Described screw-threaded shaft elevator structure includes: the screw being rotationally connected with described support arm;Through institute State the screw mandrel that screw is threadeded with described screw;The hook being connected with one end of described screw mandrel; Fix the handle being connected, wherein said handle and described hook with described screw mandrel and be positioned at described screw Both sides;
Described hook is connected with described screw mandrel by the connector of hollow, and described connector is with described Screw mandrel is fixing to be connected, and described connector offers installing hole, described hook and described connector The one end being connected be provided with in stretching into and be limited in described installing hole and make described hook with Described connector can lock part in relative rotation;
Described installing hole is circular, and described lock part is the diameter that diameter is more than described installing hole Spheroid.
Aerial earth wire lowering or hoisting gear the most according to claim 4, it is characterised in that described Installation portion is the slit offered towards the middle part of the side of described hook at described support arm.
Aerial earth wire lowering or hoisting gear the most according to claim 4, it is characterised in that described Installation portion is at least one pair of screw that the middle part about described support arm is symmetrically arranged.
CN201310219346.6A 2013-06-04 2013-06-04 Aerial earth wire lowering or hoisting gear Active CN103280738B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219346.6A CN103280738B (en) 2013-06-04 2013-06-04 Aerial earth wire lowering or hoisting gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219346.6A CN103280738B (en) 2013-06-04 2013-06-04 Aerial earth wire lowering or hoisting gear

Publications (2)

Publication Number Publication Date
CN103280738A CN103280738A (en) 2013-09-04
CN103280738B true CN103280738B (en) 2016-08-17

Family

ID=49063214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219346.6A Active CN103280738B (en) 2013-06-04 2013-06-04 Aerial earth wire lowering or hoisting gear

Country Status (1)

Country Link
CN (1) CN103280738B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105305314A (en) * 2015-12-09 2016-02-03 国网四川省电力公司达州供电公司 Distribution network straightway line lifting device
CN105439050A (en) * 2015-12-21 2016-03-30 广州地铁集团有限公司 L1, L2 and L3 type rail train linear motor rescuing and lifting device
CN105439051A (en) * 2015-12-21 2016-03-30 广州地铁集团有限公司 L4 type rail train linear motor rescue hoisting device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201584697U (en) * 2009-12-03 2010-09-15 保定供电公司 Overhead ground wire crossarm clamp used on 500KV transmission line steel tower
CN102290763A (en) * 2011-04-27 2011-12-21 江苏华厦电力成套设备有限公司 Pre-twisted double-bundle conductor anti-slip ball-hinge spacer
CN102709845A (en) * 2012-06-11 2012-10-03 宜昌供电公司输电中心 Ground wire lifter
CN203312703U (en) * 2013-06-04 2013-11-27 国家电网公司 Overhead ground wire elevating device

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4307235B2 (en) * 2003-12-17 2009-08-05 関西電力株式会社 Overhead wire lifting device
JP2009278693A (en) * 2008-05-12 2009-11-26 Tokyo Electric Power Co Inc:The Removing device of suspension clamp for earth wire

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201584697U (en) * 2009-12-03 2010-09-15 保定供电公司 Overhead ground wire crossarm clamp used on 500KV transmission line steel tower
CN102290763A (en) * 2011-04-27 2011-12-21 江苏华厦电力成套设备有限公司 Pre-twisted double-bundle conductor anti-slip ball-hinge spacer
CN102709845A (en) * 2012-06-11 2012-10-03 宜昌供电公司输电中心 Ground wire lifter
CN203312703U (en) * 2013-06-04 2013-11-27 国家电网公司 Overhead ground wire elevating device

Also Published As

Publication number Publication date
CN103280738A (en) 2013-09-04

Similar Documents

Publication Publication Date Title
CN1144334C (en) Boom-mountable robotic arm
CN108599007A (en) A kind of apparatus and method of high-tension line unmanned plane installation pulley insulating cord
CN111064123B (en) Auxiliary mounting and maintaining device for rod frame lifting type power equipment
CN113937665B (en) Cable tensioning device for overhead laying of cables based on electric power engineering
CN103280738B (en) Aerial earth wire lowering or hoisting gear
CN107370079A (en) It is a kind of to connect and hook the livewire work method of clip lead
CN105398990A (en) Auxiliary lifting device for electric angle iron tower
CN105840087A (en) Electric power overhaul folding ladder
CN112436434A (en) Electric power construction tensioner bullwheel
CN205187730U (en) Electric power angle -steel tower is with supplementary hoisting device
CN104868397A (en) Tumbling pulley used for crossing horizontally-arranged double-bundled conductor spacer
CN205204680U (en) High -voltage line tower is with supplementary hoisting device
CN105366565A (en) Auxiliary hoisting device for high-tension cable tower
CN203312703U (en) Overhead ground wire elevating device
CN101630049B (en) Aerial optical cable line construction machine
CN206775000U (en) Wire lifts insulating support
CN103606849B (en) Transmission tower multiple fission conductor live line working lifting device and special mould clamp thereof
CN203466505U (en) Device for vertically pulling cable
JP2016146687A (en) Insulator replacement assisting tool
CN107425466A (en) Wire lifts insulating support and its application method
CN106410686B (en) For replacing the service kit of insulator chain
CN104852324A (en) Lead support device assisting in replacing porcelain cross arm
CN105186152B (en) Ground connection gripping body for high-altitude earthing or grounding means
CN111799696B (en) Tool for replacing ultra-high voltage transmission line clamp
CN204068158U (en) Auto lock stockbridge damper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 065000 Langfang city of Hebei province Guangyang District No. 105 Xinhua Road

Applicant after: LANGFANG POWER SUPPLY COMPANY, STATE GRID JIBEI ELECTRIC POWER Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: LANGFANG POWER SUPPLY COMPANY, STATE GRID JIBEI ELECTRIC POWER Co.,Ltd.

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: LANGFANG POWER SUPPLY COMPANY, STATE GRID JIBEI ELECTRIC POWER Co.,Ltd.

Address before: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: Langfang Power Supply Company, Jibei Electric Power Co.,Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant