CN103279083A - ORC (organic Rankine cycle) generator set wireless monitoring system and remote monitoring method - Google Patents

ORC (organic Rankine cycle) generator set wireless monitoring system and remote monitoring method Download PDF

Info

Publication number
CN103279083A
CN103279083A CN2013101606122A CN201310160612A CN103279083A CN 103279083 A CN103279083 A CN 103279083A CN 2013101606122 A CN2013101606122 A CN 2013101606122A CN 201310160612 A CN201310160612 A CN 201310160612A CN 103279083 A CN103279083 A CN 103279083A
Authority
CN
China
Prior art keywords
control station
field
remote monitoring
wireless router
monitoring center
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101606122A
Other languages
Chinese (zh)
Other versions
CN103279083B (en
Inventor
祝广场
李志�
梅映新
付保荣
段钱胜
林红良
刘剑剑
汪佳平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
712th Research Institute of CSIC
Original Assignee
712th Research Institute of CSIC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 712th Research Institute of CSIC filed Critical 712th Research Institute of CSIC
Priority to CN201310160612.2A priority Critical patent/CN103279083B/en
Publication of CN103279083A publication Critical patent/CN103279083A/en
Application granted granted Critical
Publication of CN103279083B publication Critical patent/CN103279083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

The invention belongs to the field of ORC (organic Rankine cycle) electricity generation and particularly relates to an ORC generator set wireless monitoring system and a remote monitoring method. The system consists of a field control station and a remote monitoring center, wherein the field control station comprises a programmable logic control station, a steam turbine controller, a generator controller, an industrial grade wireless router and control logics, the industrial wireless router supports telecom 3G (3rd generation) networks, the control logics are used for equipment such as field instruments, executing mechanisms, pumps and valves, the remote monitoring center comprises an industrial control computer and a wireless router supporting telecom 3G networks, the steam turbine controller, the generator controller and the programmable logic control station realize communication through MODBUS protocols. The system has the advantages that the realization cost is lower, the anti-interference performance is high, the data transmission speed is high, and equipment of the field control station can be monitored in real time; remote failure analysis and diagnosis can be realized, the maintenance cost of the equipment is reduced, and the work efficiency is improved.

Description

A kind of ORC genset wireless supervisory control system and long-distance monitoring method
Technical field
The invention belongs to the ORC power field, particularly relate to a kind of ORC genset wireless supervisory control system and long-distance monitoring method.
Background technology
The supervisory system of at present existing ORC genset, mostly adopt control on the spot or transfer to the mode that the pulpit is controlled by wire cable, adopt cable transmission to increase cost, be interfered easily, especially remote a plurality of field apparatuss can not adopt cable transmission to carry out centralized control; And, if control on the spot when field apparatus breaks down, can't be made a response rapidly.Therefore, in the face of the problems referred to above that the ORC gen-set control system exists, be badly in need of a kind of effective solution.
Summary of the invention
The objective of the invention is in order to overcome the prior art defective, increase work efficiency, a kind of ORC genset wireless supervisory control system is provided and has utilized the telecommunications 3G network equipment to be carried out the method for remote monitoring, when field apparatus breaks down, the slip-stick artist can carry out remote diagnosis by monitoring software, plant maintenance and maintainer to the scene instruct, and have improved the efficient of fault handling, have increased the time utilized of unit.
The technical scheme of a kind of ORC genset of the present invention wireless supervisory control system is:
A kind of ORC genset wireless supervisory control system, formed by field control station and remote monitoring center, described field control station comprises the technical grade wireless router of FPGA (Field Programmable Gate Array) control station, turbine controller, engine controller, support telecommunications 3G network, and to the steering logic of equipment such as field instrument, topworks, pump, valve; Described remote monitoring center comprises industrial computer and supports the wireless router of telecommunications 3G network; Communicate by the MODBUS agreement between described turbine controller, engine controller and the FPGA (Field Programmable Gate Array) control station, equipment such as FPGA (Field Programmable Gate Array) control station and field instrument, topworks, pump, valve are by the mode swap data of Hardware I/O.
Below be the further technical scheme of the present invention:
Preferably, described field control station is sent to data wireless router and is received data from wireless router by FPGA (Field Programmable Gate Array) control station gateway.
Preferably, described remote monitoring center sends data to field control station by the data of wireless router reception field control station by wireless router.
Preferably, described remote monitoring center is set up VPN with field control station by wireless router and is connected.
Preferably, on the described remote monitoring center industrial computer monitoring software that the equipment of field control station is monitored and operated is installed.
A kind of long-distance monitoring method that is used on the aforementioned ORC genset wireless supervisory control system of the present invention may further comprise the steps:
(1) wireless router to field control station and remote monitoring center arranges IP address and domain name addresses respectively;
(2) be to add the virtual interface channel of VPN between the wireless router of field control station and remote monitoring center;
(3) the IP address is set for the programmable logic controller (PLC) of field control station;
(4) connect field control station at remote monitoring center by wireless router;
(5) field control station is monitored and operated by monitoring software at remote monitoring center.
Beneficial effect of the present invention mainly contains:
1, system realizes that cost is lower, strong interference immunity, and data rate is fast, can monitor in real time the equipment of field control station;
2, can carry out remote fault analysis and diagnosis, reduce the maintenance cost of equipment, improve work efficiency.
Description of drawings
Fig. 1 is ORC genset wireless supervisory control system block diagram;
Fig. 2 is the remote monitoring center workflow diagram;
Fig. 3 is the field control station workflow diagram.
Embodiment
It is as follows that the invention will be further described in conjunction with the accompanying drawings and embodiments:
Embodiment 1:
As shown in Figure 1, a kind of ORC genset wireless supervisory control system, this system is made up of field control station and remote monitoring center in the present embodiment, field control station comprises the technical grade wireless router of FPGA (Field Programmable Gate Array) control station, turbine controller, engine controller, support telecommunications 3G network, and to the steering logic of equipment such as field instrument, topworks, pump, valve; Remote monitoring center comprises industrial computer and supports the wireless router of telecommunications 3G network; Communicate by the MODBUS agreement between turbine controller, engine controller and the FPGA (Field Programmable Gate Array) control station, equipment such as FPGA (Field Programmable Gate Array) control station and field instrument, topworks, pump, valve are by the mode swap data of Hardware I/O.
Embodiment 2:
Different with above-described embodiment 1 is that furtherly, field control station is sent to data wireless router and received data from wireless router by FPGA (Field Programmable Gate Array) control station gateway.
Embodiment 3:
Different with above-described embodiment 2 is, furtherly, remote monitoring center receives the data of field control station by wireless router, sends data to field control station by wireless router.
Embodiment 4:
Different with above-described embodiment 3 is that furtherly, remote monitoring center is set up VPN with field control station by wireless router and is connected.
Embodiment 5:
With above-described embodiment 1,2,3,4 all different be furtherly, the monitoring software that the equipment of field control station is monitored and operated to be installed on the remote monitoring center industrial computer.This monitoring software comprises report printing, Logical Configuration, functions such as picture configuration and historical trend.
Embodiment 6:
A kind of embodiment that is used in the long-distance monitoring method on the supervisory system of the present invention, step is as follows:
(1) wireless router to field control station and remote monitoring center arranges IP address and domain name addresses respectively;
(2) be to add the virtual interface channel of VPN between the wireless router of field control station and remote monitoring center;
(3) programmable logic controller (PLC) of field control station arranges the IP address;
(4) connect field control station at remote monitoring center by wireless router;
(5) field control station is monitored and operated by monitoring software at remote monitoring center.
Fig. 2 is the remote monitoring center workflow diagram, at first the industrial computer of Surveillance center connects by the controller of VPN tunnel and field control station, operation monitoring software after the successful connection, receive the data of field control station in real time and it is saved to server, tasks such as execution is checked real time data, checked historical data, printing reports, transmitting apparatus operational order, when unusual condition appears in data, by the remote diagnosis to field apparatus, find out reason, instruct field device maintenance and operating personnel to carry out fault and get rid of, resume production as early as possible.
Fig. 3 is the field control station workflow diagram, after the field control station start, at first move the control program of control station, wait for the virtual connection of remote monitoring center then, after the successful connection, field data is gathered and handled, finish unit control, and in time with data upload to remote monitoring center, simultaneously the steering order of receiving remote Surveillance center realizes the human intervention to unit.

Claims (6)

1. ORC genset wireless supervisory control system, formed by field control station and remote monitoring center, it is characterized in that described field control station comprises the technical grade wireless router of FPGA (Field Programmable Gate Array) control station, turbine controller, engine controller, support telecommunications 3G network, and to the steering logic of equipment such as field instrument, topworks, pump, valve; Described remote monitoring center comprises industrial computer and supports the wireless router of telecommunications 3G network; Communicate by the MODBUS agreement between described turbine controller, engine controller and the FPGA (Field Programmable Gate Array) control station, equipment such as FPGA (Field Programmable Gate Array) control station and field instrument, topworks, pump, valve are by the mode swap data of Hardware I/O.
2. supervisory system according to claim 1 is characterized in that described field control station sends to data wireless router and receive data from wireless router by FPGA (Field Programmable Gate Array) control station gateway.
3. supervisory system according to claim 2 is characterized in that described remote monitoring center by the data of wireless router reception field control station, sends data to field control station by wireless router.
4. supervisory system according to claim 3 is characterized in that described remote monitoring center sets up VPN with field control station by wireless router and be connected.
5. according to the described supervisory system of one of claim 1 to 4, it is characterized in that on the described remote monitoring center industrial computer monitoring software that the equipment of field control station is monitored and operated being installed.
6. long-distance monitoring method that is used on the described supervisory system of above-mentioned any one claim is characterized in that:
(1) wireless router to field control station and remote monitoring center arranges IP address and domain name addresses respectively;
(2) be to add the virtual interface channel of VPN between the wireless router of field control station and remote monitoring center;
(3) the IP address is set for the programmable logic controller (PLC) of field control station;
(4) connect field control station at remote monitoring center by wireless router;
(5) field control station is monitored and operated by monitoring software at remote monitoring center.
CN201310160612.2A 2013-05-06 2013-05-06 A kind of ORC genset wireless supervisory control system and long-distance monitoring method Active CN103279083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310160612.2A CN103279083B (en) 2013-05-06 2013-05-06 A kind of ORC genset wireless supervisory control system and long-distance monitoring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310160612.2A CN103279083B (en) 2013-05-06 2013-05-06 A kind of ORC genset wireless supervisory control system and long-distance monitoring method

Publications (2)

Publication Number Publication Date
CN103279083A true CN103279083A (en) 2013-09-04
CN103279083B CN103279083B (en) 2016-02-24

Family

ID=49061647

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310160612.2A Active CN103279083B (en) 2013-05-06 2013-05-06 A kind of ORC genset wireless supervisory control system and long-distance monitoring method

Country Status (1)

Country Link
CN (1) CN103279083B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104454198A (en) * 2014-11-27 2015-03-25 福建唐力电力设备有限公司 Intelligent integrated controller of generator set and control method thereof
CN105025112A (en) * 2015-08-18 2015-11-04 上海冰点机电工程技术有限公司 Remote monitoring system for air conditioning equipment and control method thereof
CN105756735A (en) * 2016-04-08 2016-07-13 苏州玄禾物联网科技有限公司 Remote monitoring system for screw expander generating set
CN110315799A (en) * 2019-06-27 2019-10-11 济宁科力光电产业有限责任公司 A kind of remote monitoring system and method for servo-pressing machine production scene
CN112213997A (en) * 2020-10-09 2021-01-12 福建太元动力科技有限公司 Intelligent monitoring system for generator set
WO2022067915A1 (en) * 2020-09-30 2022-04-07 苏州艾隆科技股份有限公司 Operation and maintenance monitoring method, apparatus, and storage medium

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201166809Y (en) * 2008-03-25 2008-12-17 梁涛 Monitoring computer system for producing hydroelectric power station sandrock aggregate
CN101344789A (en) * 2008-09-03 2009-01-14 天津市纽普兰环保发展有限公司 Pneumatic conveying remote diagnosis control system
CN201408356Y (en) * 2009-05-19 2010-02-17 大庆龙江风电有限责任公司 Wind driven generator set remote monitoring device
CN201496242U (en) * 2009-03-25 2010-06-02 烟台昱合环保科技有限公司 Automatic remote control and energy saving system of cluster pump station
CN201897729U (en) * 2011-03-31 2011-07-13 广州大学城华电新能源有限公司 Power plant-dedicated remote distributed centralized control system based on industrial Ethernet
CN201903782U (en) * 2010-12-06 2011-07-20 黑龙江省科学院自动化研究所 3G wireless industrial network device
CN202018584U (en) * 2011-01-04 2011-10-26 厦门绿洋电气有限公司 Remote wireless transmission system for monitoring working state of electrical dust remover
CN202339500U (en) * 2011-11-03 2012-07-18 华电重工股份有限公司 System used for carrying out remote monitoring and diagnosis on large scale equipment

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201166809Y (en) * 2008-03-25 2008-12-17 梁涛 Monitoring computer system for producing hydroelectric power station sandrock aggregate
CN101344789A (en) * 2008-09-03 2009-01-14 天津市纽普兰环保发展有限公司 Pneumatic conveying remote diagnosis control system
CN201496242U (en) * 2009-03-25 2010-06-02 烟台昱合环保科技有限公司 Automatic remote control and energy saving system of cluster pump station
CN201408356Y (en) * 2009-05-19 2010-02-17 大庆龙江风电有限责任公司 Wind driven generator set remote monitoring device
CN201903782U (en) * 2010-12-06 2011-07-20 黑龙江省科学院自动化研究所 3G wireless industrial network device
CN202018584U (en) * 2011-01-04 2011-10-26 厦门绿洋电气有限公司 Remote wireless transmission system for monitoring working state of electrical dust remover
CN201897729U (en) * 2011-03-31 2011-07-13 广州大学城华电新能源有限公司 Power plant-dedicated remote distributed centralized control system based on industrial Ethernet
CN202339500U (en) * 2011-11-03 2012-07-18 华电重工股份有限公司 System used for carrying out remote monitoring and diagnosis on large scale equipment

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104454198A (en) * 2014-11-27 2015-03-25 福建唐力电力设备有限公司 Intelligent integrated controller of generator set and control method thereof
CN105025112A (en) * 2015-08-18 2015-11-04 上海冰点机电工程技术有限公司 Remote monitoring system for air conditioning equipment and control method thereof
CN105756735A (en) * 2016-04-08 2016-07-13 苏州玄禾物联网科技有限公司 Remote monitoring system for screw expander generating set
CN110315799A (en) * 2019-06-27 2019-10-11 济宁科力光电产业有限责任公司 A kind of remote monitoring system and method for servo-pressing machine production scene
WO2022067915A1 (en) * 2020-09-30 2022-04-07 苏州艾隆科技股份有限公司 Operation and maintenance monitoring method, apparatus, and storage medium
CN112213997A (en) * 2020-10-09 2021-01-12 福建太元动力科技有限公司 Intelligent monitoring system for generator set

Also Published As

Publication number Publication date
CN103279083B (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN103279083A (en) ORC (organic Rankine cycle) generator set wireless monitoring system and remote monitoring method
CN101968644B (en) Unattended remote medical oxygenerator monitoring system
CN104895547A (en) Intelligent mobile monitoring and full-automatic maintenance method and device of electric control system of drilling machine
CN102393715A (en) Method and system for monitoring and diagnosing large scale equipment remotely
CN203678537U (en) Monitoring system of electric precipitator
CN107995019B (en) Method and system for remote debugging and maintaining network equipment based on virtual link
CN202535476U (en) Video monitoring system for electric power device
CN104238467A (en) Remote centralized control system for distributed power generator sets
CN202406085U (en) Frequency converter system based on remote control
CN110300055A (en) Isomery fieldbus gateway system
CN106371356A (en) Base station power and environment monitoring system, interface protocol and base station power and environment monitoring method
CN203479337U (en) Online monitoring communication system for power transmission lines
CN202870601U (en) Offshore wind power plant monitoring system
CN106850816A (en) A kind of remote network control system based on VLAN
CN102681524A (en) Remote maintenance system of die-casting machine
CN102707700A (en) Engineering mechanical parameter monitoring system capable of switching modes and implementation method of engineering mechanical parameter monitoring system
CN204754902U (en) Control of rig electrical system intelligent movement and full -automatic device of maintaining
CN105093065A (en) Distribution line centralized control system and line fault detection and processing method
CN201681280U (en) Remote monitoring wireless transmitter
CN103454989A (en) Large-scale fan, high voltage motor operation monitoring system of large-scale fan and monitoring method of monitoring system
CN102611751A (en) High-power rectifier equipment on-line monitoring device based on web enterprise builder (WEB)
CN104578410A (en) Method and system for transmitting security and protection monitoring data
CN108183550B (en) Port shore power data acquisition system
CN202007765U (en) Water pump operating condition monitoring device
CN203014480U (en) Redundant device of ship power station management system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant