CN103277124A - Anchor-rod-combined supporting method for high-sulfur crush rock mine - Google Patents
Anchor-rod-combined supporting method for high-sulfur crush rock mine Download PDFInfo
- Publication number
- CN103277124A CN103277124A CN2013102230770A CN201310223077A CN103277124A CN 103277124 A CN103277124 A CN 103277124A CN 2013102230770 A CN2013102230770 A CN 2013102230770A CN 201310223077 A CN201310223077 A CN 201310223077A CN 103277124 A CN103277124 A CN 103277124A
- Authority
- CN
- China
- Prior art keywords
- rod
- anchor
- metal
- glass fiber
- reinforced plastic
- Prior art date
Links
- 239000011435 rock Substances 0.000 title claims abstract description 24
- 229910052717 sulfur Inorganic materials 0.000 title claims abstract description 19
- 239000011593 sulfur Substances 0.000 title claims abstract description 19
- 239000002184 metals Substances 0.000 claims abstract description 72
- 239000003365 glass fibers Substances 0.000 claims abstract description 47
- 239000011152 fibreglass Substances 0.000 claims abstract description 43
- 238000004873 anchoring Methods 0.000 claims abstract description 16
- 239000004568 cements Substances 0.000 claims abstract description 8
- 239000003795 chemical substances by application Substances 0.000 claims abstract description 8
- 239000006072 pastes Substances 0.000 claims abstract description 8
- 229920002430 Fibre-reinforced plastic Polymers 0.000 claims description 42
- 239000000463 materials Substances 0.000 claims description 16
- 229920003023 plastics Polymers 0.000 claims description 10
- 239000004033 plastics Substances 0.000 claims description 10
- 239000002990 reinforced plastic Substances 0.000 claims description 4
- 238000005260 corrosion Methods 0.000 abstract description 6
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 230000000875 corresponding Effects 0.000 description 3
- 238000005065 mining Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000005516 engineering processes Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000007769 metal materials Substances 0.000 description 2
- 238000000034 methods Methods 0.000 description 2
- 208000008425 Protein Deficiency Diseases 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000010586 diagrams Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000011347 resins Substances 0.000 description 1
- 229920005989 resins Polymers 0.000 description 1
- 239000011378 shotcrete Substances 0.000 description 1
- UCKMPCXJQFINFW-UHFFFAOYSA-N sulphide Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 [S-2] UCKMPCXJQFINFW-UHFFFAOYSA-N 0.000 description 1
Abstract
Description
Technical field
The invention belongs to the metal mine laneway support method, be specifically related to a kind of associating anchor rod support method for the broken ore deposit of high-sulfur rock.
Background technology
Bolt support commonly used in the underground mining of metal current mine mainly contains, cement mortar anchor pole, resin anchor, pipe-seam type anchor rod etc., and its material is made by metal material mostly.And support form is divided into bolt support, bolting with wire mesh, bolt-spary supports, shotcrete rock bolt wire mesh support substantially.At the supporting scene, need select rational support form according to on-the-spot ore deposit rock geological conditions.
But complicated and changeable along with the deterioration of the increase of the mining degree of depth, mining geology condition and ore deposit rock physicochemical properties, following problem has also appearred in these metal material anchor poles and support form that metal mine is commonly used in the supporting process: anchored force is low; Influenced by geological environment corrosion takes place and lost efficacy; After destroying, roadway deformation carries out being difficult for anchor metal is removed when repair for 2nd time is safeguarded.Adopt the glass fibre reinforced plastics rockbolts supporting can effectively eliminate ore deposit rock sulfide to the corrosiveness of anchor pole, thereby improve the bolt support effect.The name of applying for as the applicant is called the patent of invention of " a kind of metal mine anchor rod support method (ZL201010221581.3) ", has solved metal mine effectively and has adopted the problem that exists in the anchor metal supporting.But this technology is used in rock soft broken area, ore deposit and is had significantly deficiency, being mainly reflected in the supporting of independent employing glass fibre reinforced plastics rockbolts is difficult to quick fixing metal net and reaches anchoring strength fast, thereby can not satisfy initial stage construction safety requirement, bring potential safety hazard for the anchor net construction operation at supporting initial stage.
Have when in sum, metal mine adopts simple anchor metal and corresponding support pattern supporting thereof that anchored force is low, problem such as easy-clear not when corrosion-vulnerable inefficacy, support cost height, secondary supporting; Also there is initial stage linked network difficulty in the glass fibre reinforced plastics rockbolts supporting, the initial stage anchored force is low and the drawback of poor stability and adopt.
Summary of the invention
The present invention is intended to overcome the prior art defective, purpose provides a kind of anchored force height, be not subject to the burn into support cost low, fast the fixing metal net, be easy to remove and can effectively guarantee the associating anchor rod support method that is used for the broken ore deposit of high-sulfur rock of Mine Safety in Production when initial stage anchored force, secondary supporting can be provided.
For achieving the above object, the technical scheme of the associating anchor rod support method of the present invention's employing is:
Earlier bored bolthole at the tunnel wall, wire lath has been laid on the tunnel wall that has bored bolthole.
The bolthole on close wire lath four limits that wire lath is covered anchors into pipe seam formula anchor metal respectively again, or the bolthole on close wire lath four limits that again wire lath covered and the bolthole of central area anchor into pipe seam formula anchor metal respectively, and the bolthole number of central area is 1 ~ 2; Be pressed on the wire of wire lath the fixing metal net with metal tray.
All the other boltholes that wire lath is covered inject cement paste or anchoring agent then, the glass fiber reinforced plastic body of rod of glass fibre reinforced plastics rockbolts packed into inject the bolthole of cement paste or anchoring agent, the glass fibre reinforced plastics rockbolts pallet directly is pressed on the wire of wire lath, tightens the glass fibre reinforced plastics rockbolts nut and presses the glass fibre reinforced plastics rockbolts pallet.
In above-mentioned associating anchor rod support method:
Glass fibre reinforced plastics rockbolts is made up of the glass fiber reinforced plastic body of rod, nut and glass fibre reinforced plastics rockbolts pallet; Its work structuring is: the glass fibre reinforced plastics rockbolts tray sleeve is at the afterbody of the glass fiber reinforced plastic body of rod, and nut and the glass fiber reinforced plastic body of rod are screw-threaded engagement; The material of the glass fiber reinforced plastic body of rod is the reinforced plastic glass fibre plastics, and the glass fiber reinforced plastic body of rod is that full thread or afterbody are screw thread, and the Major Diam of the glass fiber reinforced plastic body of rod is 15mm ~ 25mm.
Pipe seam formula anchor metal is made up of anchor rod body and metal tray, and material is metal; Its work structuring is: metal tray is enclosed within the afterbody of anchor rod body, and anchor rod body and bolthole produce anchored force by friction.
The material of described glass fiber reinforced plastic pallet is plastics or metal, and the center-hole diameter of pallet is 25mm ~ 35mm, and external diameter is 120mm ~ 150mm.
The material of described nut is plastics or metal, and central through hole is internal thread, and the big footpath of internal thread is with the big footpath of external screw thread of the glass fiber reinforced plastic body of rod.
Point out in passing: the value span of the big footpath of the Major Diam of the glass fiber reinforced plastic body of rod, the internal thread of nut, the center-hole diameter of glass fibre reinforced plastics rockbolts pallet is that wherein big value or little value is corresponding one by one, be one of them parts values when being lower limit (or lower range) then the value correspondence of remaining parts also be lower limit (or lower range), if also capping (or lower range or median) accordingly of the value of remaining parts then when one of them parts values is the upper limit (or upper range or median).
Owing to adopt technique scheme: the present invention adopts pipe seam formula anchor metal and glass fibre reinforced plastics rockbolts Support Method in the rock of the broken ore deposit of metal mine high-sulfur, effectively improved the safety of linked network speed and initial stage bolt support, guaranteed that also the later stage bolt support has higher anchored force and safety.Wherein adopt pipe seam formula anchor metal to carry out linked network, effectively brought into play the advantage that the installation of pipe seam formula anchor metal is convenient, the fixing metal net is quick effectively, effective initial stage anchored force and supporting reliability can be provided; Adopt the glass fibre reinforced plastics rockbolts supporting can effectively avoid behind the later stage anchor metal corrosion failure influence of stability of the roadway is strengthened the validity of whole bolt support.
The present invention adopts pipe seam formula anchor metal to reduce anchoring initial stage linked network difficulty, and effective initial stage anchoring strength is provided, and has increased the initial stage working security; Adopt the glass fibre reinforced plastics rockbolts supporting to reduce the corrosion failure influence degree, improved the broken ore deposit rock later stage supporting reliability of high-sulfur, be easy to during secondary supporting remove and can effectively guarantee Mine Safety in Production.
Therefore, the present invention has the anchored force height, be not subject to the burn into support cost low, fast the fixing metal net, be easy to when initial stage anchored force, secondary supporting can be provided remove and can effectively guarantee the characteristics of Mine Safety in Production be applicable to the supporting of the broken ore deposit of high-sulfur rock.
Description of drawings
Fig. 1 is a kind of section structure schematic diagram of the present invention;
Fig. 2 is the structural representation of the glass fibre reinforced plastics rockbolts 3 among Fig. 1;
Fig. 3 is the structural representation of the pipe seam formula anchor metal 1 among Fig. 1.
The specific embodiment
The present invention will be further described below in conjunction with the drawings and specific embodiments, is not the restriction to protection domain:
Embodiment 1
A kind of associating anchor rod support method for the broken ore deposit of high-sulfur rock.The associating anchor rod support method is:
As shown in Figure 1: bored bolthole at tunnel wall 4 earlier, wire lath 2 is laid on the tunnel wall 4 that has bored bolthole.
The bolthole on close wire lath 2 four limits that wire lath 2 is covered anchors into pipe seam formula anchor metal 1 respectively again, is pressed on the wire on wire lath 2 four limits fixing metal net 2 with metal tray 9.
All the other boltholes that wire lath 2 is covered inject cement paste then, the glass fiber reinforced plastic body of rod 5 of glass fibre reinforced plastics rockbolts 3 packed into inject the bolthole of cement paste, glass fibre reinforced plastics rockbolts pallet 6 directly is pressed on the wire of wire lath 2, tightens glass fibre reinforced plastics rockbolts nut 7 and presses glass fibre reinforced plastics rockbolts pallet 6.
In above-mentioned associating anchor rod support method:
As shown in Figure 2, glass fibre reinforced plastics rockbolts 3 is made up of the glass fiber reinforced plastic body of rod 5, nut 7 and glass fibre reinforced plastics rockbolts pallet 6.The work structuring of glass fibre reinforced plastics rockbolts 3 is: glass fibre reinforced plastics rockbolts pallet 6 is enclosed within the afterbody of the glass fiber reinforced plastic body of rod 5, and nut 7 is screw-threaded engagement with the glass fiber reinforced plastic body of rod 5; The material of the glass fiber reinforced plastic body of rod 5 is the reinforced plastic glass fibre plastics, and the glass fiber reinforced plastic body of rod 5 is full thread, and the Major Diam of the glass fiber reinforced plastic body of rod 5 is 15mm ~ 20mm.
The material of described glass fiber reinforced plastic pallet 6 is plastics, and the center-hole diameter of pallet 6 is 25mm ~ 30mm, and external diameter is 120mm ~ 140mm.
The material of described nut 7 is plastics, and central through hole is internal thread, and the big footpath of internal thread is with the big footpath of external screw thread of the glass fiber reinforced plastic body of rod 5.
As shown in Figure 3, pipe seam formula anchor metal 1 is made up of anchor rod body 8 and metal tray 9, and material is metal; The work structuring of pipe seam formula anchor metal 1 is: metal tray 9 is enclosed within the afterbody of anchor rod body 8, and anchor rod body 8 produces anchored force with bolthole by friction.
Embodiment 2
A kind of associating anchor rod support method for the broken ore deposit of high-sulfur rock.The associating anchor rod support method is:
As shown in Figure 1: bored bolthole at tunnel wall 4 earlier, wire lath 2 is laid on the tunnel wall 4 that has bored bolthole.
The bolthole on close wire lath 2 four limits that wire lath 2 is covered and the bolthole of central area anchor into pipe seam formula anchor metal 1 respectively again, and the bolthole number of central area is 1 ~ 2; Be pressed on the wire of wire lath 2 four limits and central area fixing metal net 2 with metal tray 9.
All the other boltholes that wire lath 2 is covered inject the anchoring agent then, the glass fiber reinforced plastic body of rod 5 of glass fibre reinforced plastics rockbolts 3 packed into inject the bolthole of anchoring agent, glass fibre reinforced plastics rockbolts pallet 6 directly is pressed on the wire of wire lath 2, tightens glass fibre reinforced plastics rockbolts nut 7 and presses glass fibre reinforced plastics rockbolts pallet 6.
In above-mentioned associating anchor rod support method:
As shown in Figure 2, glass fibre reinforced plastics rockbolts 3 is made up of the glass fiber reinforced plastic body of rod 5, nut 7 and glass fibre reinforced plastics rockbolts pallet 6.The work structuring of glass fibre reinforced plastics rockbolts 3 is: glass fibre reinforced plastics rockbolts pallet 6 is enclosed within the afterbody of the glass fiber reinforced plastic body of rod 5, and nut 7 is screw-threaded engagement with the glass fiber reinforced plastic body of rod 5; The material of the glass fiber reinforced plastic body of rod 5 is the reinforced plastic glass fibre plastics, and the glass fiber reinforced plastic body of rod 5 afterbodys are screw thread, and the Major Diam of the glass fiber reinforced plastic body of rod 5 is 20mm ~ 25mm.
The material of described glass fiber reinforced plastic pallet 6 is metal, and the center-hole diameter of pallet 6 is 30mm ~ 35mm, and external diameter is 130mm ~ 150mm.
The material of described nut 7 is metal, and central through hole is internal thread, and the big footpath of internal thread is with the big footpath of external screw thread of the glass fiber reinforced plastic body of rod 5.
Pipe seam formula anchor metal 1 is with embodiment 1.
Point out in passing: the span of the big footpath of the Major Diam of the glass fiber reinforced plastic body of rod 5 in this specific embodiment, the internal thread of nut 7 and the center-hole diameter of glass fibre reinforced plastics rockbolts pallet 6 is that wherein big value or little value is corresponding one by one, be one of them parts values when being lower limit (or lower range) then the value correspondence of remaining parts also be lower limit (or lower range), if also capping (or lower range or median) accordingly of the value of remaining parts then when one of them parts values is the upper limit (or upper range or median).
This specific embodiment adopts the Support Method of pipe seam formula anchor metal 1 and glass fibre reinforced plastics rockbolts 3 in the rock of the broken ore deposit of metal mine high-sulfur, effectively improved the safety of linked network speed and initial stage bolt support, guaranteed that also the later stage bolt support has higher anchored force and safety.Wherein adopt pipe seam formula anchor metal 1 to carry out linked network, effectively brought into play the advantage that 1 installation of pipe seam formula anchor metal is convenient, the fixing metal net is quick effectively, effective initial stage anchored force and supporting reliability can be provided; Adopt glass fibre reinforced plastics rockbolts 3 supportings can effectively avoid behind the later stage anchor metal corrosion failure influence of stability of the roadway is strengthened the validity of whole bolt support.
This specific embodiment adopts pipe seam formula anchor metal 1 to reduce anchoring initial stage linked network difficulty, and effective initial stage anchoring strength is provided, and has increased the initial stage working security; Adopt glass fibre reinforced plastics rockbolts 3 supportings to reduce the corrosion failure influence degree, improved the broken ore deposit rock later stage supporting reliability of high-sulfur, be easy to during secondary supporting remove and can effectively guarantee Mine Safety in Production.
Therefore, this specific embodiment has the anchored force height, be not subject to the burn into support cost low, fast the fixing metal net, be easy to when initial stage anchored force, secondary supporting can be provided remove and can effectively guarantee the characteristics of Mine Safety in Production be applicable to the supporting of the broken ore deposit of high-sulfur rock.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310223077.0A CN103277124B (en) | 2013-06-06 | 2013-06-06 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310223077.0A CN103277124B (en) | 2013-06-06 | 2013-06-06 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103277124A true CN103277124A (en) | 2013-09-04 |
CN103277124B CN103277124B (en) | 2015-03-25 |
Family
ID=49059728
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310223077.0A CN103277124B (en) | 2013-06-06 | 2013-06-06 | Anchor-rod-combined supporting method for high-sulfur crush rock mine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103277124B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106050283A (en) * | 2016-05-14 | 2016-10-26 | 西安科技大学 | Method and device for support design of three-soft coal bed mining roadway |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3012613A1 (en) * | 1980-04-01 | 1981-10-08 | Bwz Berg Ind Tech | Tunnel or mine gallery support matting anchorage - involves bushings holding paired sliding bars distributed round periphery |
JPH0960498A (en) * | 1995-08-25 | 1997-03-04 | Shimizu Corp | Structure and execution method for timbering wall |
CN1693670A (en) * | 2005-05-19 | 2005-11-09 | 中国矿业大学 | Three-anchor coupling supporting method for high stress tunnel break wall rock |
RU2348811C1 (en) * | 2007-07-06 | 2009-03-10 | Федеральное государственное унитарное предприятие "Государственный научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов" ФГУП "Гипроцветмет" | Method of supporting mine tunnels |
CN201232558Y (en) * | 2008-06-24 | 2009-05-06 | 义马煤业(集团)有限责任公司 | Fully-mechanized mining cutting hole full-section anchored net support |
CN101892851A (en) * | 2010-06-29 | 2010-11-24 | 武汉科技大学 | Metal mine anchor rod support method |
CN202064981U (en) * | 2011-05-07 | 2011-12-07 | 山西晋城无烟煤矿业集团有限责任公司 | Soft coal layer roadway supporting structure |
CN102733836A (en) * | 2012-07-05 | 2012-10-17 | 大同煤矿集团有限责任公司 | Roadway support method for fully mechanized caving mining of weak extra-thick coal seam |
CN202900292U (en) * | 2012-10-25 | 2013-04-24 | 师永贵 | Novel retaining and protecting device used in underground coal mine |
-
2013
- 2013-06-06 CN CN201310223077.0A patent/CN103277124B/en not_active IP Right Cessation
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3012613A1 (en) * | 1980-04-01 | 1981-10-08 | Bwz Berg Ind Tech | Tunnel or mine gallery support matting anchorage - involves bushings holding paired sliding bars distributed round periphery |
JPH0960498A (en) * | 1995-08-25 | 1997-03-04 | Shimizu Corp | Structure and execution method for timbering wall |
CN1693670A (en) * | 2005-05-19 | 2005-11-09 | 中国矿业大学 | Three-anchor coupling supporting method for high stress tunnel break wall rock |
RU2348811C1 (en) * | 2007-07-06 | 2009-03-10 | Федеральное государственное унитарное предприятие "Государственный научно-исследовательский, проектный и конструкторский институт горного дела и металлургии цветных металлов" ФГУП "Гипроцветмет" | Method of supporting mine tunnels |
CN201232558Y (en) * | 2008-06-24 | 2009-05-06 | 义马煤业(集团)有限责任公司 | Fully-mechanized mining cutting hole full-section anchored net support |
CN101892851A (en) * | 2010-06-29 | 2010-11-24 | 武汉科技大学 | Metal mine anchor rod support method |
CN202064981U (en) * | 2011-05-07 | 2011-12-07 | 山西晋城无烟煤矿业集团有限责任公司 | Soft coal layer roadway supporting structure |
CN102733836A (en) * | 2012-07-05 | 2012-10-17 | 大同煤矿集团有限责任公司 | Roadway support method for fully mechanized caving mining of weak extra-thick coal seam |
CN202900292U (en) * | 2012-10-25 | 2013-04-24 | 师永贵 | Novel retaining and protecting device used in underground coal mine |
Non-Patent Citations (2)
Title |
---|
王文杰等: "《金山店铁矿玻璃钢锚杆支护试验及存在问题》", 《金属矿山》 * |
马生徽等: "《基于FLAC3D的管缝锚杆与玻璃钢锚杆支护效果对比》", 《金属矿山》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106050283A (en) * | 2016-05-14 | 2016-10-26 | 西安科技大学 | Method and device for support design of three-soft coal bed mining roadway |
CN106050283B (en) * | 2016-05-14 | 2018-02-06 | 西安科技大学 | A kind of three soft coal layer re-exploration laneway support design method and device |
Also Published As
Publication number | Publication date |
---|---|
CN103277124B (en) | 2015-03-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894833B (en) | Gob side entry driving unbalanced support structure and construction method under the unstable overlying strata in deep | |
CN103277105B (en) | Strong rock burst tunnel micro seismic monitoring and stress relieving construction method | |
CN103321653B (en) | Method of treating lining after collapse of underground cavern crown | |
CN103527219B (en) | For the construction of the tunnel support structure on large deformation stratum | |
CN103352581B (en) | Adopt the method for inner prestressed reinforcement bolt anchorage sintered clay brick masonry structure | |
CN203320725U (en) | Self-resetting energy consumption support | |
CN103510552B (en) | A kind of nonmetal anti-float anchor rod creep test charger | |
CN103047951B (en) | Method for installing multipoint extensometer for detecting displacement at deep part of surrounding rock | |
Yang et al. | Failure mechanism and control technology of water-immersed roadway in high-stress and soft rock in a deep mine | |
CN102979535B (en) | Draining type section of jurisdiction is used in a kind of tunnel lining | |
CN2878511Y (en) | Tensile compression combined self-anchored rock anchor rod | |
CN201236718Y (en) | Inner slip-casting anchor cable | |
CN101338679B (en) | Deep well great section loose wall rock laneway support method | |
CN203891540U (en) | Basalt fiber wire pole | |
CN203049591U (en) | Reinforced structure of fractured rock mass and high oriented side slope | |
CN201103397Y (en) | Yielding deformed steel bar slip-casting anchor bar | |
CN202360119U (en) | Soft rock roadway supporting structure with multiple spray layers of seal coats | |
CN202881945U (en) | Grouting anchor-bolt-end type multistage stop-grouting plug | |
CN104060617B (en) | The prefabricated assembled inner support system of foundation pit support system and construction method | |
CN103174435B (en) | Roadway support method adopting U-shaped canopy frame support structure body | |
CN102140924B (en) | Double-shell coupling supporting method of deep soft rock tunnel | |
CN103967289B (en) | A kind ofly be applicable to the bar planting method and the bar planting structure that improve anchoring bearing capacity after plain concrete | |
CN104373145B (en) | Embedded classification constant-resistance shearing resistance large deformation anchor and method | |
CN103758358A (en) | Steel plate angle iron combined constructional column and anchor adhering steel plate brickwork reinforcing structure and construction method | |
CN102002956B (en) | Multi-level fully-closed reinforcement technology of exposed fault zone of excavated side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
GR01 | Patent grant | ||
C14 | Grant of patent or utility model | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150325 Termination date: 20160606 |